03/16/09 TVA, Presentation Slides for Browns Ferry, Unit 1
ML090770162
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 06/03/2009
From: Ellen Brown
Plant Licensing Branch II
To:
Brown E, NRR/DORL, 415-2315
Shared Package
ML090770387 List:
References
TAC ME0438
Download: ML090770162 (8)


Text


Z JJ () CD CD ('")  ::r ::J -L to .... 11-::J ...... OJ...., o :E ::::J en r-+...., CD < c:: CD


Q.)Q.) ("") Q.) (Q Q.)("")Q.)CO

--

Revised January 28 meeting -NRC requested that the submittal schedule be reviewed to determine best possible dates Areva and TVA have agreed on approach improve schedule -Preliminary core design work will be eliminated

-Final core design has commenced using best available energy plan estimate for current cycle -TVA review time for selected reload inputs and analyses will be accelerated Revised Schedule

  • Areva will deliver all reload needed to support submittal by 1* TVA will require time to prepare final submittal package and complete internal reviews and approvals

-TVA will commit to a submittal date of 12/11/09


<

LAR

  • LAR will be a complete package -No supplemental information planned to be submitted
  • Will include the following reports: -Thermal Hydraulic Design Report -Mechanical Design Report -ANP-2637 (BWR Licensing Methodology Compendium)

-Fuel Cycle Design Report -Reload Safety Report

  • Will not submit the LOCA break spectrum report -Will provide justification as to unit 1 applicability
  • Will include the following Tech Spec related changes: -SLMCPR Tech Spec (if required)

-Tech Spec 5.6.5 update to add Areva analytical methods -Tech Spec Bases page changes LAR Contents

  • LAR will also address the eleven items requested by NRC in the draft Summary of Information Request Request NRC formally issue final as soon as possible RAI Reviews -LAR will address the prior BFN 2/3 fuel related EPU RAls Will also address the RAls from the Brunswick transition