IR 05000219/2009201
| ML093220887 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 11/17/2009 |
| From: | Shannon M NRC/NSIR/DSO/DDSO/SPEB |
| To: | Pardee C G Exelon Generation Co |
| References | |
| IR-09-201 | |
| Download: ML093220887 (4) | |
Text
November 17, 2009
Mr. Charles Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.
Warrenville, IL 60555
SUBJECT: OYSTER CREEK NUCLEAR GENERATING STATION, - NRC SECURITY INSPECTION REPORT 05000219/2009201
Dear Mr. Pardee:
On October 16, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the Oyster Creek Nuclear Generating Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on October 22, 2009, with Timothy Keenan and other members of the staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agency-wide Documents Access and Management Systems (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosures will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Enclosure Contains Safe guards Information. U pon se paration , this p a ge is decontrolled. Should you have any questions concerning this letter, please contact us. Your cooperation is appreciated.
Sincerely,/RA/
Michael Shannon, Acting Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response
Docket No.: 50-219 License No.: DPR-16
Enclosure:
NRC Inspection Report No. 05000219/2009201 w/
Attachments:
Supplemental Information, Table of Security Personnel, Exercise One, Exercise Two, Exercise Three (SAFEGUARDS)
cc w/encl: Vice President Operations/Plant Manager Oyster Creek Nuclear Generating Station P.O. Box 388 Forked River, New Jersey 08731
T. Keenan, Security Manager, Oyster Creek, Exelon Nuclear P. Baldauf, Assistant Director, NJ Radiation Protection Programs R. Canas, Director, NJ Office of Homeland Security & Preparedness cc w/encl: S. Coker, NSIR D. Johnson, RI J. Kulp, DRP, SRI D. Brady, STSB J. Curry, DDSO/DSO
Distribution w/o encl