ML113000224

From kanterella
Revision as of 22:52, 12 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requalification Program Inspection - Susquehanna Steam Electric Station, Units 1 and 2
ML113000224
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/27/2011
From: Diane Jackson
Operations Branch I
To: Rausch T
Susquehanna
Shared Package
ML110030678 List:
References
Download: ML113000224 (3)


Text

UNITED STATES NUCLEAR REGU LATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSlA. PA 19406-1415 0ctober 27, 20LL Mr. Timothy S. Rausch Senior Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard Benruick, PA 18603-0467

SUBJECT:

REQUALIFICATIONPROGRAMINSPECTION-SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2

Dear Mr. Rausch:

ln a telephone conversation on October 19,2011, Mr. John Caruso, Senior Operations Engineer, and Mr. Kelly Griffith, Licensed Operator Requalification Training Supervisor, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Susquehanna facility. The inspection is planned for the week of November 28,2011, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

ln accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. ln order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past tvro years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, v'nitten examinations and operating test scheduled for the week of the inspection to the NRC by November 14, 2011.

Mr. Griffith has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, appCIval number 3150-0018.

The public reporting burden for this collection of information is estimated to a\\erage four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52),

U.S. Nuclear Regulatory Commission, Washington, D.C. 20555{001, or by Intemet electronic

T. Rausch 2

mailto INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington D.C.20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid Office of Management and Budget (OMB) control number. ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at htto://www.nrc.qov/readinq-rmiadams.html (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. lf you have any questions regarding this inspection, please contact John Caruso at (610) 337-5389.

Wrk Operations Branch Division of Reactor Safety Docket Nos. 50-387 and 50-388 License Nos. NPF-14 and NPF-22 cc: Distribution via ListServ

T. Rausch 2

mailto INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of lnformation and Regulatory Affairs, NEOB-1 0202, (3150-0018), office of Management and Budget, Washington D.C.20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid Office of Management and Budget (OMB) control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://wraniv.nrc.sov/readinq-rm/adams.html (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. lf you have any questions regarding this inspection, please contact John Caruso at (610) 337-5389.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-387 and 50-388 License Nos. NPF-14 and NPF-22 cc: Distribution via ListServ SUNSI Review Gomplete: DEJ (Reviewer,s Initials)

ADAMS PKG: ML110030628 ADAMS AcC #MLt 1}OOO224 DOCUMENT NAME: G:\\DRS\\Operations Branch\\CARUSO\\Requal FY12-SUSQ Nov11\\60dayrpi.doc After declaring this document "An Official Agency Record" it will be released to the public.

To receive a copy of this document, indicate in the box: "G" = Copy without attachmenUenclosure "E" = Copy with attachmenVenclosure "N" = No copy OFFICE RI/DRS NAME CJBixler/JGC for" DATE 10t20t11 OFFICIAL RECORD COPY