l.
. _ ,
./^
t.
.+
'
.
t
December 16,1998
Mr. John F. Franz, Jr.
Vice President, Nuclear
,
L
! Alliant Tower -
200 First Street SE
j
L
P. O; Box 351
!
' Cedar Rapids, lA 52406-0351
'
SUBJECT:
NRC DUANE ARNOLD ENERGY CENTER SECURITY INSPECTION
i
l'
REPORT 50-331/98018(DRS)
l
' Dear Mr. Franz:
!
r
4
L
On December 8,1998, the NRC completed a security inspection of your Duane Amold
j
Energy Center reactor facility. The onsite inspection effort was conducted between
,
November 16-20,-1998. The enclosed report presents the results of that inspection.
!
~ - No violations of NRC requirements were identified during this inspection. Your security .
' equipment testing and maintenance program was a performance strength. The dedication
l
of the maintenance technicians ensured that problems were corrected efficiently and
l
effectively. JThe cooperation between the security department and various other
L
maintenance departments resulted in' low equipment outage times and contributed to
L. .
improvements in delay barriers. The security force had an aggressive and effective
equipment testing program. We also observed that your security organization implemented
. their duties and responsibilities in an effective manner.
'
'
L
.Two' issues were . identified that will require further analysis by us. One issue relates to
,
'
.several occasions when the required number of armed response force members were not
{
g
immediately available, and the reporting requirements for such incidents. The other issue
l
' pertains to the unescorted access authorization for a contractor employee. Resolution of
,
these issues will be addressed by separate correspondence,
o
I
e
'
\\
L
\\
L
.!:
040138
9902050013L981216
!"
!
,!
ADOCK 05000331
u
.G
-
.
.-
.
.
.
_
_
_ _ _ . _
-
-
.
.. __.-
_ _ . _
.
s
'
.
i
.
J. Franz
-2-
]
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
the enclosure will be placed in the NRC Public Document Room (PDR).
Sincerely,
/s/ J. R. Creed
James R. Creed, Chief,
Plant Support Branch 1
Docket No.: 50-331
License No.: DPR-49
Enclosure:
Inspection Report 50-331/98018(DRS)
cc w/ encl:
E. Protsch, Executive Vice President
1
Energy Delivery Alliant;
]
President, IES Utilities, Inc.
G. Van Middlesworth, Plant Manager
K. Peveler, Manager, Regulatory Performance
j
Chairperson, Iowa Utilities Board
1
l
1
i
l
i
.
._
-
.-.
.
i
~ J. Franz -
-2-
i
l
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
'the enclosure will be placed in the NRC Public Document Room (PDR).
Sincerely,
l
James R. Creed, Chief,
i
Plant Support Branch 1
i
,
Docket No.: 50-331
l
License No.: DPR-49
Enclosure:
Inspection Report 50-331/98018(DRS)
cc w/ encl:
E. Protsch, Executive Vice President
Energy Delivery Alliant;
President, IES Utilities, Inc.
G. Van Middlesworth, Plant Manager
l
K. Peveler, Manager, Regulatory Performance
Chairperson, Iowa Utilities Board
Distribution:
RPC (E-Mail)
Project Mgr., NRR w/enci
J. Caldwell, Rlli w/enci
C. Pederson, Rlli w/enct
B. Clayton, Rlli w/enct
SRI Duane Arnold w/enct
DRP w/ encl
TSS w/enci
DRS (2) w/enci
Rlll PRR w/enct
PUBLIC IE-01 w/ enc!
Docket File w/enci
-GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
DOCUMENT NAME: G:DRS\\DUA98018.WPD
To r.
. c.p, , a. .,c
oi. in.c
in m. i=: e cm unwi en.cnm.nu.ncew. r cm m n on.nu.new.=
w No copy
OFFICE
Rlli
Rill
Rlli
l
NAME
Pirtle:jp
Lanksbury
Creed
DATE
02/ /99
02/ /99
02/ /99