IR 05000416/2017005

From kanterella
Revision as of 01:47, 17 May 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2017005)
ML17242A224
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/28/2017
From: Kozal J W
NRC/RGN-IV/DRP
To: Emily Larson
Entergy Operations
JASON KOZAL
References
IR 2017005
Download: ML17242A224 (5)


Text

August 28. 2017 Mr. Eric Larson Site Vice President Entergy Operations, Inc.

Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 SUBJECT: UPDATED INSPECTON PLAN FOR GRAND GULF NUCLEAR STATION (REPORT 05000416/2017005)

Dear Mr. Larson:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019 , for Grand Gulf Nuclear Station. The U. S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security

-related inspections, which will be sent via separate, non

-publicly available correspondence.

In addition, from July 1, 2016, to June 30, 2017, the NRC issued seven Severity Level IV traditional enforcement violations associated with impeding the regulatory process. Therefore, the NRC plans to conduct Inspection Procedure 92723, "Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12

-Month Period," to follow-up on these violations. This inspection will be scheduled after you notify the NRC of your readiness.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011

-4511 public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 817-200-1144 with any questions you have regarding this letter.

Sincerely,

/RA/ Jason Kozal, Chief Division of Reactor Projects Docket No. 50-416 License No

. NPF-29 Enclosure:

Grand Gulf Nuclear Station Inspection Plan

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: CHY/dll Yes No Publicly Available Sensitive NRC-002 OFFICE BC:DRP/C NAME JKozal SIGNATURE /RA/ DATE 8/28/17 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Grand GulfInspection / Activity Plan 07/01/2017

-06/30/2019 Page 1 of 2 08/25/2017 08:22:09EXAM-INITIAL EXAM (2ND ONE)

4 1 INITIAL EXAM GRAND GULF (12/2017)

X02598 10/30/201711/03/2017 1 INITIAL EXAM GRAND GULF (12/2017)

X02598 12/04/2017 12/08/2017 95001-95001 GRAND GULF SCRAMS PI 7 1 IP Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area 95001 08/21/2017 09/30/2017 RS 5678-RS TEAM 4 1 IP Radiation Monitoring Instrumentation71124.05 07/10/2017 07/14/2017 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 07/10/2017 07/14/2017 1 IP Radiological Environmental Monitoring Program71124.07 07/10/2017 07/14/2017 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 07/10/2017 07/14/2017 BRQ-BRQ INSPECTION 3 1 IP Licensed Operator Requalification Program7111111B 07/31/2017 08/04/2017 ISFSI-ISFSI LOADING INSPECTION 1 1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 08/21/2017 08/25/2017 EB1-21M-GG DESIGN BASIS INSPECTION 6 1 IP Design Bases Assurance Inspection (Teams)7111121M09/11/2017 09/29/2017TSB 52B-BIENNIAL PI&R 4 1 IP Problem Identification and Resolution71152B 10/30/201711/03/2017 1 IP Problem Identification and Resolution71152B11/13/201711/17/201771111.08-INSERVICE INSPECTION R21 1 1 IP Inservice Inspection Activities - BWR7111108G 04/23/2018 04/27/2018 RS 12PI-RAD SAFETY 2 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/23/2018 04/27/2018 1 IP Occupational ALARA Planning and Controls71124.02 04/23/2018 04/27/2018 1 IP Occupational Exposure Control Effectiveness71151-OR01 04/23/2018 04/27/2018 1 IP Occupational Exposure Control Effectiveness71151-OR01 04/23/2018 04/27/2018 EB1-17T-GG 50.59 CHANGES, TESTS, EXPERIMENTS 3 1 IP Evaluations of Changes, Tests, and Experiments7111117T 10/22/2018 10/26/2018 EP-1-EP PROGRAM INSPECTION 1 1 IP A lert and Notification System Testing711140211/05/201811/09/2018 1 IP Emergency Preparedness Organization Staffing and Augmentation System711140311/05/201811/09/2018 1 IP Emergency Action Level and Emergency Plan Changes711140411/05/201811/09/2018 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies711140511/05/201811/09/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Grand GulfInspection / Activity Plan 07/01/2017

-06/30/2019 Page 2 of 2 08/25/2017 08:22:09 EP-1-EP PROGRAM INSPECTION 1 1 IP Drill/Exercise Performance71151-EP0111/05/201811/09/2018 1 IP ERO Readiness71151-EP0211/05/201811/09/2018 1 IP A lert & Notification System Reliability71151-EP0311/05/201811/09/2018 RS 5678-RAD SAFETY 4 1 IP Radiation Monitoring Instrumentation71124.0511/26/201811/30/2018 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.0611/26/201811/30/2018 1 IP Radiological Environmental Monitoring Program71124.0711/26/201811/30/2018 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/26/201811/30/2018 RS 24-RP INSPECTION 2 1 IP Occupational ALARA Planning and Controls71124.02 01/28/2019 02/01/2019 1 IP Occupational Dose Assessment71124.04 01/28/2019 02/01/2019 EP-2-EP EXERCISE INSPECTION 4 1 IP Exercise Evaluation711140103/11/2019 03/15/2019 1 IP Emergency Action Level and Emergency Plan Changes711140403/11/2019 03/15/2019 1 IP Drill/Exercise Performance71151-EP0103/11/2019 03/15/2019 1 IP ERO Readiness71151-EP0203/11/2019 03/15/2019 1 IP A lert & Notification System Reliability71151-EP0303/11/2019 03/15/2019 EB1-07T-GRAND GULF HEAT SINK INSPECTION 2 1 IP Heat Sink Performance7111107T 06/17/2019 06/21/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.