Informs That 871209 Review of Remedial Action Insp Plan (Raip) for Riverton Umtra Project Complete.Review Limited to Portions of Raip Dealing W/Contaminated Matl to Be Removed from Site.Raip Considered Acceptable
ML20150F877
Person / Time
Issue date: 03/22/1988
From: Hawkins E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Arthur W
ENERGY, DEPT. OF
References
REF-WM-60 NUDOCS 8804060045
Download: ML20150F877 (1)


Text

i DISTRIBUTION Docket File WM-60

PDR/DCS' DBangart, RIV WM-60/DLJ/88/03/21/0 RGonzales MBrown, RCPD, NM LLO Branch,LLWM URF0 r/f MAR 221988 URFL
DLJ Docket No. WM-60 040WM060110E W. John Arthur, III, Project Manager Uranium Mill Tailings Project Office U.S. Department of Energy Albuquerque Operations Office P.O. Box 5400 Albuquerque, New Mexico 87115

Dear Mr. Arthur:

My staff has completed their review of the December 9, 1987, Remedial Action Inspection Plan (RAIP) for the Riverton VMTRA Project.

Their review was limited to the portions of the RAIP dealing with the contaminatcd material that will be removed from the site.

As the excavation of contaminated material will conform to the limits established by "Health Physics Personnel" (RAIP Section 4.2.2), the Riverton RAIP is acceptable.

Sincerely, r

/S; Edward F. Hawkins, Chief Licensing Branch 1 Uranium Recovery Field Office Region IV _

Case Closed:

040WM060110E 2

M L

cc:

D. Mann, DOE

}

a

~

5?

8804060045 880322 4

PDR WASTE WM-60 PDR

...l..

f....f..._U_R_F.

_____,_____[_,,,_______l_________,__[___________l___________

NAME

  • M.P.P Gl.s/_d_bj _ffHawkins f

c DATE$88/03/21 3kR$ $