2017 RIC Presentation from Yamir Diaz-Castillo Entitled, Current NRC Vendor Findings and the Results from the 1st SONGS Lessons Learned Inspection.
ML17088A657
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/28/2017
From: Yamir Diaz-Castillo
Division of Construction Inspection and Operational Programs
To:
Sakadales A
References
Download: ML17088A657 (7)


Text

Nuclear Supply Chain - Opportunity to Excel Current NRC Vendor Findings and the Results from the 1st SONGS Lessons Learned Inspection Yamir Diaz-Castillo Quality and Vendor Inspection Branch-2 Division of Construction Inspection &

Operational Programs Office of New Reactors

Agenda

  • NRC Vendor Inspection Results
  • Inspection Trends
  • Questions 2

NRC Vendor Inspection Results FY 2015 NOVs and NONs FY 2016 NOVs and NONs Control of Special Instructions, Procedures, Processes and Drawings 4% Nonconforming 4.55%

Nonconforming Materials, Parts, or Materials, parts, or Components Components Part 21 4.55% Part 21 7% 7%

9.09%

Control of Handling, Storage, Corrective Action Purchased and Shipping 28% Material, 2% Equipment, and Services 4.55% Audits Design Control 4.55%

50.00%

Control of Organization Control of Special Design Control Purchased Processes 2%

30% Equipment, 9.09%

Materials, and Services 18% Corrective Instructions, Organization Action Procedures, and 4.55% 9.09%

Drawings 2%

3

Inspection Trends

  • Increase in the number of Notices of Nonconformances against Criterion III, Design Control"
  • Some inspections resulted in no findings
  • Continue to observe issues with:

- adequate implementation of commercial-grade dedication programs

- adequate qualification of safety-related suppliers and sub-suppliers

- adequate implementation of corrective action programs 4

SONGS Lessons Learned

  • Evaluate lessons learned in the area of vendor oversight
  • 2 recommendations identified:

- Perform pilot design-related inspections at vendor facilities prior to and/or during the fabrication process for safety-related major plant modifications

- Develop identification guidelines and screening criteria to determine:

  • When a plant change can be considered a major plant modification
  • When a major plant modification should be subject to a vendor inspection
  • 1st pilot design related aspect inspection at Equipos Nucleares, S.A (ENSA) in Santander, Spain
  • At least 1 other planned 5

SONGS Lessons Learned

  • Conclusions

- No specific findings identified related to issues in the design review, design change process, design documentation, or design related software at ENSA

- Continue to perform design-related inspections as part of the pilot program

- Assessment will determine if design related aspect inspections continue on a permanent basis 6

Questions Contact Information:

Yamir Diaz-Castillo Mail Stop T-7D24 Washington, DC 20555-0001 Phone: 1-301-415-2228 Email: yamir.diaz-castillo@nrc.gov https://www.nrc.gov/reactors/