ML100620833
| ML100620833 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 03/03/2010 |
| From: | Collins S J Reactor Projects Branch 1 |
| To: | Carlin J T Ginna |
| Shared Package | |
| ML100541651 | List: |
| References | |
| IR-10-001 | |
| Download: ML100620833 (5) | |
See also: IR 05000244/2010001
Text
UNITED NUCLEAR REGULATORY
REGION 475 ALLENDALE KING OF PRUSSIA, PENNSYLVANIA
March 3, 2010 Mr. John T. Carlin Vice President
R. E. Ginna Nuclear Power Plant R. E. Ginna Nuclear Power Plant, 1503 Lake Ontario, NY
ANNUAL ASSESSMENT
LEDER R. E. GINNA NUCLEAR POWER (REPORT
Dear Mr. Carlin: On February 12, 2010, the NRC staff completed
its performance
review of R. E. Ginna Nuclear Power Plant (Ginna). Our technical
staff reviewed performance
indicators (Pis) for the most recent quarter and inspection
results for the period from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment
of your safety performance
during this period and our plans for future inspections
at your facility.
This performance review
and enclosed inspection
plan do not include security information.
A separate letter designated
and marked as "Official
Use Only-Security
Information" will include the security cornerstone
performance
review and resultant
inspection
plan. Overall, Ginna operated in a manner that preserved
public health and safety and met all cornerstone
objectives
with moderate degradation
in safety performance.
Plant performance
for the most recent quarter was within the Degraded Cornerstone
column of the NRC's Action Matrix. based on two findings having low to moderatei
safety Significance (White) and one White PI in the Mitigating
Systems Cornerstone.
The first White finding, originating
in the first quarter 2009, was related to Ginna's inadequate
implementation
of a preventive
maintenance (PM) program for, and the subsequent
failure of, the turbine-driven
auxiliary
feedwater (TDAFW) pump governor.
The second White finding. originating
in the fourth quarter 2009, was related to inadequate
corrective
actions which led to binding of the governor control valve and failure of the same TDAFW pump. Additionally, the assigned White PI resulted from exceeding
the White significance
threshold
for the Mitigating
Systems Performance
Index (MSPI), Heat Removal Systems PI, in the third quarter 2009, due to the reliability
and unavailability
issues associated
with the TDAFW pump. In addition to reactor oversight
process (ROP) baseline inspection
at your facility, based on our current assessment
of performance
for Ginna, we plan to conduct a supplemental
inspection
using Inspection
Procedure
95002, "Inspection
for One Degraded Cornerstone
or Any Three White Inputs in a Strategic
Performance
Area." The NRC has previously
conducted
inspections (Ml093160122, ML093160200
and ML091250233)1
to ensure that deficiencies
associated
with the TDAFW pump have been corrected.
However, this inspection
will be conducted, when your staff notifies us of your readiness, to provide assurance
that the root and contributing
causes for the risk significant
performance
issues are understood, to independentty
assess the extent of I DeSignation
in parenthesis
refers to an ADAMS accession
number. Documents
referenced
in this letter are publicly available
using the accession
number in ADAMS
J. Carlin 2 condition and extent
of cause, to Independently
detennine
if safety culture components
contributed
to the performance
issues, and to provide assurance
that the corrective
actions are sufficient
to prevent recurrence.
The enclosed inspection
plan details the inspections, less those related to security, scheduled
through June 30, 2011. In addition to the previously
noted 95002 supplemental
inspection
and the baseline inspections, we plan on conducting
independent
spent fuel storage installation (ISFSI) inspections.
The inspection
plan is provided to allow for the resolution
of any scheduling
conflicts
and personnel
availability
issues well in advance of inspector
arrival onsite. Routine resident inspections
are not listed due to their ongoing and continuous
nature. The inspections
in the last nine months of the inspection
plan are tentlative
and may be revised at the mid-cycle
review. In accordance
with 10 CFR 2.390 of the NRC's
of Practice," a copy of this letter and its enclosure
will be made available
electronically
for public inspection
in the NRC Public Document Room or from the Publicly Available
Records (PARS) component
of NRC's document system (ADAMS). ADAMS is accessible
from the NRC Web site at http://www.nrc.gov/readingrm/adams.html (the Public Electronic
Reading Room). If circumstances
arise which cause us to change this inspection
plan, we will contact you to discuss the change as soon as possible.
Please contact Glenn Dentel of my staff at 610-337-5233
with any questions
you may have regarding
this letter or the inspection
plan. Sincerely, Regional Administrator, Region I Docket No. 50-244 License No. DPR-18 Enclosure:
Ginna Inspection
I Activity Plan cc w/encl: Distribution
via ListServ
OFFICE NAME DATE J. Carlin 2 condition
and extent of cause, to independently
determine
if safety culture components
contributed
to the performance
issues, and to provide assurance
that the corrective
actions are sufficient
to prevent recurrence.
The enclosed inspection
plan details the inspections, less those related to security, scheduled
through June 30, 2011. In addition to the previously
noted 95002 supplemental
inspection
and the baseline inspections, we plan on conducting
independent
spent fuel storage installation (ISFSI) inspections.
The inspection
plan is provided to allow for the resolution
of any scheduling
conflicts
and personnel
availability
issues well in advance of inspector
arrival onsite. Routine resident inspections
are not listed due to their ongoing and continuous
nature. The inspections
in the last nine months of the inspection
plan are tentative
and may be revised at the mid-cycle
review. In accordance
with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure
will be made available
electronically
for public inspection
in the NRC Public Document Room or from the Publicly Available
Records (PARS) component
of NRC's document system (ADAMS). ADAMS is accessible
from the NRC Web site at
rmfadams.html (the Public Electronic
Reading Room). If circumstances
arise which cause us to change this inspection
plan, we will contact you to discuss the change as soon as possible.
Please contact Glenn Dentel of my staff at 610-337-5233
with any questions
you may have regarding
this letter or the inspection
plan. Sincerely, IRA! Samuel J. Collins Regional Administrator, Region I Docket No. 50-244 License No. DPR-18 Distribution
w/encl: (via E-mail) S. Collins, RA (R1AMAIL RESOllRCE)
M. Dapas. IlRA(R1MA1LRt!SOURCEI
D. Lew, ORP (R1IlR_RESOURCE)
J. Clifford, DRP (R1DRPMAIL
RESOllRCIE)
D. Roberts, DRS
R"o_1 P. Wilson, DRS (R1PRS ..... 1R**.,.)
L. Trocine, RI OEDO G. Dantel. DRP N.Peny,DRP
J. Hawkins, DRP S. Sloan, ORP K. Kolaczyk, DRP. SRI L. Casey, DRP, RI M. Rose, DRP. OA RidsNrrPMREGinna
Res()urce
RldsNrrOorlLpl1-1
Resource SUNSI Review Complete:
_N:.:,:P"'--
___(Reviewer's
Initials)
DOCUMENT NAME: S:\ROP*10
EOC Revlew\Branch
1\Ginna AA Letter 2.doc RQPreportsResource@nrc.gov
ORS Branch Chiefs (6) L. Scholl, DRS D.Silk, DRS J. Trapp, DRS D. Serenci, PAO N. Sheehan, PAO R. Barkley, ORA ML 100620833
After declaring
this document "An Official Agency Record" it will be released to the Public. To receive a copy of this document, indicate In the box: "C*;:: Copy without attachment/enclosure "En", Copy with attachment/enclosure
uN" ... No copy RI/DRP I RIIDRP I RIIDRP I RI/ORA NPerry/NP
GDentellGTD
DLew/DCL
03/0112010
03/01/10 03/01/10 03/01/10 OFFICIAL RECORD COPY I
0211912010
Page 1 012 Report2Z 1 1 1 1 1 10:14:25 Planned Start 01/1112010
01/1512010
01/1112010
01f15/2010
0210812010
0211212010
0210812010
0211212010
0210812010
02/1212010
02/08/2010
0211212010
02108/2010
02112/2010
02108/2010
0211212010
0210812010
0211212010
05/2412010
0512812010
06121/2010
0710212010
0312212010
03/26/2010
05ii7i20iQ
OS/2812010
05/1712010
0512812010
05124/2010
05/2812010
0610712010
06111/2010
0612112010
06125/2010
06121/2010
06125/2010
1110812010
11/12/2010
0912712010
1010112010
0912712010
10/0112010
09/27/2010
10/0112010
10/1812010
10/22/2010
11/0112010
11/1212010
Ginna Inspection
/ Activity Plan 01/01/2010
-0613012011
Titi" 71124 -RADIATION
SAFETY 1 lP 71124.01 Radiological
Hazard Assessment
and Exposure Controls IP 71124.02 Occupational
ALARA Planning and Controls EP PROG -EP PROGRAM INSPECTION
IP 7111402 Radiological
Environmental
Monitoring
Program IP 7111403 Emergency
Response Organization
Augmentation
Testing IP 7111404 Emergency
Action Level and Emergency
Plan Changes lP 7111405 Correction
of Emergency
Preparedness
Weaknesses
and Deficiencies
IP 71151-EP01
DrilllExercise
Performance
IP 71151-EP02
ERO Drill Participation
IP 71151-EP03
Alert & Notification
System 6f21EXAM -OPERATOR LICENSING
INITIAL EXAMS 5 U01766 FY10 -GINNA INITIAL OPERATOR LICENSING
EXAM U01766 FY10 -GINNA INITIAL OPERATOR LICENSING
EXAM 71124.08 * RAD SOLID WASTE PROCESS AND RAD MATL HAN 1 lP 71124.08 Radioactive
Solid Waste Processing
and Radioactive
Material Handling, Storage. and Transportation
ISFSI -ISFSI DRY RUN AND INITIAL LOADING IP 80854 Preoperational
Testing Of An ISFSI IP 80855 Operation
Of An ISFSI 71152B *PI&R 4 IP 711528 Identffication
and Resolution
of Problems IP 711528 Identification
and Resolution
of Problems 2515/173 -INDUSTRY
GROUND WATER INITIATIVE
IP 2515/173 Review of the Implementation
of the Industry Ground Water Protection
Voluntary
Inttlative
71124.07 .REMP 1 IP 71124.07 Public Radiation
Safety 711111 B -REQUAL INSP WI P/F RESULTS 3 IP 71111118 Licensed Operator Requallficatlon
Program 71124 -RAD SAFElY -RAe HAZZARD ASSESSIALARA
IP 71124.01 Radiological
Hazard Assessment
and Exposure Controls lP 71124.02 Occupational
ALARA Planning and Controls IP 71151 Performance
Indicator
Verification
CDBI * COMPONENT
DESIGN BASES INSPECTION
6 IP 7111121 Component
Design Bases Inspection
IP 7111121 Component
Design Bases Inspection
his report does not inClude INPO andOlJTAGE
activities.
This report shows only on-site and announced
inspection
procedures.
Page 2 012 02/1912010
10:14:25 Report 22 Planned Dates Start End 0110312011
01/0712011
03128/2011
0410112011
1 03/2812011
04/01/2011
1 03/2812011
04f01/2011
0312812011
0410112011
0312812011
0410112011
04/04/2011
0410812011
05/0912011
05/2012011
05/09/2011
05/2712011
05/0912011
05127/2011
05/0912011
05/2712011
05/0912011
05127/2011
05/09/2011
05i27i20ii
71124.05 IP 71124.05 71124.01 IP 71124.01 IP 71124.02 lP 71124.03 IP 71124.04 lP 71124.05 TI-177 IP 2515/177 7111108P IP 7111108P 71124.01 IP 71124.01 IP 71124.02 IP 71124.03 IP 71124.04 iP 71124.05 Ginna Inspection
/ Activity Plan 01/0112010
-0613012011
Title -RAD INSTRUMENTATION
Radiation
Monitoring
Instrumentation
-RAe HAZZARD ASSESS, ALARA, AIR, DOSE 1 Radiological
Hazard Assessment
and Exposure Controls Occupational
ALARA Planning and Controls In*Plant Airborne Radioactivity
Control and Mitigatlon
Occupational
Oose Assessment
Radiation
Monitoring
InstrumentatiQn
- MANAGING GAS ACCUMULATION
IN ECCS 2 Managing Gas Accumulatlon
In Emergency
Core Cooling, Decay Heat Removal 8. Containment
Spray System *INSERVICE
INSPECTION
1 Inservice
Inspection
Activities
-PWR -RAD HAZARD ASSESS, ALARA, AIR, DOSE 1 Radiological
Hazard Assessment
and Exposure Controls Occupational
ALARA Planning and Controls In-Plant Alrborne Radioactivity
Control and MitigatJon
OccupatJonal
Dose Assessment
Radiation
ivionitoring
Instrumentation
is report does not include INPO and OUTAGE activities.
This report shows only on-site and announced
inspection
procedures.