Robinson Inspection / Activity Plan 09/01/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 09/02/2008 16:50:55 Report 22 3
TI-171
- B.5.B PHASE 2&3 Generic Safety Inspectio Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 09/08/2008 09/12/2008 2
2515/171 IP 1
EB3ISI
- INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 10/06/2008 10/10/2008 2
7111108P IP 2
PSB1-RP
- RAD PROTECTION OCCUPATIONAL WK1 Baseline Inspections Access Control to Radiologically Significant Areas 10/13/2008 10/17/2008 2
7112101 IP Baseline Inspections ALARA Planning and Controls 10/13/2008 10/17/2008 2
7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 10/13/2008 10/17/2008 2
7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 10/13/2008 10/17/2008 2
71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 10/13/2008 10/17/2008 2
71151-PR01 IP 2
PSB1-RP
- RAD PROTECTION OCCUPATIONAL WK2 Baseline Inspections Access Control to Radiologically Significant Areas 10/20/2008 10/24/2008 2
7112101 IP Baseline Inspections ALARA Planning and Controls 10/20/2008 10/24/2008 2
7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 10/20/2008 10/24/2008 2
7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 10/20/2008 10/24/2008 2
71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 10/20/2008 10/24/2008 2
71151-PR01 IP 1
EB3TI172
- EB3 TI-172 RCS DM BUTT WELDS Generic Safety Inspectio Reactor Coolant System Dissimiliar Metal Butt Welds 11/17/2008 11/21/2008 2
2515/172 IP 1
PSB1-RP
- RAD PROTECTION PRE-INSPECTION VISIT Baseline Inspections Access Control to Radiologically Significant Areas 12/15/2008 12/17/2008 2
7112101 IP 4
PSB1-RP
- RADIATION PROTECTIO PUBLIC BASELINE INSP Baseline Inspections Access Control to Radiologically Significant Areas 01/12/2009 01/16/2009 2
7112101 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 01/12/2009 01/16/2009 2
7112103 IP Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 01/12/2009 01/16/2009 2
7112201 IP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 01/12/2009 01/16/2009 2
7112203 IP Baseline Inspections Occupational Exposure Control Effectiveness 01/12/2009 01/16/2009 2
71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 01/12/2009 01/16/2009 2
71151-PR01 IP 2
- REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 03/02/2009 03/06/2009 2
7111111B IP 3
PSB1EP
- EMERGENCY PREPAREDNESS EXERCISE Baseline Inspections Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 05/18/2009 05/22/2009 2
2515/175 IP EP Baseline Inspection Exercise Evaluation 05/18/2009 05/22/2009 2
7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 05/18/2009 05/22/2009 2
7111404 IP Baseline Inspections ERO Drill Participation 05/18/2009 05/22/2009 2
71151-EP02 IP Baseline Inspections Alert & Notification System 05/18/2009 05/22/2009 2
71151-EP03 IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Robinson Inspection / Activity Plan 09/01/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 09/02/2008 16:50:55 Report 22 3
PSB1EP
- EMERGENCY PREPAREDNESS EXERCISE Baseline Inspections Alert & Notification System 05/18/2009 05/22/2009 2
71151-EP03 IP 1
EB3-HS
- HEAT SINK Baseline Inspections Heat Sink Performance 06/01/2009 06/05/2009 2
7111107B IP 3
OL EXAM
- INITIAL EXAM PREP Not Applicable ROBINSON/JULY 2009 EXAM AT POWER FACILITIES 07/06/2009 07/10/2009 2
V23310 3
OL EXAM
- INITIAL EXAM - WEEK 1 Not Applicable ROBINSON/JULY 2009 EXAM AT POWER FACILITIES 07/27/2009 07/31/2009 2
V23310 2
OL EXAM
- INTIAL EXAM - WEEK2 Not Applicable ROBINSON/JULY 2009 EXAM AT POWER FACILITIES 08/10/2009 08/14/2009 2
V23310 4
EB1-MODS
- MODIFICATIONS-10CFR50.59 Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 09/28/2009 10/02/2009 2
7111117B IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.