Forwards Amends 177 & 164 to Licenses DPR-39 & DPR-48, Respectively & Safety Evaluation.Amends Allow Commonwealth Edison to Control Reactor Coolant Sys Pressure & Temperature Limits for Heatup,Cooldown,Low Temp Operation & Testing
ML20132F498
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/20/1996
From: Shiraki C
NRC (Affiliation Not Assigned)
To: Johnson I
COMMONWEALTH EDISON CO.
Shared Package
ML20132F504 List:
References
TAC-M96228, TAC-M96229, NUDOCS 9612240304
Download: ML20132F498 (3)


Text

_ _. _

_.m Cetbd TqO m

o p na T5 c23

/

UNITED STATES I

g g

NUCLEAR REGULATORY COMMISSION ggp t

WASHINGTON D.C. 20666-0001

\\...../

4 December 20, 1996 Ms. Irene Johnson, Acting Manager Nuclear Regulatory Services Commonwealth Euison Company Executive Towers West III 1400 Opus Place, Suite 500 Downers Grove, IL 60515

SUBJECT:

ISSUANCE OF AMENDMENTS (TAC NOS. M96228 AND M96229)

Dear Ms. Johnson:

j The U.S. Nuclear Regulatory Commission (Commission) has issued the enclosed Amendment No. 177 to Facility Operating License No. DPR-39 and Amendment i

No. 164 to Facility Operating License No. DPR-48 for the Zion Nuclear Power 1

Station, Units 1 and 2, respectively. The amendments are in response to your application dated July 26, 1996, as supplemented on September 3, 1996, September 18, 1996, two submittals dated October 14, 1996, October 22, 1996, two submittals dated November 8,1996, and December 17, 1996.

The amendments allow Commonwealth Edison Company (Comed) to control the reactor coolant system pressure and temperature limits for heatup, cooldown, low temperature operation and hydrostatic testing. They also revise the reactor vessel material surveillance program specimen withdrawal schedule such that the Unit 2 removal of capsule X is delayed until 19 Effective Full Power Years.

For Zion, Unit 1, weld WF-154, Comed t. sed surveillance data from the Point i

Beach, Unit 2, surveillance program to determine the chemistry factor. The staff has concluded that an adjustment in the chemistry factor for the Zion welds of +13 degrees Fahrenheit to account for the 13 degrees Fahrenheit difference in irradiation temperature between the Point Beach, Unit 2, surveillance capsules and the Zion vessel, should have been factored into the calculations. This adjustment is reflected in the enclosed safety evaluation.

The amendments are satisfactory for implementation because this adjustment does not affect the pressure-temperature limit curves. However, depending on future surveillance capsule results, it is possible that it could become limiting. Therefore, in future calculations using surveillance data from Point Beach, Unit 2, an adjustment in the chemistry factor should be made to account for the difference in irradiation temperature.

In its letter dated December 17, 1996, the licensee agreed to this change in methodology.

If this causes a change in the limiting weld, Comed is requested to notify the staff.

NBC EE CENTER COPY

/

\\

240057 9612240304 961220 PDR ADOCK 05000295 P

PDR

4 1

Ms. Irene Johnson,

The Notice of Issuance will be included in the Commission's biweekly Federal Reaister notice.

Sincerely, 4

9 Clyd Y. S iraki, Senior Project Manager Project Directorate III-2 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation Docket Nos. 50-295, 50-304

Enclosures:

1.

Amendment No. 177 to DPR-39 2.

Amendment No. 164 to DPR-48 3.

Safety Evaluation cc w/encls:

see next page I

DISTRIBUTION:

Docket File PUBLIC PDIII-2 r/f J. Roe, JWR i

E. Adensam, EGA R. Capra C. Moore M. Mitchell C. Shiraki M. Dapas, RIII OGC, 015B18 G. Hill (4), T5C3 C. Grimes, 013H15 ACRS, T2E26 R. Jones, 08E23 K. Wichman, 07D4 J. Wermiel, 08H3 M. Shuaibi

  • see previous page-for' concurrence
    • Memo from SRXB dated 11/19/96; no major-changes DOCUMENT NAME: ZION \\Zl96228.AMD Ts receive e sepy of this document.pdoete h the box: *C" = Copy without onclosures *E" = Copy with enclosures "N" = No copy 0FFICE PM:PD3-2 l 4

'LAh@ -En S EMCB l HICB l SRXB l OGGJ4,

D:PD3-AL_

NAME CSHIRAKI rA QWDREA VW

  • KWICHMAN
  • JWERMIEL
    • RJONES #7d/Atf/

RCAP94 F &

DATE 12/I')/96

~

12/11 /96 11/26/96 11/26/96 11/19/96

~12/m /D6 12/g/96' 0FFICIAL RECORD COPY

I. Johnson Zion Nuclear Power Station Commonwealth Edison Company Unit Nos. I and 2 cc:

Michael I. Miller, Esquire Sidley and Austin One First National Plaza Chicago, Illinois 60603 Dr. Cecil Lue-Hing Director of Research and Development Metropolitan Sanitary District of Greater Chicago 1

100 East Erie Street Chicago, Illinois '60611 j

Phillip Steptoe, Esquire Sidley and Austin One First National Plaza Chicago, Illinois 60603 Mayor of Zion Zion, Illinois 60099 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 U.S. Nuclear Regulatory Commission Zion Resident Inspectors Office l

105 Shiloh Blvd.

Zion, Illinois 60099 Regional Administrator U.S. NRC, Region III 801 Warrenville Road Lisle, Illinois 60532-4351 Station Manager Zion Nuclear Power Station 101 Shiloh Blvd.

Zion, Illinois 60099-2797 1

Document Control Desk-Licensing Commonwealth Edison Company 1400 Opus Place, Suite 400 Downers Grove, Illinois 60515

_.