Revised Monthly Operating Rept for Jul 1980
ML20003A367
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/22/1981
From: Sarsour B
TOLEDO EDISON CO.
To:
Shared Package
ML20003A329 List:
References
NUDOCS 8102030564
Download: ML20003A367 (1)


Text

-

i

'I Rev. 1 - 1/22/81 i

OPERATING DATA REPORT DOCKET NO. 50-346 DATE Annust 7. 1980 i

COMPLETED BY Bilal Sarsour TELEPHONE 259-5000 Ext.251 1

I OPERATING STATUS f

N'

1. Unit Name:

Davis-Besse Wir di Julv. 1980

2. Reporting Period:

2772

3. Licensed Thermal Power (MWt):

925

4. Nameplate Rating (Gross MWe):

906

5. Design Electrical Rating (Net MWe):

934

6. Maximum Dependable Capacity (Gross MWe):

890

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

t i'

9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions.If Any:

1 1

l This Month Yr.-to-Date Cumulative 744 5.111 79.616 II. Hours in Reporting Period

)

0 2.07R 11.na?

12. Number Of Hours Reactor Was Critical 0

0 2,875.8

1l
13. Reactor Reserve Shutdown Hours n

?,nna 7 11,RR1.0

14. Hours Generator On-Line 0

0 1.728

15. Unit Reserve Shutdown Hours 0

4.687.305 24.886.812

16. Gross Thermal Energy Generated (MWH) 0 1.583.559 R;107 07n i
17. Gross Electrical Energy Generated (MWH) 0 1.4R1_7R7 7.654.365

. i

18. Net Electrical Energy Generated (MWH) 9 10 1 A7 1
19. Unit Service Factor I

39.3 54.6

20. Unit ' Availability Factor
21. Unit Capacity Factor (Using MDC Net)
  • 17 6 35.9 l

15.3 d

12.0

22. Unit Capacity Factor (Using DER Net) 0 14.3 25.6
23. Unit ; orced Outage Rate

)

24. Shr.tdowns Scheduled Over Next 6 Monti.s (Type. Date.and Duration of Each):

i August 11, 1980

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units in Test States (Prior to Commercial Operation):

Forecast Achieved l

i INITIAL CRITICALITY INITIA L ELECTRICITY

. COMMERCIAL OPERATION l

-810 2 0 3 0 SW

,w e-

, - - +_-

ev /