ML20058H928

From kanterella
Revision as of 08:49, 17 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 70-1257/93-12 on 931101-05.No Violations Noted
ML20058H928
Person / Time
Site: Framatome ANP Richland
Issue date: 11/24/1993
From: Reese J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Femreite B
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
Shared Package
ML20058H930 List:
References
NUDOCS 9312130277
Download: ML20058H928 (2)


Text

,.

i

~

~

/

h UNITED STATES L

' /*^

.A NUCLEAR REGULATORY COfAfdlSSION REGION V 5

~

1450 MAR!A LANE WAltJUT CREEK. CAUFORNIA 9496-5368 l

1 7,' 2 4 C 3 Docket No. 70-1257 License No. SNM-1227

{

Siemens Power Corporation t

2101 Horn Rapids Road P. O. Box 130 Richland, Washington 99352-0130 j

Attention: Mr. B. N. Femreite, Plant Manager

SUBJECT:

NRC INSPECTION REPORT NO. 70-1257/93-12 i

This refers to the routine inspection conducted by Mr. C. A. Hooker of this office on November 1-5, 1993. The inspection included a review of activities authorized for your Siemens Power Corporation facility in Richland, Washington. At the conclusion of the inspection, the findings were discussed i

with those members of your staff identified in the enclosed report.

Areas examined during this inspection are described in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations of activities in progress. The purpose of the f

inspection was to determine whether activities authorized by the license were conducted cafely and in accordance with NRC requirements.

i Within the scope of this inspection, no violations or deviations from NRC requirements were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

Should you have any questions concerning this inspection, we will be glad to discuss them with you.

interely, I

,ese,haief Jah[lities RadioTogical Protection

[

'6 Branch l

Enclosure:

Inspection Report No. 70-1257/93-12 cc w/ enclosure:

~,

State of Washington L. J. Maas, Manager, Regulatory Compliance 9312130277 931124 PDR ADOCK 07001257 -

C pyg

i f

)

s I

bcc w/ enclosure-PDR '

i DCS Inspection File i

B. Faulkenberry G. Cook i

M. Adams, NMSS R. Bellamy, RI D. Collins, RII

)

J. Grobe, RIII l

C. Cain, RIV i

bcc w/o enclosure:

'I M. Smith REGION V & NMSS, 3

CHooker#4/f-JI - se j

'll/F2/93 1'

3

/YES()/RJQu ST COPY][

ST COPY)

NO II YE

/ N0 1 v

v i

t i

t

'I P

i 20005S h

k i

r T o?