Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2017005)
ML17242A224
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/28/2017
From: Kozal J W
NRC/RGN-IV/DRP
To: Emily Larson
Entergy Operations
JASON KOZAL
References
IR 2017005
Download: ML17242A224 (5)


Text

August 28. 2017 Mr. Eric Larson Site Vice President Entergy Operations, Inc. Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150

SUBJECT: UPDATED INSPECTON PLAN FOR GRAND GULF NUCLEAR STATION (REPORT 05000416/2017005)

Dear Mr. Larson:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Grand Gulf Nuclear Station. The U. S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. In addition, from July 1, 2016, to June 30, 2017, the NRC issued seven Severity Level IV traditional enforcement violations associated with impeding the regulatory process. Therefore, the NRC plans to conduct Inspection Procedure 92723, "Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period," to follow-up on these violations. This inspection will be scheduled after you notify the NRC of your readiness.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 817-200-1144 with any questions you have regarding this letter.

Sincerely,/RA/ Jason Kozal, Chief Division of Reactor Projects Docket No. 50-416 License No. NPF-29

Enclosure:

Grand Gulf Nuclear Station Inspection Plan

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: CHY/dll Yes No Publicly Available Sensitive NRC-002 OFFICE BC:DRP/C NAME JKozal SIGNATURE /RA/ DATE 8/28/17 Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteGrand GulfInspection / Activity Plan07/01/2017-06/30/2019Page 1 of 208/25/2017 08:22:09EXAM-INITIAL EXAM (2ND ONE)41 INITIAL EXAM GRAND GULF (12/2017)X0259810/30/201711/03/20171 INITIAL EXAM GRAND GULF (12/2017)X0259812/04/201712/08/201795001-95001 GRAND GULF SCRAMS PI71 IPSupplemental Inspection for One or Two White Inputs in a Strategic Performance Area9500108/21/201709/30/2017RS 5678-RS TEAM41 IPRadiation Monitoring Instrumentation71124.0507/10/201707/14/20171 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0607/10/201707/14/20171 IPRadiological Environmental Monitoring Program71124.0707/10/201707/14/20171 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0807/10/201707/14/2017BRQ-BRQ INSPECTION31 IPLicensed Operator Requalification Program7111111B07/31/201708/04/2017ISFSI-ISFSI LOADING INSPECTION11 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.108/21/201708/25/2017EB1-21M-GG DESIGN BASIS INSPECTION61 IPDesign Bases Assurance Inspection (Teams)7111121M09/11/201709/29/2017TSB 52B-BIENNIAL PI&R41 IPProblem Identification and Resolution71152B10/30/201711/03/20171 IPProblem Identification and Resolution71152B11/13/201711/17/201771111.08-INSERVICE INSPECTION R2111 IPInservice Inspection Activities - BWR7111108G04/23/201804/27/2018RS 12PI-RAD SAFETY21 IPRadiological Hazard Assessment and Exposure Controls71124.0104/23/201804/27/20181 IPOccupational ALARA Planning and Controls71124.0204/23/201804/27/20181 IPOccupational Exposure Control Effectiveness71151-OR0104/23/201804/27/20181 IPOccupational Exposure Control Effectiveness71151-OR0104/23/201804/27/2018EB1-17T-GG 50.59 CHANGES, TESTS, EXPERIMENTS31 IPEvaluations of Changes, Tests, and Experiments7111117T10/22/201810/26/2018EP-1-EP PROGRAM INSPECTION11 IPAlert and Notification System Testing711140211/05/201811/09/20181 IPEmergency Preparedness Organization Staffing and Augmentation System711140311/05/201811/09/20181 IPEmergency Action Level and Emergency Plan Changes711140411/05/201811/09/20181 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140511/05/201811/09/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteGrand GulfInspection / Activity Plan07/01/2017-06/30/2019Page 2 of 208/25/2017 08:22:09EP-1-EP PROGRAM INSPECTION11 IPDrill/Exercise Performance71151-EP0111/05/201811/09/20181 IPERO Readiness71151-EP0211/05/201811/09/20181 IPAlert & Notification System Reliability71151-EP0311/05/201811/09/2018RS 5678-RAD SAFETY41 IPRadiation Monitoring Instrumentation71124.0511/26/201811/30/20181 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0611/26/201811/30/20181 IPRadiological Environmental Monitoring Program71124.0711/26/201811/30/20181 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/26/201811/30/2018RS 24-RP INSPECTION21 IPOccupational ALARA Planning and Controls71124.0201/28/201902/01/20191 IPOccupational Dose Assessment71124.0401/28/201902/01/2019EP-2-EP EXERCISE INSPECTION41 IPExercise Evaluation711140103/11/201903/15/20191 IPEmergency Action Level and Emergency Plan Changes711140403/11/201903/15/20191 IPDrill/Exercise Performance71151-EP0103/11/201903/15/20191 IPERO Readiness71151-EP0203/11/201903/15/20191 IPAlert & Notification System Reliability71151-EP0303/11/201903/15/2019EB1-07T-GRAND GULF HEAT SINK INSPECTION21 IPHeat Sink Performance7111107T06/17/201906/21/2019This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.