ML110310092
| ML110310092 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 01/24/2011 |
| From: | - No Known Affiliation |
| To: | Division of License Renewal |
| References | |
| Download: ML110310092 (88) | |
Text
1 DiabloCanyonNPEm Resource From: Sizemore, Brandy [BNSM@pge.com]
Sent: Monday, January 24, 2011 12:25 PM To:Pick, Greg Cc: Grebel, Terence; Tan, Miranda
Subject:
RE: Notifications and other general questions Attachments:
Summary Status of Regional Inspecti on Notifications.xls; SAPN 50313350.pdf; SAPN 50333175.pdf; SAPN 50335453.pdf; SAPN 50336850.pdf; SAPN 50341482.pdf; SAPN
50341635.pdf; SAPN 50341709 (DN 50341482).pdf; SAPN 50341717.pdf; SAPN
50341749.pdf; SAPN 50341752.pdf; SAPN 50341848.pdf; SAPN 50341874.pdf; SAPN
50341877.pdf; SAPN 50341879.pdf; SAPN 50341911.pdf; SAPN 50341964 (DN
50341749).pdf; SAPN 50341966 (DN 50341752).pdf; SAPN 50342570 (DN 50341848).pdf;
SAPN 50342573 (DN 50341874).pdf; SAPN 50342574 (DN 50341877).pdf; SAPN 50342575 (DN 50341879).pdf; SAPN 50344181 (DN 50341911).pdf; SAPN 50359698.pdf; SAPN
50360132 (DN 50359698).pdf Hello Greg, Attached is a summary of the status of the notifications lis ted below. I also attached the notifications.
Some of them were changed from a DN to a DA so I attached both.
Please let me know if you have any questions.
Thanks Brandy Sizemore
From: Pick, Greg [1]
Sent: Tuesday, January 11, 2011 12:33 PM To: Grebel, Terence Cc: Sizemore, Brandy
Subject:
Notifications and other general questions Good morning, I have listed the Notifications that are discussed in the inspection report and would like updated copies of the Notifications and any corrective actions taken, completed or planned.
50313350 50333175 50335453 50336850 50341482 50341635 50341717 50341749 50341752 50341848 50341874 50341877 50341879 2 50341911 50359698 As a ballpark figure - how many components are listed in the LR Database created in preparation for the application? I figure 10s of thousands but do not really know.
How many of your license renewal programs had no proposed or draft procedures developed?
Did you create a Master Tracking Notification or matrix for your programs? If so could I get a copy?
Do you have a notification tracking the long term plan?
Do you know the number of individual requests for information that you have received, including followup requests? I know that you have ~200 Requests for Information without counting followup questions?
Have a great day!!
Hearing Identifier: DiabloCanyon_LicenseRenewal_NonPublic Email Number: 2446 Mail Envelope Properties (D776CF09EA15C644831E2FD16142395602B065D1)
Subject:
RE: Notifications and other general questions Sent Date: 1/24/2011 12:24:43 PM Received Date: 1/24/2011 12:24:55 PM From: Sizemore, Brandy Created By: BNSM@pge.com Recipients: "Grebel, Terence" <TLG1@pge.com>
Tracking Status: None "Tan, Miranda" <M1TF@pge.com>
Tracking Status: None "Pick, Greg" <Greg.Pick@nrc.gov> Tracking Status: None
Post Office: exchange18.Utility.pge.com Files Size Date & Time MESSAGE 1567 1/24/2011 12:24:55 PM Summary Status of Regional Inspection Notifications.xls 29760 SAPN 50313350.pdf 27672 SAPN 50333175.pdf 11191 SAPN 50335453.pdf 11086 SAPN 50336850.pdf 21027 SAPN 50341482.pdf 11262 SAPN 50341635.pdf 15979 SAPN 50341709 (DN 50341482).pdf 10695 SAPN 50341717.pdf 14447 SAPN 50341749.pdf 22203 SAPN 50341752.pdf 11352 SAPN 50341848.pdf 11151 SAPN 50341874.pdf 11544 SAPN 50341877.pdf 11124 SAPN 50341879.pdf 11407 SAPN 50341911.pdf 13673 SAPN 50341964 (DN 50341749).pdf 32653 SAPN 50341966 (DN 50341752).pdf 15720 SAPN 50342570 (DN 50341848).pdf 10534 SAPN 50342573 (DN 50341874).pdf 19376 SAPN 50342574 (DN 50341877).pdf 10436 SAPN 50342575 (DN 50341879).pdf 11763 SAPN 50344181 (DN 50341911).pdf 10842 SAPN 50359698.pdf 11409
SAPN 50360132 (DN 50359698).pdf 11359 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
Regional Inspection NotificationsItemSAPN # (DN)SAPN # (DA)Due DatePlant LRSummary of StatusContainment strain gauges cover plates evaluation to maintain water tight seal503416355/1/2011Wong/ ZaitzDukeCivil will create maintenance plan to monitor strain gauges and cover plates. Will also issue a design change. System 25 Elastomer Hoses5033685050336850ClosedKubranPMs created to replace elastomer hose from backup air bottles to hard piping every 10 years. Therefore no aging management required.AD7.DC8 & AWP E-016 Enhancement - inspection of below grade structures and cable supports/restraints inspection guidelines50313350503133509/1/2011HorstmanDukeAWP E-016 will be revised to enhance inspection guidelines. Additional tasks in progress. Re-evaluate CCW inspection criteria503417173/31/2011JuarezSizemoreMike Wright to discuss with Sab.230 kV and 500 kV switchyard structure evalaution and house keeping50341749503419642/18/2011GoryanceBowen50341749 (DN) was closed to DA 50341964. The civil structural evaluations were completed on task 2. Insulator evaluations were completed on task 3.
Task 4 is only remaining action. These tasks address the NRC concern. Task 4 will be evaluated for creating a PM to replace/change the insulators in the switchyard. Set the due date to within 5 years and set the frequency to 25 years.Evaluate selective leaching AMP - one time vs. periodic inspection based on OE5034175250341966ClosedBeardBraicoIncluded in DCL-10-164Error in LRA - disconnect numbers vs. switchyard breaker numbers5034148250341709ClosedGoryanceTanIncluded as part of annual update. DCL-10-158Green - CompleteRed - OustandingPage 1 of 2 Regional Inspection NotificationsItemSAPN # (DN)SAPN # (DA)Due DatePlant LRSummary of StatusEvaluate one time inspection program sample size5034187450342573ClosedBeardWhiteleyThis is being tracked by notification 50332273 for the OTI program. Due date for this notification 12/31/17. Developed as part of implementation plan. (Target date December 2011)Evaluate LR App. J and IWE AMPs50341877503425744/30/2011HoltzDukeDrafted changes, scheduled to be complete by end of April. Component material ref in SAP - Unit 2 AIR-I-I-1231A regulator material discrepancy5034187950342575ClosedN/AGibbonsMaterial was correctly classified in LRA. No further action necessary.Material type in LRA for diesel pump-PVC5034191150344181ClosedBraicoResolved as part of the annual update. DCL-10-158Scoping of turbine building components5034184850342570ClosedGibbonsThis was addressed by submittal DCL-10-132 dated 10-12-2010.Training system engineers on method of monitoring external corrosion5033545312/31/2011FrantzSizemoreEvaluating training methods to be provided to system engineers. LR commitment #17 added thermograph quality record5033317512/31/2011GoryanceTanNeed to develop an implementation plan for Metal Enclosed Bus. Target date December 2011Revise MA1.ID20 to align with LRA50359698503601323/31/2011AnastasioBraicoProcedure revision scheduled by 03/31/2011. Anastasio awaiting direction from Dunlap for prioritization.Green - CompleteRed - OustandingPage 2 of 2 U-0 Notification:
50313350 Type: DAWorkType:DOCUMADMN
Description:
LTCA-LRAInspect..:AD7.DC8Enhancement Order:Funct.Loc:DC-0U0ReportedBy:
WRH5William(Bill)R.HorstmanRptByWorkCtr:
EDCContactInfo:
WRH5William(Bill)R.Horstman805/545-6628CreatedOn:29Apr1015:26PlannerGroup:MainWrkCtr:
EDC-012 Engineer PROBLEM DESCRIPTION04/29/201015:26:33JanaM.Orlando(JMSO)Phone805/545-312604/26/201013:53:41W.Horstman(WRH5)Phone805/545-6628DuringtheNRC'sLicenseRenewalApplicationInspectionoftheAging ManagementProgram(AMP)forstructures(AMPXI.S6),thefollowingRequestforAdditionalInformation(RAIno.B2.1.32-32b)wasgiventoPG&Easadraft:
."DuetohighchlorideambientenvironmentatDCPPandindicationsofconcretecracking,spalling,anddelaminations,andsteelreinforcement corrosionnotedinProgramElement10,OperatingExperience,forseveralstructuresprovideanyplansforopportunisiticinspectionsofbelow-gradestructures."
.Inorderassurethatinspectionsofbelow-gradestructures(e.g,belwogradeportionsofstructures,foundations,vaults,utilityboxes,etc.)
willbeperformedatthetimethattheyareexposedinexcavationsforanyreason,PG&EwillenhanceprocedureAD7.DC8(WorkControl)toincludeaholdpointforCivilEngineeringinspections.Thisis classifiedasanenhancementtotheprocedurefortheLRAandisnotintendedtoaddressacurrentproceduraldeficiency.04/28/201010:18:01DavidG.Wong(DGW1)Phone805/545-6546 Asthecivilengineeringsupervisor,IconcurwiththeidentificationofEventDate26Apr10NotifRequiredBy01Sep11StationSig.:3WorkGroupEvalPrintDate:24Jan1108:36PG&ECorporationDIABLOCANYONPage1of9 Notification:
50313350 Type: DAWorkType:DOCUMADMN
Description:
LTCA-LRAInspect..:AD7.DC8Enhancement Order: U-0theaboverequesttoenhanceAD7.DC8toincludeaholdpointforCivilEngineeringinspectionsofbelowgradeSSCs.Thisisconsideredtobeaproceduralenahncementandtherearenoissueswiththecurrent procedure.
.Notificationisassignedtotheresponsibleengineerforaction.
.
04/29/201015:26:28JanaM.Orlando(JMSO)Phone805/545-3126Theissue/eventdocumentedonthisnotificationwasreviewedbytheNotificationReviewTeam(NRT)anddeterminedtobetheindicated significancelevelperOM7.ID1,Attachment1,Category18.1.Ifadditionalinformationisdiscoveredthatwouldaffectthesignificanceleveldetermination,contactamemberoftheNRT.
.DNclosedtoDA.
.
05/03/201007:50:27JanaM.Orlando(JMSO)Phone805/545-3126Perthe4/29/10NRT,changetherequiredbydatefrom12/31/2010to 10/26/2010.
.05/24/201014:31:52W.Horstman(WRH5)Phone805/545-6628
.
ReassignedtoLicenseRenewalProjectatthedirectionoftheCivilDesignEngineeringSupervisorforresolution.
.
09/08/201012:44:28KyleDuke(KADB)Phone805/550-6311UponfurtherdiscussionwiththeWorkPlanningGroup,LicenseRenewalGroup,andCivilDesignEngineeringGroup,anactionplanwasdevelopedtofurtherenhanceourprogressofthislicensingcommitment.Thefollowingactionswillbetakentocarryoutourcommitment:*LicenseRenewalwillprovideanexcelspreadsheetcontainingalistofallin-scopepullboxesforbothLicenseRenewal,andMaintenanceRulePrintDate:24Jan1108:36PG&ECorporationDIABLOCANYONPage2of9 Notification:
50313350 Type: DAWorkType:DOCUMADMN
Description:
LTCA-LRAInspect..:AD7.DC8Enhancement Order: U-0totheWorkPlanningGroup.*WorkPlanningwillcreate/assignandFLOC(PhysicalLocationID)foreachbox.*AclassificationwillbecreatedforeachpullboxcoverinLRandMR.*Aprogramwillbecreated(IT).UnderSAP,anoperationwillbecreatedwhenaworkorderhitsonbox/cover.*ChangemanagementwilloccurforprocedureAD7.DC8revisionstoincludethiscommitmentandcivilengineeringwillsupport24hourschedulingtoinspectwhenaboxisopen.Actionsarecurrentlybeingtakenontheseitems.However,duetopersonnelschedulingissueswiththeupcomingrefuelingoutage,due datesfortheseactionswillbepushedbackafewmonthsaftertheoutage.ThisSAPNwillbeupdatedwithtaskscreatedandassignedtotheappropriatepersonnel.
09/14/201017:17:03KyleDuke(KADB)Phone805/550-6311DuringweektwooftheNRCregionalinspections,aquestionwasraisedinregardstocablesupports/restraintsaswellasvarioustiesandwrapsthatareusedtoprovideassurancethatthecableswillnotcomeintocontactwiththebottomofthepullbox.Currently,maintenanceruleinspectorsarenotresponsibletoassesstheconditionofthecableoritslocationinthebox.Ithasbeen determinedthatduringmaintenanceruleinspections,andinadditiontocurrentinspectionguidelines,inspectorswillberequiredtolookatthecablesandverifythatnodrooping/saggingbelow12inchesfromthe bottomoftheboxisoccuring.Ifsuchdrooping/saggingisidentified,theelectricalgroupwillbeimmediatelycontactedtoconducttheirownassessmentofthecable.ThesenewinspectionrequirementswillbeincludedinplantprocedureAWPE-016.PrintDate:24Jan1108:36PG&ECorporationDIABLOCANYONPage3of9 Notification:
50313350 Type: DAWorkType:DOCUMADMN
Description:
LTCA-LRAInspect..:AD7.DC8Enhancement Order: U-0ProcedureAWPE-016,Appendix7.4,Section8willberevisedtoincludethefollowinginspectionguidelines:*Verifythatdrooping/saggingofthecablebelow12inchesfromthebottomofthepullboxisnotoccuring.Ifsuchsaggingisidentified,contactelectricalgroupforfurtherevaluation.
09/15/201016:54:42KyleDuke(KADB)Phone805/550-6311NRCinspectorhasaskedustoincluderequirementstoinspectcablesforvisibleindicationsofdamageordegradationpayingparticularattentiontoentrance,exitandsupportpoints.Contactelectricalengineeringifanydegradationisnoted.11/17/201009:13:11KyleDuke(KADB)Phone805/550-6311PG&EletterDCL-10-077isthedocumentthatisdrivingthecommitment fortheprocedurerevisiontoincludetheholdpointengineeringtoinspectpullboxesastheyareopened.ThesecondcommitmentinthebodyofthisnotificationregardingtheprocedurerevisionofAWPE-016willbeincludedintableA-4oftheLicenseRenewalApplication.
11/29/201013:18:54W.Horstman(WRH5)Phone805/545-6628
.***LongTermCorrectiveAction:
.Theactionsassociatedwiththeresolutionofthisnotification(e.g.,proceduralchanges,FLOCcreations,scopeidentification,etc.)are requiredaspartoftheLicenseRenewalprocess,notaspartofthecurrentoperatinglicenseforDCPP.Assuch,thecompletionoftheseactionsisrequiredpriortothestartoftheperiodofextended operationforDCPP(circa2024),andcanbeclassifiedasLongTermCorrectiveActionsinaccordancewithOM7.iD1,Section10.6(classifiedasaSginificantProgrammaticChangeperItem10.6.1e).
.PrintDate:24Jan1108:36PG&ECorporationDIABLOCANYONPage4of9 Notification:
50313350 Type: DAWorkType:DOCUMADMN
Description:
LTCA-LRAInspect..:AD7.DC8Enhancement Order: U-012/16/201013:33:18PaulL.Johnson(PLJ6)Phone805/545-481212/16/201016:47:19PaulL.Johnson(PLJ6)Phone805/545-4812LTCAapprovalauthorizedbyEngineeringDirectoron12/16/2010.
STATUS DETAILSUserStatus:25ASGNAssignedtoTargetWorkcenterSystemStatus:NOPRNOPTOSTSTask#1ProvidelistofboxestoWorkPlanning Status: TSCOTaskCompletedCodeGroup:TaskCode: Responsible:UserResponsibleKADBKyleDuke 805/550-6311WorkCtr: PLProjectManager-LicenseRenewalCreatedOn:17Nov10 By: KADBKyleDukePlannedStart:17Nov10PlannedFinish:25Nov10CompletedOn:22Nov1000:00 By: KADBKyleDuke 805/550-631111/17/201009:00:03KyleDuke(KADB)Phone805/550-6311InordertobeginassigningFLOCstoeachpullbox,theworkplanninggroup mustidentifyallnecessaryboxesthatareinscope.Thistaskistoprovidea completelistofpullboxesthatareinscopeforbothlicenserenewaland maintenancerule.
11/22/201013:23:53PatrickT.Nugent(PXN2)Phone805/545-4701 Duedateextendedwithin14dayinitialassignmentwindow.
11/22/201016:10:00KyleDuke(KADB)Phone805/550-6311Attachedinthisnotificationaredocumentscontainingthelistofin-scopepullboxesforbothLicenseRenewalandMaintenanceRule.(SeeAttachments)PrintDate:24Jan1108:36PG&ECorporationDIABLOCANYONPage5of9 Notification:
50313350 Type: DAWorkType:DOCUMADMN
Description:
LTCA-LRAInspect..:AD7.DC8Enhancement Order: U-0Task#2LTCA-Create/AssignFLOCStopullboxes Status: TSOSTaskOutstandingCodeGroup:
DE-ENG-TDiabloEngineeringTasksTaskCode: 0025FLOCReview Responsible:UserResponsibleKADBKyleDuke 805/550-6311WorkCtr: EDC-012 EngineerCreatedOn:17Nov10 By: KADBKyleDukePlannedStart:20Nov10PlannedFinish:28Feb11CompletedOn:By:11/17/201009:03:37KyleDuke(KADB)Phone805/550-6311Uponrecievingthecompletelistofpullboxesthatareinscopeforbothlicense renewalandmaintenancerule,theworkplanninggroupwillcreate/assignan FLOCforeachbox.Task#3LTCA-Createclassificationforeachbox Status: TSRLTaskReleasedCodeGroup:
DE-ENG-TDiabloEngineeringTasksTaskCode: 0025FLOCReview Responsible:UserResponsibleKADBKyleDuke 805/550-6311WorkCtr: EDC-012 EngineerCreatedOn:17Nov10 By: KADBKyleDukePlannedStart:20Nov10PlannedFinish:28Feb11CompletedOn:By:11/17/201009:07:10KyleDuke(KADB)Phone805/550-6311thistasktrackstheneedtocreateaclassificationforeachpullboxcoverinLR andMR.PrintDate:24Jan1108:36PG&ECorporationDIABLOCANYONPage6of9 Notification:
50313350 Type: DAWorkType:DOCUMADMN
Description:
LTCA-LRAInspect..:AD7.DC8Enhancement Order: U-0Task#4LTCA-Createprogramandoperation Status: TSRLTaskReleasedCodeGroup:
DG-EVALDCGeneralEvaluationsTaskCode: EVALEvaluatethefollowing(SeeLongText)
Responsible:UserResponsibleKADBKyleDuke 805/550-6311WorkCtr: EDC-012 EngineerCreatedOn:17Nov10 By: KADBKyleDukePlannedStart:20Nov10PlannedFinish:28Feb11CompletedOn:By:11/17/201009:09:41KyleDuke(KADB)Phone805/550-6311thistasktrackstheneedfortheITdepartmenttocreateaprogram.Under SAP,anoperationwillbecreatedwhenaworkorderhitsonthebox/cover.Task#5LTCA-Changemanagementforrevision Status: TSRLTaskReleasedCodeGroup:
DG-EVALDCGeneralEvaluationsTaskCode: EVALEvaluatethefollowing(SeeLongText)
Responsible:UserResponsibleKADBKyleDuke 805/550-6311WorkCtr: EDC-012 EngineerCreatedOn:17Nov10 By: KADBKyleDukePlannedStart:20Nov10PlannedFinish:28Feb11CompletedOn:By:11/17/201009:11:54KyleDuke(KADB)Phone805/550-6311Thistasktrackstheneedforchangemanagementtooccurforprocedure AD7.DC8revisionstoincludethiscommitmentandcivilengineeringwill support24hourschedulingtoinspectwhenabosisopened.PrintDate:24Jan1108:36PG&ECorporationDIABLOCANYONPage7of9 Notification:
50313350 Type: DAWorkType:DOCUMADMN
Description:
LTCA-LRAInspect..:AD7.DC8Enhancement Order: U-0Task#6LTCA-LRAPullboxInspections;LTCAAppr Status: TSCOTaskCompletedCodeGroup:DCGeneralEvaluationsTaskCode:Evaluatethefollowing(SeeLongText)
Responsible:UserResponsibleWorkCtr: EDManager-DesignEngineeringCreatedOn:29Nov10 By: WRH5William(Bill)R.PlannedStart:29Nov10PlannedFinish:24Dec10CompletedOn:20Dec1000:00 By: RLK1RichardL.Klimczak 805/545-651311/29/201013:24:55W.Horstman(WRH5)Phone805/545-6628
.
Pleasereviewtheschedulingoftheresolutionofthisnotificationasalong-term correctiveactionperOM7.ID1,Section10.6.RationaleforLTCAdesignation isdescribedintheLongTextentrydated11/29/2010.
.
12/14/201008:53:10W.Horstman(WRH5)Phone805/545-6628
.
PerdiscussionwithCivilDesignEngineeringSupervisor,acompletiondateof12/31/2012isproposed.
.12/20/201014:29:29RichardL.Klimczak(RLK1)Phone805/545-6513IconcurwithLTCAdesignation.Note:Perentryinbodyofthisnotification LTCAdesignationapprovedbyEngineeringDirectoron12/16/10.Task#7LTCA-DevelopFLOCdesignator Status: TSRLTaskReleasedCodeGroup:
DE-ENG-TDiabloEngineeringTasksTaskCode: 0060ProcedureChange Responsible:UserResponsibleWRH5William(Bill)R.
805/545-6628WorkCtr: EDC-004HorstmanBill-WRH5CreatedOn:08Dec10 By: RSV1RichardS.ViarPlannedStart:08Dec10PlannedFinish:15Feb11CompletedOn:By:12/08/201007:48:46RichardS.Viar(RSV1)Phone805/545-3059TOeffectivelymanageextensionFLOCsselectedforthepurposeofLicense ExtensionandMRFFinspectioncandidates,afieldmustbePrintDate:24Jan1108:36PG&ECorporationDIABLOCANYONPage8of9 Notification:
50313350 Type: DAWorkType:DOCUMADMN
Description:
LTCA-LRAInspect..:AD7.DC8Enhancement Order: U-0developedallowingflaggingassaidcandidate.Uponcreation,amodificationtoSAPwillalsoberequiredsimilartotheCIVprocess,wherebyanauto generatedsuboperationiscreatedwhentheflocisselectedthuseliminating thehumanerrorfactorandensuringthattherequiredinspectioncandidates areidentified.PrintDate:24Jan1108:36PG&ECorporationDIABLOCANYONPage9of9 DC Notification:
50333175 Type: DNWorkType:EVALAANS
Description:
LRCommitmentItem#17 Order:Funct.Loc:DCDIABLOCANYONReportedBy:
M1TFMirandaTanRptByWorkCtr:
PLContactInfo:
PNS3PhilippeR.Soenen805/544-6984CreatedOn:09Aug1014:01PlannerGroup:MainWrkCtr:
PLProjectManager-LicenseRenewal PROBLEM DESCRIPTION08/09/201014:01:38MirandaTan(M1TF)TheLicenseRenewalApplication(LRA)forDCPPUnits1and2wassubmittedon11/23/09,DCL-09-079.Thisnotificationtracksimple mentationofLRATableA4-1,LicenseRenewalCommitments,Item#17.Priortotheperiodofextendedoperation,DCPPwillenhancetheMetalEnclosedBus(MEB)program:"TheexistingbusworkorderinspectionactivitiesforinspectionandtestingoftheMEBswillbeproceduralizedtoincludespecific inspectionscope,frequenciesandactionstobetakenwhenacceptancecriteriaarenotmet."Proceduretoimplement:Implementnewprocedure,TS1.DC1,LicenseRenewalElectricalAging Management.ThebasisforthiscommitmentcanbefoundinLRASectionB2.1.36andNUREG-1801,XI.E4,MetalEnclosedBus,TechnicalReport.DCPPUnit1and2operatinglicensesexpireon11/2/2024and08/26/2025respectively.ThiscommitmentrequiresthatnewprocedureTS1.DC1be implementedpriortotheperiodofextendedoperation.EventDate09Aug10NotifRequiredBy31Dec11StationSig.:5OtherPrintDate:24Jan1108:54PG&ECorporationDIABLOCANYONPage1of2 Notification:
50333175 Type: DNWorkType:EVALAANS
Description:
LRCommitmentItem#17 Order: DC08/10/201013:18:08RobynA.Goff(RAC3)Phone805/545-3023Theissue/eventdocumentedonthisnotificationwasreviewedbytheNotificationReviewTeam(NRT)anddeterminedtobetheindicatedsignificancelevelperOM7.ID1.Ifadditionalinformationisdiscovered thatwouldaffectthesignificanceleveldetermination,contactamemberoftheNRTore-mailDCPPNRTMembers.
.
11/08/201009:15:19MirandaTan(M1TF)ProcedureMPE-101A,InfraredThermographyInspections,Section2.10,statesthatthermalinspectionprogramisnotrequiredforlicensingor regulatorcompliance.LRASectionB2.1.36requiredthatmaintenanceofthethermalinspectionresults.Thermographyisaqualityrecord.ProcedureMPE-101A,needstoberevised.
STATUS DETAILSUserStatus:20APPV ApprovedSystemStatus:
NOPRPrintDate:24Jan1108:54PG&ECorporationDIABLOCANYONPage2of2 DC Notification:
50335453 Type: DNWorkType:LRNPA
Description:
LPA:MonitoringExternalCorrosion(SEs)
Order:Funct.Loc:DCDIABLOCANYONReportedBy:
MKF4MarkK.FrantzRptByWorkCtr:
EMPContactInfo:CreatedOn:18Aug1019:31PlannerGroup:MainWrkCtr:
EMP-000Supervisor-FrantzMark-MKF4 PROBLEM DESCRIPTION08/18/201019:28:46MarkK.Frantz(MKF4)Phone805/545-4386Thisnotificationistorequestalineperformanceanalysisbeconductedtotrain/qualifySystemEngineersinmethodsofmonitoringexternal corrosion.ThisskillsetisnecessarytoeffectivelymonitorthematerialconditionoftheirsystemsinaccordancewithTS5.ID1.Training/QualificationisalsoarequiredelementfortheExternal SurfacesMonitoringProgram(B2.1.20)andistohavespecialfocusonthesubjectofagingeffectsonplantsystemandcomponents,andthecorrespondingagingeffectsmanagementmethods.EPRITechnicalReport1007933,AgingAssessmentFieldGuide,hasbeenusedinthepastforsimilartrainingactivities.ThisandotherEPRI modules(i.e.,1010793)shouldbeconsideredassourcedocuments.Training/qualificationshouldalsoalignwiththerequirementsofthespecifiedAMP.
08/19/201013:11:01JanaM.Orlando(JMSO)Phone805/545-3126Theissue/eventdocumentedonthisnotificationwasreviewedbytheNotificationReviewTeam(NRT)anddeterminedtobetheindicated significancelevelperOM7.ID1.Ifadditionalinformationisdiscoveredthatwouldaffectthesignificanceleveldetermination,contactamemberoftheNRTore-mailDCPPNRTMembers.
.EventDate18Aug10NotifRequiredBy31Dec11StationSig.:5OtherPrintDate:24Jan1108:53PG&ECorporationDIABLOCANYONPage1of2 Notification:
50335453 Type: DNWorkType:LRNPA
Description:
LPA:MonitoringExternalCorrosion(SEs)
Order: DC01/17/201110:36:50MichaelD.Wright(MDW4)Phone805/545-4067
.DuedateforthisSAPNchangedto12/31/2011.ThisdatehasbeenagreedtowiththeLRteamandtheSAPNowner.Itistheintentthatthe trainingprogramandschedulebedeterminedbythisdate.
.STATUS DETAILSUserStatus:20APPV ApprovedSystemStatus:OSNONOPTPrintDate:24Jan1108:53PG&ECorporationDIABLOCANYONPage2of2 U-0 Notification:
50336850 Type: DAWorkType:EVALAANS
Description:
LRQuestiononSys25ElastomerHoses Order:Funct.Loc:DC-0-04U0SYS04TURBINESTEAMSUPPLYReportedBy:
PNS3PhilippeR.SoenenRptByWorkCtr:
PLContactInfo:
PNS3PhilippeR.Soenen805/544-6984CreatedOn:23Aug1016:25PlannerGroup:MainWrkCtr:
EMS-005KubranKrystina-KHK3 PROBLEM DESCRIPTION08/23/201016:25:46JanaM.Orlando(JMSO)Phone805/545-312608/19/201016:55:41PhilippeR.Soenen(PNS3)Phone805/781-9782DuringtheanNRCinsepctionwalkdownelastomerhoseswereidentifiedin thecompressedairsystemfortheportionofthesystemthatisinscopeforlicenserenewal.Thematerialtypeofelastomerhadpreviouslynotbeenidentifiedaswithinlicenserenewalscopeforsystem25.The questionwasraisedonhowtheseelastomerhoseswouldbeagingmanagedfortheperiodofextendedoperation.Thelicenserenewalprojectteamhasdeterminedthattheseelastomerhosesarewithinthescopeoflicenserenewalandwouldhavetobeagingmanagedbyanagingmanagementprogramorperiodicallyreplaced.If periodicallyreplacedthehoseswouldbescreenedoutfromrequiringagingmanagementper10CFR54.TheprojectrecommendsthecreationofaPMthatwouldperiodicallyreplacethesehosesandeliminatetherequirementtoapplyanagingmanagementprogramtothesehoses.Thefinaldeterminationonperiodicallyreplacingthesehosesorcommitingtoapplyinganagingmanagementprogramwillneedtobec ommunicatedtotheNRCaspartoftheLicenseRenewalreviewprocess.AEventDate19Aug10NotifRequiredBy19Nov10StationSig.:3WorkGroupEvalPrintDate:24Jan1108:35PG&ECorporationDIABLOCANYONPage1of7 Notification:
50336850 Type: DAWorkType:EVALAANS
Description:
LRQuestiononSys25ElastomerHoses Order: U-0taskwillbeinitiatedoffthisnotificationtotrackthesumittaltotheNRC.08/23/201016:25:40JanaM.Orlando(JMSO)Phone805/545-3126Theissue/eventdocumentedonthisnotificationwasreviewedbythe NotificationReviewTeam(NRT)anddeterminedtobetheindicatedsignificancelevelperOM7.ID1,Attachment1,Category18.1.Ifadditionalinformationisdiscoveredthatwouldaffectthesignificance leveldetermination,contactamemberoftheNRTore-mailDCPPNRT Members..
DNclosedtoDA.
.09/15/201013:50:58MichaelD.Wright(MDW4)Phone805/545-4067
.Re-routedtoSystemEngineer:
Action:
WorkwithPMgrouptocreateaPMforhosereplacementsona10yrfrequencyforairlinesassociatedwiththebackupairbottlestothe10%ADV's.
.Ifthereisanyquestionanthescopeoftheairlines,contacttheLicenserenewalproject.
.10/19/201003:13:41KrystynaH.Kubran(KHK3)Phone805/545-3231OrdersforSTPI-4-pcv19/20/21/22haveasteptoinspectairsupplyhosesand:A.ReplaceairsupplyhosesandfittingsIAWMPI-2.24-3asneeded.
B.Performanydedicationactivitiesasrequired.C.PerformpressurecheckandverifynoleaksIAWMPI-2.24-4
.
Thismaybeexpandedtoincludeallelastomerhosesassociatedwitheach valve..
10/26/201000:11:40MichaelD.Wright(MDW4)Phone805/545-4067PrintDate:24Jan1108:35PG&ECorporationDIABLOCANYONPage2of7 Notification:
50336850 Type: DAWorkType:EVALAANS
Description:
LRQuestiononSys25ElastomerHoses Order: U-0.TherequestwasfortheelastomerhosesfromthebackupairbottlestothePCV's.TherequestwastocreateaPMtoreplace,notinspect,ata10yearfrequency.By"replacing"versus"inspecting"wedonothaveto developanagingmanagementprogram.Again,thesearethehosesatthe bottles..
PleasereviewthiswithMSEManagerpriortoclosing.
.10/26/201015:29:06KrystynaH.Kubran(KHK3)Phone805/545-3231SystemengineerisrequestingthatSAPOsforSTPI-4-pcv19/20/21/22haveOperation0100updatedtoreflectthatALLelastomerhosesaretobe visuallychecked.
.CurrentOperationdescription:
INSPECTAIRSUPPLYHOSESAND:REPLACEAIRSUPPLYHOSESANDFITTINGSIAWMPI-2.24-3ASNEEDED.PERFORMANYDEDICATIONACTIVITIESASREQUIRED.
PERFORMPRESSURECHECKANDVERIFYNOLEAKSIAWMPI-2.24-4Requestupdatetoread:INSPECTALLELASTOMERAIRSUPPLY(ANDBACKUPSUPPLY)HOSESAND:REPLACEAIRSUPPLYHOSESANDFITTINGSIAWMPI-2.24-3ASNEEDED.PERFORMANYDEDICATIONACTIVITIESASREQUIRED.
PERFORMPRESSURECHECKANDVERIFYNOLEAKSIAWMPI-2.24-4
..
PCV-19(Unit1)FLOCDC-1-04-P-VOA-MS-1-PCV-19RefMaintenancePlan#7713 NextOrder:64038438Due:10/14/2012PCV-19(Unit2)FLOCDC-2-04-P-VOA-MS-2-PCV-19PrintDate:24Jan1108:35PG&ECorporationDIABLOCANYONPage3of7 Notification:
50336850 Type: DAWorkType:EVALAANS
Description:
LRQuestiononSys25ElastomerHoses Order: U-0OrdercodedunderFLOC:DC-2-04-I-CI-HIC-516RefMaintenancePlan#9680NextOrder:64026248Due:11/01/2011PCV-20(Unit1)FLOCDC-1-04-P-VOA-MS-1-PCV-20RefMaintenancePlan#7714 NextOrder:64026506Due:02/25/2011PCV-20(Unit2)FLOCDC-2-04-P-VOA-MS-2-PCV-20RefMaintenancePlan#9681NextOrder:64026172Due:11/01/2011PCV-21(Unit1)FLOCDC-1-04-P-V-MS-1-PCV-21(noteFLOCiscodedVratherthanVOA)
RefMaintenancePlan#7715NextOrder:64021726Due:12/11/2011PCV-21(Unit2)FLOCDC-2-04-P-VOA-MS-2-PCV-21RefMaintenancePlan#9682 NextOrder:64042243Due:02/12/2012PCV-22(Unit1)FLOCDC-1-04-P-VOA-MS-1-PCV-22OrdercodedunderFLOC:DC-1-04-I-CI-HIC-546RefMaintenancePlan#7716 NextOrder:64018443Due:05/15/2011PCV-22(Unit2)FLOCDC-2-04-P-VOA-MS-2-PCV-22OrdercodedunderFLOC:DC-2-04-I-CI-HIC-546RefMaintenancePlan#9683NextOrder:64043606Due:01/08/2012PrintDate:24Jan1108:35PG&ECorporationDIABLOCANYONPage4of7 Notification:
50336850 Type: DAWorkType:EVALAANS
Description:
LRQuestiononSys25ElastomerHoses Order: U-0.10/28/201013:39:41JanisL.Bailey(JXDJ)Phone545-3370NotificationduedateextendedtoallowcompletionofcorrectiveactionsforcreationofPMs.
11/03/201009:13:27KrystynaH.Kubran(KHK3)Phone805/545-3231
.EngineeringcreationofPMswillbeasfollows:
Components:Elastomerhosewhichconnectstheportablebackupairbottletothehardmetalfixedairlinepiping.FrequencyofReplacement:10years(asrecommendedbyengineering
mngmnt).11/04/201016:01:34JohnN.Mellinger(JNM1)Phone805/545-4691 ThefollowingPMtaskshavebeeninitiatedforreplacementoftheBack-upairbottlehoses:
.
2919264064235(New)REPLACE1-PCV-22BACKUPAIRHOSES 11/27/20132919164064234(New)REPLACE1-PCV-21BACKUPAIRHOSES 12/07/20132918964064232(New)REPLACE1-PCV-19BACKUPAIRHOSES 01/02/20142919464064237(New)REPLACE2-PCV-20BACKUPAIRHOSES 01/02/20142919064064233(New)REPLACE1-PCV-20BACKUPAIRHOSES 01/29/20142919364064236(New)REPLACE2-PCV-19BACKUPAIRHOSES 01/29/20142919564064238(New)REPLACE2-PCV-21BACKUPAIRHOSES 03/08/20142919664064239(New)REPLACE2-PCV-22BACKUPAIRHOSES 03/08/2014
.ThesePMshavebeenalignedwiththebottlegaugecalibrationpmtasks.
.PrintDate:24Jan1108:35PG&ECorporationDIABLOCANYONPage5of7 Notification:
50336850 Type: DAWorkType:EVALAANS
Description:
LRQuestiononSys25ElastomerHoses Order: U-011/10/201008:54:19KrystynaH.Kubran(KHK3)Phone805/545-3231PMsarecreatedandinplaceperworkcontrolprocess.
.CreationandimplementationofPMswerethegoalofthisSAPN.Actions arenowcompleteforclosure.SAPNnowclosed.
.STATUS DETAILSUserStatus:20APPV ApprovedSystemStatus:NOCONOPTATCOTask#1Tracksubmittalofapproachdetermined Status: TSCOTaskCompletedCodeGroup:
DG-EVALDCGeneralEvaluationsTaskCode: EVALEvaluatethefollowing(SeeLongText)
Responsible:UserResponsiblePNS3PhilippeR.Soenen 805/544-6984WorkCtr: PLProjectManager-LicenseRenewalCreatedOn:19Aug10 By: PNS3PhilippeR.SoenenPlannedStart:20Aug10PlannedFinish:15Dec10CompletedOn:10Nov1009:51 By: PNS3PhilippeR.Soenen 805/544-698411/02/201009:24:10SidneyS.Bowen(SSB3)Phone805/545-61170Changedtashduedatetocorrolatewithnotificationresolution.
11/10/201008:54:56KrystynaH.Kubran(KHK3)Phone805/545-3231 PMshavebeencreatedforelastomerhosereplacementfrombackupair bottlestohardpiping(permanentplantequipment).
.
SAPNmaynowbeclosed.
.PrintDate:24Jan1108:35PG&ECorporationDIABLOCANYONPage6of7 Notification:
50336850 Type: DAWorkType:EVALAANS
Description:
LRQuestiononSys25ElastomerHoses Order: U-0Task#2MSEmanagerreview Status: TSCOTaskCompletedCodeGroup:
DG-EVALDCGeneralEvaluationsTaskCode: EVALEvaluatethefollowing(SeeLongText)
Responsible:UserResponsibleWorkCtr: EMS-000Supervisor-BaileyJanis-JXDJCreatedOn:26Oct10 By: MDW4MichaelD.WrightPlannedStart:26Oct10PlannedFinish:31Dec10CompletedOn:04Nov1023:00 By: MDWMichaelD.Wright 805/545-406710/26/201000:15:53MichaelD.Wright(MDW4)Phone805/545-4067ReviewwithMSEmanagerpriortocompleting.
.
11/04/201023:00:29MichaelD.Wright(MDW4)Phone805/545-4067
donePrintDate:24Jan1108:35PG&ECorporationDIABLOCANYONPage7of7 DC Notification:
50341482 Type: DNWorkType:DOCUMAANS
Description:
LicenseRenewalApplicationhasanerror Order:Funct.Loc:DCDIABLOCANYONReportedBy:
SSB3SidneyS.BowenRptByWorkCtr:
PLContactInfo:CreatedOn:14Sep1017:56PlannerGroup:MainWrkCtr:
PLProjectManager-LicenseRenewal PROBLEM DESCRIPTION09/14/201017:54:16SidneyS.Bowen(SSB3)Phone805/545-61170TheLicenserenewalapplicationhasanerrorinappendixB.AppendixBB2.1.38:"Inthe500kVswitchyardthesearethecomponentsbetweenthemaintransformersandswitchyardbreakers532/632inUnit1and543/641"(543/641shouldbe642/542)inUnit2.543and641aredisconnectnumbers,notswitchyardbreakernumbers.642and542arethebreakernumbers.TheenhancementsectionoftheSwitchyardAMPhasthesameparagraph.Thisisnotaplantequipmentissue.09/15/201014:10:34JanaM.Orlando(JMSO)Phone805/545-3126Theissue/eventdocumentedonthisnotificationwasreviewedbytheNotificationReviewTeam(NRT)anddeterminedtobetheindicated significancelevelperOM7.ID1,Attachment1,Category7.4.Ifadditionalinformationisdiscoveredthatwouldaffectthesignificanceleveldetermination,contactamemberoftheNRTore-mailDCPPNRT
Members.EventDate14Sep10NotifRequiredBy29Jan11StationSig.:3WorkGroupEvalPrintDate:24Jan1108:42PG&ECorporationDIABLOCANYONPage1of2 Notification:
50341482 Type: DNWorkType:DOCUMAANS
Description:
LicenseRenewalApplicationhasanerror Order: DC.DNclosedtoDA.
.STATUS DETAILSUserStatus:20APPV ApprovedSystemStatus:NOCONOPTATCOTask#1 000050341709 Status: TSCOTaskCompletedCodeGroup:
DG-CRConditionReportTaskCode: OR Organizational Responsible:UserResponsibleWorkCtr:CreatedOn:15Sep10 By: JMSOJanaM.OrlandoPlannedStart:15Sep10PlannedFinish:15Sep10CompletedOn:15Sep1014:10 By: JMSOJanaM.Orlando 805/545-3126PrintDate:24Jan1108:42PG&ECorporationDIABLOCANYONPage2of2 U-0 Notification:
50341635 Type: DNWorkType:EVALENGR
Description:
EvaluatetheneedforstraingaugePM Order:Funct.Loc:DC-0-80-FU0SYS80FACILReportedBy:
KMMHKristinM.ZaitzRptByWorkCtr:
EDC-008ContactInfo:CreatedOn:15Sep1012:20PlannerGroup:MainWrkCtr:
EDC-008ZaitzKristin-KMMH PROBLEM DESCRIPTION09/15/201012:16:45KristinM.Zaitz(KMMH)Phone805/545-6058Thepurposeofthisnotificationistoevaluatetheneedforpreventativeand/orcorrectivemaintenancetomaintainawatertight sealaroundthecontainmentstraingauges.Thisnotificationdoesnotreportanequipmentproblem.Existingdrawingsanddescriptionsofthesestraingaugesarenotadequateforengineeringtodetermineifa waterleakpathexiststhatcouldovertimeexposethecontainmentrebartocorrosiveconditionsandposeanagingmanagementconcern.Thesegaugesareout-of-service(abandonedinplace),anddonotimpactthe designfunctionofthecontainmentstructure.Theresultsofthisevaluationwillbeusedtoenhancecontainmentinspectionsandtheassociatedagingmanagementprogram,ifdeemednecessary.
Background:
StraingaugeswereinstalledatvariouslocationsonthecontainmentstructuretoassesstheperformanceofthestructureduringtheStructuralIntegrityTest.ForUnit1,thistestwasconductedbetween August1and11,1975.ForUnit2,thistestwasconductedbetweenOctober26andNovember5,1977.Thesestraingaugeswererequiredonlyforthesetests#theyarenolongerinservice.EventDate15Sep10NotifRequiredBy01May11StationSig.:5OtherPrintDate:24Jan1108:35PG&ECorporationDIABLOCANYONPage1of4 Notification:
50341635 Type: DNWorkType:EVALENGR
Description:
EvaluatetheneedforstraingaugePM Order: U-0Thestraingaugesaremountedonthecontainmentstructureno.18reinforcingbars.Thecableusedforthestraingaugeswiringtothestrainindicationequipmentisroutedthroughaflexibleconduitthatisembeddedintheconcrete,extendingfromthegaugeareatojunction boxesattachedtotheoutsidesurfaceofcontainment.Acoverplatewithsiliconecaulkingisinstalledatthesurfaceofcontainment,butthedetailsofthisconfigurationarevague.Refertothefollowing drawingsformoreinformation:
103512 663075-654
663075-657ContainmentstructureinspectionsperformedinaccordancewithASMESectionXISubsectionIWLhavenotedlocationswherethestraingaugecoverplateshavepartiallydisengagedorfallenoutofplace.TheIWLconcreteinspectionshaveinvestigatedtheconditionoftheconcrete aroundthesecoverplatesandfoundtheretobenodegradationorindicationsofcorrosionoftheunderlyingreinforcingbars.Althoughthereiscurrentlynoevidenceofcorrosiononthesurface,the configurationofthestraingaugesmaybesuchthatthereisawaterleakpaththatcouldextendfromthesurfaceofcontainmenttotherebarinthelongterm.Ifthispathexists,theninspectionsandPMshould focusonensuringawatertightsealattheselocationstoprecludedegradationoftherebarattheselocations.09/15/201013:50:37DavidG.Wong(DGW1)Phone805/545-6546Asthecivilengineeringsupervisor,Ihavereviewedtheabovewriteupandprovidemyapproval.Thisnotificationdoesnotreportanon-conformingordegradedcondition,ratheritisatrackingtoolthat engineeringwillusetodeterminewhetherornotamaintenanceplanisneededtoprovideenhancedmonitoringofthestrainguagesandtheircoverplatesforanydegradedconditionsoftheguages.Ifadegraded conditionisfound,aseparatenotificationwillbewrittentoplaceitintothecorrectiveactionprogram.
.
NotificationassignedtotheresponsibleengineertodeterminethebestPrintDate:24Jan1108:35PG&ECorporationDIABLOCANYONPage2of4 Notification:
50341635 Type: DNWorkType:EVALENGR
Description:
EvaluatetheneedforstraingaugePM Order: U-0waytomonitorthestrainguages/coverplates(doesthepresentIWLinspectionssufficeordoesanewmaintenanceplanneedtotrackit?)
.09/15/201015:40:22BehroozShakibnia(BXS5)Phone805/545-6094Forconcretesurfaceconduitboxdetails,seedrawing663075-655.
.
09/16/201014:59:59JanaM.Orlando(JMSO)Phone805/545-3126Theissue/eventdocumentedonthisnotificationwasreviewedbytheNotificationReviewTeam(NRT)anddeterminedtobetheindicated significancelevelperOM7.ID1.Ifadditionalinformationisdiscoveredthatwouldaffectthesignificanceleveldetermination,contactamemberoftheNRTore-mailDCPPNRTMembers.
.09/16/201018:38:41DavidG.Wong(DGW1)Phone805/545-6546Thecontainmentstructuresystemengineershouldalsoconsider institutingamorepermanentfix,suchassealingupoftheentirestrainguagewirebox.
.10/28/201023:22:04DavidG.Wong(DGW1)Phone805/545-6546CivilEngineeringwillbecreatingamaintenanceplanthatwillensure enhancedmonitoringofthestraingaugesandtheircoverplatesfordegradedconditions.CivilEngineeringwillalsobeissuingadesignchangeorN-Modtoprovidepermanentfixoptions(includingsealingup oftheentirestrainguagewirebox)thatcanbeimplementeddependingupontheas-foundcondition(extentofdamage)ofthestrainguagewire boxes.
.PrintDate:24Jan1108:35PG&ECorporationDIABLOCANYONPage3of4 Notification:
50341635 Type: DNWorkType:EVALENGR
Description:
EvaluatetheneedforstraingaugePM Order: U-0 STATUS DETAILSUserStatus:25ASGNAssignedtoTargetWorkcenterSystemStatus:OSNOOSTSTask#1Issuedesignimplementationvehicle Status: TSRLTaskReleasedCodeGroup:
DE-ENG-TDiabloEngineeringTasksTaskCode: 0170Designchangeevaluation Responsible:UserResponsibleKADBKyleDuke 805/550-6311WorkCtr: EDC-012 EngineerCreatedOn:14Jan11 By: DGW1DavidG.WongPlannedStart:14Jan11PlannedFinish:01May11CompletedOn:By:PrintDate:24Jan1108:35PG&ECorporationDIABLOCANYONPage4of4 DC Notification:
50341709 Type: DAWorkType:DOCUMAANS
Description:
LicenseRenewalApplicationhasanerror Order:Funct.Loc:DCDIABLOCANYONReportedBy:
SSB3SidneyS.BowenRptByWorkCtr:
PLContactInfo:CreatedOn:15Sep1014:10PlannerGroup:MainWrkCtr:
PLProjectManager-LicenseRenewal PROBLEM DESCRIPTION09/15/201014:10:39JanaM.Orlando(JMSO)Phone805/545-312609/14/201017:54:16SidneyS.Bowen(SSB3)Phone805/545-61170TheLicenserenewalapplicationhasanerrorinappendixB.AppendixBB2.1.38:"Inthe500kVswitchyardthesearethecomponentsbetweenthemaintransformersandswitchyardbreakers532/632inUnit1and543/641"(543/641shouldbe642/542)inUnit2.543and641aredisconnectnumbers,notswitchyardbreakernumbers.642and542arethebreakernumbers.TheenhancementsectionoftheSwitchyardAMPhasthesameparagraph.Thisisnotaplantequipmentissue.09/15/201014:10:34JanaM.Orlando(JMSO)Phone805/545-3126Theissue/eventdocumentedonthisnotificationwasreviewedbythe NotificationReviewTeam(NRT)anddeterminedtobetheindicatedsignificancelevelperOM7.ID1,Attachment1,Category7.4.Ifadditionalinformationisdiscoveredthatwouldaffectthesignificance leveldetermination,contactamemberoftheNRTore-mailDCPPNRTEventDate14Sep10NotifRequiredBy29Jan11StationSig.:3WorkGroupEvalPrintDate:24Jan1108:43PG&ECorporationDIABLOCANYONPage1of2 Notification:
50341709 Type: DAWorkType:DOCUMAANS
Description:
LicenseRenewalApplicationhasanerror Order: DC Members..DNclosedtoDA.
.
12/29/201010:17:49TerenceL.Grebel(TLG1)Phone805/545-4160CompleteseeDCL-10-158datedDecember29,2010.
STATUS DETAILSUserStatus:20APPV ApprovedSystemStatus:
NOCOPrintDate:24Jan1108:43PG&ECorporationDIABLOCANYONPage2of2 U-0 Notification:
50341717 Type: DNWorkType:EVALAANS
Description:
ReevaluateClosedCycleCoolingAMP Order:Funct.Loc:DC-0-14U0SYS14COMPONENTCOOLINGWATERReportedBy:
TAJ7TimothyA.JuarezRptByWorkCtr:
EMB-005ContactInfo:CreatedOn:15Sep1015:58PlannerGroup:MainWrkCtr:
EMB-006SabharwalSab-SNS1 PROBLEM DESCRIPTION09/15/201015:54:49TimothyA.Juarez(TAJ7)CurrentlytheAMPforclosedcyclecoolingwateridentifiesthatCCW-1-585andCCW-2-585willbeinspectedonaroutinebasistodet erminetheeffectivenessthechemicalshaveonthesystem.DuringtheLicenserenewalaudit,itwasidentifiedthissectionofpipeisnotalow-flowsectionofpipe(flowvelocitylessthan3ft/sec).The questionwasaskedastowhetherornotitthiswasarepresentativesectionofpipethatcouldbereliedupontoasearlydetectionofCCWchemicaleffectiveness.ThisnotificationrequeststoreevaluateiftheinspectioncriteriacalledoutforCCW-1/2-585providevalueasamonitoredparameterfor theeffectivenessofchemistrymanagementfortheCCWsystem.Ifthisactivityisdeterminetobeinsufficient,orprovidesnovalue,indicatesupplementaloranalternateinspectionactivitiesthatwould satisfactorilymonitorchemicaleffectivesforthesystem.09/16/201011:27:38TimothyA.Juarez(TAJ7)ThisactionshouldbecompletedpriortoimplemenationofclosedcyclecoolingwaterAMP.Asdelegatedsupervisor,Iapprovethisnotification.EventDate15Sep10NotifRequiredBy31Mar11StationSig.:5OtherPrintDate:24Jan1109:02PG&ECorporationDIABLOCANYONPage1of3 Notification:
50341717 Type: DNWorkType:EVALAANS
Description:
ReevaluateClosedCycleCoolingAMP Order: U-009/20/201013:34:16JanaM.Orlando(JMSO)Phone805/545-3126Theissue/eventdocumentedonthisnotificationwasreviewedbytheNotificationReviewTeam(NRT)anddeterminedtobetheindicatedsignificancelevelperOM7.ID1.Ifadditionalinformationisdiscovered thatwouldaffectthesignificanceleveldetermination,contactamemberoftheNRTore-mailDCPPNRTMembers.
.
01/12/201116:48:53SurendraN.Sabharwal(SNS1)PleasenotetheabovereferencedpipesectionthatcontainsvalveCCW-1/2-585isnotarepresentativesectionforcorrosionmonitoringas thedesignflowthruthispipeis880gpmanditisa10"-Kspecpipe,thatgivesavelocitythruthispipeofgraterthan3fps;notalowflowsection.
Toevaluatetheeffectivenessofthecorrosioninhibitor,thesystemdesignprovidesacorrosiontestloopattheoutletofLetdownHX,wheremostofthetimetheflowsarelow(controlledbyTCV-130).Thetest loopconsistsoffourcouponlocationsandtwospareconnectionsforfutureuse.TestcouponsofrepresentativematerialsareexposedtoCCWconditionsforaspecifiedamountoftimeandthenanalyzedtodetermine theoverallcorrosionrates.
STATUS DETAILSUserStatus:20APPV ApprovedSystemStatus:OSNOATCOPrintDate:24Jan1109:02PG&ECorporationDIABLOCANYONPage2of3 Notification:
50341717 Type: DNWorkType:EVALAANS
Description:
ReevaluateClosedCycleCoolingAMP Order: U-0Task#1Provideinfoonmeasuresinplacetomon Status: TSCOTaskCompletedCodeGroup:
DG-EVALDCGeneralEvaluationsTaskCode: EVALEvaluatethefollowing(SeeLongText)
Responsible:UserResponsibleESW1EricS.WesselWorkCtr: OCEChemistryEngineersCreatedOn:11Jan11 By: SNS1SurendraN.PlannedStart:12Jan11PlannedFinish:04Feb11CompletedOn:20Jan1113:56 By: ESW1EricS.Wessel01/11/201117:13:18SurendraN.Sabharwal(SNS1)Inordertofurtherevaluatetherequestnotedinthisnotification,pleaseprovide thefollowing:
Infoonprovisionsinplacetomonitortheeffectivenessofthechemicals additiontotheCCWsystem;alongwithparametersmonitored.Alsowhat actionswillprovideanearlydetectionofineffectivenessofCCWchemistry management(ifitoccurs).01/20/201113:24:31EricS.Wessel(ESW1)CorrosionmonitoringisaccomplishedbyevaluationgcorrosiontestcouponsinstalledasdescribedinthebodyofthisSAPN.ReferenceAR#411232, A0411234,&A0411236.
- SpoolpieceswithaflowrestrictingorificeareinstalledinCCW-1&CCW-2, FLOC1(2)-14-P-P-LINE-7020.Thesearevisuallyexaminedforbiofoulingon atwoyearfrequancy.Reference64006180&64012392.
- AdditionallyCCWreliefvalvesthatareinspectedbyengineeringfor"as-found" conditionwillnoteanydebrisand/orfoulingandbedocumentedinthe inspectionresults.ApartoftheresponsetoINPOAFI3.1inspectionstepsfor debrisand/orfoulingwereaddedtothefollowingReliefValveswaps:CCW-1/2-RV-41RT51928/551928CCW-1/2-RV-42RT51929/551929 CCW-1/2-RV-43RT51930/551930 CCW-1/2-RV-44RT51931/551931 CCW-1/2-RV-52RT51949/551949 CCW-1/2-RV-46RT51950/551950PrintDate:24Jan1109:02PG&ECorporationDIABLOCANYONPage3of3 U-0 Notification:
50341749 Type: DNWorkType:EVALAANS
Description:
230kV&500kVswitchyardNRCinspection Order:Funct.Loc:DC-0-70U0SYS70500KVReportedBy:
M4MNManuelL.MunozRptByWorkCtr:
EIE-007ContactInfo:CreatedOn:15Sep1018:12PlannerGroup:
NPRNoplanningrequrdMainWrkCtr:
EIEElectricalSystems/Components PROBLEM DESCRIPTION09/15/201018:12:20ManuelL.Munoz(M4MN)Phone805/545-6164DuringNRCLicenseRenewalAgingManagementinspectionofthe500kVand230kVswitchyardson9-14-10,thefollowingindicationswereidentified oninsulatorsandsupportsthatwillneedanexpertevaluation.1.230kVswitchyard-hairlinecrackingwasidentifiedinthefoundation(Westleg)oftheCB212latticestructure.
2.500kVswitchyard-TransmissionlineTowersshowedcrackingonthegroutofthefoundationswherethestructuremeetstheconcrete.Also,rustwaspresentonmetalplatesusedasspacersbetweenthestructure andfoundation.3.Switch631Bphasestructurefoundcrackinginthegroutwherethestructuremeetsthefoundation.
4.Switch541Aphaselowerpartofthestructureisbent,foundationgroutiscracked.AlsoaboltintheNWofthetopofthisstructureisrusted.CivilEngineeringwillneedtoevaluatethesefindings.5.500kVswitchyard-Transmissionlinetowers,verticalandhorizontalinsulatorbellsshowdiscolorationonthebellsnearesttotheenergized TransmissionLine.RustwasidentifiedonA,B,&CphaseconnectorsofEventDate15Sep10NotifRequiredBy17Oct10StationSig.:3WorkGroupEvalPrintDate:24Jan1107:53PG&ECorporationDIABLOCANYONPage1of6 Notification:
50341749 Type: DNWorkType:EVALAANS
Description:
230kV&500kVswitchyardNRCinspection Order: U-0thetowers.Transmission&SubstationAssetStrategywillneedtoinspectandevaluatethesefindings.Indicationsdescribedabovearebeingevaluatedforagingofsystem.Thesefindingsarenotanimmediateconcernandwillnotimpactthe functionofthesesystems.09/16/201010:26:21JosephGoryance(JXG3)Phone805/545-3454
.
Item#6includedgeneralhousekeepingintheswitchyardnearthevicinityofthe500kvbreakersanddisconnectswitches.thehousekeepingitemsnoticedduringthewalkdownwerefastenerhardware(nuts, washers,bolts)foundontheground.RequestplantmaintenancecoordinatewithSubstationdepartmenttoperformathoroughwalkdownoftheswitchyardandperformageneralcleanupofthearea.
09/16/201015:25:41JanaM.Orlando(JMSO)Phone805/545-3126Theissue/eventdocumentedonthisnotificationwasreviewedbytheNotificationReviewTeam(NRT)anddeterminedtobetheindicated significancelevelperOM7.ID1,Attachment1,Category18.Ifadditionalinformationisdiscoveredthatwouldaffectthesignificanceleveldetermination,contactamemberoftheNRTore-mailDCPPNRTMembers.
.DNclosedtoDA.
.STATUS DETAILSUserStatus:20APPV ApprovedSystemStatus:NOCONOPTATCOPrintDate:24Jan1107:53PG&ECorporationDIABLOCANYONPage2of6 Notification:
50341749 Type: DNWorkType:EVALAANS
Description:
230kV&500kVswitchyardNRCinspection Order: U-0Task#1 Status: TSCOTaskCompletedCodeGroup:
DO-EFFCTDCPlantEffectAssessmentTaskCode: SFMRSFMReview Responsible:UserResponsibleWorkCtr: OPROperationsCrew-OnShiftCreatedOn:15Sep10 By: M4MNManuelL.MunozPlannedStart:16Sep10PlannedFinish:16Sep10CompletedOn:16Sep1003:26 By: DRS5DanielR.StermerTask#2 Status: TSCOTaskCompletedCodeGroup:
DO-OPEROperabilityEvaluationTaskCode: OPERSSCisOperable Responsible:UserResponsibleWorkCtr: OPRCreatedOn:16Sep10 By: DRS5DanielR.StermerPlannedStart:16Sep10PlannedFinish:16Sep10CompletedOn:16Sep1003:40 By: DRS5DanielR.Stermer09/16/201003:26:16DanielR.Stermer(DRS5)1.Describethedegradedornonconformingcondition.Ifthereisnosuch condition,forinstanceifthenotificationistrackingafuturedesignchange, write"Nodegradedornonconformingconditionexists"inthetaskanddonot answerthefollowingquestions.Thedegradedconditionsareasfollows:
1.230kVswitchyard-hairlinecrackinginthefoundation(Westleg)oftheCB212latticestructure.
2.500kVswitchyard-TransmissionlineTowersshowedcrackingonthe groutofthefoundationswherethestructuremeetstheconcrete.Also, rustwaspresentonmetalplatesusedasspacersbetweenthestructure andfoundation.
3.Switch631Bphasestructurefoundcrackinginthegroutwherethe structuremeetsthefoundation.PrintDate:24Jan1107:53PG&ECorporationDIABLOCANYONPage3of6 Notification:
50341749 Type: DNWorkType:EVALAANS
Description:
230kV&500kVswitchyardNRCinspection Order: U-04.Switch541Aphaselowerpartofthestructureisbent,foundationgroutiscracked.
5.AboltintheNWofthetopofthisstructureisrusted.6.500kVswitchyard-Transmissionlinetowers,verticalandhorizontalinsulatorbellsshowdiscolorationonthebellsnearesttotheenergized TransmissionLine.RustwasidentifiedonA,B,andCphase.2.SpecifytheSSCaffectedbythedegradedornonconformingcondition.IfthecomponentisnotTSorECGrequiredanddoesnotprovideanysupportfunctionsforTSorECGrequiredequipmentwrite"TheSSChasnosafety function"inthetaskanddonotanswerthefollowingquestions.TheSSCsarethe230and500kvsystems.
3.DescribetheeffectorpotentialeffectofthedegradedornonconformingconditionontheaffectedSSC'sabilitytoperformitssafetyfunction.Thepotentialeffectisiftheconditionsweretoworsenoveralongperiodoftime,thephysicalstrengthofthecomponentscouldweakentothepointof failing.Thiswouldresultinalossofpowertothesiteaswellaspotentially causingaplanttransientifa500kvlinewerelost.4.SummarizewhythereisreasonableexpectationofOPERABILITY.
Theitemsnotedarebeingevaluatedforaging.TheindividualperformingtheinspectionindicatesthattheSSCsareexpectedtobeabletoperformtheir safetyfunction.Noneoftheitemsindicatethatthereisanimmediateconcern thatwouldresultintheSSCtonotbeabletoperformitsfunction.TheSSCs remainoperable.Task#3SeeDAforTask Status: TSCOTaskCompletedCodeGroup:
DE-MRULEDCMaintenanceRuleTaskCode: RFFNMaintRuleFunct.Failure:NO Responsible:UserResponsibleWorkCtr: EIEElectricalSystems/ComponentsCreatedOn:16Sep10 By: DRS5DanielR.StermerPlannedStart:16Sep10PlannedFinish:16Oct10CompletedOn:16Sep1015:27 By: JMSOJanaM.Orlando 805/545-312609/16/201003:41:16DanielR.Stermer(DRS5)DONOTPERFORMACLOSUREOFTHISTASKIFYOUDONOTPrintDate:24Jan1107:53PG&ECorporationDIABLOCANYONPage4of6 Notification:
50341749 Type: DNWorkType:EVALAANS
Description:
230kV&500kVswitchyardNRCinspection Order: U-0POSSESSANENGNTS9QUALIFICATION"UNLESSTHISTASKISADUPLICATE,NOTANEQUIPMENTPROBLEM(EQPR)TYPENOTIFICATIONORTHISNOTIFICATIONWASCREATEDIN ERROR.09/16/201015:26:15JanaM.Orlando(JMSO)Phone805/545-3126PerR.Allen,thistaskisaduplicatetask-SeeDA.
.Task#4EvaluateLongTermImpact Status: TSCOTaskCompletedCodeGroup:
DE-ENG-TDiabloEngineeringTasksTaskCode: 0065EngineeringEvaluation Responsible:UserResponsibleWorkCtr: EDCDesignEng-CivilSeismicPipingCreatedOn:16Sep10 By: RAW2RobertA.WaltosPlannedStart:16Sep10PlannedFinish:23Sep10CompletedOn:16Sep1015:27 By: JMSOJanaM.Orlando 805/545-312609/16/201014:24:10RobertA.Waltos(RAW2)Phone805/545-4400
.
TheevaluationinTaskNo.2providesanimmediatedeterminationof operabilitybyoperations.Thisistorequestanevaluationoftheidentified conditionsforlongtermreliabilityandisspecifictotheconditionsdescribedin items1through4intheNotification.Whentheevaluationiscomplete,ithasbeenrequestedbytheOperationsMangerthataDO-OPERTaskbeinitiatedandtheWorkControlShiftForeman
notified.
.PrintDate:24Jan1107:53PG&ECorporationDIABLOCANYONPage5of6 Notification:
50341749 Type: DNWorkType:EVALAANS
Description:
230kV&500kVswitchyardNRCinspection Order: U-0Task#5EvaluateLongTermImpact Status: TSCOTaskCompletedCodeGroup:
DE-ENG-TDiabloEngineeringTasksTaskCode: 0065EngineeringEvaluation Responsible:UserResponsibleWorkCtr: EIEElectricalSystems/ComponentsCreatedOn:16Sep10 By: RAW2RobertA.WaltosPlannedStart:16Sep10PlannedFinish:23Sep10CompletedOn:16Sep1015:27 By: JMSOJanaM.Orlando 805/545-312609/16/201014:26:05RobertA.Waltos(RAW2)Phone805/545-4400
.
TheevaluationinTaskNo.2providesanimmediatedeterminationof operabilitybyoperationsoftheconditionsidentifiedinthenotification.Thisis torequestanevaluationoftheidentifiedconditionsforlongtermreliabilityand isspecifictotheconditionsdescribedinitems5oftheNotification.Whentheevaluationiscomplete,ithasbeenrequestedbytheOperationsMangerthataDO-OPERTaskbeinitiatedandtheWorkControlShiftForeman notified..Task#6 000050341964 Status: TSCOTaskCompletedCodeGroup:
DG-CRConditionReportTaskCode: OR Organizational Responsible:UserResponsibleWorkCtr: EIECreatedOn:16Sep10 By: JMSOJanaM.OrlandoPlannedStart:16Sep10PlannedFinish:16Sep10CompletedOn:16Sep1015:25 By: JMSOJanaM.Orlando 805/545-3126PrintDate:24Jan1107:53PG&ECorporationDIABLOCANYONPage6of6 DC Notification:
50341752 Type: DNWorkType:EVALAANS
Description:
EvaluateSelectiveLeachingAMP Order:Funct.Loc:DCDIABLOCANYONReportedBy:
DNGDDanielJ.GibbonsRptByWorkCtr:
PLContactInfo:CreatedOn:15Sep1016:48PlannerGroup:MainWrkCtr:
PLProjectManager-LicenseRenewal PROBLEM DESCRIPTION09/15/201016:48:08DanielJ.Gibbons(DNGD)BasedondiscussionwiththeNRCduringtheLicenseRenewalRegionalInspection,theLicenseRenewalAgingManagementProgramforSelective Leaching,XI.M33,willneedtobeevaluatedinordertodetermineiftheprogramshouldincludeaonetimeinspectionoraperiodicinspectionplan,basedonplantoperatingexperience.
09/16/201014:03:14PhilippeR.Soenen(PNS3)Phone805/781-9782FurhterdiscussionwiththeNRCinspectoridentifiedtheneedtospecificallyaddressthepotentialneedforamoresubstantialsampling(largersamplesizeordestructivetesting)forthematerialandenvironmentcombinationofsaltwaterandaluminumbronze.
09/16/201015:27:53JanaM.Orlando(JMSO)Phone805/545-3126Theissue/eventdocumentedonthisnotificationwasreviewedbytheNotificationReviewTeam(NRT)anddeterminedtobetheindicated significancelevelperOM7.ID1,Attachment1,Category18.Ifadditionalinformationisdiscoveredthatwouldaffectthesignificanceleveldetermination,contactamemberoftheNRTore-mailDCPPNRTMembers.
.DNclosedtoDA.
.EventDate15Sep10NotifRequiredBy31Dec10StationSig.:3WorkGroupEvalPrintDate:24Jan1108:38PG&ECorporationDIABLOCANYONPage1of2 Notification:
50341752 Type: DNWorkType:EVALAANS
Description:
EvaluateSelectiveLeachingAMP Order: DC STATUS DETAILSUserStatus:20APPV ApprovedSystemStatus:NOCOATCOTask#1 000050341966 Status: TSCOTaskCompletedCodeGroup:
DG-CRConditionReportTaskCode: OR Organizational Responsible:UserResponsibleWorkCtr:CreatedOn:16Sep10 By: JMSOJanaM.OrlandoPlannedStart:16Sep10PlannedFinish:16Sep10CompletedOn:16Sep1015:27 By: JMSOJanaM.Orlando 805/545-3126PrintDate:24Jan1108:38PG&ECorporationDIABLOCANYONPage2of2 DC Notification:
50341848 Type: DNWorkType:EVALAANS
Description:
DocumentationforLRScopingofTBComps Order:Funct.Loc:DCDIABLOCANYONReportedBy:
DNGDDanielJ.GibbonsRptByWorkCtr:
PLContactInfo:CreatedOn:16Sep1014:57PlannerGroup:MainWrkCtr:
PLProjectManager-LicenseRenewal PROBLEM DESCRIPTION09/16/201014:57:27DanielJ.Gibbons(DNGD)DuringtheNRCLicenseRenewalRegionalInspection,itwasrequestedthatweprovidedocumentationtoshowtheevaluationofwhichcomponents intheTurbineBuildingareinscopeforlicenserenewal.ThespecificcomponentsinquestionaretheSCWHeadTankandthefirewaterpipinginthevicinityoftheControlRoomPressurizationSystem.
09/20/201014:32:33JanaM.Orlando(JMSO)Phone805/545-3126Theissue/eventdocumentedonthisnotificationwasreviewedbytheNotificationReviewTeam(NRT)anddeterminedtobetheindicated significancelevelperOM7.ID1,Attachment1,Category18.1.Ifadditionalinformationisdiscoveredthatwouldaffectthesignificanceleveldetermination,contactamemberoftheNRTore-mailDCPPNRT
Members..DNclosedtoDA.
.STATUS DETAILSUserStatus:20APPV ApprovedSystemStatus:NOCOATCOEventDate16Sep10NotifRequiredBy15Oct10StationSig.:3WorkGroupEvalPrintDate:24Jan1108:51PG&ECorporationDIABLOCANYONPage1of2 Notification:
50341848 Type: DNWorkType:EVALAANS
Description:
DocumentationforLRScopingofTBComps Order: DCTask#1 000050342570 Status: TSCOTaskCompletedCodeGroup:
DG-CRConditionReportTaskCode: OR Organizational Responsible:UserResponsibleWorkCtr:CreatedOn:20Sep10 By: JMSOJanaM.OrlandoPlannedStart:20Sep10PlannedFinish:20Sep10CompletedOn:20Sep1014:32 By: JMSOJanaM.Orlando 805/545-3126PrintDate:24Jan1108:51PG&ECorporationDIABLOCANYONPage2of2 DC Notification:
50341874 Type: DNWorkType:EVALAANS
Description:
EvaluateLROneTimeInspectionProgram Order:Funct.Loc:DCDIABLOCANYONReportedBy:
PNS3PhilippeR.SoenenRptByWorkCtr:
PLContactInfo:
PNS3PhilippeR.Soenen805/544-6984CreatedOn:16Sep1013:50PlannerGroup:MainWrkCtr:
PLProjectManager-LicenseRenewal PROBLEM DESCRIPTION09/16/201013:50:16PhilippeR.Soenen(PNS3)Phone805/781-9782DuringthelicenserenewalregionalinspectionanNRCinspectorrequestedthatthelicenserenewalone-timeinspectionagingmanagement programbeevaluatedtoconsiderrevisionsoftefollowingitems:1)Thebasisforthecurrentlyproposedsamplesize.TheNRCinspectorrelayedthatthecurrentsamplesizeseemedappropriateforasingleunitplant.2)Considerincludingsomesamplesofothermaterialtypesforagivenenvironmentinadditiontothematerialtypethatwillbeidentifiedasthemostsusceptiblematerialtotheapplicableagingeffectforthe
environment.3)Considerexpandingtheinpsectionscopetootherlesssusceptiblematerialtypesifcorrosionisidentifiedduringtheinspectioninadditiontothematerialtypethatwillbeidentifiedasthemostsusceptiblematerialtotheapplicableagingeffectfortheenvironment.Therearenooperabilityorequipmentissuesidentifiedaspartofthis notification.
09/20/201014:33:32JanaM.Orlando(JMSO)Phone805/545-3126EventDate16Sep10NotifRequiredBy31Dec10StationSig.:3WorkGroupEvalPrintDate:24Jan1108:44PG&ECorporationDIABLOCANYONPage1of2 Notification:
50341874 Type: DNWorkType:EVALAANS
Description:
EvaluateLROneTimeInspectionProgram Order: DCTheissue/eventdocumentedonthisnotificationwasreviewedbytheNotificationReviewTeam(NRT)anddeterminedtobetheindicatedsignificancelevelperOM7.ID1,Attachment1,Category18.1.Ifadditionalinformationisdiscoveredthatwouldaffectthesignificance leveldetermination,contactamemberoftheNRTore-mailDCPPNRT Members..
DNclosedtoDA.
.STATUS DETAILSUserStatus:20APPV ApprovedSystemStatus:NOCOATCOTask#1 000050342573 Status: TSCOTaskCompletedCodeGroup:
DG-CRConditionReportTaskCode: OR Organizational Responsible:UserResponsibleWorkCtr:CreatedOn:20Sep10 By: JMSOJanaM.OrlandoPlannedStart:20Sep10PlannedFinish:20Sep10CompletedOn:20Sep1014:33 By: JMSOJanaM.Orlando 805/545-3126PrintDate:24Jan1108:44PG&ECorporationDIABLOCANYONPage2of2 DC Notification:
50341877 Type: DNWorkType:EVALAANS
Description:
EvaluateLRApp.JandIWEAMPs Order:Funct.Loc:DCDIABLOCANYONReportedBy:
PNS3PhilippeR.SoenenRptByWorkCtr:
PLContactInfo:
PNS3PhilippeR.Soenen805/544-6984CreatedOn:16Sep1014:27PlannerGroup:MainWrkCtr:
PLProjectManager-LicenseRenewal PROBLEM DESCRIPTION09/16/201014:27:44PhilippeR.Soenen(PNS3)Phone805/781-9782DuringthelicenserenewalregionalinspectionitwasidentifiedthatthetenelementevaluationsforlicenserenewalApp.JandIWEaging managementprogramsneedtobeevlautedtopotentiallyclarifythecrossreferencingbetweenthesetwoagingmanagementprogramsforthetestingofpenetrationseals.
09/20/201014:33:54JanaM.Orlando(JMSO)Phone805/545-3126Theissue/eventdocumentedonthisnotificationwasreviewedbytheNotificationReviewTeam(NRT)anddeterminedtobetheindicated significancelevelperOM7.ID1,Attachment1,Category18.1.Ifadditionalinformationisdiscoveredthatwouldaffectthesignificanceleveldetermination,contactamemberoftheNRTore-mailDCPPNRT
Members..DNclosedtoDA.
.STATUS DETAILSUserStatus:20APPV ApprovedSystemStatus:NOCOATCOEventDate16Sep10NotifRequiredBy31Dec10StationSig.:3WorkGroupEvalPrintDate:24Jan1108:46PG&ECorporationDIABLOCANYONPage1of2 Notification:
50341877 Type: DNWorkType:EVALAANS
Description:
EvaluateLRApp.JandIWEAMPs Order: DCTask#1 000050342574 Status: TSCOTaskCompletedCodeGroup:
DG-CRConditionReportTaskCode: OR Organizational Responsible:UserResponsibleWorkCtr:CreatedOn:20Sep10 By: JMSOJanaM.OrlandoPlannedStart:20Sep10PlannedFinish:20Sep10CompletedOn:20Sep1014:33 By: JMSOJanaM.Orlando 805/545-3126PrintDate:24Jan1108:46PG&ECorporationDIABLOCANYONPage2of2 U-2 Notification:
50341879 Type: DNWorkType:EVALAANS
Description:
ComponentmaterialrefinSAP Order:Funct.Loc:DC-2-25-P-REG-AIR-I-2-1231AREGVLVTOFCV-633ReportedBy:
PNS3PhilippeR.SoenenRptByWorkCtr:
PLContactInfo:
PNS3PhilippeR.Soenen805/544-6984CreatedOn:16Sep1014:55PlannerGroup:MainWrkCtr:
PLProjectManager-LicenseRenewal PROBLEM DESCRIPTION09/16/201014:46:12PhilippeR.Soenen(PNS3)Phone805/781-9782DuringalicenserenewalregionalinspectionwalkdownthematerialtypefortheUnit2AIR-I-I-1231Aregulatorwasquestionswhencomparedto whatSAPidentifiesthematerialtobe.SAPidentifiesthiscomponenttobemadeofaluminumwhereasthewalkdownidentifiedthiscomponenttobesometypeofcopperalloy.ThecomponentmaterialneedstobeverifiedinthefieldandSAPshouldberevisedasnecessarytoreflecttheactualmaterialtype.The licenserenewalapplicationandthebasisdocumentsneedtoberevisedasappropriatetoreflectthecorrectmaterialtype.Thereisnooperabilityorfunctinalconcernwiththiscomponentitisonlyadocumentationclarification.09/20/201014:34:13JanaM.Orlando(JMSO)Phone805/545-3126 Theissue/eventdocumentedonthisnotificationwasreviewedbytheNotificationReviewTeam(NRT)anddeterminedtobetheindicatedsignificancelevelperOM7.ID1,Attachment1,Category18.1.If additionalinformationisdiscoveredthatwouldaffectthesignificanceleveldetermination,contactamemberoftheNRTore-mailDCPPNRT Members.
.EventDate16Sep10NotifRequiredBy31Dec10StationSig.:3WorkGroupEvalPrintDate:24Jan1108:47PG&ECorporationDIABLOCANYONPage1of2 Notification:
50341879 Type: DNWorkType:EVALAANS
Description:
ComponentmaterialrefinSAP Order: U-2DNclosedtoDA.
.STATUS DETAILSUserStatus:20APPV ApprovedSystemStatus:NOCOATCOTask#1 000050342575 Status: TSCOTaskCompletedCodeGroup:
DG-CRConditionReportTaskCode: OR Organizational Responsible:UserResponsibleWorkCtr:CreatedOn:20Sep10 By: JMSOJanaM.OrlandoPlannedStart:20Sep10PlannedFinish:20Sep10CompletedOn:20Sep1014:34 By: JMSOJanaM.Orlando 805/545-3126PrintDate:24Jan1108:47PG&ECorporationDIABLOCANYONPage2of2 DC Notification:
50341911 Type: DNWorkType:EVALAANS
Description:
MaterialtypeinLRAfordieselpump Order:Funct.Loc:DCDIABLOCANYONReportedBy:
PNS3PhilippeR.SoenenRptByWorkCtr:
PLContactInfo:
PNS3PhilippeR.Soenen805/544-6984CreatedOn:16Sep1015:08PlannerGroup:MainWrkCtr:
PLProjectManager-LicenseRenewal PROBLEM DESCRIPTION09/16/201015:08:20PhilippeR.Soenen(PNS3)Phone805/781-9782Duringthelicenserenewalregionalinspectionitwasidentifiedthatthematerialreferencedforthedieselgeneratormakeupprimingpumpin thelicenserenewaldocumentsisPVC.Goingthroughthevendormaterialsitwasidentifiedthatthepumpsaremadeofatrademarkthermo-plastic.Itneedstobeevaluatedifthematerialshouldbe calledoutassomethingotherthanPVCintheapplicationandbasisdocuments.Theagingeffectsandagingmanagementneedstobeevaluatedforthismaterialtoconfirmtheyarecorrect.Thereisnoequipmentorfunctionalissueassociatedwiththesecomponents,onlyadocumentationclarificationneeded.
09/27/201014:08:10JanaM.Orlando(JMSO)Phone805/545-3126Theissue/eventdocumentedonthisnotificationwasreviewedbytheNotificationReviewTeam(NRT)anddeterminedtobetheindicated significancelevelperOM7.ID1,Attachment1,Category7.4.Ifadditionalinformationisdiscoveredthatwouldaffectthesignificanceleveldetermination,contactamemberoftheNRTore-mailDCPPNRT
Members..DNclosedtoDA.
.EventDate16Sep10NotifRequiredBy31Dec10StationSig.:3WorkGroupEvalPrintDate:24Jan1108:49PG&ECorporationDIABLOCANYONPage1of3 Notification:
50341911 Type: DNWorkType:EVALAANS
Description:
MaterialtypeinLRAfordieselpump Order: DC STATUS DETAILSUserStatus:20APPV ApprovedSystemStatus:NOCONOPTATCOTask#1 Status: TSCOTaskCompletedCodeGroup:
DO-OPEROperabilityEvaluationTaskCode: OPERSSCisOperable Responsible:UserResponsibleWorkCtr:CreatedOn:23Sep10 By: JRC1JerryR.CollinsPlannedStart:23Sep10PlannedFinish:23Sep10CompletedOn:23Sep1017:31 By: JBDOJamesB.Dillis 805/545-324309/23/201017:30:03JamesB.Dillis(JBDO)Phone805/545-32431.Describethedegradedornon-conformingcondition.Ifthereisnosuch condition,forinstanceifthenotificationistrackingafuturedesignchange, write"Nodegradedornon-conformingconditionexists"inthetaskanddonot answerthefollowingquestions.Thedegradedconditionisadiscrepancybetweenthepaperworkidentifyingthematerialusedinthedieselgenerator'sprimingpumps,PVCversusthe vendorthermo-plastic.2.SpecifytheSSCaffectedbythedegradedornon-conformingcondition.IfthecomponentisnotTSorECGrequiredanddoesnotprovideanysupport functionsforTSorECGrequiredequipmentwrite"TheSSChasnosafety function"inthetaskanddonotanswerthefollowingquestions.TheSSCisthefuelprimingpumpontheDieselGenerator,(DG),whichhasnosafetyfunction.PrintDate:24Jan1108:49PG&ECorporationDIABLOCANYONPage2of3 Notification:
50341911 Type: DNWorkType:EVALAANS
Description:
MaterialtypeinLRAfordieselpump Order: DCTask#2 000050344181 Status: TSCOTaskCompletedCodeGroup:
DG-CRConditionReportTaskCode: OR Organizational Responsible:UserResponsibleWorkCtr:CreatedOn:27Sep10 By: JMSOJanaM.OrlandoPlannedStart:27Sep10PlannedFinish:27Sep10CompletedOn:27Sep1014:08 By: JMSOJanaM.Orlando 805/545-3126PrintDate:24Jan1108:49PG&ECorporationDIABLOCANYONPage3of3 U-0 Notification:
50341964 Type: DAWorkType:EVALAANS
Description:
230kV&500kVswitchyardNRCinspection Order:Funct.Loc:DC-0-70U0SYS70500KVReportedBy:
M4MNManuelL.MunozRptByWorkCtr:
EIE-007ContactInfo:CreatedOn:16Sep1015:25PlannerGroup:
NPRNoplanningrequrdMainWrkCtr:
EIE-007MunozManuel-M4MN PROBLEM DESCRIPTION09/16/201015:25:47JanaM.Orlando(JMSO)Phone805/545-312609/15/201018:12:20ManuelL.Munoz(M4MN)Phone805/545-6164DuringNRCLicenseRenewalAgingManagementinspectionofthe500kVand 230kVswitchyardson9-14-10,thefollowingindicationswereidentifiedoninsulatorsandsupportsthatwillneedanexpertevaluation.1.230kVswitchyard-hairlinecrackingwasidentifiedinthefoundation (Westleg)oftheCB212latticestructure.2.500kVswitchyard-TransmissionlineTowersshowedcrackingonthegroutofthefoundationswherethestructuremeetstheconcrete.Also, rustwaspresentonmetalplatesusedasspacersbetweenthestructureandfoundation.3.Switch631Bphasestructurefoundcrackinginthegroutwherethe structuremeetsthefoundation.4.Switch541Aphaselowerpartofthestructureisbent,foundationgroutiscracked.
AlsoaboltintheNWofthetopofthisstructureisrusted.CivilEngineeringwillneedtoevaluatethesefindings.5.500kVswitchyard-Transmissionlinetowers,verticalandhorizontalinsulatorbellsshowdiscolorationonthebellsnearesttotheenergizedEventDate15Sep10NotifRequiredBy18Feb11StationSig.:3WorkGroupEvalPrintDate:24Jan1108:33PG&ECorporationDIABLOCANYONPage1of10 Notification:
50341964 Type: DAWorkType:EVALAANS
Description:
230kV&500kVswitchyardNRCinspection Order: U-0TransmissionLine.RustwasidentifiedonA,B,&Cphaseconnectorsofthetowers.Transmission&SubstationAssetStrategywillneedtoinspectandevaluatethesefindings.Indicationsdescribedabovearebeingevaluatedforagingofsystem.Thesefindingsarenotanimmediateconcernandwillnotimpactthefunctionofthesesystems.09/16/201010:26:21JosephGoryance(JXG3)Phone805/545-3454
.Item#6includedgeneralhousekeepingintheswitchyardnearthevicinityofthe500kvbreakersanddisconnectswitches.thehouse keepingitemsnoticedduringthewalkdownwerefastenerhardware(nuts,washers,bolts)foundontheground.RequestplantmaintenancecoordinatewithSubstationdepartmenttoperformathoroughwalkdownof theswitchyardandperformageneralcleanupofthearea.09/16/201015:25:41JanaM.Orlando(JMSO)Phone805/545-3126Theissue/eventdocumentedonthisnotificationwasreviewedbythe NotificationReviewTeam(NRT)anddeterminedtobetheindicatedsignificancelevelperOM7.ID1,Attachment1,Category18.Ifadditionalinformationisdiscoveredthatwouldaffectthesignificancelevel determination,contactamemberoftheNRTore-mailDCPPNRTMembers.
.DNclosedtoDA.
.10/26/201013:25:31KimberleyL.Corona(KLCP)Phone805/545-5424TrendingComplete.
01/20/201116:49:40JosephGoryance(JXG3)Phone805/545-3454duedatechangedtoallowtask4coordinationwithPMprogram coordinator.PrintDate:24Jan1108:33PG&ECorporationDIABLOCANYONPage2of10 Notification:
50341964 Type: DAWorkType:EVALAANS
Description:
230kV&500kVswitchyardNRCinspection Order: U-0 STATUS DETAILSUserStatus:20APPV ApprovedSystemStatus:OSNONOPTOSTSTask#1 mrff=no Status: TSCOTaskCompletedCodeGroup:
DE-MRULEDCMaintenanceRuleTaskCode: RFFNMaintRuleFunct.Failure:NO Responsible:UserResponsibleM4MNManuelL.Munoz 805/545-6164WorkCtr: EIE-007MunozManuel-M4MNCreatedOn:16Sep10 By: JMSOJanaM.OrlandoPlannedStart:16Sep10PlannedFinish:16Oct10CompletedOn:07Oct1013:16 By: JXG3JosephGoryance 805/545-345409/16/201015:25:47JanaM.Orlando(JMSO)Phone805/545-312609/16/201003:41:16DanielR.Stermer(DRS5)
DONOTPERFORMACLOSUREOFTHISTASKIFYOUDONOT POSSESSANENGNTS9QUALIFICATION"UNLESSTHISTASKISA DUPLICATE,NOTANEQUIPMENTPROBLEM(EQPR)TYPE NOTIFICATIONORTHISNOTIFICATIONWASCREATEDINERROR.09/23/201016:06:50ManuelL.Munoz(M4MN)Phone805/545-6164ThisisanMRFF=No,Allinsulatorcorrosionfindingsinthe500kVswitchyarddonotposeathreattothefunctionofthissystem.TLineexperthasverifiedthestrenghtandintegrityoftheinsulatorstobesufficientandhasnolongterm reliabilityissues 10/07/201013:14:49JosephGoryance(JXG3)Phone805/545-3454
.
concurwithassessmentnosystem69orsystem70maintenancerule functionswerefailedasaresultoftheseconditions.mrff=no.PrintDate:24Jan1108:33PG&ECorporationDIABLOCANYONPage3of10 Notification:
50341964 Type: DAWorkType:EVALAANS
Description:
230kV&500kVswitchyardNRCinspection Order: U-0Task#2EvaluateLongTermImpact Status: TSCOTaskCompletedCodeGroup:
DE-ENG-TDiabloEngineeringTasksTaskCode: 0065EngineeringEvaluation Responsible:UserResponsibleFXF2FarzinFaili 415/305-5228WorkCtr: EDC-011Chingburanakit,Sakdichai(Chai)-SXC8CreatedOn:16Sep10 By: JMSOJanaM.OrlandoPlannedStart:16Sep10PlannedFinish:23Sep10CompletedOn:23Sep1009:32 By: FXF2FarzinFaili 415/305-522809/16/201015:25:47JanaM.Orlando(JMSO)Phone805/545-312609/16/201014:24:10RobertA.Waltos(RAW2)Phone805/545-4400
.
TheevaluationinTaskNo.2providesanimmediatedeterminationof operabilitybyoperations.Thisistorequestanevaluationoftheidentified conditionsforlongtermreliabilityandisspecifictotheconditionsdescribedin items1through4intheNotification.Whentheevaluationiscomplete,ithasbeenrequestedbytheOperationsMangerthataDO-OPERTaskbeinitiatedandtheWorkControlShiftForeman notified.
.
09/23/201008:46:14ChaiChingburanakit(SXC8)EDCivilengineeringresponse:AwalkdownwasperformedbyEDciviland500KVand230KVsystemengineeringtoidentifyandevaluatetheasfoundconditionsofitems1through4ofthisnotification.Item1.230KVswitchyards#theminorhairlineconcretecracksinthe foundationarecommoninnature,andhavenostructuralimpacttoexisting foundation.Thefoundationisstructurallysoundtoperformitsdesignfunction.
Item2.500KVswitchyards#Spalledgroutatthechamferededgebetween oneofthebaseplateandthefoundation,thisisthenon-structureportionofthe groutforthebaseplate.Thesubjectbaseplatemaintainshavingfullbearingontheremaininggroutandadequatelyperformitsdesignfunctions.Thebaseplateshavesomerustandtheyare appearedtobesurfacerust.ThereforethesePrintDate:24Jan1108:33PG&ECorporationDIABLOCANYONPage4of10 Notification:
50341964 Type: DAWorkType:EVALAANS
Description:
230kV&500kVswitchyardNRCinspection Order: U-0aforementioneditemshavenostructureimpacttotheTransmissionlineTowerstructure.However,itisrecommendedtocleanandpaintthebaseplatesin accordancewithPG&Espec.8848,latestrevision,andrepairthegroutin accordancewithMICP7.0,latestrevisiontopreventfurthercorrosionandspall ofgrout.
Item3.Switch631Bphase#Thegroutbetweenthesteelbaseplatesandthe foundationshascracksalongthechamferededgeswhicharenon-structure.
Therefore,thereisnostructuralimpacttothedesignstructure.
Item4.Switch541#Minordeflectionoftheverticalmemberatthelowerpartoftheframehasnoimpactontheoverallstructuralintegrityoftheframework toperformitsdesignfunctions.Inaddition,theaforementionedrustedboltatthetopN-Wcornerofthestructurehassurfacerust.Structuralintegrityand capacityoftheboltisnotaffectedordegradedbytherust.However,EDCivil engineeringrecommendstocleanandpainttherustedboltinaccordancewith PG&Espec8848,latestrevision.09/23/201008:50:04ChaiChingburanakit(SXC8)Thisnotificationhasbeenforwardedtofxf2forpeerreview.
09/23/201008:52:39ChaiChingburanakit(SXC8)09/23/201009:26:51FarzinFaili(FXF2)Phone415/305-5228 Aspeerreviewer,Iconcurwiththeaboveevaluation.Task#3EvaluateLongTermImpact Status: TSCOTaskCompletedCodeGroup:
DE-ENG-TDiabloEngineeringTasksTaskCode: 0065EngineeringEvaluation Responsible:UserResponsibleM4MNManuelL.Munoz 805/545-6164WorkCtr: EIE-007MunozManuel-M4MNCreatedOn:16Sep10 By: JMSOJanaM.OrlandoPlannedStart:16Sep10PlannedFinish:23Sep10CompletedOn:26Sep1015:52 By: JXG3JosephGoryance 805/545-345409/16/201015:25:47JanaM.Orlando(JMSO)Phone805/545-312609/16/201014:26:05RobertA.Waltos(RAW2)Phone805/545-4400
.PrintDate:24Jan1108:33PG&ECorporationDIABLOCANYONPage5of10 Notification:
50341964 Type: DAWorkType:EVALAANS
Description:
230kV&500kVswitchyardNRCinspection Order: U-0TheevaluationinTaskNo.2providesanimmediatedeterminationofoperabilitybyoperationsoftheconditionsidentifiedinthenotification.Thisis torequestanevaluationoftheidentifiedconditionsforlongtermreliabilityandisspecifictotheconditionsdescribedinitems5oftheNotification.Whentheevaluationiscomplete,ithasbeenrequestedbytheOperationsMangerthataDO-OPERTaskbeinitiatedandtheWorkControlShiftForeman
notified.
.
09/23/201016:03:46ManuelL.Munoz(M4MN)Phone805/545-6164 RickReyes(R1R2),fromPG&E-TLinedepartment,isanexpertatinspecting 500kVconductor,components,andinsulatingequipment.Rickhasinspected 500kVswitchyardconductor,components,andinsulatingequipmentandhas determinedthesystemcomponentstobeina"Good"condition.Current conditionsdonotindicatealongtermreliabilityissueintheDCPP500kV
==
Conclusion:==
Theinsulationlevelhasbeenoverdesignedwhichprovidemoreinsulationthanwhatisrequired.Thereforethefindingswillnotposeathreattofunction ofthissystem.TheExpertTLineinspectorisconfidentthatthisisa Low-Mediumlevelofcorrosionandthroughexperiencehascommonlyseen thislevelrustonthehotendoftheinsulatorsthroughoutthePG&E500kV system.Thisisacosmeticdefectthathasnoreliabilityissuesthatwill jeopardizethefunctionofthe500kVsystem.Hisoverallassessmentofthe 500kVinsulatorsarethattheyarein"GoodShape"giventhetimeframewhich thehavebeeninservice.Itisrecommended,DCPPreplacetheseinsulatorsin 5yrs,basedonhisindustryexperienceandexpertise.Duetothesaltair corrosionenvironment,hisrecommendationistocontinueourannual inspectionsoftheseinsulatorsandcontinuetotrackanynewfindingsduring ourquarterlywalkdowns.09/26/201015:48:05JosephGoryance(JXG3)Phone805/545-3454reviewedthistaskandconsideritcomplete.newtaskcreatedtotrack changestothemaintenanceplantoreplacetheinsulatorswithin5years.PrintDate:24Jan1108:33PG&ECorporationDIABLOCANYONPage6of10 Notification:
50341964 Type: DAWorkType:EVALAANS
Description:
230kV&500kVswitchyardNRCinspection Order: U-0Task#4Follow-upOD Status: TSCOTaskCompletedCodeGroup:
DO-OPEROperabilityEvaluationTaskCode: OPERSSCisOperable Responsible:UserResponsibleWorkCtr: EIE-007CreatedOn:24Sep10 By: RAW2RobertA.WaltosPlannedStart:24Sep10PlannedFinish:24Sep10CompletedOn:24Sep1018:05 By: FTB1FredT.Barthell 805/545-311709/24/201013:59:41RobertA.Waltos(RAW2)Phone805/545-4400
.
TheimmediateOperabilityDeterminationinTaskNo.2in50341749was basedontheinitialfindingsoftheconditionsdescribedintheNotification.
SubsequentevaluationhasbeenperformedbyEngineeringoftheidentified conditionsinTaskNo's2and3ofthisNotification.Therefore,inaccordance withtherequestinTaskNo's.2and3,afollow-upOperabilityDeterminationis beingrequested
.09/24/201017:24:16FredT.Barthell(FTB1)Phone805/545-31171.,,Describethedegradedornonconformingcondition.Ifthereisnosuchcondition,forinstanceifthenotificationistrackingafuture designchange,write"Nodegradedornonconformingconditionexists"in thetaskanddonotanswerthefollowingquestions.Thedegradedconditionsareasfollows:
1.230kVswitchyard-hairlinecrackinginthefoundation(Westleg)oftheCB212latticestructure.
2.500kVswitchyard-TransmissionlineTowersshowedcrackingonthe groutofthefoundationswherethestructuremeetstheconcrete.Also, rustwaspresentonmetalplatesusedasspacersbetweenthestructure andfoundation.
3.Switch631Bphasestructurefoundcrackinginthegroutwherethe structuremeetsthefoundation.4.Switch541Aphaselowerpartofthestructureisbent,foundationgroutiscracked.
5.AboltintheNWofthetopofthisstructureisrusted.
6.500kVswitchyard-Transmissionlinetowers,verticalandhorizontalinsulatorbellsshowdiscolorationonthebellsnearesttotheenergizedTransmissionLine.RustwasidentifiedonA,B,andCphase.PrintDate:24Jan1108:33PG&ECorporationDIABLOCANYONPage7of10 Notification:
50341964 Type: DAWorkType:EVALAANS
Description:
230kV&500kVswitchyardNRCinspection Order: U-02.,,SpecifytheSSCaffectedbythedegradedornonconformingcondition.IfthecomponentisnotTSorECGrequiredanddoesnot provideanysupportfunctionsforTSorECGrequiredequipmentwrite "TheSSChasnosafetyfunction"inthetaskanddonotanswerthe followingquestions.TheSSCsarethe230and500kvsystems.
3.,,DescribetheeffectorpotentialeffectofthedegradedornonconformingconditionontheaffectedSSC'sabilitytoperformitssafety function.Thepotentialeffectisiftheconditionsweretoworsenoveralongperiodoftime,thephysicalstrengthofthecomponentscouldweakento thepointoffailing.Thiswouldresultinalossofpowertothesite aswellaspotentiallycausingaplanttransientifa500kvlinewere
lost.4.,,SummarizewhythereisreasonableexpectationofOPERABILITY Engineeringevaluationfindings:Item1.230KVswitchyards#theminorhairlineconcretecracksinthe foundationarecommoninnature,andhavenostructuralimpactto existingfoundation.Thefoundationisstructurallysoundtoperform itsdesignfunction.
Item2.500KVswitchyards#Spalledgroutatthechamferededge betweenoneofthebaseplateandthefoundation,thisisthe non-structureportionofthegroutforthebaseplate.Thesubjectbase platemaintainshavingfullbearingontheremaininggroutand adequatelyperformitsdesignfunctions.Thebaseplateshavesomerust andtheyareappearedtobesurfacerust.Thereforethese aforementioneditemshavenostructureimpacttotheTransmissionline Towerstructure.However,itisrecommendedtocleanandpaintthebaseplatesinaccordancewithPG&Espec.8848,latestrevision,andrepairthegroutinaccordancewithMICP7.0,latestrevisiontoprevent furthercorrosionandspallofgrout.
Item3.Switch631Bphase#Thegroutbetweenthesteelbaseplates andthefoundationshascracksalongthechamferededgeswhichare non-structure.Therefore,thereisnostructuralimpacttothedesign
structure.
Item4.Switch541#Minordeflectionoftheverticalmemberatthelowerpartoftheframehasnoimpactontheoverallstructuralintegrityoftheframeworktoperformitsdesignfunctions.In addition,theaforementionedrustedboltatthetopN-WcornerofthePrintDate:24Jan1108:33PG&ECorporationDIABLOCANYONPage8of10 Notification:
50341964 Type: DAWorkType:EVALAANS
Description:
230kV&500kVswitchyardNRCinspection Order: U-0structurehassurfacerust.Structuralintegrityandcapacityoftheboltisnotaffectedordegradedbytherust.However,EDCivil engineeringrecommendstocleanandpainttherustedboltinaccordance withPG&Espec8848,latestrevision.Linedepartmentevaluationresults:RickReyes(R1R2),fromPG&E-TLinedepartment,isanexpertatinspecting 500kVconductor,components,andinsulatingequipment.Rickhas inspected500kVswitchyardconductor,components,andinsulating equipmentandhasdeterminedthesystemcomponentstobeina"Good" condition.Currentconditionsdonotindicatealongtermreliability issueintheDCPP500kVswitchyard.
==
Conclusion:==
,,Theinsulationlevelhasbeenoverdesignedwhichprovidemore insulationthanwhatisrequired.Thereforethefindingswillnotpose athreattofunctionofthissystem.TheExpertTLineinspectoris confidentthatthisisaLow-Mediumlevelofcorrosionandthrough experiencehascommonlyseenthislevelrustonthehotendofthe insulatorsthroughoutthePG&E500kVsystem.Thisisacosmeticdefect thathasnoreliabilityissuesthatwilljeopardizethefunctionofthe 500kVsystem.Hisoverallassessmentofthe500kVinsulatorsarethat theyarein"GoodShape"giventhetimeframewhichthehavebeenin service.Itisrecommended,DCPPreplacetheseinsulatorsin5yrs, basedonhisindustryexperienceandexpertise.Duetothesaltair corrosionenvironment,hisrecommendationistocontinueourannual inspectionsoftheseinsulatorsandcontinuetotrackanynewfindings duringourquarterlywalkdowns.Thedegradationoftheconcretecomponentsofboththe230KVand500KVareminorwithslightcrackingofnon-supportinggroutandchamferededging.
Metalstructureshavesurfacerustthatdoesnotaffectcomponentstrength.
Theslightdeflectionoftheverticalmemberoftheframeworkforswitch541 doesnotaffecttheintegrityoftheoverallframe.Theelectricalcomponentsareengineeredtoexperienceminorrustdegradationintoconsiderationallowingornormalcorrosionlevelsfortheserviceconditionsofthesecomponents.Nostructuralorelectricaldegradationhastakenplacethediscolorationiscosmeticinnature.Boththe230KVand500KVsystemswillcontinuetoperformtheirdesignfunctionsandremainOperable.PrintDate:24Jan1108:33PG&ECorporationDIABLOCANYONPage9of10 Notification:
50341964 Type: DAWorkType:EVALAANS
Description:
230kV&500kVswitchyardNRCinspection Order: U-0Task#5Reviewrepalacementprocess Status: TSOSTaskOutstandingCodeGroup:
DE-ENG-TDiabloEngineeringTasksTaskCode: 0065EngineeringEvaluation Responsible:UserResponsibleM4MNManuelL.Munoz 805/545-6164WorkCtr: EIE-007MunozManuel-M4MNCreatedOn:26Sep10 By: JXG3JosephGoryancePlannedStart:24Sep10PlannedFinish:10Feb11CompletedOn:By:09/26/201015:43:24JosephGoryance(JXG3)Phone805/545-3454Reviewofthemaintenancehistoryindicatestheseinsulatorsaretheoriginal equipmentinstalledwhentheswitchyardwasconstructed.Requestsystem engineeringtocoordinatewithTransmissiononarecommendedreplacement plan/schedule.IncorporatetheT-Linerecommendationtoreplacethe insulatorswithin5yearsintoDCPPmaintenanceplans.
.
Note:theT-Lineinsulatorswerereplacedontheinter-planttowersforbothunit 1&2inbetween2000/2003.PrintDate:24Jan1108:33PG&ECorporationDIABLOCANYONPage10of10 DC Notification:
50341966 Type: DAWorkType:EVALAANS
Description:
EvaluateSelectiveLeachingAMP Order:Funct.Loc:DCDIABLOCANYONReportedBy:
DNGDDanielJ.GibbonsRptByWorkCtr:
PLContactInfo:CreatedOn:16Sep1015:27PlannerGroup:MainWrkCtr:
ETI-002BeardChris-CTB6 PROBLEM DESCRIPTION09/16/201015:27:57JanaM.Orlando(JMSO)Phone805/545-312609/15/201016:48:08DanielJ.Gibbons(DNGD)BasedondiscussionwiththeNRCduringtheLicenseRenewalRegional Inspection,theLicenseRenewalAgingManagementProgramforSelectiveLeaching,XI.M33,willneedtobeevaluatedinordertodetermineiftheprogramshouldincludeaonetimeinspectionoraperiodicinspection plan,basedonplantoperatingexperience.09/16/201014:03:14PhilippeR.Soenen(PNS3)Phone805/781-9782FurhterdiscussionwiththeNRCinspectoridentifiedtheneedtospecificallyaddressthepotentialneedforamoresubstantialsampling(largersamplesizeordestructivetesting)forthematerialand environmentcombinationofsaltwaterandaluminumbronze.09/16/201015:27:53JanaM.Orlando(JMSO)Phone805/545-3126Theissue/eventdocumentedonthisnotificationwasreviewedbythe NotificationReviewTeam(NRT)anddeterminedtobetheindicatedsignificancelevelperOM7.ID1,Attachment1,Category18.Ifadditionalinformationisdiscoveredthatwouldaffectthesignificancelevel determination,contactamemberoftheNRTore-mailDCPPNRTMembers.
.DNclosedtoDA.
.EventDate15Sep10NotifRequiredBy31Dec10StationSig.:3WorkGroupEvalPrintDate:24Jan1108:39PG&ECorporationDIABLOCANYONPage1of4 Notification:
50341966 Type: DAWorkType:EVALAANS
Description:
EvaluateSelectiveLeachingAMP Order: DC12/17/201013:49:21ChristopherT.Beard(CTB6)Phone805/545-4581InDCL-10-164,datedDecember13,2010DiabloCanyonprovidedthebasisforthesampleselectionfortheDCPPSelectiveLeachingProgram.The responseandthesampleselectionisconsistentwithNUREG-1801"GenericAgingLessonsLearn",Revision-2.D-RAIB2.1.17-2
......................................................................
Background
......................................................................GALLAMPXI.M33,"SelectiveLeachingofMaterials"states,inthe"scopeofprogram"programelement,thattheprogramincludesaone-timevisual inspectionandhardnessmeasurementofaselectedsetofsamplecomponentstodeterminewhetherlossofmaterialduetoselectiveleachingisnotoccurringfortheperiodofextendedoperation.LRASectionB2.1.17,SelectiveLeachingofMaterials,statesthattheprogramincludesaone-timevisualinspectionandhardnessmeasurement orotherindustry-acceptedmechanicalinspectiontechniques(wherefeasiblebasedonformandconfiguration)ofselectedcomponentsthatmaybesusceptibletoselectiveleachingtodeterminewhetherlossof materialduetoselectiveleachingisoccurring.
........................................................................
Issue.......................................................................Duetotheuncertaintyindeterminingthemostsusceptiblelocationsand thepotentialforagingtooccurinotherlocations,thestaffnotedthatlargesamplesizes(atleast20%)mayberequiredinordertoadequatelyconfirmanagingeffectisnotoccurring.Theapplicant's SelectiveLeachingProgramdoesnotincludespecificinformationregardinghowtheselectedsetofcomponentswillbechosenorhowthesamplesizewillbedetermined.
.PrintDate:24Jan1108:39PG&ECorporationDIABLOCANYONPage2of4 Notification:
50341966 Type: DAWorkType:EVALAANS
Description:
EvaluateSelectiveLeachingAMP Order: DC.......................................................................
Request.......................................................................
.
Providespecificinformationregardinghowtheselectedsetofcomponentstobesampledwillbedeterminedandthesizeofthesampleofcomponentsthatwillbeinspected.
........................................................................PG&EResponsetoD-RAIB2.1.17-2
.......................................................................TheSelectiveLeachingprogramcomponenttypesincludingpiping,valvebodiesandbonnets,pumpcasings,andheatexchangercomponentsthatare susceptibletoselectiveleaching.Thematerialsofconstructionforthesecomponentsmayincludegraycastironandcopperalloys(exceptforinhibitedbrass)containinggreaterthan15percentzincorgreater than8percentaluminum.Thesecomponentsmaybeexposedtorawwater,treatedwater,closedcoolingwater,groundwater,watercontaminatedfueloil,orwater-contaminatedlubeoil.
.Arepresentativesampleofthecomponentpopulationfocusesonthosecomponentsmostsusceptibletoagingduetotimeinservice,severityof operatingconditions,andlowestdesignmargin.Asamplesizeoftwentypercentofthepopulationwithamaximumsampleof25componentinspectionsperunitwillbeestablishedforeachofthematerialand environmentcombinations.Componentswillbegroupedbymaterialandenvironmentwitheachgroupofmaterialandenvironmentcombinationsconsideredasaseparatepopulation.
.Aone-timeinspectionwillbeconductedwithinthe5-yearperiodpriortotheperiodofextendedoperation.Formaterialsandenvironments whereselectiveleachingiscurrentlyoccurringorformaterialsinenvironmentswherethecomponenthasbeenrepairedwiththesamematerial,aplantspecificprogramwillbecreated.
......................................................................PrintDate:24Jan1108:39PG&ECorporationDIABLOCANYONPage3of4 Notification:
50341966 Type: DAWorkType:EVALAANS
Description:
EvaluateSelectiveLeachingAMP Order: DC.DCL-10-164isattachedtothisnotificationasa.pdffile.
.TobeconsistentwithGALLRev-2AluminumBronzewith>8%aluminumfound intheDCPPsaltwatersystemwillrequireaperiodicprogramtomanageaging.Thisisbasedonoperatingexperiencethatselectiveleachinghasalreadybeenidentifiedonaluminumbronzecheckvalves.A preliminaryreviewfoundthatalltheSystem-17checkvalveshaveperiodicinspectionswhichincludesstepstoidentifymaterialloss.TheremainderaluminumbronzevalveswillalsoneedaPMtomonitorfor theoccurrenceofselectiveleaching.
.OTIswillbeperformedonthematerial/environmentsthathavenot experiencedselectiveleaching.InthecourseoftheOTI,theidentificationofselectiveleachingwouldrequirearecurringPMtomanageagingatafrequencyappropriatetomaintainfunctionality.
12/17/201014:27:02DavidA.Gonzalez(DAG1)
Reviewed.STATUS DETAILSUserStatus:20APPV ApprovedSystemStatus:NOCONOPTPrintDate:24Jan1108:39PG&ECorporationDIABLOCANYONPage4of4 DC Notification:
50342570 Type: DAWorkType:EVALAANS
Description:
DocumentationforLRScopingofTBComps Order:Funct.Loc:DCDIABLOCANYONReportedBy:
DNGDDanielJ.GibbonsRptByWorkCtr:
PLContactInfo:CreatedOn:20Sep1014:32PlannerGroup:MainWrkCtr:
PLProjectManager-LicenseRenewal PROBLEM DESCRIPTION09/20/201014:32:37JanaM.Orlando(JMSO)Phone805/545-312609/16/201014:57:27DanielJ.Gibbons(DNGD)DuringtheNRCLicenseRenewalRegionalInspection,itwasrequested thatweprovidedocumentationtoshowtheevaluationofwhichcomponentsintheTurbineBuildingareinscopeforlicenserenewal.ThespecificcomponentsinquestionaretheSCWHeadTankandthefirewaterpipingin thevicinityoftheControlRoomPressurizationSystem.09/20/201014:32:33JanaM.Orlando(JMSO)Phone805/545-3126Theissue/eventdocumentedonthisnotificationwasreviewedbythe NotificationReviewTeam(NRT)anddeterminedtobetheindicatedsignificancelevelperOM7.ID1,Attachment1,Category18.1.Ifadditionalinformationisdiscoveredthatwouldaffectthesignificance leveldetermination,contactamemberoftheNRTore-mailDCPPNRT Members..
DNclosedtoDA.
.10/13/201014:46:02DanielJ.Gibbons(DNGD)
ThiswasaddressedinresponsetoRAI2.1-1.SeeDCL-10-132dated 10-12-2010.EventDate16Sep10NotifRequiredBy15Oct10StationSig.:3WorkGroupEvalPrintDate:24Jan1108:51PG&ECorporationDIABLOCANYONPage1of2 Notification:
50342570 Type: DAWorkType:EVALAANS
Description:
DocumentationforLRScopingofTBComps Order: DC STATUS DETAILSUserStatus:20APPV ApprovedSystemStatus:NOCONOPTPrintDate:24Jan1108:51PG&ECorporationDIABLOCANYONPage2of2 DC Notification:
50342573 Type: DAWorkType:EVALAANS
Description:
EvaluateLROneTimeInspectionProgram Order:Funct.Loc:DCDIABLOCANYONReportedBy:
PNS3PhilippeR.SoenenRptByWorkCtr:
PLContactInfo:
PNS3PhilippeR.Soenen805/544-6984CreatedOn:20Sep1014:33PlannerGroup:MainWrkCtr:
ETI-002BeardChris-CTB6 PROBLEM DESCRIPTION09/20/201014:33:40JanaM.Orlando(JMSO)Phone805/545-312609/16/201013:50:16PhilippeR.Soenen(PNS3)Phone805/781-9782DuringthelicenserenewalregionalinspectionanNRCinspector requestedthatthelicenserenewalone-timeinspectionagingmanagementprogrambeevaluatedtoconsiderrevisionsoftefollowingitems:1)Thebasisforthecurrentlyproposedsamplesize.TheNRCinspectorrelayedthatthecurrentsamplesizeseemedappropriateforasingleunitplant.2)Considerincludingsomesamplesofothermaterialtypesforagivenenvironmentinadditiontothematerialtypethatwillbeidentifiedas themostsusceptiblematerialtotheapplicableagingeffectforthe environment.3)Considerexpandingtheinpsectionscopetootherlesssusceptiblematerialtypesifcorrosionisidentifiedduringtheinspectioninadditiontothematerialtypethatwillbeidentifiedasthemost susceptiblematerialtotheapplicableagingeffectfortheenvironment.Therearenooperabilityorequipmentissuesidentifiedaspartofthis notification.EventDate16Sep10NotifRequiredBy31Dec10StationSig.:3WorkGroupEvalPrintDate:24Jan1108:44PG&ECorporationDIABLOCANYONPage1of6 Notification:
50342573 Type: DAWorkType:EVALAANS
Description:
EvaluateLROneTimeInspectionProgram Order: DC09/20/201014:33:32JanaM.Orlando(JMSO)Phone805/545-3126Theissue/eventdocumentedonthisnotificationwasreviewedbytheNotificationReviewTeam(NRT)anddeterminedtobetheindicatedsignificancelevelperOM7.ID1,Attachment1,Category18.1.If additionalinformationisdiscoveredthatwouldaffectthesignificanceleveldetermination,contactamemberoftheNRTore-mailDCPPNRT Members.
.DNclosedtoDA.
.
12/17/201010:04:15ChristopherT.Beard(CTB6)Phone805/545-4581TheDCPPOne-TimeInspectionProgramwillincorporatetheaboverevisionsasfollowstoensurethattheOTIprogramverifiesthe effectivenessoftheWaterChemistryProgram,LubricatingOilProgramandFuel-OilChemistryProgram.
.
Item(1)ThebasisforthecurrentlyproposedsamplesizeasofSeptember20,2010.InLetterdatedOctober27,2010,DCL-10-134,DCPPsupplementedthefollowingRAIB2.1.16-1."InitsJuly7,2010responsetoRAIB2.1.16-1,theapplicantprovideddetailsofthesamplingprocedurethatwillbeusedfortheOne-TimeInspectionProgram.However,thestaffwasunclearofthebasisfor samplingsizesselectedforthevariousagingeffects".Priortotheresponse(providedbelow)additionalclarifyingphonecallswereheldwiththeNRCstaff;thesecallsandengineeringreviewoftheselectionprocessinfluencedthesampleselectioncriteriathatwasdeveloped.TheresultingsupplementalresponsetoRAIB2.1.16-1isthe currentbasisforthesampleselectioncriteriafortheOne-TimeInspectionProgram.
.
.PrintDate:24Jan1108:44PG&ECorporationDIABLOCANYONPage2of6 Notification:
50342573 Type: DAWorkType:EVALAANS
Description:
EvaluateLROneTimeInspectionProgram Order: DC.................................................................One-TimeInspection-WaterChemistry
.................................................................TheDiabloCanyonPowerPlant(DCPP)One-TimeInspection(OTI)Program willverifytheeffectivenessoftheWaterChemistryProgramatmanagingmateriallossbyidentifyingapopulationforeachin-scopesystemwherethefulleffectofaWaterChemistryProgrammaynotbeachieved,based onthemostsusceptiblematerialwithinthesystem(i.e.carbonsteelinfeedwatersystem,stainlesssteelinchemicalandvolumecontrolsystem)atstagnantlocations.Asampleof10percentofthestagnantlocations withthemostsusceptiblematerialtypesuitableforultrasonicthicknessexaminationwillbeinspectedineachin-scopesystemperunit.TheOTIProgramwilltakecreditforvolumetricexaminations performedunderotherAgingManagementProgram(AMP),suchasflow-acceleratedcorrosion,whentheabovecriteriaismetandtheexamsareperformedwithinthe10yearspriortotheperiodofextended
operation.TheDCPPOTIProgramwillverifytheeffectivenessoftheWaterChemistryProgramatmanagingcrackingofstainlesssteelwithtemperaturesgreaterthan140°Fbyidentifyingthepopulationofcomponentswithinin-scopesystemsthatareatstagnantlocationswhere thefullbenefitofeffectiveWaterChemistryProgrammaynotbeachieved.Asampleof10percentofthispopulationofstainlesssteelgreaterthan140°Finstagnantorlowflowlocationswillbeinspected usingultrasonictechniquesappropriatetodetectcracking.TheOTIProgramwilltakecreditforvolumetricexaminationsperformedunderotherAMPs,suchasClass1smallboreandinserviceinspection,when theabovecriteriaismetandtheexamsareperformedwithinthe10yearspriortotheperiodofextendedoperation.Inadditiontothe10percentsampleinpipingsystems,theDCPPOTIProgramwillperform100 percent(ormaximumachievable)eddycurrenttestingofstainlesssteeltubesinonenon-regenerativeheatexchanger.TheDCPPOTIProgramwillverifytheeffectivenessoftheWaterPrintDate:24Jan1108:44PG&ECorporationDIABLOCANYONPage3of6 Notification:
50342573 Type: DAWorkType:EVALAANS
Description:
EvaluateLROneTimeInspectionProgram Order: DCChemistryProgramatmanagingfoulingofheatexchangertubesexposedtotreatedwaterbyperformingavisualexaminationofoneheatexchangerperin-scopesystem,function,andmaterial/environmentcombinationperunit.Considerationofinspectabilityandradiologicalconcernswill factorintotheselectionofheatexchangersforthissample.
..
....................................................................One-TimeInspection-FuelOilChemistry
....................................................................
.TheDCPPOTIProgramwillverifytheeffectivenessoftheFuelChemistryProgramatmanagingmateriallossbyidentifyingapopulationof componentswithinthedieselgeneratorsystem(DG)andDGfueltransfersystem,whicharestagnantandatlowerelevationsthatmaypermittheaccumulationofwater.Asampleof10percentofcarbonsteelpiping componentsidentifiedintheDGsystemforeachdieselasbeingstagnantandataanelevationthatwouldpermitwateraccumulationwillbeexaminedusingappropriatevolumetricnondestructiveexamination techniques.Inadditiontothepipingsample,stainlesssteelfueloilprimingtankbottomswillbevolumetricallyexaminedandcarbonsteelfueloildaytanksthatpermitaccesstotheinsidesurfaceofthetank bottomwillbevolumetricallyexaminedtotheextentaccessible.Asampleof10percentofcarbonsteelpipingcomponentsidentifiedintheDGfueltransfersystemforeachunitwillbevolumetricallyinspected withinthe10yearspriortotheperiodofextendedoperation.
..
.....................................................................One-TimeInspection-LubricatingOilAnalysis
.....................................................................
.TheDCPPOTIProgramwillverifytheeffectivenessoftheLubricatingOilAnalysisProgramatmanagingmateriallossbyperformingvolumetric orvisualexaminationsofoneheatexchangerperin-scopesystemandPrintDate:24Jan1108:44PG&ECorporationDIABLOCANYONPage4of6 Notification:
50342573 Type: DAWorkType:EVALAANS
Description:
EvaluateLROneTimeInspectionProgram Order: DCfunctionperunit.Forexample,onecopperalloycentrifugalchargingpumplubeoilcoolerperunitoutofapopulationoftwocoolersperunitwillbeexamined.Thissampleselectionwouldincludealuminum,copperalloy,andcarbonsteelheatexchangershells.
.......................................................................
SupplementaltoItem(1)
.....................................................................
.
AlthoughnotcommittedtoinDCL-10-134,DCPPsupplementtoRAIB2.1.16-1,theDCPPOTIProgramsamplebasisstatedabovewillbeimplementedonaperunitbasis.The10%sampleofstagnantlocations willbedoneperunit,withthesampleselectionforoneunit/system/environmentbeingdifferenttotheextentpossibletotheotherunit/system/environment.Inspectingdifferentlocationswithin thesamematerial/environmentperunitincreasestheeffectivenessofthesampleprogramatidentifyingapotentialagingmechanism.
.
.........................................................................Items(2)and(3)considerinspectingotherthanthemostsusceptible materialforeachenvironment.
........................................................................
.
TheDCPPOne-TimeInspectionProgram(OTI)willinspectthemostsusceptiblematerialtypeforeachenvironmentduringtheimplementationoftheOTIProgram.IntheeventtheOTIProgramidentifiesaging mechanismssuchasmateriallossorcracking,theconditionshallbeenteredintotheCAPforfitnessforserviceevaluationandextentofconditionevaluation.ExtentofconditionevaluationfortheDCPP One-TimeInspectionprogramwillincludeexpandinginspectionscopetootherlocationswithsimilarmaterial/environmentforwhichtheagingmechanismwasfirstidentifiedandalsoexpandingscopetoother materialswithintheenvironmentforwhichagingwasidentified.ThisPrintDate:24Jan1108:44PG&ECorporationDIABLOCANYONPage5of6 Notification:
50342573 Type: DAWorkType:EVALAANS
Description:
EvaluateLROneTimeInspectionProgram Order: DCscopeexpansioncriteriawillbeappliedusingengineeringjudgmenttoensurethattheagingmechanismisadequatelyboundedtoallmaterials,frommostsusceptibletoleastsusceptiblefortheenvironmentforwhichagingisidentified.
STATUS DETAILSUserStatus:20APPV ApprovedSystemStatus:NOCONOPTPrintDate:24Jan1108:44PG&ECorporationDIABLOCANYONPage6of6 DC Notification:
50342574 Type: DAWorkType:EVALAANS
Description:
EvaluateLRApp.JandIWEAMPs Order:Funct.Loc:DCDIABLOCANYONReportedBy:
PNS3PhilippeR.SoenenRptByWorkCtr:
PLContactInfo:
PNS3PhilippeR.Soenen805/544-6984CreatedOn:20Sep1014:33PlannerGroup:MainWrkCtr:
PLProjectManager-LicenseRenewal PROBLEM DESCRIPTION09/20/201014:33:58JanaM.Orlando(JMSO)Phone805/545-312609/16/201014:27:44PhilippeR.Soenen(PNS3)Phone805/781-9782Duringthelicenserenewalregionalinspectionitwasidentifiedthat thetenelementevaluationsforlicenserenewalApp.JandIWEagingmanagementprogramsneedtobeevlautedtopotentiallyclarifythecrossreferencingbetweenthesetwoagingmanagementprogramsforthetesting ofpenetrationseals.09/20/201014:33:54JanaM.Orlando(JMSO)Phone805/545-3126Theissue/eventdocumentedonthisnotificationwasreviewedbythe NotificationReviewTeam(NRT)anddeterminedtobetheindicatedsignificancelevelperOM7.ID1,Attachment1,Category18.1.Ifadditionalinformationisdiscoveredthatwouldaffectthesignificance leveldetermination,contactamemberoftheNRTore-mailDCPPNRT Members..
DNclosedtoDA.
.STATUS DETAILSUserStatus:20APPV ApprovedSystemStatus:OSNONOPTEventDate16Sep10NotifRequiredBy30Apr11StationSig.:3WorkGroupEvalPrintDate:24Jan1108:47PG&ECorporationDIABLOCANYONPage1of2 Notification:
50342574 Type: DAWorkType:EVALAANS
Description:
EvaluateLRApp.JandIWEAMPs Order: DCPrintDate:24Jan1108:47PG&ECorporationDIABLOCANYONPage2of2 U-2 Notification:
50342575 Type: DAWorkType:EVALAANS
Description:
ComponentmaterialrefinSAP Order:Funct.Loc:DC-2-25-P-REG-AIR-I-2-1231AREGVLVTOFCV-633ReportedBy:
PNS3PhilippeR.SoenenRptByWorkCtr:
PLContactInfo:
PNS3PhilippeR.Soenen805/544-6984CreatedOn:20Sep1014:34PlannerGroup:
MPMMaintPlng-MechMainWrkCtr:
PLProjectManager-LicenseRenewal PROBLEM DESCRIPTION09/20/201014:34:18JanaM.Orlando(JMSO)Phone805/545-312609/16/201014:46:12PhilippeR.Soenen(PNS3)Phone805/781-9782Duringalicenserenewalregionalinspectionwalkdownthematerialtype fortheUnit2AIR-I-I-1231AregulatorwasquestionswhencomparedtowhatSAPidentifiesthematerialtobe.SAPidentifiesthiscomponenttobemadeofaluminumwhereasthewalkdownidentifiedthiscomponentto besometypeofcopperalloy.ThecomponentmaterialneedstobeverifiedinthefieldandSAPshouldberevisedasnecessarytoreflecttheactualmaterialtype.Thelicenserenewalapplicationandthebasisdocumentsneedtoberevisedasappropriatetoreflectthecorrectmaterialtype.Thereisnooperabilityorfunctinalconcernwiththiscomponentitisonlyadocumentationclarification.
09/20/201014:34:13JanaM.Orlando(JMSO)Phone805/545-3126Theissue/eventdocumentedonthisnotificationwasreviewedbytheNotificationReviewTeam(NRT)anddeterminedtobetheindicated significancelevelperOM7.ID1,Attachment1,Category18.1.Ifadditionalinformationisdiscoveredthatwouldaffectthesignificanceleveldetermination,contactamemberoftheNRTore-mailDCPPNRT
Members.EventDate16Sep10NotifRequiredBy31Dec10StationSig.:3WorkGroupEvalPrintDate:24Jan1108:48PG&ECorporationDIABLOCANYONPage1of2 Notification:
50342575 Type: DAWorkType:EVALAANS
Description:
ComponentmaterialrefinSAP Order: U-2.DNclosedtoDA.
.11/09/201016:44:51MirandaTan(M1TF)
WalkdownwillbeperformedtoverifycomponentmaterialforbothUnit1andUnit2.Thelicenserenewalapplicationwillbeupdatedtoreflectthecorrectmaterialtypeaspartoftheannualupdate.
11/10/201008:25:34DanielJ.Gibbons(DNGD)Onawalkdownon11/10/2010,forUnit2,AIR-I-1-1231Aappearedtobeconstructedofstainlesssteelandcopperalloycomponentsonits pressureboundarybasedonvisualandmagneticinspection.ForUnit1,AIR-I-1-1231Aappearedtobealuminumbasedonvisualandmagnetic inspection.
11/11/201010:12:33DanielJ.Gibbons(DNGD)Tocorrecttheabove,itshouldread"forUnit2,AIR-I-2-1231Aappearedtobeconstructedofstainlesssteelandcopperalloycomponentsonits pressureboundarybasedonvisualandmagneticinspection."Theclarifythisstatement,thevalveconsistedofastainlesssteelpieceandacopperalloypiece.
12/09/201009:00:56DanielJ.Gibbons(DNGD)Perthewalkdowndiscussedabove,AIR-I-2-1231Aconsistsofastainlesssteelandacopperalloypiece.Afterreviewingthevendormanual, 663169-146Rev3,allpressureretainingportionsofthevalvearestainlesssteel.ThematerialofthisvalveiscorrectlyclassifiedasstainlesssteelintheLicenseRenewalApplication(LRA)andtheLicense RenewalDataManagementTool(LRDMT).Nofurtheractionisneeded.12/20/201008:32:55TerenceL.Grebel(TLG1)Phone805/545-4160Iconcurwiththeactivitybeingcomplete.
STATUS DETAILSUserStatus:20APPV ApprovedSystemStatus:NOCONOPTPrintDate:24Jan1108:48PG&ECorporationDIABLOCANYONPage2of2 DC Notification:
50344181 Type: DAWorkType:EVALAANS
Description:
MaterialtypeinLRAfordieselpump Order:Funct.Loc:DCDIABLOCANYONReportedBy:
PNS3PhilippeR.SoenenRptByWorkCtr:
PLContactInfo:
PNS3PhilippeR.Soenen805/544-6984CreatedOn:27Sep1014:08PlannerGroup:MainWrkCtr:
PLProjectManager-LicenseRenewal PROBLEM DESCRIPTION09/27/201014:08:15JanaM.Orlando(JMSO)Phone805/545-312609/16/201015:08:20PhilippeR.Soenen(PNS3)Phone805/781-9782Duringthelicenserenewalregionalinspectionitwasidentifiedthat thematerialreferencedforthedieselgeneratormakeupprimingpumpinthelicenserenewaldocumentsisPVC.Goingthroughthevendormaterialsitwasidentifiedthatthepumpsaremadeofatrademark thermo-plastic.ItneedstobeevaluatedifthematerialshouldbecalledoutassomethingotherthanPVCintheapplicationandbasisdocuments.Theagingeffectsandagingmanagementneedstobeevaluated forthismaterialtoconfirmtheyarecorrect.Thereisnoequipmentorfunctionalissueassociatedwiththesecomponents,onlyadocumentationclarificationneeded.09/27/201014:08:10JanaM.Orlando(JMSO)Phone805/545-3126Theissue/eventdocumentedonthisnotificationwasreviewedbythe NotificationReviewTeam(NRT)anddeterminedtobetheindicatedsignificancelevelperOM7.ID1,Attachment1,Category7.4.Ifadditionalinformationisdiscoveredthatwouldaffectthesignificance leveldetermination,contactamemberoftheNRTore-mailDCPPNRT Members..
DNclosedtoDA.EventDate16Sep10NotifRequiredBy31Dec10StationSig.:3WorkGroupEvalPrintDate:24Jan1108:50PG&ECorporationDIABLOCANYONPage1of2 Notification:
50344181 Type: DAWorkType:EVALAANS
Description:
MaterialtypeinLRAfordieselpump Order: DC.12/29/201010:16:13TerenceL.Grebel(TLG1)Phone805/545-4160CompleteseeDCL-10-158datedDecember29,2010 STATUS DETAILSUserStatus:20APPV ApprovedSystemStatus:NOCONOPTPrintDate:24Jan1108:50PG&ECorporationDIABLOCANYONPage2of2 DC Notification:
50359698 Type: DNWorkType:EVALAANS
Description:
ReviseMA1.ID20toAlignwithLRA Order:Funct.Loc:DCDIABLOCANYONReportedBy:
M1TFMirandaTanRptByWorkCtr:
PLContactInfo:
M1TFMirandaTanCreatedOn:08Nov1011:28PlannerGroup:MainWrkCtr:
PLProjectManager-LicenseRenewal PROBLEM DESCRIPTION11/08/201011:28:57MirandaTan(M1TF)TheLicenseRenewalApplication(LRA)forDCPPUnits1and2wassubmittedon11/23/09,DCL-09-079.ProcedureMA1.ID20,Testing/InspectionsforAuxSaltwaterSystemNRCGenericLetter89-13Compliance,Rev.2,Section5.7.7.a,statesthat "Althoughthereisnocommitmenttotest,CCWheatexchangersarepartofGL89-13:itisconsideredprudenttomonitorheattransfer performance."LRASectionB2.1.9,Open-CycleCoolingWaterSystem,statesthatDCPPperformsperiodictestingoftheCCWheatexchangerspriortoeach refuelingoutagetoverifytheirheattransfercapability.ProcedureMA1.ID20,Section5.7.7.a,needstoberevised.11/09/201014:43:09SandraM.Wessel(SML1)Phone805/545-4154Theissue/eventdocumentedonthisnotificationwasreviewedbytheNotificationReviewTeam(NRT)anddeterminedtobetheindicated significancelevelperOM7.ID1,Attachment1,Category21.1.Ifadditionalinformationisdiscoveredthatwouldaffectthesignificanceleveldetermination,contactamemberoftheNRTore-mailDCPPNRT
Members.EventDate08Nov10NotifRequiredBy31Mar11StationSig.:3WorkGroupEvalPrintDate:24Jan1108:55PG&ECorporationDIABLOCANYONPage1of2 Notification:
50359698 Type: DNWorkType:EVALAANS
Description:
ReviseMA1.ID20toAlignwithLRA Order: DC.DNclosedtoDA.
.STATUS DETAILSUserStatus:20APPV ApprovedSystemStatus:NOCOATCOTask#1 000050360132 Status: TSCOTaskCompletedCodeGroup:
DG-CRConditionReportTaskCode: OR Organizational Responsible:UserResponsibleWorkCtr:CreatedOn:09Nov10 By: SML1SandraM.WesselPlannedStart:09Nov10PlannedFinish:09Nov10CompletedOn:09Nov1014:43 By: SML1SandraM.Wessel 805/545-4154PrintDate:24Jan1108:55PG&ECorporationDIABLOCANYONPage2of2 DC Notification:
50360132 Type: DAWorkType:EVALAANS
Description:
ReviseMA1.ID20toAlignwithLRA Order:Funct.Loc:DCDIABLOCANYONReportedBy:
M1TFMirandaTanRptByWorkCtr:
PLContactInfo:
M1TFMirandaTanCreatedOn:09Nov1014:43PlannerGroup:MainWrkCtr:
EMB-001AnastasioJoe-JEA3 PROBLEM DESCRIPTION11/09/201014:43:15SandraM.Wessel(SML1)Phone805/545-415411/08/201011:28:57MirandaTan(M1TF)TheLicenseRenewalApplication(LRA)forDCPPUnits1and2was submittedon11/23/09,DCL-09-079.ProcedureMA1.ID20,Testing/InspectionsforAuxSaltwaterSystemNRCGenericLetter89-13Compliance,Rev.2,Section5.7.7.a,statesthat"Althoughthereisnocommitmenttotest,CCWheatexchangersarepartofGL89-13:itisconsideredprudenttomonitorheattransfer
performance."LRASectionB2.1.9,Open-CycleCoolingWaterSystem,statesthatDCPPperformsperiodictestingoftheCCWheatexchangerspriortoeachrefuelingoutagetoverifytheirheattransfercapability.ProcedureMA1.ID20,Section5.7.7.a,needstoberevised.11/09/201014:43:09SandraM.Wessel(SML1)Phone805/545-4154Theissue/eventdocumentedonthisnotificationwasreviewedbythe NotificationReviewTeam(NRT)anddeterminedtobetheindicatedsignificancelevelperOM7.ID1,Attachment1,Category21.1.Ifadditionalinformationisdiscoveredthatwouldaffectthesignificance leveldetermination,contactamemberoftheNRTore-mailDCPPNRTEventDate08Nov10NotifRequiredBy31Mar11StationSig.:3WorkGroupEvalPrintDate:24Jan1108:56PG&ECorporationDIABLOCANYONPage1of2 Notification:
50360132 Type: DAWorkType:EVALAANS
Description:
ReviseMA1.ID20toAlignwithLRA Order: DC Members..DNclosedtoDA.
.
11/16/201008:01:42KevinBraico(KNBM)Phone805/781-9414NotificationhasbeenreassignedtoprocedureMA1.ID20owner.
.12/07/201014:54:00LawrenceS.Dunlap(LSD8)Phone805/545-4443 Clarification:Removealtogether5.7.7.a,whichstates:-Althoughthereisnocommitmenttotest,CCWheatexchangersarepart ofGL89-13;itisconsideredprudenttomonitorheattransfer performance.leaving5.7.7.bwhichstates:-Testingisperformedpriortoarefuelingoutageperrecurringtasks83363,83364,583363,and583364.Thisdemonstratestheeffectivenessof heattransferpriorcleaningasdescribedinstep5.5.1.
.STATUS DETAILSUserStatus:20APPV ApprovedSystemStatus:OSNONOPTPrintDate:24Jan1108:56PG&ECorporationDIABLOCANYONPage2of2