| Site: | Portsmouth Gaseous Diffusion Plant |
| Issue date: | 06/23/1998 |
| From: | Toelle S UNITED STATES ENRICHMENT CORP. (USEC) |
| To: | Dopp R NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| GDP-98-0123, GDP-98-123, NUDOCS 9806300212 | |
| Download: ML20249C513 (2) | |
Text
. _ _-_ _ ____ _ - __ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ - _ _ _ _ - _ _ _ _ _ _
USEC A Global Energy Company l
t June 23,1998 GDP 98-0123 Mr. Richard A. Dopp_
Acting Director, Division of Security and Facilities Office of. Administration Attention: Document Control Desk
]
U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Portsmouth Gaseous Diffusion Plant (PORTS).
Docket No 70-7002 International Atomic Energy Agency Activities
Dear Mr. Dopp:
The Intemational Atomic Energy Agency (IAEA) is conducting a long-term verification experiment at the Portsmouth site on the down blending of highly enriched uranium (HEU) materials in the X-326 Process Building. The United States Enrichment Corporation (USEC) forwarded the IAEA Safeguards and Security Plan to the Nuclear Regulatory Commission (NRC) for review on November 25,1997 (Reference 1). The NRC responded in Reference 2, which stated the NRC had no objection to the IAEA inspectors reviewing DOE classified National Security Information in USEC leased space subject to NRC regulations.' Reference 2 also stated that, since the IAEA inspectors are not conducting inspections in NRC certified space, they are not subject to the requirements of 10 CFR 95.36. However, they are subject to the commitments made in the NRC approved "Portsmouth Gaseous Diffusion Plant Security Plan for the Protection of Classified Matter" when handling classified information in USEC leased space subject to NRC regulations.
The IAEA has identified a need to observe the sampling and analysis of the low enriched uranium (LEU) UF. process flow by laboratory personnel in the X-710 facility as part of the experiment to verify that the HEU flow is in fact being down blended to a LEU flow. USEC believes that the i
intent of this additional activity is the same as that described in the plan forwarded to the NRC in Reference 1, and as~such does not constitute an inspection. USEC does want the NRC to be fully apprised of this additional activity and has provided a description of the activity (Addendum 3 to the l
DOE approved IAEA security plan) in Enclosure 1 for NRC's information.
y C
9806300212 900623 PDR ADOCK 07007002 3fgl W
C PDR N
q.
6903 RoclJedge Drive, Bethesda, MD 20817-1818
/
\\\\
l Telephone 301-564-3200 Fax 301-564-3201 http://www.usec.com OfTices in Livermore CA Paducah. KY Portsmouth, OH Washington, DC 1
i l
.e Mr. Rich'ard A. Dopp
' June 23,1998 GDP 98-0123, Page 2 There are no new commitments made in this letter. Should pou have any questions or comments on
. the enclosed infe anation, please call Bern Stapleton at (301) 564-3492 or Mark Lombard at (301) 1 564-3248.
. Sincerely, A
S. R.
I Steven A. Toelle Nuclear Regulatory Assurance and Policy Manager
Enclosure:
As' stated cc:
NRC Region III Office NRC Resident Inspector - PORTS 1
i 1
1 E____________1-______
)
Mr. Richard A. Dopp June 23,1998 GDP 98-0123, Page 3 l
REFERENCES 1.
Letter from Steven A. Toelle (USEC) to Raymond J. Brady (NRC), " Transmittal of Safeguards and Security Plan for Approval as Required by 10 CFR 95.36," GDP 97-0200, November 25,1997.
2.
Letter from Raymond J. Brady (NRC) to Steven A. Toelle (USEC), November 28,1997.
i l
i l
_ _ _ _ _. _ _ _ _