i p Jonn peormg, Jr.
Vics President Peach Bottom Atomic Power Station g
I)
PECO NUCLEAR ecco ene como.nv 1848 Lay Road A Unit of PECO Energy Delta. PA 17314-9o32 717 456 dooo Fax 717 456 4243 E-mait jdoenng@peco-energycom December 16,1998 10CFR50.54(p)
Docket Nos.: 50-277 50-278 U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Mail Station P1-137 Washington, DC 20555
Subject:
Peach Bottom Atomic Power Station Unit 2 and Unit 3 Revisions to the Physical Security Plan, Plant Security Personnel Training and Qualification Plan and Safeguards Contingency Plan
Dear NRC Officials:
This letter submits, in accordance with 10CFR50,4(b)(4)(iii), four (4) controlled copies each, of the revised Peach Bottom Atomic Power Station (PBAPS) Physical Security Plan, Rev.12, Plant Security Personnel Training and Qualification Plan, Rev. 3, and the Safeguards Contingency Plan, Rev.10. The revisions are detailed for each Plan in their respective Sumrnary of Plan Revisions.
The Manager - Nuclear Security may be reached at 717-456-4915 to address all comments relative to the administrative processing of the security plan revisions.
These revisions are being submitted in accordance with 10CFR50.54(p)(2), and have been determined not to decrease the effectiveness of the PBAPS Physical Security Plan, Plant Security Personnel Training and Qualification Plan, or the Safeguards Contingency Plan.
In accordance with 10CFR73.21, we request that the enclosed revisions to the PBAPS Physical Security Plan, Plant Security Personnel Training and Qualification Plan and the Safeguards Contingency Plan, which contain Safeguards Information, be withheld from public disclosure and protected, as described in 10CFR73.21.
Sincerely,
/
Joh Doering, Jr.
Vice President Peach Bottom Atomic Power Station JD/kM/JA r
Enclosure (8) f E E3 9812300146 981216 PDR ADOCK 05000277 F
PDR I i
y l
cc:
H. J. Miller, Administrator, Region 1, USNRC (Enclosures - 2) i A. C. Mc Murtray, Senior Resident inspector, USNRC (Enclot ures - 1)
R. l. McLean, Departrnent of Natural Resources (w/o Enclosuces)
R. R. Janati, Director, Bureau of Radiation Protection (w/o Enclosures)
A. F. Kirby, Ill, General Manager, Demarva Power & Light Co. (w/o Enclosures)
N. J. Sproul, Public Service Electric & Gas (w/o Enclosures)
ENCLOSURES CONTAIN SAFEGUARDS INFORMATION, UPON SEPARATION, THIS LETTER IS DECONTROLLED CCN: 98-14093 l
L
)
i I
as
!A
Subject:
Peach Bottom Atomic Power Station Unit 2 and Unit 3 Revisions to the Physical Security Plan, l
Plant Security Personnel Training and Qualification Plan, and Safeguards Contingency Plan i
December 16,1998 bec:
J. A. Slaymaker Enclosure SC1-1 PBAPS H, F. McNally, Jr.
Enclosure TSC1-2 Limerick J. J. Hagan w/o Enclosures 62C-3 Chesterbrook M. E. Warner w/o Enclosures A4-1S PBAPS J. W. Durham w/o Enclosures S-26-1 2301 Market St.
T.A.Shea w/o Enclosures SMB 4-5 PBAPS G. D. Edwards w/o Enclosures 62A-1 Chesterbrook R. A. Kankus w/o Enclosures 61C-1 Chesterbrook J. F. Hufnagel w/o Enclosures 62A-1 Chesterbrook C. A. McNeill, Jr.
w/o Enclosures S26-1
'2301 Market St.
D. R. Meyers w/o Enclosures SMB 4-8 PBAPS G. R. Rainey w/o Enclosures 63C-3 Chesterbrook M. J. Taylor w/o Enclosures A4-5S PBAPS DAC w/o Endosures 618-5 Chesterbrook Correspondence Control Desk w/o Enclosures 61 B-5 Ct.csterbrook lh