ML20134E996

From kanterella
Revision as of 04:48, 12 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of 961106 Meeting W/Listed Attendees to Discuss Recent Industry Activities on Developing Procedures for Circumferential Crack Sizing IAW EPRI Guidelines & Other Related Issues
ML20134E996
Person / Time
Issue date: 10/31/1996
From: Sullivan E
NRC (Affiliation Not Assigned)
To: Wichman K
NRC (Affiliation Not Assigned)
References
NUDOCS 9611040211
Download: ML20134E996 (3)


Text

T Octcber 31, 1996 MEMORANDUM T0:

Keith Wichman, Acting Branch Chief Material and Chemical Engineering Branch Division of Engineering FROM:

Edmund J. Sullivan, Section Chief Material and Chemical Engineering Branch Division of Engineering

SUBJECT:

FORTHCOMING MEETING WITH NEI AND EPRI REGARDING l

QUALIFICATION OF CIRCUMFERENTIAL CRACK SIZING PROCEDURES DATE & TIME:

November 6, 1996 2 p.m. - 4:00 p.m.

LOCATION:

One White Flint North 11555 Rockville Pike, Room 6-R-13 Rockville, Maryland l

PURPOSE:

The purpose of the meeting is to discuss recent industry l

activities on developing procedures for circumferential l

crack sizing in accordance with EPRI guidelines and other related issues.

l PARTICIPANTS:

NRC EP_R1 NEl l

B. Sheron C. Welty C. Callaway l

J. Strosnider G. Henry l

K. Wichman E. Sullivan l

et. al.

r

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78.

1 CONTACT:

Edmund Sullivan, NRR l

301-415-3266 l

lorrrCE DE:EMCB 6

DE -)E BM E DI#

l NE

[$g))jyan K

{a i

lDATE

[Q /3p/96 Jh/h//96 C h M' Document Name:

G:\\SULLIVAN\\MTGll6.NEI 1

9611040211 961031 i

I PDR REVGP ERGNUMRC l

PDR

,i l.

ps afoo h

  • 4 UNITED STATES k

f j

NUCLEAR REGULATORY COMMISSION R

WASHINGTON, D.C. 20555-0001 o

%9....,&

October 31, 1996 MEMORANDUM T0:

Keith Wichman, Acting Branch Chief Material and Chemical Engineering Branch Division of Engineering i

h

@y Material and Chemical Engineering Branch FROM:

Edmund J. Sullivan, Section Chief

\\

D1 9t Division of Engineering

SUBJECT:

FORTHCOMING MEETING WITH NEI AND EPRI REGARDING QUALIFICATION OF CIRCUMFERENTIAL CRACK SIZING PROCEDURES DATE & TIME:

November 6, 1996 2 p.m. - 4:00 p.m.

LOCATION:

One White Flint North 11555 Rockville Pike, Room 6-B-13 Rockville, Maryland i

{

PURPOSE:

The purpose of the meeting is to discuss recent industry activities on developing procedures for circumferential crack sizing in accordance with EPRI guidelines and other l

related issues.

l PARTICIPANTS *:

NRC QR1 Nll B. Sheron C. Welty C. Callaway J. Strosnider G. Henry K. Wichman et al.

E. Sullivan et al.

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78.

CONTACT:

Edmund Sullivan, NRR 301-415-3266 l

l

k.

Meeting Notice 4

DISTRIBUTION:

i NPUBLIC; G. Lainas J. Strosnider M. Mayfield K. Wichman i

E. Murphy T. Reed E. Sullivan K. Karwoski 1

P. Rush J. Tsao G. Hornseth S. Coffin C. Beardslee J. Donoghue R. Jones S. Long J. Muscara R. Hermann 0GC Receptionist (0WFN)

N. Dudley, ACRS OPA NRR Mailroom, PMAS 12/G/18 P. O' Dell, PMAS E. Hackett, EDO l

i 4