Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
475 ALLENDALE ROAD
KING OF PRUSSIA, PENNSYLVANIA 19406-1415
March 3, 2010
Mr. John T. Carlin
Vice President R. E. Ginna Nuclear Power Plant
R. E. Ginna Nuclear Power Plant, LLC
1503 Lake Road
Ontario, NY 14519
SUBJECT: ANNUAL ASSESSMENT LEDER ~ R. E. GINNA NUCLEAR POWER PLANT
(REPORT 05000244/2010001)
Dear Mr. Carlin:
On February 12, 2010, the NRC staff completed its performance review of R. E. Ginna Nuclear
Power Plant (Ginna). Our technical staff reviewed performance indicators (Pis) for the most
recent quarter and inspection results for the period from January 1 through December 31, 2009.
The purpose of this letter is to inform you of our assessment of your safety performance during
this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A
separate letter designated and marked as "Official Use Only-Security Information" will include
the security cornerstone performance review and resultant inspection plan.
Overall, Ginna operated in a manner that preserved public health and safety and met all
cornerstone objectives with moderate degradation in safety performance. Plant performance for
the most recent quarter was within the Degraded Cornerstone column of the NRC's Action
Matrix. based on two findings having low to moderatei safety Significance (White) and one White
PI in the Mitigating Systems Cornerstone. The first White finding, originating in the first quarter
2009, was related to Ginna's inadequate implementation of a preventive maintenance (PM)
program for, and the subsequent failure of, the turbine-driven auxiliary feedwater (TDAFW)
pump governor. The second White finding. originating in the fourth quarter 2009, was related to
inadequate corrective actions which led to binding of the governor control valve and failure of
the same TDAFW pump. Additionally, the assigned White PI resulted from exceeding the White
significance threshold for the Mitigating Systems Performance Index (MSPI), Heat Removal
Systems PI, in the third quarter 2009, due to the reliability and unavailability issues associated
with the TDAFW pump.
In addition to reactor oversight process (ROP) baseline inspection at your facility, based on our
current assessment of performance for Ginna, we plan to conduct a supplemental inspection
using Inspection Procedure 95002, "Inspection for One Degraded Cornerstone or Any Three
White Inputs in a Strategic Performance Area." The NRC has previously conducted inspections
(Ml093160122, ML093160200 and ML091250233)1 to ensure that deficiencies associated with
the TDAFW pump have been corrected. However, this inspection will be conducted, when your
staff notifies us of your readiness, to provide assurance that the root and contributing causes for
the risk significant performance issues are understood, to independentty assess the extent of
I DeSignation in parenthesis refers to an ADAMS accession number. Documents referenced in this letter
are publicly available using the accession number in ADAMS
J. Carlin 2
condition and extent of cause, to Independently detennine if safety culture components
contributed to the performance issues, and to provide assurance that the corrective actions are
sufficient to prevent recurrence.
The enclosed inspection plan details the inspections, less those related to security, scheduled
through June 30, 2011. In addition to the previously noted 95002 supplemental inspection and
the baseline inspections, we plan on conducting independent spent fuel storage installation
(ISFSI) inspections. The inspection plan is provided to allow for the resolution of any scheduling
conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine
resident inspections are not listed due to their ongoing and continuous nature. The inspections
in the last nine months of the inspection plan are tentlative and may be revised at the mid-cycle
review.
In accordance with 10 CFR 2.390 of the NRC's ~Rules of Practice," a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's document
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to
discuss the change as soon as possible. Please contact Glenn Dentel of my staff at
610-337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
~~
Regional Administrator, Region I
Docket No. 50-244
License No. DPR-18
Enclosure: Ginna Inspection I Activity Plan
cc w/encl: Distribution via ListServ
J. Carlin 2
condition and extent of cause, to independently determine if safety culture components
contributed to the performance issues, and to provide assurance that the corrective actions are
sufficient to prevent recurrence.
The enclosed inspection plan details the inspections, less those related to security, scheduled
through June 30, 2011. In addition to the previously noted 95002 supplemental inspection and
the baseline inspections, we plan on conducting independent spent fuel storage installation
(ISFSI) inspections. The inspection plan is provided to allow for the resolution of any scheduling
conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine
resident inspections are not listed due to their ongoing and continuous nature. The inspections
in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle
review.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's document
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
rmfadams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to
discuss the change as soon as possible. Please contact Glenn Dentel of my staff at
610-337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
IRA!
Samuel J. Collins
Regional Administrator, Region I
Docket No. 50-244
License No. DPR-18
G. Dantel. DRP RQPreportsResource@nrc.gov
Distribution w/encl: (via E-mail) N.Peny,DRP ORS Branch Chiefs (6)
S. Collins, RA (R1AMAIL RESOllRCE) J. Hawkins, DRP L. Scholl, DRS
M. Dapas. IlRA(R1MA1LRt!SOURCEI S. Sloan, ORP D.Silk, DRS
D. Lew, ORP (R1IlR_RESOURCE) K. Kolaczyk, DRP. SRI J. Trapp, DRS
J. Clifford, DRP (R1DRPMAIL RESOllRCIE) L. Casey, DRP, RI D. Serenci, PAO
D. Roberts, DRS (R1DR~oII R"o_1 M. Rose, DRP. OA N. Sheehan, PAO
P. Wilson, DRS (R1PRS.....1R**.,.) RidsNrrPMREGinna Res()urce R. Barkley, ORA
L. Trocine, RI OEDO RldsNrrOorlLpl1-1 Resource
SUNSI Review Complete: _N:.:,:P"'--_ _ _ (Reviewer's Initials) ML100620833
DOCUMENT NAME: S:\ROP*10 EOC Revlew\Branch 1\Ginna AA Letter 2.doc
After declaring this document "An Official Agency Record" it will be released to the Public.
To receive a copy of this document, indicate In the box: "C*;:: Copy without attachment/enclosure "En", Copy with
attachment/enclosure uN" ... No copy
OFFICE RI/DRP I RIIDRP I RIIDRP I RI/ORA I I
NAME NPerry/NP GDentellGTD DLew/DCL SCollins/SJC
DATE 03/0112010 03/01/10 03/01/10 03/01/10
OFFICIAL RECORD COPY
Page 1 012 Ginna
0211912010 10:14:25 Inspection / Activity Plan
Report2Z
01/01/2010 - 0613012011
Planned Dates
Start End Titi"
71124 - RADIATION SAFETY 1
01/1112010 01/1512010 lP 71124.01 Radiological Hazard Assessment and Exposure Controls
1 01/1112010 01f15/2010 IP 71124.02 Occupational ALARA Planning and Controls
EP PROG - EP PROGRAM INSPECTION
1 0210812010 0211212010 IP 7111402 Radiological Environmental Monitoring Program
0210812010 0211212010 IP 7111403 Emergency Response Organization Augmentation Testing
0210812010 02/1212010 IP 7111404 Emergency Action Level and Emergency Plan Changes
02/08/2010 0211212010 lP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies
02108/2010 02112/2010 IP 71151-EP01 DrilllExercise Performance
1 02108/2010 0211212010 IP 71151-EP02 ERO Drill Participation
1 0210812010 0211212010 IP 71151-EP03 Alert & Notification System
6f21EXAM - OPERATOR LICENSING INITIAL EXAMS 5
05/2412010 0512812010 U01766 FY10 - GINNA INITIAL OPERATOR LICENSING EXAM
06121/2010 0710212010 U01766 FY10 - GINNA INITIAL OPERATOR LICENSING EXAM
71124.08 * RAD SOLID WASTE PROCESS AND RAD MATL HAN 1
0312212010 03/26/2010 lP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage. and Transportation
ISFSI - ISFSI DRY RUN AND INITIAL LOADING
05ii7i20iQ OS/2812010 IP 80854 Preoperational Testing Of An ISFSI
05/1712010 0512812010 IP 80855 Operation Of An ISFSI
71152B *PI&R 4
05124/2010 05/2812010 IP 711528 Identffication and Resolution of Problems
1 0610712010 06111/2010 IP 711528 Identification and Resolution of Problems
2515/173 -INDUSTRY GROUND WATER INITIATIVE
0612112010 06125/2010 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Inttlative
06121/2010 06125/2010 IP 71124.07 Public Radiation Safety
711111 B - REQUAL INSP WI P/F RESULTS 3
1110812010 11/12/2010 IP 71111118 Licensed Operator Requallficatlon Program
71124 - RAD SAFElY - RAe HAZZARD ASSESSIALARA
0912712010 1010112010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
0912712010 10/0112010 lP 71124.02 Occupational ALARA Planning and Controls
09/27/2010 10/0112010 IP 71151 Performance Indicator Verification
CDBI * COMPONENT DESIGN BASES INSPECTION 6
10/1812010 10/22/2010 IP 7111121 Component Design Bases Inspection
11/0112010 11/1212010 IP 7111121 Component Design Bases Inspection
his report does not inClude INPO andOlJTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 012 Ginna
02/1912010 10:14:25 Inspection / Activity Plan
Report 22
01/0112010 - 0613012011
Planned Dates
Start End Title
71124.05 - RAD INSTRUMENTATION
0110312011 01/0712011 IP 71124.05 Radiation Monitoring Instrumentation
71124.01 - RAe HAZZARD ASSESS, ALARA, AIR, DOSE 1
03128/2011 0410112011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
1 03/2812011 04/01/2011 IP 71124.02 Occupational ALARA Planning and Controls
1 03/2812011 04f01/2011 lP 71124.03 In*Plant Airborne Radioactivity Control and Mitigatlon
0312812011 0410112011 IP 71124.04 Occupational Oose Assessment
0312812011 0410112011 lP 71124.05 Radiation Monitoring InstrumentatiQn
TI-177 * MANAGING GAS ACCUMULATION IN ECCS 2
04/04/2011 0410812011 IP 2515/177 Managing Gas Accumulatlon In Emergency Core Cooling, Decay Heat Removal 8. Containment Spray System
7111108P *INSERVICE INSPECTION 1
05/0912011 05/2012011 IP 7111108P Inservice Inspection Activities - PWR
71124.01 - RAD HAZARD ASSESS, ALARA, AIR, DOSE 1
05/09/2011 05/2712011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
05/0912011 05127/2011 IP 71124.02 Occupational ALARA Planning and Controls
05/0912011 05/2712011 IP 71124.03 In-Plant Alrborne Radioactivity Control and MitigatJon
05/0912011 05127/2011 IP 71124.04 OccupatJonal Dose Assessment
05/09/2011 05i27i20ii iP 71124.05 Radiation ivionitoring Instrumentation
is report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.