ML19254F009
| ML19254F009 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 10/24/1979 |
| From: | Warembourg D PUBLIC SERVICE CO. OF COLORADO |
| To: | Kuzmycz G Office of Nuclear Reactor Regulation |
| References | |
| P-79246, NUDOCS 7911050341 | |
| Download: ML19254F009 (4) | |
Text
.
public service company of cene nese 16805 Weld County Road 19 1/2, Platteville, Colorado 80651 October 24, 1979 Fort S t.
Vrain Unit No. 1 P-79246 Mr. George Kuzmycz Project >bnager, Special Projects Division of Project Management U. S. Nuclear Regulatory Cormission Washington, D.C.
20555 Docket No. 50-267 S GJECT: Reques ts for Technical Specification Changes
Dear Mr. Kuzmycz:
Attached is the list of outstanding letters and requests for Techni-cal Specification changes. I realize that some items on this list will be included in Amendment 22, but they are included here for com-pleteness.
If I can be of further assistance please contact me.
Very truly yours,
&Lu Y Ms Don Warembourg
/
Manager, Nuclear Production DW/alk v
Tty 1269 340 W
79110 W
FORT ST. VRAIN; PUBLIC SERVICE COMPANY OF COLORADO PLATTEVILLE, COLORADO OUTSTANDING LETTERS / REQUESTS FOR TECHNICAL SPECIFICATION CHANGES AS OF 10-24-79 P
ITEM LETTER PRIORITY NO.
_ NUMBER S ECTION DESCRIPTION 3
24 P-76075 S R N R 1.1 Sampling of non-radioactive e f fluen ts. HOLD: This will be superceded by new Appendix B.
7 25 P-760 75 S R 5.4.1 Taole 5.4-1, Item 3C, Table 5.4-4, Item 1C.
3 73 P-7709 7 LCO NR 1.1 Nalco 7320, Solution 1 ppa (temporary change).
9 78 P-7715 3 LCO 4. 3.10 Added two new snubbers.
5 91 P-77188 LCO 4. 4.1 Change Table 4.4-3, Items 2a and 2b.
Added NOTE (u) and Basis Page 4. 4-12.
2 93 P-7722 8 LCO 4.4.1 Revise format of Table 4.4-1 to include absolute trip values and units.
2 94 P-7722 8 LCO 4.4.1 Table 4.4-1, Item 8, added ab-solute trip values.
2 95 P-7722 8 LCO 4.4.1 Addeo definition of absolute trip value to LCO, Page 4.4-1, 2
96 P-7722 8 LCO 4.4.1 Table 4.4-1, Item 4, add per-missable bypass conditions per NOTE (h).
2 97 P-7722 3 LCO 4.4.1 Revise NOTE (t) for Tables 4.4-1 through 4.4-4.
2 98 P-7722 8 AC 7.1.2 PORC, Item e.
3 100 P-77251 License Revise D(2) Pages 4 and 3.
3 101 P-77251 Appendix B Delete in entirety.
3 102 P-77251 SR 5.9.1 Delete in entirety.
3 103 P-77251 New Appendix B.
New Environmental Technical Spe-cifications.
1269 341
P ITEM LETTER P RIORITY NO.
NL'MB ER S ECTION.
DESCRIPTION 3
105 P-78008 LCO 4.8.1 Delete LCO, replace with ELCO 2.1.1.
3 106 P-78008 LCO 4. 8.2 Delete LCO, replace with ELCO 2.1.2.
3 107 P-78008 LCO 4.8.3 Delete LCO, replace with ELCO 2.1. 3.
3 108 P-78008 S R 5. 8.1 Delete SR, replace with ESR 2.1.1.
3 109 P-78008 SR 5.8.2 Delete SR, replace with ESR 2.1.2.
3 110 P-78008 LCO 4.6.1 Include UAT and time.
3 111 P-7 S008 AC 7.5.1 Revise Sections b and c.
3 112 P-7800 8 LCO 4.4.1 Re vis e NOTE (d), s ee I ten 14 3.
3 113 P-78008 LCO 4.3.10 Delete six MSS snubbers, add 16 VSS.
3 114 P-78008 License Add Ra 228, 266.
HOLD 115 P-780 58 LCO 4.4.1 Re vis e NOTE (n).
8 116 P-78062 LC0 4. 3.10 lbdify LCO and Basis.
9 117 P-78062 LCO 4. 3.10, Add two new snubbers.
Table 4. 3.10-1 133 P-79 001 LC0 4.2.18 De fine times to s tart depres-surization (Supercede Iten 120).
134 P-79015 AC 7.1 Reorganization - Titles.
135 P-79015 AC 7.2 Reorganization - Titles.
136 P-79015 AC 7.3 Reorganization - Titles.
141 P-79164 SL 3.1 Specify limits for power to flow ratios less than 2.5 or greater than 1. 7, stipulate applicability.
1269 342
- P ITEM LETTER P RIORITY NO.
N UMBER S ECTION DESC RIPTION 142 P-79056 LCO 4.6.l(d)
Diesel generator day tank in-ventory from 500 to 325 gal-lons.
143 P-79133 LCO 4.4.1 Revise Note (d) and Item 14 a)
S R 5.4.1 of Table 5.4-1, See Item 112.
144 P-79164 LCO 4.2.17 Bas is Change time f rom one week to 108 hours0.00125 days <br />0.03 hours <br />1.785714e-4 weeks <br />4.1094e-5 months <br />.
145_
P-79170 LCO 4.2.6/
Fire Suppression and Protection SR 5.2.10 to reflect Standard Technical Sp eci fications.
146 P-79170 New SR 5.2.24 Circulating Water Makeup Pump to reflect S tandard Technical Sp eci fications.
147 P-79170 S R 5.10. 3 Reflect S tandard Technical Spe-cifications.
148 P-79170 LCO 4.10.5/
Fire Suppression and Protection S R 5.10.6 to reflect Standard Technical Sp ecifications.
149 P-79170 LCO 4.10.6/
Fire Suppression and Protection SR 5.10. 7 to reflect Standard Technical Specifications.
150 P-79170 New LCO 4.10.7/
Fire Suppression and Protection New SR 5.10.8 to reflect Standard Technical Spe cifications.
151 P-79170 New LCO 4.10.8/
Fire Suppression and Protection New SR 5.10.9 to reflect S tandard Technical S p eci fications.
152 P-79218 Table 4.3.10-1 Update to reflect current desig-of LCO 4. 3.10 nation of all Class I snubbers.
1269 343
$