Monthly Operating Rept for Sept 1992 for Re Ginna Nuclear Power Plant
ML17262B053
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/30/1992
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9210200504
Download: ML17262B053 (6)


Text

ycczI.FR<rFo pgvgauvrow ozMo pa.prox svsvzM

,g

"\\

/

ACCESSION NBR:9210200504 DOC.DATE:,92/09/30 NOTARIZED: NO DOCKET ¹ FACIL:50-;.244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTQ.NAME AUTHOR AFFILIATION DODGE,R.E.

Rochester Gas

& Electric Corp.

MECREDY,R.C.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

'UBJECT:

Monthly operating rept for Sept 1992 for RE Ginna Nuclear Power Plant.W/921015 ltr.

DISTRIBUTION CODE:

ZE24D COPIES RECEIVED:LTR

/

ENCLl SIZE:

TITLE: Monthly Operating Report (per Tech Spec

)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72);

05000244 S

RECIPIENT ID CODE/NAME PD1-3 LA JOHNSONiA INTERNAL: AEOD/DOA NRR DLPQ LPEB10 G FI 01 EXTERNAL: EG&G BRYCEiJ.H NSIC

~go p~>po pp (g p COPIES LTTR ENCL 3

3 1

1 1

1 1

1 1

1 1

1

~

1 1

RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGN1 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 14

y civvy uzztz

>'III(ij(jr'Zrieruu I re:ill ZixrZ 4

ROCHESTER GAS HgV I ~ t OAIIS j

$VAlE AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001 TELEPHONE AREA CODE 7IE 546-2700 GINNA STATION October 15, 1992 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for September, 1992 Operating Status Information R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of September, 1992.

Very truly yours, Robert C.

Mec edy RCM/

Attachments cc:.

Mr. Thomas T. Martin NRC (1) 2QO'8,08 9210200504

'720930 PDR ADOCK 05000244 R

PDR

c OPERATING DATA REPORT DOCKET NO.

DATE COMPLETED BY 50-244 Octo r 15 1992

%%RATING STATUS Robert E. Dodge TELEPHONE 315 524-4446 ext. 396 1.

2.

3.

4.

5 ~

6.

7.

8.

Notes:

The unit operated at approx.

97% reactor power level for the entire report period.

Unit Name:

R.E GINHA NUCLEAR P(NER PUUIT Reporting Period:

Se tember 1992 Licensed Thermal Power (Wt):

1520 Nameplate Rating (Gross MWe):

490 Design Electrical Rating (Het We):

470 MaxicLm Dependable Capacity (Gross MWe):

490 Maxiram Dependable Capacity (Het MWe):

470 If Changes Occur in Capacity Ratings (Items Humber 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level to Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

This Month Yr.-to-gate Cunuiative 11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

Hours In Report Period Nwher of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (HWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Het)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate 720 720 720 1 059 758 357 488 339 653 100%

100%

100.37%

100.37%

6 575 5 424.71 5 328.75 7 574 10S 2 560 097 2 429 704 81.05%

S1.05%

78.62%

78.62%

2.85%

200 681.45 158 755.67 1 687.55 156 034.13 8.5 220 788 621 72 889 704 69 182 251 77.91%

77.91%

74.69%

74.69%

5.95/

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuelin and Maintenance

- March 19 1993 45 da s 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

26.

Units In Test Status (Prior to Ccmnercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY CCMMERCIAL OPERATION

  • CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975
    • CUMULATIVE TOTAL COMMEHCIHG NOVEMBER 8, 1969

e t

t AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY 50-244 R.E.

Ginna Nuclear Power Plant Octobe 15 1992 Robert E.

Do ge MONTH TELEPHONE 1

315 524-4446 ext.

396 Se tember 1992 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~

472 17.

471 2.

472 18.

473 3

~

472 19.

473 5.

472 382 20.

21.

474 474 6.

7.

8.

9.

10.

474 474 478 475 475 473 22.

23.

24.

25.

26.

27.

474 475 475 475 477 480 12.

473 28.

477 13.

472 29.

478 14.

473 30.

478 15.

473 31 ~

16.

473 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

1)O(:Kl:1'O.

SO-244 UNITNAhtl'. R E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS

(:OhtP LI:.TI:D ItY ge REPORT MONTH ~~BR 1992 1.FI FpljONir 315 524 4446 ext 39 Ho.

Date o

o a

~

o A~

C4 C0 IA00 tL ca o-0 oco0 ohio tx.'IA C

0 Cl l.icensee Event Report 4

Ew 0

0 lO 0 IA Q c0 Ih 0C Q

D0 O

Cause 5 Corrective Action to Prevent Recurrence 92-07 09-05-92 S

0 Planned maintenance on transmission lines.

F: Forced St Scheduled REV. 4/8$

4949 Reason:

A-Etluipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E&perator Training & License Exatnination F-Administrative G-Operational Error (Explain)

Hither (Explain) 3 Method:

I-Manual 2-Manual Scram.

3-Automatic Scram.

4-Other (Explain)

Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-ol6I)

Exhibit I - Same Source

NARRATIVE

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE October 15 1992 COMPLETED BY Robert E.

Dodge TELEPHONE 1

315 524-4446 ext.

396 MONTH Se tember 1992 The unit operated at approximately 97% Reactor Power Level for the entire month of September, with the exception on September 5,

1992.

A power reduction to 61% was initiated to perform mainten-ance on transmission lines and returned to full power that same day.