Initial Exam 2008-301 Final Sim/In - Plant Job Performance Measure Worksheet
ML101970310
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 06/28/2010
From:
NRC/RGN-II
To:
Carolina Power & Light Co
References
50-261/08-301
Download: ML101970310 (137)


Text

Appendix C Appendix C Job Performance Measure Job Performance Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:

Facility: HB ROBINSON HB ROBINSON Task No.:

Task No.: 01001100302 01001100302 Task Title:

Task Title: Perform Rod Perform Rod Cluster Exercise lAW Cluster Exercise lAW JPM JPM No.:

No.: 2008 NRC 2008 NRC SIMSIM aa OST-Oll.

OST-011.

KIA

Reference:

K/A

Reference:

001 A2.11 001 A2.11 4.4/4.7 4.4/4.7 Examinee: NRC Examiner:

Facility Evaluator:

Facility Evaluator: Date:

Date:

Method of testing:

Simulated Performance: Performance:

Actual Performance: x Classroom - - - Simulator x

X Plant Plant READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: ** The plant is at 75% power.

OST-Ol 1, ROD CLUSTER CONTROL EXERCISE AND ROD

  • OST-011, POSITION INDICATION (Monthly) is being performed.
  • The prerequisites of Section 4 have been completed.

Task Standard: Reactor has been manually tripped in response to a dropped rod.

Required Materials: OST-Ol OST-011, 1, Rod Cluster Control Exercise and Rod Position Indication (Monthly)

General

References:

OST-Ol OST-011, 1, Rod Cluster Control Exercise and Rod Position Indication (Monthly)

Handouts:

Handouts: OST -0111,, Section 8.1 OST-Ol 8.1 Initiating Initiating Cue: You areare to perform OST-0111 commencing with Section 8.1 perform OST-Ol 8.1 for Shutdown Bank A Bank "An rods.

Time Critical Task:

Time Critical Task: NO NO Validation Validation Time:Time: 18 18 minutes minutes 2008 2008 NRC NRC SIM SIM aa NUREG 1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Job Performance Job Performance Measure Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet SIMULATOR SETUP SIMULATOR SETUP 1.

1. IC#6i8.

IC # 618.

2. SCN: 006_JPM_S8.

3.

3. When directed byby the Chief Chief Examiner, Examiner, insert insert IMF IMF CRF03A CRFO3A for Shutdown Bank Bank "A" A Rod Rod N-7 to drop into N-7 into the core during withdrawal.
4. OST-Oi 1 Prerequisites are signed off as complete.

OST-011 2008 NRC 2008 NRC SIM SIM aa NUREG 1021, NUREG 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 33 of Page of 11 11 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION (Denote Critical (Denote Critical Steps Steps with with an an asterisk) asterisk)

START TIME: _ __

STARTTIME:

Performance Step:

Performance Step: 11 Reviews procedure Reviews procedure and and any any required required information.

information.

Standard:

Standard: OST-Ol OST -011,1, Section Section 8.1 8.1 is required procedure is the required procedure to bebe performed.

performed.

Examiners Note:

Examiner's Candidate may wish to review review the prerequisites in Section Section 4.

Comment:

Performance Step: 2 Record the initial Group Step counter height for Shutdown Bank A. (Step 8.1.1)

"An.

Standard: Candidate observes the proper group step counters and records 225 steps for Groups A and B.

Examiners Note:

Examiner's Comment:

2008 2008 NRC NRC SIM SIM aa NUREG 1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 44 of Page 11 of 11 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 33 IfIf necessary necessary to verify performance to verify performance of of Shutdown Shutdown Bank Bank AA Demand Demand Position Indication Position Indication System System prior prior to to the the required required height height change change position of position of the test, THEN the test, THEN PERFORM PERFORM the the following:

following:

Position the Position the ROD ROD BANK BANK SELECTOR SELECTOR switch switch toto the the SBA SBA position position for Shutdown for Shutdown BankBank "A". (Step 8.1.2.1)

A. (Step 8.1.2.1)

Standard:

Standard: Candidate places Candidate places the the ROD ROD BANKBANK SELECTOR SELECTOR switch switch to to the the SBA SBA position.

position.

Examiners Note:

Examiner's Note:

Examiners Cue:

Examiner's Performance of Shutdown Bank A Demand Position Indication System is required.

Comment:

Performance Step: 4 IN-HOLD-OUT lever AND RTGB step counter Using the IN-HOLD-OUT indication, POSITION Shutdown Bank A "A" rods in TWO steps.

(Step 8.1.2.2)

Standard: Candidate uses the IN-HOLD-O IN-HOLD-OUT UT lever and inserts Shutdown Bank A"A" rods from 225 steps to 223 steps.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 2008 NRC NRC SIM SIM aa NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 55 of Page of 11 ii Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 55 Using the Using the IN-HOLD-OUT IN-HOLD-OUT lever,lever, RETURN RETURN rods rods to to the the initial initial height height as indicated on as indicated on the the operable operable step step counter(s) counter(s) for for Shutdown Shutdown Bank Bank A.(Step 8.1.2.3)

"A".(Step 8.1 .2.3)

Standard:

Standard: Candidate uses Candidate uses the IN-HOLD-OUT lever the IN-HOLD-OUT lever and and withdraws withdraws Shutdown Bank Shutdown Bank "A" A rods rods from from 223 steps to 223 steps 225 steps.

to 225 steps.

Examiners Note:

Examiner's Note:

Comment:

Performance Step: 6 Check that Shutdown Bank "A" A individual RPI indications on ERFIS have returned to their pre-test positions. (Step 8.1.2.4) 8.1 .2.4)

Standard: Candidate checks that Shutdown Bank "A" A RPI indications on ERFIS have returned to their pre-test positions.

Examiners Examiner's Note:

Comment:

2008 NRC SIM 2008 NRC SIM aa NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 66 of Page of 11 11 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 77 Record Initial Record Initial Rod Rod Heights Heights fromfrom the RTGB (Steps),

the RTGB (Steps), Initial Initial Rod Rod Heights from Heights from ERFIS (Inches). (Step ERFIS (Inches). (Step 8.1.3) 8.i .3)

Standard:

Standard: Candidate records Candidate records initial initial rod rod heights heights from from the the RTGB RTGB andand ERFIS.

ERFIS.

Examiners Note:

Examiner's Comment:

    • Performance Step: 8 Determine the required change in rod height based on current 8.i .4) plant conditions. (Step 8.1.4)

Standard: Plant is in Mode 11.. Rod height change is 19 steps.

22519=206 225 - 19 = 206 steps.

Examiners Note:

Examiner's Comment:

  • Performance Step: 9 Verify the ROD BANK SELECTOR switch in the SBA position for Shutdown Bank A. "A". (Step 8.1 .5) 8.1.5)

Standard: Candidate re-positions switch to the SBA position.

Examiners Examiner's Note:

Note:

Comment:

2008 NRC SIM 2008 NRC SIM aa NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Page 77 of Page ii of 11 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 10 10 Using the IN-HOLD-OUT Using the IN-HOLD-OUT lever lever and RTGB Step and RTGB Step Counter Counter indication, position indication, position Shutdown Shutdown Bank Bank "A" A rods rods to the required to the required number of number of steps steps as dictated by as dictated plant conditions.

by plant conditions. (Step (Step 8.1.6) 8.1 .6)

Standard:

Standard: Candidate positions Candidate positions the the IN-HOLD-OUT IN-HOLD-OUT lever lever to to IN IN position position and and inserts Shutdown inserts Shutdown BankBank "A" 19 steps to 206 A 19 206 steps.

steps.

Examiners Note:

Examiner's APP-005-F3, APP-005-06 APP-005-F3, APP-005-D6 and and APP-003-F4 will be received received during the rod during insertion.

rod insertion.

Comment:

Performance Step: 11 Record tested Rod Heights from the RTGB (Steps) and tested Rod Heights from ERFIS (Inches). (Step 8.1.7)

Standard: Candidate records Shutdown Bank "A" A Rod Heights from RTGB (Steps) and Rod Heights from ERFIS (Inches).

Examiners Note:

Examiner's Comment:

2008 NRC 2008 NRC SIM SIM aa NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 88 of Page of 11 11 Form ES-C-1 Form ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 12 12 Using the Using the IN-HOLD-OUT IN-HOLD-OUT lever, lever, return return rods rods toto the the Initial Initial Height Height (Steps) as (Steps) indicated by as indicated by the step step counters.

counters. (Step (Step 8.1.8) 8.1 .8)

Standard: positions the IN-HOLD-OUT Candidate positions IN-HOLD-OUT lever to the OUT position and begins and begins withdrawing Shutdown Shutdown BankBank "A" A rods.

rods.

Examiners Note:

Examiner's Withdrawal shall NOT be be the continuous 19 steps per Precaution 5.5.5.

Precaution Booth Operator: Insert malfunction IMF CRF03ACRFO3A to cause Rod N-7 to drop into the core AFTER the candidate starts the second withdrawal of the rods.

Comment:

    • Performance Step: 13 Candidate diagnoses a dropped rod in Shutdown Bank "A". A.

Standard: Candidate determines a dropped rod has occurred in Shutdown A by the following indications:

Bank "A"

  • Rod Bottom Light for Rod N-7
  • Prompt drop in reactor power
  • APP-005-A3; PR DROPPED DROPPED ROD
  • APP-005-C3; PR CHANNEL DEV
  • APP-005-F2; ROD BOTTOMBOTTOM ROD DROP Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 2008 NRC SIM aa NRC SIM NUREG 1021, NUREG 1021, Revision Revision 9,9, Supplement Supplement i1

Appendix C Appendix C Page 99 of Page 11 of 11 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance 14 Step: 14 Stop withdrawal Stop withdrawal ofof Shutdown Shutdown Bank Bank "An A rods.

rods.

Standard:

Standard: Candidate releases Candidate releases IN-HOLD-OUT IN-HOLD-OUT lever lever to to the the HOLD HOLD position.

position.

Examiners Note:

Examiner's Note:

Comment:

    • Performance Step: 15 Informs CRSS of need to trip reactor and initiates a manual reactor trip. (Based on Caution at the beginning of Section 8.1 and Precaution 5.5.4).

Standard: Informs CRSS and depresses either reactor trip pushbutton.

Candidate verifies that reactor is tripped by Reactor Trip and Bypass breaker indication, Rod Bottom Lights, RPI indication, and Nuclear Flux decreasing.

Examiners Note:

Examiner's Comment:

ENDOFTAS END OF TASK K Termination: Reactor has been manually tripped due to aa dropped rod while in Individual Bank select mode.

STOP STOP TIME:

2008 NRC 2008 NRC SIM SIM aa NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix C Appendix C Page 10 Page of 11 10 of 11 Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job Performance Job Performance Measure Measure No.:

No.: 2008 NRC 2008 NRC SIM SIM aa Examinees Name:

Examinee's Name:

Date Performed:

Date Performed:

Facility Evaluator:

Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature:

Examiner's Date:


2008 2008 NRC NRC SIM SIM aa NUREG 1021, Revision NUREG 1021, 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 11 Page 11 of of 11 11 Form Form ES-C-1 ES-C-i JPM CUE JPM SHEET CUE SHEET INITIAL CONDITIONS:

INITIAL CONDITIONS: The plant

    • The plant isis at at 75%

75% power.

power.

    • OST-011, OST-Ol 1, RODROD CLUSTER CLUSTER CONTROL CONTROL EXERCISE EXERCISE AND AND ROD ROD POSITION INDICATION POSITION INDICATION (Monthly)

(Monthly) is is being performed.

being performed.

    • The The prerequisites prerequisites of of Section Section 44 have have been been completed.

completed.

INITIATING CUE:

INITIATING You are to perform perform OST-011 OST-Ol 1 commencing commencing with Section Section 8.1 for Bank "A" Shutdown Bank rods.

A rods.

2008 NRC SIM 2008 NRC SIM aa NUREG 1021, Revision NUREG 1021, 9, Supplement Revision 9, Supplement 11

Appendix C Appendix C Job Job Performance Performance Measure Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:

Facility: HB ROBINSON HB ROBINSON Task No.:

Task No.: 01006100101 01006100101 Task Title:

Task Title: Fill aa Safety Fill Safety Injection Injection Accumulator Accumulator lAW lAW JPM No.:

JPM No.: 2008 NRC 2008 NRC SIMSIM bb OP-202.

OP-202.

K/A

Reference:

KIA

Reference:

006 A4.01 006 A4.0l 4.1/3.9 4.1/3.9 006 A4.02 006 A4.02 4.0/3.8 4.0/3.8 006 A Al1.07

.07 3.3/3.6 Al.13 3.5/3.7 006 A1.13 Examinee: NRC Examiner:

Facility Evaluator: Date:

Date:

Method of testing:

Simulated Performance: Actual Performance: xX Classroom

- - - Simulator X

_.:....:X_ Plant READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • The plant is operating at 100% RTP.
  • SI ACCUM C HilLa HI/LO LVL (APP-002-E4) alarm has been received and actions have been reviewed by the RO.

8.2.1 .1 Initial Conditions have been completed.

  • Refueling Water Purification is NOT in progress.
  • You are the Licensed Dedicated Operator referred to in OP-202.
  • Safety Injection Pump "A" A has been walked down and pre-start checks are complete.

Task Standard: SI Accumulator C "C" filled to reset the lowlow level alarm without exceeding specified limits.

Required Materials: OP-202, OP-202, Revision 75, 75, Section 8.2.18.2.1 General General

References:

References:

OP-202, Revision OP-202, Revision 75, Section 8.2.1 75, Section 8.2.1 2008 NRC 2008 NRC SIM SIM bb NUREG 1021, NUREG 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Job Performance Job Performance Measure Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Handouts:

Handouts: OP-202, Revision OP-202, Revision 75, 75, Section Section 8.2.1 8.2.1 Initiating Cue:

Initiating Cue: The CRSS The CRSS briefs briefs and has directed and has directed you you to to fill fill SI SI Accumulator Accumulator "C" C to to reset reset the low the low level level alarm alarm lAW lAW OP-202, OP-202, Section Section 8.2.1.

8.2.1.

Time Critical Time Critical Task:

Task: NO NO Validation Time:

Validation Time: 12 minutes 12 minutes SIMULATOR SETUP SIMULATOR

1. IC-611.
2. NO SCN Required.
3. lC-61 1 not available, reset simulator to IC-13 If IC-611 IC-i 3 and drain SI Accumulator "C" C to -61 6i %.
4. Ensure that Refueling Water Purification is NOT in progress.
5. Mark up OP-202, Section 8.2.1 with Initial Conditions Steps 8.2.1.1.a 8.2.1 .1 .a through 8.2.1.1.f.2 8.2.1 .1 .f.2 completed.
6. FREEZE the simulator until directed by the Chief Examiner to RUN.

2008 NRC 2008 NRC SIMb SIM b NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 33 of Page of 11 ii Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION (Denote Critical (Denote Critical Steps with an Steps with an asterisk) asterisk)

START TIME: _ __

STARTTIME:

Examiners Note:

Examiner's Note: The candidate The candidate may may use ERFIS to use ERFIS to monitor monitor SI Accumulator "c" SI Accumulator C level. (ERFIS:QP level. (ERFIS:QP ACCUM ACCUM C) C)

Performance Step:

Performance Step: 11 Check open Check open SI-856A, SI-856A, SI SI PUMP PUMP RECIRC RECIRC andand SI-8568, SI-856B, SISI PUMP PUMP RECI RC.

RECIRC.

Standard: Sl-856A and 8B checked OPEN.

Valves SI-856A Comment:

    • Performance Step: 2 Performance Verify the Control Power Defeat Switch for SI-869 is in the NORMAL position.

Standard: Locating NORMAL I/ DEFEAT key switch for SI-869 Sl-869 and placing the switch in the NORMAL position.

Examiners Examiner's Note: ** Key switch is located in the rear of the RTGB on the ECCS "ECCS VALVES CONTROL POWER DEFEAT PANEL." PANEL.

  • When the key switch is selected to NORMAL, amber light above the key switch will ILLUMINAT ILLUMINATE. E.

Comment:

Comment:

2008 2008 NRC NRC SIMb SIM b NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 44 of Page of 11 ii Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 33 IfIf an an SI actuation isis received SI actuation received during filling, then during filling, then immediately immediately close the close the applicable applicable SI SI Accumulator makeup makeup valve valve and and perform perform Step 8.2.1.2.m Step 8.2.1 .2.m to restore restore the SI SI System System lineup.

lineup.

Standard:

Standard: Candidate acknowledges Candidate acknowledges continuous continuous action action step step in in the the event event of of an SI actuation.

Examiners Note:

Examiner's Note:

Comment:

    • Performance Step: 4 Sl-869, SI HOT LEG HDR.

Open SI-869, Standard: Valve SI-869 opened.

Examiners Note:

Examiner's Comment:

2008 NRC 2008 NRC SIMb SIM b NUREG 1021, Revision NUREG iO2i, Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Page 55 of Page of 11 11 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 55 Start SI Start Pump "A".

SI Pump A.

Standard: Pump "A" SI Pump A started.

started.

Examiners Note:

Examiner's Neither SI has been run in the last 15 15 days.

When an SI Pump Pump isis started, APP-002-C3, BIT HDR HI PRESS will be received due to the cold leg leg header header being pressurized by the SI Pump. This is an expected alarm and the BOP should be directed to review the APP.

Listed below are APP-002-C3 actions:

  • Compare the indications on PI-943 P1-943 and PI-934 P1-934 to determine validity.
  • If the header high pressure is due to SI System testing, then do NOT perform actions to clear the high pressure until testing is complete or the operating SI Pump discharge valve is closed.

Comment:

Performance Step: 6 At least 11 SI Pump Area Cooling unit is operating (HVH-6A or 68 6B or both).

Standard: HVH-6A and/or 6B 68 verified operating.

Examiners Examiner's Note:

Note:

Comment:

2008 NRC 2008 SIM bb NRC SIM NUREG 1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 66 of Page of 11 11 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION NOTE: The NOTE: The following following are pressure and are pressure and level level Note prior prior to Step limits/alarms for limits/alarms for the the SI Accumulators:

SI Accumulators:

Note Step 8.2.1.2.h 8.2.1.2.h ** High Pressure High Pressure Alarm 646 646 psig psig

    • Normal Operating Pressure Normal Pressure psig 630 psig
    • High Level High Level Alarm Alarm 75 percent 75 percent
    • Low Level Alarm 67 percent
    • Performance Step: 7 SI-851 C, MAKEUP.
a. Open SI-851C,
b. Monitor the level and pressure of SI Accumulator "C". C.
c. When desired level is obtained, then close SI-851 C.

SI-851C.

Standard: Sl-851C opened.

a. Valve SI-851C
b. Maintained> 614 psig and < < 646 psig pressure limits as P1-929/931 and>

indicated on PI-929/931 and > 67% and < <75%

75% level limits as indicated on U-928/930.

Ll-9281930.

Sl-851 C closed.

c. Valve SI-851 Examiners Note:

Examiner's ITS limits for SI Accumulators:

Pressure of 600 - 660 psig.

Level of 61.580.4%.

61.5 - 80.4%.

Comment:

2008 NRC 2008 NRC SIM SIM bb NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 77 of Page 11 of 11 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 88 the operating Stop the Stop operating SI SI Pump Pump Standard:

Standard: Operating SI Operating SI Pump Pump stopped.

stopped.

Examiners Note:

Examiner's Note:

Comment:

Performance Step: 9 Verify both SI Pump Area Cooling units (HVH-6A and 68) 6B) are OFF Standard: Verifies HVH-6A and 686B are OFF.

Examiners Note:

Examiner's Comment:

2008 NRC 2008 NRC SIM SIM bb NUREG 1021, Revision NUREG 1021, 9, Supplement Revision 9, Supplement 11

Appendix C Appendix C Page 88 of Page of 11 11 Form ES-C-1 Form ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 10 10 Close SI-869, Close SI-869, 81 SI HOT LEG HDR HOT LEG HDR Standard:

Standard: Valve SI-869 Valve SI-869 closed closed and and independently independently verified verified closed.

closed.

Examiners Note:

Examiner's When an independent verification of Valve SI-869 Sl-869 is candidate that the valve has been requested, inform the candidate independently verified closed.

independently Comment:

    • Performance Step: 11 Place the Control Power Defeat switch for SI-869 S1-869 in the DEFEAT position.

Standard: Valve SI-869 control power switch has been positioned to DEFEAT.

Examiners Cue:

Examiner's When an independent verification of SI-869 Control Power switch is requested, inform the candidate that the switch has been independently verified in the DEFEAT position.

Examiners Examiner's Note: When switch is positioned to DEFEAT position, amber light above the switch will extinguish.

Comment:

2008 2008 NRC NRC SIM SIM bb NUREG 1021, NUREG 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Page 99 of Page of 11 11 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 12 12 IF the IF the Refueling Refueling Water Water Purification Purification Pump Pump was was stopped stopped inin Step Step 8.2.1.1 .f, THEN B.2.1.1.f, perform the THEN perform the following:

following:

    • Open SFPC-B05B, Open SFPC-805B, RWST RWST RETURN.

RETURN.

    • Start the Start the Refueling Refueling Water Water Purification Purification Pump.

Pump.

Standard: Candidate determines that the RWST purification purification was NOT in places Nt progress from the initial conditions and places As in these steps.

N/As Examiners Note:

Examiner's Comment:

END OF OFTASK TASK Terminating Cue: SI Accumulator C "C" has been filled to clear the low low level alarm.

STOP STOP TIME:

TIME:

2008 200B NRC NRC SlMb SIM b NUREG 1021, NUREG 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Page 10 Page of 11 10 of 11 Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION COMPLETION OF COMPLETION Job Performance Job Performance Measure Measure No.:

No.: 2008 NRC 2008 NRC SIM SIM bb Examinees Name:

Examinee's Name:

Date Performed:

Date Performed:

Facility Evaluator:

Facility Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Examiner's Signature: Date:


2008 NRC 2008 NRC SIM SIM bb NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 11 Page 1 1 of 11 of 11 Form Form ES-C-1 ES-C-i JPM CUE JPM CUE SHEET SHEET INITIAL CONDITIONS:

INITIAL CONDITIONS: The plant

    • The plant isis operating operating atat 100%

100% RTP.RTP.

    • SI SI ACCUM ACCUM C HI/LO LVL C HIILO LVL (APP-002-E4)

(APP-002-E4) alarm has been alarm has been received received and and actions have actions have been been reviewed reviewed by by the the RO.

RO.

    • OP-202, OP-202, Section Section 8.2.1.1 8.2.1 .1 Initial Initial Conditions Conditions have have been been completed.

completed.

    • Refueling Refueling Water Purification Purification is is NOT NOT inin progress.

progress.

    • You are the Licensed Dedicated Dedicated Operator referred to in OP-202.
    • Safety Safety Injection Injection Pump Pump "A" has been A has been walked down down and and pre-start pre-start checks are complete.

INITIATING CUE: The CRSS briefs and has directed you to fill SI Accumulator "C" C to reset the low level alarm lAW OP-202, Section 8.2.1.

2008 2008 NRC NRC SIMb SIM b NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C C Job Performance Measure Form ES-C-i ES-C-1 Worksheet Facility: HB ROBINSON Task No.: 01000109605 Task Title: Isolate Ruptured S/G lAW PATH-2. JPM No.: 2008 NRC SIM c K/A

Reference:

KIA 038 EK3.02 4.4/4.5 038 EA2.09 3.2/3.3 038 EA1.i1 EA 1.11 3.8/3.9 038 EA1.16 EA 1.16 4.4/4.3 038 EA1.18 4.0/3.9 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom - - - Simulator --X - Plant READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: ** The plant was operating at 100% RTP.

  • S/G "A"A has been identified as ruptured.
  • Grid location 8-6B-6 (Maintain at least ONE S/G available for RCS Cooldown) of PATH-2 has just been reached.
  • Supplement G actions have NOT been completed.

Task Standard: S/G "A"A is isolated per PATH-2 and Supplement N.

Required Materials: PATH-2, Revision 17 and Supplement N, Revision 35.

General

References:

PATH-2, Revision 17 and Supplement N, Revision 35.

Handouts: None Initiating Cue: The CRSS directs you to completely isolate S/G "A" A starting at PATH-2 grid location 8-6B-6 (Ruptured S/G identified) in preparation for a rapid cooldown.

2008 NRC SIM c NUREG 1021, Revision 9, Supplement 11

Appendix C Appendix C Job Performance Job Performance Measure Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Time Critical Time Critical Task:

Task: NO NO Validation Time: minutes 20 minutes SIMULATOR SETUP

1. IC-614.
1.10-614.
2. SCN 006_JPM_S4.

lC-61 4 is not available, reset simulator to IC-13

3. If IC-614 IC-i 3 and perform the following:

Vi-3A to the OPEN position - IMF MSS03A

a. Override MSIV V1-3A MSSO3A f:FAIL_ TO_CLOSE.

f:FAIL_TO_CLOSE.

b. Override MSIV V1-3A Vi -3A OPEN /I CLOSED indication AS IS - lOR IOR doMSSDDOO49B f:OFF and lOR doMSSDD00498 IOR doMSSDD0049C doMSSDDOO49C f:ON.
c. Insert 300 GPM tube rupture on S/G - SGNO2A.

SIG A - MFI SGN02A.

d. Carry out actions of PATH-1 PATH-i and PATH-2 until Step 8-6 B-6 is reached then FREEZE.
4. Ensure PATH-2 is marked up to Step B-6. 8-6. Have a copy of SUPPLEMENT N N available for the operator to use and mark up.

2008 NRC 2008 NRC SIM SIM cc NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 33 of Page of 15 15 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION (Denote Critical (Denote Critical Steps Steps with with an an asterisk) asterisk)

START TIME: _ __

STARTTIME:

Performance Step:

Performance Step: 11 Maintain at Maintain least one at least one S/G SIG available available for for RCS RCS cooldown.

cooldown.

Standard:

Standard: Operator identifies Operator identifies S/Gs and "c" B and S/Gs "B" are available C are available for for RCS RCS cooldown.

cooldown.

Examiners Note:

Examiner's Note:

Comment:

    • Performance Step: 2 Performance Verify ruptured Steam Line PORV setpoint at 1035 psig using status board.

Standard: Operator adjusts potentiometer potentiometer to 3.36, steam line PORV setpoint at 1035 psig, by comparing Status Board setpoint for A PORV with potentiometer S/G "A" potentiometer setting for RV1-1.

RV1 -1.

Examiners Note:

Examiner's Comment:

2008 2008 NRC NRC SIM SIM cc NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 44 of Page of 15 15 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 33 Verify RCS Verify temp less RCS temp less than than 547 547 of

°F prior prior to to MSIV MSIV closure.

closure.

Standard:

Standard: Operator dumps Operator dumps steam steam to to lower lower RCS RCS temperature temperature below below 547547 of

°F using Steam using Steam Line Line PORVs PORVs or or Condenser Condenser Steam Steam Dumps.

Dumps.

    • Condenser Steam Condenser Steam Dumps:

Dumps:

    • PC-464B to MANUAL Take PC-464B MANUAL and adjust valvevalve position position using UP using UP oror DOWN DOWN pushbuttons.

pushbuttons.

    • PC-464B in PC-464B in Automatic, Automatic, adjust adjust potentiometer potentiometer toto aa lower lower setting to reduce RCS temperature.

Examiners Note:

Examiner's Comment:

Performance Step: 4 Close ruptured S/G MSIV AND MSIV bypass.

Standard: After RCS temperature less than 547 °F, of, Operator attempts to close MSIV.

MSIV.

Examiners Examiner's Note:

Note: MSIV will NOT MSIV NOT close.

close.

Comment:

Comment:

2008 2008 NRC NRC SIMSIM cc NUREG 1021, NUREG 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 55 of Page of 15 15 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 55 Ruptured S/G Ruptured SIG MSIV MSIV AND AND MSIV MSIV Bypass Bypass Closed.

Closed.

Standard:

Standard: Operator responds Operator responds NO, NO, MSIV MSIV A A will will not not close.

close. Will Will transition transition to to Supplement N Supplement to complete N to complete the the isolation.

isolation.

Examiners Note:

Examiner's Note: The Operator will go to Supplement N N to address the method of isolating the ruptured S/G.

alternate method SIG.

Comment:

Supplement N Actions Performance Step: 6 Verify BOTH Turbine Stop Valves CLOSED. (Step 1)

Standard: Operator verifies BOTH Turbine Stop Valves indicate CLOSED on the RTGB.

Examiners Note:

Examiner's Turbine Stop and Bypass Valves were closed when the plant tripped.

Comment:

2008 2008 NRC NRC SIMc SIM c NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix C Appendix C Page 66 of Page 15 of 15 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step: 7 Performance ALL Condenser Verify ALL Condenser Steam Steam Dump Dump Valves CLOSED CLOSED (Step(Step 2) 2)

Standard:

Standard: Operator closes Operator closes the the condenser condenser dump isolation valves, dump isolation valves, and and indicate CLOSED verifies that ALL valves indicate CLOSED (GREEN).

(GREEN).

    • NE COND DUMP NE DUMP 1324A-1 1324A-1
    • NW COND DUMP NW COND DUMP 1324B-1 1324B-1
  • SE COND DUMP 1324A-2
    • W COND DUMPDUMP 1324B-3 1324B-3
  • SW COND DUMP 1324B-2 Examiners Note:

Examiner's Condenser steam dump valves can be closed by placing PC- PC 464B in MAN and closing ALL valves OR place the Steam 4648 Dump Control to OFF.

Comment:

Performance Step: B8 Verify ALL MSR Purge Valves CLOSED (Step 3)

Standard: Operator verifies valves MS-V1 i A, MS-Vi MS-V1-6-1 1 B, MS-V1 MS-V1-6-1 MS-V1-6-2A 2A and MS-V1 2B are closed at the RTGB by observing green MS-V1-6-2B lights illuminated illuminated the MSR Purge isolation valves.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 NRC 2008 SIM cc NRC SIM NUREG 1021, NUREG 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 77 of Page 15 of 15 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 99 Verify ALL Verify ALL MSR MSR Shutoff Valves CLOSED Shutoff Valves CLOSED (Step(Step 4) 4)

Standard:

Standard: Operator verifies Operator verifies MS-V1-5-1 MS-Vi i A,A, 11 B, 2A, && 2B B, 2A, 2B valves valves are are closed closed at at the RTGB by the RTGB by observing observing green green lights lights illuminated illuminated the the MSR MSR Shutoff Shutoff isolation valves.

isolation valves.

Examiners Note:

Examiner's Note:

Comment:

  • Performance Step: 10 Performance Go To Step 6 to address the S/G SIG "A"A MSIV NOT closing. (Step 5)

Verify the S/G "B"B & "C" C MSIVs CLOSED. (Step 6)

Standard: Operator closes MSIVs V1-3B Vi -3B and Vi -3C for S/Gs V1-3C B & "C".

S!Gs "B" C.

Examiners Examiner's Note:

Comment:

2008 NRC 2008 NRC SIM SIM cc NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix C Appendix C Page of 15 Page 88 of 15 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 11 11 Verify steam supply Verify steam supply valve valve to to SDAFW SDAFW pump pump from from S/G SIG "A" A

CLOSED. (Step CLOSED. (Step 7) 7)

Standard:

Standard: Operator CLOSES Operator Vi -8A, Steam CLOSES V1-8A, Steam Shutoff Shutoff and and Goes Goes to to Step Step 14.

14.

Examiners Cue:

Examiner's Examiners Note:

Examiner's Note:

Comment:

    • Performance Step: 12 Dispatch an Operator to perform the following: (Step 14) a) Check BOTH the Turbine Stop Valve Bypass valves MS- MS 297 & 298 CLOSED.

b) Close Gland Seal Steam Supply Inlet Valve, GS-31.GS-3i.

c) Close ALL Condenser Steam Dump Trap Isolation valves

  • MS-128, PRV-1324A-2, Trap T-67 Inlet PRV-i 324A-1, Trap T-66 Inlet MS-i 33, PRV-1324A-1,
  • MS-133, PRV-i324B-2, Trap T-69 Inlet MS-i 39, PRV-1324B-2,
  • MS-139,
  • MS-145, PRV-1324B-i, Trap T-68 Inlet MS-i45, PRV-1324B-1,
  • MS-148, PRV-i324B-3, PRV-1324B-3, Trap T-70 Inlet Standard: Operator directs AO to close and / or verify the valves closed.

Examiners Examiner's Note:

Examiners Examiner's Cue:

Cue: When directed by by operator, operator, acknowledge request.

request. Report that all valves are closed.

Comment:

2008 2008 NRC NRC SIM SIM cc NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 99 of Page of 15 15 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Performance Step:

Step: 13 13 Check ALL Check actions of ALL actions of Supplement Supplement NN complete.

complete. (Step (Step 15) 15)

Standard:

Standard: Operator informs Operator informs CRSS CRSS that that ALL ALL actions actions of of Supplement Supplement N N are are complete.

complete.

Examiner's Examiners Note:

Note: This completes This completes the actions of the actions of Supplement Supplement N, the Operator N, the Operator should now should now resume resume PATH-2 PATH-2 atat Step Step 8-8.

B-8.

Comment:

Performance Step: 14 Use intact Steam Line PORVs for steam dump.

Standard: Operator uses intact steam line PORVs for steam dump (S/G (SIG '8' B

C only).

and 'C' Examiners Note:

Examiner's Comment:

Performance Step:

Performance Step: 15 15 Ruptured S/G isolated isolated from at least one intact SIG.

S/G.

Standard:

Standard: Operator Operator answers YES,YES, Ruptured Ruptured SIG S/G is is isolated isolated from atat least least one S/G.

S/G.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 2008 NRC NRC SIMSIM cc NUREG 1021, Revision NUREG 1021, Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Page 10 Page 10 of of 15 15 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 16 16 WHEN ruptured WHEN ruptured S/G press decreases S/G press decreases below below 1035 1035 psig psig THEN THEN verify ruptured steam verify ruptured steam line line PORV PORV closed.

closed.

Standard:

Standard: Operator verifies Operator verifies PORV PORV RV1-1RV1 -i closed closed when when S/G S!G 'A' A pressure pressure less than 1035 less than 1035 psig.

psig.

Examiners Note:

Examiner's Comment:

Comment:

Performance Step: 1717 IF MDAFW pump is not available, THEN maintain at least one SIG supply to SDAFW pump.

S/G Standard: Operator verifies both MDAFW pumps available.

Examiners Note:

Examiner's Comment:

Performance Step: 1818 Close ruptured SIGS/G steam shutoff to SDAFW pump.

Standard: Operator verifies MS-V1 MS-V1-8A -8A closed.

Examiner's Note:

Examiners Comment:

2008 NRC 2008 NRC SIM SIM cc NUREG 1021, NUREG 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 11 Page of 15 1 1 of 15 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Performance Step:

Step: 19 19 Verify S/G Verify blowdown isolation S/G blowdown isolation and sample valves and sample valves closed.

closed.

Standard:

Standard: Operator verifies Operator verifies S/G SIG 'A' blowdown isolation A blowdown isolation and and sample sample valves valves closed (FCV-1930 closed (FCV-1930 A&B, A&B, FCV-1933 FCV-1933 A&B)

A&B) byby Phase Phase A panel A panel status light illuminated status light illuminated on on RTGB.

RTGB.

Examiners Note:

Examiner's Phase A panel status light Phase light illuminates illuminates when all of the blowdown and blowdown and sample isolation valves for S/G sample isolation SIG A are are closed.

closed.

Candidate may use SPDS function for Containment to verify SIG Blowdown and Sample valves are closed.

that all S/G Comment:

    • Performance Step: 20 Locally close warmup steam supply from ruptured S/G SDAFW pump.

SIG to Standard: Operator dispatches an AO to locally close warmup steam supply from S/G A 'A' to SDAFW pump.

Booth Operator Note: When directed by operator, acknowledge request. Close valve MS-20 by selecting Remote Function MSS047 (IRF MSSO47 MSS047 1:0).

f:O). Report back that valve is closed.

Comment:

2008 NRC 2008 NRC SIM SIM cc NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 12 Page 12 ofof 15 15 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 21 21 Locally close Locally close MSIV above and MSIV above and below below seatseat drains drains fromfrom ruptured ruptured SIG.

S/G.

Standard:

Standard: These are These locked valves are locked valves thatthat are are part part ofof the the CV CV Integrity Integrity boundary in boundary in the the steam lines and steam lines and do do not not require require local local action action to to verify the verify valves are the valves are shut.

shut. These These valves valves are normally locked are normally locked closed and closed and aa dedicated dedicated operator operator is provided to is provided to close close them them in in the the event that event that an an accident accident takes takes place.

place. ItIt is is expected expected that that ifif aa valve valve has been has opened the CRSS been opened CRSS would be be aware of of it.

it. The Operator Operator may dispatch may dispatch an an AO AO toto close close MSIV MSIV MS-V1-3A MS-V1 -3A aboveabove and and belowbelow seat drains seat drains from from S/G SIG 'A'.

A.

Booth Operator Note: If directed by operator, acknowledge request. Report back valves closed.

Comment:

Performance Step: 22 Isolate feed flow to any ruptured S/G SIG that is faulted unless needed for RCS cooldown.

Standard: Operator determines that the S/G 'A' A is not faulted.

Examiners Note:

Examiner's Comment:

  • Performance Performance Step: 23 When ruptured S/G S/G level greater than 8% [18%] then isolate feed flow.

Standard:

Standard: Operator checks level Operator level greater greater than 8% 8% andand isolates isolates feed flow to to SIG S/G A by closing

'A' by closing V2-14A V2-14A and and V2-16A.

V2-16A.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 NRC 2008 SIM cc NRC SIM NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 13 Page 13 of of 15 15 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance 24 Step: 24 Open breakers Open breakers for for any any V1-8, Vi -8, V2-14, V2-1 4, and and V2-16 V2-1 6 valve valve closed closed to to isolate ruptured isolate ruptured S/G.

S/G.

Standard:

Standard: Operator contacts Operator contacts AO AO toto open open breakers breakers for for V1-8A, Vi -8A, V2-14A V2-1 4A and and V2-1 6A.

V2-16A.

Booth Operator Booth Operator Note:

Note: IRF EPSMCC5_189 IRF EPSMCC5_189 f:RACK_OUT f:RACK_OUT IRF EPSMCC10_262 IRF EPSMCC1O_262 f:RACK_OUT f:RACK_OUT IRF EPSMCC10_264 IRF EPSMCC1O264 f:RACK_OUT f:RACK_OUT IRF EPSMCC9_255 IRF EPSMCC9_255 f:RACK_OUT f:RACK_OUT Valve V2-16A Note: Valve V2-i 6A has has 22 power power supplies, Normal and Emergency.

Emergency.

Comment:

Terminating Cue: Ruptured SIG has been isolated lAW Supplement N.

STOP STOP TIME:

2008 NRC 2008 NRC SIM SIM cc NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Page 14 of Page 14 of 15 15 Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job Performance Job Performance Measure Measure No.:

No.: 2008 NRC 2008 NRC SIM SIM cc Examinees Name:

Examinee's Name:

Date Performed:

Date Performed:

Facility Evaluator:

Number of Attempts:

Number Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Examiner's Signature: Date:


2008 NRC 2008 NRC SIM SIM cc NUREG 1021, Revision NUREG 1021, 9, Supplement Revision 9, Supplement 11

Appendix C Appendix C Page 15 Page of 15 15 of 15 Form Form ES-C-1 ES-C-i JPM CUE JPM SHEET CUE SHEET INITIAL CONDITIONS:

INITIAL CONDITIONS: ** The plant was The plant was operating operating atat 100%

100% RTP.

RTP.

Injection.

    • S/G A has S/G "A" has been been identified identified as as ruptured.

ruptured.

  • Grid location 8-6 B-6 (Maintain at least least ONE S/G available for RCS Cooldown) of PATH-2 has just been reached.
    • Supplement Supplement G actions have G actions have NOT NOT been been completed.

completed.

INITIATING CUE: The CRSS directs you to completely isolate S/G "A" A starting at B-6 (Maintain at least ONE S/G available for RCS grid location 8-6 Cooldown) of PATH-2 in preparation for a rapid cooldown.

2008 2008 NRC NRC SIM SIM cc NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11

YES ANY S/G WITH UNCONTROLLED LEVEL INCREASE NO ANY S/G VERIFY RUPTURED STEAM YES SAMPLE WITH AT HIGH ACTIVITY NO NO R-31A, B, AND C RAD LEVELS NORMAL YES NO R-19A, B, C ~

NO RUPTURED S/G R-15 RAD MSIV ~ MSIV LEVELS NORMAL BYPASS CLOSED YES YES PERFORM SUPPLEMENT SEARCH FOR AND N FOR RUP.TURED S/G ATTEMPT TO IDENTIFY X4 WHEN RUPTURED S/G oN RUPTURED S/G PRESS DECREASES BELOW I 1035 PSIG WE!+/- THEN VERIFY I RUPTURED STEAM LINE PORV FLOSED

. LOSED USE INTACT STEAM LINE PORVs FOR STEAM DUMP 41E MDAJW F UMP IS NON 1

AVAJLABLE, ThEN MAJNTAJN AT LEAST ONE S/G

\PPLY TO ?DAFW PUM)

RUPTURED S/G ISOLATED FROM AT LEA,s-;.3I-O-si.... CLOSE RUPTURED ONE INTACT S/G S/C S/G STEAM SHUTOFF SDAFW PUMP TO SDAF'I'

/RIFY S/C BLOWDOWN ISOLATION SAMPLE VALVES CLOSED (LOCALLY LOCALL Y CLOSECLOSE WAN WARMUP I STEAM STEAM SUPPLY SUPPLY FROM FROM RUPTURED S/C S/G TO SDAFW TO SDAFW PUMP PUMP LOCALLY LOCALL Y CLOSE CLOSE MSIV MSIV ABOVE AND BELOW BELOW SEAT ORAJNS DRAINS RUP1URED S/C FROM RUPTURED S/G 4iSOLATE ISOLATE FEED FLOW FLOW TO ANY ANY RUPTURED RUPTURED S/C S/G THAT THAT I IS IS FAULTED FAULTED UNLESS UNLESS NEEDED NEEDED FOR FOR RCSRCS COO COO DOWN DOWN fLbEN RUP URED S/\

LEVEL GREATER THAN 8Z 118X], INEbI ISOLATE FEED FLOW

~ OPEN OPEN BREAKERS BREAKERS FOR FOR ANY ANY V1-8,V1-B, V2-4 V2-14 AN2 ~

I V2-16 V2-16 VALVEVALVE CLOSED CLOSED TO TO

\.ISOIATE ISOLATE RUPTURED RUPTURED S/C S/G I

Rev.

Rev. 35 35 EPP-Supplements EPP-Supplements SUPPLEMENTS SUPPLEMENTS Page 72 72 of 89 89

-L1-t INSTRUCTIONS j

CONTINUOUS USE

[ RESPONSE NOT OBTAINED Supplement N N Isolation of a Ruptured SIG S!G From Intact SIGs S/Gs (Page 11 of 5) erify BOTH Turbine Stop Valves

~f--- - CLOSED

-

NOTE Local operation of the Steam Dump valves below is via reverse acting handwheels.

erify ALL Condenser Steam Dump

)_-Valve S - CLOSED Yf6

-

(1324A-1)

(1324B-1)

    • SE COND DUMP (l324A - 2)

(1324A-2)

. COND DUMP (l324B- 3)

(1324B-3)

SW COND DUMP (l324B-2)

(1324B-2)

Verify ALL MSR PURGE Valves - -

CLOSED y'f~

-

    • MS-Vl-6-1A MS-V1-6-1A
    • MS-Vl-6-1B MS-V1-6-1B
    • MS-Vl-6-2A MS-V1-6-2A
    • MS-Vl-6-2B MS-V1-6-2B

Rev. 35 35 EPP-Supplements EPP-Supplements SUPPLEMENTS SUPPLEMENTS 73 of Page 73 of 89 89

-j-c INSTRUCTIONS INSTRUCTIONS I I CONTINUOUS USE RESPONSE NOT OBTAINED Supplement NN Isolation of a Ruptured Ruotured S/G S/C From Intact S/Gs S/Os

~

(Page 22 of 5)

. . MSR SIUTOFF Valves -

Verify ALL MSR,~UTOFF -

CLOSED CLOSED 1~3

  • MS-V1-5-1A MS-Vl-5-1A
  • MS-V1-5-1B MS-Vl-5-1B
  • MS-V1-5-2A MS-Vl-5-2A
  • MS-V1-5-2B MS-Vl-5-2B NOTE This procedure is designed to handle ONLY one stuck open MSIV.

/

Go Go To Appropriate Step From Following Table:

Z/ -

STUCK MSIV c..Yl-3A p

L

!/sTEP

-TEP 6~

-/

Vl-3B V1-3B 99 Vl- 3C V1-3C 12 12

~rifY I

~~OSED Verify The BB && CC S/C S/G MSIVs - -

Ye~

CLOSED

~ -

.

  • erify Steam erify SDAFW Pump SDAFW Pump From Supply Valve Steam Supply From S/C Vl-8A, STEAM V1-8A, Valve To S/G A-STEAM SHUTOFF SHUTOFF To "A"- CLOSED CLOSED

)v't?~

To Step To Step 14 14

Rev. 35 EPP-Supplements SUPPLEMENTS Page 74 of 89

] STEP_H INSTRUCTIONS CONTINUOUS USE I RESPONSE NOT OBTAINED Supplement N Isolation of a Ruptured S/G From Intact S/Gs (Page 33 of 5)

9. Verify The AA &

& C C S/G MSIVs --

CLOSED

10. Verify Steam Supply Valve To SDAFW Pump From S/G "B"-

B- CLOSED

  • Vl-8B, V1-8B, STEAM SHUTOFF
11. Go To Step 14
12. Verify The AA &

& B S!G MSIVs -

B S/G -

CLOSED

13. Verify Steam Supply Valve To SDAFW Pump From 5/0 C- CLOSED S/G "C"-
  • Vl-8C, STEAM SHUTOFF

Rev. 35 EPP-Supplements SUPPLEMENTS Page 75 of 89

] STEP INSTRUCTIONS CONTINUOUS USE I RESPONSE NOT OBTAINED Supplement N N Isolation of a Ruptured SIG S/G From Intact SIGs S/Gs

~ (Page 4 of 5)

~!~~~~~hT~: ~~~~~~~~gT~ocal ispatch An Operator To Perform The Following Local Actions:

4~eck

/heck BOTH the TURBINE STOP

~ALVE VALVE BYPASS Valves - CLOSED -

a. Perform the following:
1) Verify ALL Governor valves
    • MS-297 are closed.
    • MS-298 MS-298 2) Contact Plant Operations Staff to intiate action to fail the valves closed.

~ose Gland

~~lve, Valve, Seal Steam Supply lose Gland Seal Steam Supply GS-31, STEAM SUPPLY GS-31, STEAM SUPPLY I ET

~::*

~~~p lose ALL Condenser Steam Dump Trap Isolation Valves

    • 115-128, PRV-1324A-2 TRAP MS-128, T-67 INLET
    • MS-133, PRV-1324A-1 TRAP T-66 INLET
    • MS -139, PRV-1324B-2 TRAP 115-139, T-69 INLET
    • MS-145, PRV-1324B-1 TRAP T-68 INLET
  • MS-148, PRV-1324B-3 TRAP T-70 INLET ieck ALL Actions Supplement N N -- WHEN ALL actions have been COMPLETE THEN notify the CRSS completed, THEN that Supplement NN is complete.

IF an action can NOT be completed, THEN notify the CRSS completed, status.

of its status.

Rev. 35 EPP-Supplements SUPPLEMENTS Page 76 of 89

STEP H INSTRUCTIONS CONTINUOUS USE I RESPONSE NOT OBTAINED I

Supplement NN Isolation of a Ruptured S/G S/C From Intact S/Gs S/Cs (Page 55 of 5) tify The CRSS That Supplement

)tify Is Complete

- END -

- -

Appendix C Appendix C Job Performance Job Perlormance MeasureMeasure Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:

Facility: HB ROBINSON HB ROBINSON Task No.:

Task No.: 01026100101 01026100101 Task Title:

Task Title: Manually Initiate Manually Initiate Containment Containment Spray Spray JPM No.:

JPM No.: 2008 NRC 2008 NRC SIM SIM dd lAW PATH-1.

lAW PATH-i.

Reference:

K/A

Reference:

KIA 026 A3.01 026 A3.01 4.3/4.5 4.3/4.5 026 A4.01 026 A4.01 4.5/4.3 4.5/4.3 Examinee:

Examinee: NRC Examiner:

NRC Examiner:

Facility Evaluator:

Facility Evaluator: Date:

Date:

Method of Method of testing:

testing:

Simulated Performance: Actual Performance: xX Classroom ---

Simulator X

_.:....:X_ Plant READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Initial Conditions: ** You are the RO.

  • PATH-1 PATH-i has been implemented and is complete through grid location B-6, Restart

'Restart Battery Chargers within 30 minutes of power loss using OP-60i.

OP-601'.

  • Foldout A "A" is in effect.

Task Standard: Containment Spray is manually aligned lAW PATH-i. PATH-1.

Required Materials:

Materials: PATH-i, PATH-1, REACTOR REACTOR TRIP TRIP AND AND SAFETY SAFETY INJECTION, INJECTION, Rev.Rev. 1818 General General

References:

References:

PATH-i, PATH-1, REACTOR REACTOR TRIP TRIP AND AND SAFETY SAFETY INJECTION, INJECTION, Rev.Rev. 1818 Handouts:

Handouts: PATH-i, PATH-1, REACTOR REACTOR TRIP TRIP AND AND SAFETY SAFETY INJECTION, INJECTION, Rev.Rev. 1818 Initiating Initiating Cue:

Cue: The The CRSS CRSS has has directed directed you you to to continue continue PATH-i PATH-1 execution.

execution.

Time Time Critical Critical Task:

Task: NO NO Validation Validation Time: Time: 10 10 minutes minutes 2008 2008 NRC NRC SIM SIM dd NUREG 1021, NUREG 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Job Performance Measure Job Performance Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet SIMULATOR SETUP SIMULATOR SETUP 1.

1. IC-615.

IC-61S.

2.

2. SCN: 006_JPM_SS.

SCN: 006_JPM_S5.

2008 NRC SIM 2008 NRC SIM dd NUREG 1021, NUREG 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 33 of Page of 88 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION (Denote Critical (Denote Critical Steps Steps with with an an asterisk) asterisk)

    • Performance Step:

Performance Step: 11 CV pressure CV pressure remained remained below below 10 10 psig.

psig.

Standard:

Standard: Candidate checks Candidate checks CV CV pressure and determines determines itit has has NOT NOT remained below 1010 psig.

Examiners Note:

Examiner's Note:

Comment:

    • Performance Step: 2 Verify CV Spray initiated.

Standard: Identifies CV Spray has NOT been initiated.

Examiners Note:

Examiner's NO CV Spray pumps are running, SI-880Al8/C/D SI-880A/B/C/D are closed.

The candidate may depress the CV Spray pushbuttons, push buttons, but they will be unsuccessful. The candidate may also return to Foldout A to stop RCPs due to low subcooling.

"A" Comment:

2008 NRC 2008 NRC SIM SIM dd NUREG 1021, Revision NUREG 1021, 9, Supplement Revision 9, Supplement 11

Appendix C Appendix C Page 44 of Page of 88 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 33 Verify all Verify CV Spray all CV Spray pumps pumps running running with with valves valves properly properly aligned.

aligned.

Standard: Candidate attempts to start CV Spray Candidate Pumps "A" Spray Pumps A and and "B",

B, and open SI-845 and SI-880 valves. Candidate Candidate should recognize recognize and report that report that CV CV Spray Spray Pump Pump "A" A will will NOT NOT start.

start.

Examiners Note:

Examiner's Acknowledge candidates report. Starting CV Spray Pump B and aligning "8" "8" B train valves satisfies the requirement oftheJPM.

of the JPM.

Supplement 8 B valves and required positions for CV Spray B:

Train 8:

- Sl-844B, PUMP 8B INLET - OPEN SI-8448,

- SI-845B, SAT DISCH - OPEN SI-8458,

- Sl-845C, SAT THROTTLING - THROTTLED TO -12 SI-845C, -

GPM

- Sl-880C, PUMP 8B DISCH - OPEN SI-880C,

- SI-880D, Sl-880D, PUMP 8 B DISCH - OPEN

Note: Opening either SI-880C or SI-880D SI-8800 will provide CV Spray flow path to the CV.

Comment:

Performance Step: 4 Verify approximately 1212 GPM spray additive tank flow.

Standard:

Standard: Candidate observes Fl-949 FI-949 indicates - 20 GPM and manually

adjusts Sl-845C SI-845C until flow is 12-12 GPM.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 NRC 2008 NRC SIM SIM dd NUREG NUREG 1021,1021, Revision Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Page 55 of Page of 88 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 55 Verify Phase Verify Phase BB isolation isolation valves valves closed.

closed.

Standard:

Standard: Candidate shuts Candidate shuts Phase Phase BB isolation isolation valves valves CCW-716A CCW-71 6A OR OR 716B, 71 6B, CCW-730, CCW-626 CCW-730, CCW-626 OR OR 735735 and and CVC-381 CVC-381 using using RTGB RTGB control control switches. Only switches. Only 11 of either CCW-716A of either CCW-71 6A or BB is is required required for for either CCW-626 or 735 completion. Only 11 of either 735 is required for completion.

Examiners Note:

Examiner's Note: Supplement B valves that will close on a Phase B signal:

- CVC-381, SEAL WTR RTRN ISO

- FCV-626, THERM BAR FLOW FLOW CONT

- CC-735, THERM BAR OUT ISO ISO

- CC-716A, CCW TO RCP ISO

- CC-716B, CCW TO RCP ISO

- CC-730, BRG OUTLET ISO

- MSIV AND MSIV BYPs Comment:

    • Performance Step: 6 Stop all RCPs.

Standard: Candidate places all RCP control switches to STOP.

Examiner's Note:

Examiners Comment:

2008 2008 NRC NRC SIM SIM dd NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Page 66 of Page of 88 Form Form ES-C-1 ES-C-i PERFORMANCE IINFORMATION PERFORMANCE N FORMATION

    • Performance Step:

Performance Step: 77 Verify all Verify all MSIVs MSIVs andand MSIV MSIV Bypasses Bypasses closed.

closed.

Standard: verifies all MSIVs Candidate verifies MSIVs and MSIV MSIV Bypasses Bypasses closed by by placing the control switches for the MSIVs placing MSIVs to CLOSE.

CLOSE.

Examiners Note:

Examiner's Comment:

Performance Step: 8 HVS-i at MCC-5, CMPT 77JJ within 60 Locally open breaker for HVS-1 minutes of SI initiation.

Standard: Candidate contacts AO to open breaker for HVS-1.

HVS-i.

Examiners Note:

Examiner's JPM is complete when the candidate has established one Train of CV Spray and the Inside AO has been contacted to open the breaker for HVS-1.

Comment:

Termination: At At least train of least 11 train of CV CV Spray Spray has been initiated.

has been initiated.

STOP STOP TIME:

TIME:

2008 2008 NRC NRC SIM SIM dd NUREG 1021, Revision NUREG 1021, Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Page 77 of Page of 88 Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job Performance Measure Job Performance Measure No.:

No.: 2008 NRC 2008 NRC SIM SIM dd Examinees Name:

Examinee's Name:

Performed:

Date Performed:

Date Facility Evaluator:

Number of Attempts:

Time to Complete:

Documentation:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature:

Examiner's Date:


2008 2008 NRC NRC SIM SIM dd NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement i1

Appendix C Appendix C Page 88 of Page of 88 Form Form ES-C-1 ES-C-i JPM CUE JPM CUE SHEET SHEET INITIAL CONDITIONS:

INITIAL CONDITIONS: You are

    • You are the the RO.

RO.

    • The plant plant was operating at 100% 100% RTP, RTP, 15 minutes ago 15 minutes ago an an automatic automatic Reactor Trip and Safety Reactor Safety Injection Injection was initiated.

initiated.

  • PATH-1 PATH-i has been implemented and is is complete through grid location location B-6, 'Restart B-6, Restart Battery Battery Chargers within 30 minutes of power power loss using using OP-601.'.

OP-601 Foldout "A"

  • Foldout A is in in effect.

INITIATING CUE: The CRSS has directed you to continue PATH-1 PATH-i execution.

2008 2008 NRC NRC SIM SIM dd NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

~ SUPPLEMENT M SUPPLEMENT M ~ VERIF VERIFlf BOTH EDGs RUNNING UNNING

)K ( RESTART ~BATTERY RESTART BATTERY (CHARGERS CHARGERS WIT UN IN 30 MIN OF OF

\WER_LOSS POWER LOSS USING OP-501 CV CV ~ NO

)K /' PRESS REMAINED BELOW 10 10 PSIG

/' /"' I1 VERIFY CV VERIFY CV SPRAY INITIATED SPRAY YE~ ~ I C

YES VERIFY ALL VERIFY ALL CV SPRAY CV SPRAY PUMPS PUMPS RUNNING RUNNING WITH VALVES WITH VALVES PROPERLY, ALIGNED ALIGNED AUTOMATIC AUTOMATIC

~ "'--

NO /

NO STEAM LINE STEAM LINE ISOLATION ISOLATION INITIATED INITIATED / VERIFY

( VERIFY APPROXIMATELYN APPROXIMATELY 12 CPM 12 GPM SPRAY SPRAY AUTOMATIC "- /' ADDITIVE ADDITIVE TANK TANK FLOWFLOW AUTOMATIC?

STEAM YES YES I

STEAM LINE LINE ISOLATION ISOLATION YES I

REQUIRED REQUIRED

~ ( VERIFY VERIFY PHASEPHASE B B

/ ' VERIFY VERIFY ALL ALL MSIVs MSIVs ANDAND ' \ ISOLATION GOLATION VALVES VALVES CLOSED CLOSE

~MSIV 8YP~SES MSIV BYPASSES CLOSED CLOSED:

NO Cl NO LOCALLY LOCALLY OPENOPEN BREAKER BREAKER FOR FOR

'I' STOP STOP ALLALL RCPs RCPs HVS-1, HVS-1, AT AT MCC-5 MCC-5 CMPT CMPT 7J 7J WITHIN WITHIN 60 60 IlJN OF SI MIN ,OF INITIATION SIINITIATION X

RCS PRESS PRESS YES / EATER THAN GREATER THAN 1350 1350 PSIG PSIG 1250 PSIGI

[1250 PSIGJ OS

Rev. 35 35 EPP- Supplements EPP-Supplements SUPPLEMENTS SUPPLEMENTS Page 20 20 of of 89 89 CONTINUOUS USE Supplement B B B And CV Spray Component Alignment Phase BAnd (Page 11 of 1)

~o 1. o establish Phase B B Containment Isolation, verify the following valves - CLOSED valves -

~CP Cooling

  • CVC-381, SEAL WTR RTRN ISO CVC-38l,
  • FCV-626, THERM BAR FLOW PLOW CONT

~SIV

b. SIV AND MSIV BYPs - CLOSED

-

~~ 2. o establish CV Spray, perform the following:

~erifY erify valves positioned as follows:

  • SI-EiiA, SI 8~~A, PUMP A A INLET -

OPEN

    • SI-844B, PUMP BB INLET - OPEN -
    • SI-5A, gAT DISCH S! 8'lSA, SAT DIgCH - OPEN

-

    • SI-845B, SAT DISCH - OPEN -
    • SI-845C, SAT THROTTLING - THROTTLED TO APPROXIMATELY 12

- 12 GPM

.. S!. 880A, PUMP A DIbCH OPEN

  • -SI-22OE_ PUHP SI 88GB, PUMP A0 DICTT 11 DISCH OPEN .
    • SI-880C, PUMP SI-88OC, PUMP BB DISCH DISCH - OPEN

-

    • SI-880D, PUMP BB DISCH SI-88OD, DISCH - OPEN

- OPEN

~Return Return to procedure procedure and and step step in in effect.

effect.

- END

- END -

-

Appendix C Appendix C Job Job Performance Performance Measure Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:

Facility: HB ROBINSON HB ROBINSON Task No.:

Task No.: 01000102805 01000102805 Task Title:

Task Title: Perform aa Post Perform Post LOCA LOCA Cooldown Cooldown and and JPM No.:

JPM No.: 2008 NRC 2008 NRC SIM SIM ee Depressurization lAW Depressurization lAW EPP-8.

EPP-8.

KIA

Reference:

K/A

Reference:

K3.02 3.5/3.7 063 K3.02 3.5/3.7 002 K1.08 002 Ki.08 4.5/4.6 4.5/4.6 00009 EA EA11.13

.13 4.4/4.4 00009 EA2.15 3.3/3.4 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom - - - Simulator X

-"-'--

Plant READ TO THE EXAMINEEEXAM INEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • Plant was initially at 100% power.

PATH-i has directed the crew to EPP-8, POST LOCA COOLDOWN

  • PATH-1 AND DEPRESSURIZATION.
  • You are the Reactor Operator.
  • EPP-8 has been completed through Step 28.
  • CV Pressure is at its maximum value reached during the transient.

Task Standard:

Task SI Accumulators are eithereither isolated or depressurized lAW EPP-8.

Required Required Materials:

Materials: EPP-8, Revision EPP-8, 16, Post Revision 16, Post LOCA LOCA Cooldown and Depressurization.

Cooldown and Depressurization.

General General

References:

References:

EPP-8, Revision EPP-8, Revision 16, 16, Post Post LOCA LOCA Cooldown and Depressurization.

Cooldown and Depressurization.

Handouts:

Handouts: EPP-8, EPP-8, Revision 16, Post Revision 16, Post LOCA LOCA Cooldown and Depressurization.

Cooldown and Depressurization.

2008 2008 NRC NRC SIMSIM ee NUREG 1021, NUREG 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Job Performance Measure Job Performance Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Initiating Cue:

Initiating Cue: The CRSS The CRSS has has directed directed you to continue you to continue with with EPP-8 EPP-8 until until the the SI SI Accumulators Accumulators have been have been isolated.

isolated.

Time Critical Time Critical Task:

Task: NO NO Validation Time:

Validation Time: 17 minutes 17 minutes SIMULATOR SETUP SIMULATOR SETUP

1. IC#612.

IC # 612.

2. SCN: 006_JPM_S2.
3. EPP-8 marked up as completed through Step 28.

2008 2008 NRC NRC SIM SIM ee NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page of 13 Page 33 of 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION (Denote Critical (Denote Critical Steps Steps with an an asterisk) asterisk)

START TIME: _ _

STARTTIME:

Performance Step:

Performance Step: 11 Determine ifif One SI Pump Determine Pump should bebe stopped:

Check SI Check SI Pumps Pumps - Any Any Running Running (Step (Step 29.a).

29.a).

Standard: Determines that 2 SI SI Pumps are running.

running.

Examiners Note:

Examiner's Comment:

Performance Step: 2 Determine if One SI Pump should be stopped:

Determine required RCS Subcooling from Table:

Conditions: - 3 Charging Pumps Running

-

- NO RCPs running

-

- 2 SI Pumps Running

-

Required RCS Subcooling is 70 [93] degrees F.

Standard: Determines from table that required RCS Subcooling is 70 degrees F.

Examiners Examiner's Note:

Note:

Comment:

2008 NRC 2008 SIM ee NRC SIM NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 44 of Page of 13 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 33 Check RCS Check RCS Subcooling Subcooling - Less Less than required subcooling.

than required subcooling.

Standard:

Standard: Determines that RCS Determines RCS subcooling is is - 149 149 degrees FF which is is more than the required required sUbQooling.

subcooling.

Go Go To To Step Step 29.1 29.f ( If,,-, 1

,

Examiners Note:

Examiner's Comment:

Performance Step: 4 level Greater than 24% [45%].

Check PZR level-Standard: Determines that PZR level is greater than required level.

Examiners Note:

Examiner's PZR is full.

Comment:

  • Performance Step: 55 Stop one SI Pump.

Standard:

Standard: Candidate stops either SI Pump "A" or C.

Pump A "C".

Comment:

Comment:

2008 2008 NRC NRC SIM SIM ee NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 55 of Page of 13 13 Form Form ES-C-1 ESC-1 PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 66 Check RCS Check RCS pressure pressure - Stable Stable oror Increasing.

Increasing.

Standard:

Standard: Determines that Determines that RCS RCS pressure pressure isis decreasing decreasing duedue to to stopping stopping the the SI Pump.

SI Pump. Step Step 29.h 29.h RNO RNO action action will will hold hold candidate candidate until until pressure pressure is stable or is stable or increasing increasing and and then then proceed proceed back back to to Step Step 29.a.

29.a.

Examiners Note:

Examiner's Note: RCS pressure RCS pressure will will stabilize stabilize atat - 1220 1220 psig psig and and should should take take - 44 minutes to minutes to stabilize stabilize after after the the SI Pump is SI Pump is secured.

secured.

Examiners Cue:

Examiner's minute has After - 11 minute has elapsed, inform inform the operator operator that RCS RCS pressure is pressure is stable.

Comment:

Performance Step: 7 Determine if One SI Pump should be stopped:

Check SI Pumps - Any Running (Step 29.a)

Standard: Determines that one SI Pump is running.

Examiners Examiner's Note:

Comment:

2008 2008 NRC NRC SIM SIM ee NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 66 of Page of 13 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 88 Determine ifif One Determine One SI SI Pump Pump should should be be stopped:

stopped:

Determine required Determine required RCS RCS Subcooling Subcooling from from Table:

Table:

Conditions: - 33 Charging Conditions: - Charging Pumps Pumps Running Running

- NO

- NO RCPs RCPs running running

- 11 SI

- SI Pump Pump Running Running Required RCS Required Subcooling isis 165 RCS Subcooling 165 [191] degrees F.

[1911 degrees F.

Standard:

Standard: Determines from Determines from table that that required required RCS RCS Subcooling Subcooling is is 165 165 degrees F.

degrees F.

Examiners Note:

Examiner's Comment:

Comment:

  • Performance Step: 9 Performance Check RCS Subcooling - Less than required subcooling.

Standard: Determines that RCS subcooling is - 125 125 degrees FF which is less than less than the required subcooling.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 2008 NRC NRC SIM SIM ee NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 77 of Page 13 of 13 Form ES-C-1 Form ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 10 10 Check RCS Check Hot Leg RCS Hot Leg temperatures temperatures - Less Less than than 320 320 [300]

[300]

degrees F.

degrees F.

Standard:

Standard: Determines that Determines that RCS RCS Hot Hot Leg Leg temperatures temperatures are are - 440

- 440 degrees degrees F.

F.

To Step Go To Go Step 32.

32. ( M);)

Examiners Note:

Examiner's Comment:

Performance Step: 11 Check SI Reinitiation Criteria as follows:

  • Check RCS Subcooling - Greater than 35 [55] degrees F
  • Level Greater than 10% [32%]

Check PZR Level-Standard: Determines that both conditions are satisfied.

Examiners Note:

Examiner's RCS Subcooling is 125 degrees F and PZR level is 100%.

Comment:

2008 2008 NRC NRC SIM SIM ee NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 88 of Page of 13 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 12 12 Determine ifif SI Determine SI Accumulators Accumulators should should be be isolated:

isolated:

  • . Check RCS Check RCS subcooling subcooling - Less Less than than 3535 [55]

[55] degrees degrees FF Standard:

Standard: Determines that Determines that RCS RCS subcooling subcooling isis greater greater than than specified.

specified.

Go To Go To Step 33.d. l!

Step 33.d. i Examiners Note:

Examiner's Note: RCS Subcooling RCS Subcooling is is 125 125 degrees degrees F. F.

Comment:

Comment:

    • Performance Step: 13 Level Greater than 10% [32%].

Check PZR Level-Standard:

Standard: Determines that PZR Level is greater than specified limits.

Examiners Examiner's Note: PZR level is 100%.

100%.

Comment:

Comment:

2008 2008 NRC NRC SIM SIM ee NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 99 of Page of 13 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance 14 Step: 14 Isolate SI Isolate Accumulators as SI Accumulators follows:

as follows:

Locally close Locally close the the breakers breakers for for

CMPT 9F)

CMPT 14F)

CMPT 1OJ)

Standard: Contacts the Inside andand Outside AOs to to close the the breakers for the Discharge Valves on MCC-5 SI Accumulator Discharge MCC-5 and 6.

Examiners Note:

Examiner's The Inside and Outside AOs will communicate back to the Reactor Operator that the breakers are closed as requested.

Valves SI-865A1B/C will have RED open indication on the RTGB.

Comment:

  • Performance Step: 15 15 Verify all ACCUM DISCHs - CLOSED.

Sl-865A, SI-865A, Sl-865B, SI-8658, Sl-865C.

SI-865C.

Standard:

Standard: Control switches are placed in in the closed position.

position. Candidate should should note note that SI-865A SI-865A and Sl-865B SI-8658 close but Sl-865C SI-865C has has dual dual indication indication (RED and GREEN position (RED and position lights lights ILLUMINAT ILLUMINATED)ED)

Go To Go To Step 34.b. RNO Step 34.b. RNO Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 NRC SIM 2008 NRC SIM ee NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 10 Page 10 of of 13 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 16 16 Vent any Vent any unisolated unisolated accumulator accumulator as follows:

as follows:

Verify SI-855, Verify SI-855, ACC ACC NITROGEN NITROGEN ISO, is closed.

ISO, is closed.

Standard:

Standard: Candidate determines Candidate determines that that valve valve SI-855 SI-855 isis closed.

closed.

Examiners Note:

Examiner's Note:

Comment:

Comment:

    • Performance Step: 17 Open the appropriate ACCUM VENT valve: SI-853C.

Standard:

Standard: Candidate opens valve SI-853C to align SI Accumulator "c" C to the vent path.

Examiners Note:

Examiner's Comment:

2008 NRC 2008 NRC SIM SIM ee NUREG 1021, Revision NUREG 1021, Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Page 11 Page of 13 1 1 of 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 18 18 Open HIC-936, Open HIC-936, ACC VENT HDR ACC VENT HDR FLOW.

FLOW.

Standard:

Standard: HIC-936 by Candidate opens HIC-936 by turning the valve potentiometer potentiometer in the clockwise direction clockwise direction to to open open the valve and depressurize SI the valve and depressurize SI Accumulator "c" C to the CV atmosphere.

Examiners Note:

Examiner's Note: APP-002-F4, SI ACCUM C HI/LO HI/LO PRESS, PRESS, will clear and come in as the accumulator is back in is depressurized.

depressurized.

APP-036-C9, CV N2 HDR HI/LO PRESS, will be received when HIC-936 is opened.

Once candidate notes that SI Accumulator "C" C pressure is decreasing, examiner can terminate the JPM at his discretion.

Comment:

END OF TASK Termination: SI Accumulators are isolated and/or andlor depressurizin depressurizing.g.

STOP TIME:

2008 NRC 2008 SIM ee NRC SIM NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 12 Page 12 of of 13 13 Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job Performance Job Performance Measure Measure No.:

No.: 2008 NRC 2008 NRC SIM SIM ee Examinees Name:

Examinee's Name:

Date Performed:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Examiner's Signature: Date:


2008 2008 NRCNRC SIM SIM ee NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 13 Page 13 of of 13 13 Form Form ES-C-1 ES-C-i JPM CUE JPM CUE SHEET SHEET INITIAL CONDITIONS:

INITIAL CONDITIONS: Plant was

    • Plant initially at was initially at 100%

100% power.

power.

    • RCS RCS depressurization depressurization resulted resulted inin aa Reactor Reactor Trip Trip and and Safety Safety Injection.

Injection.

    • PATH-1 PATH-i hashas directed directed thethe crew crew to to EPP-8, EPP-8, POST POST LOCA LOCA COOLDOWN COOLDOWN AND DEPRESSURIZATION.

AND DEPRESSURIZATION.

    • You You are are the the Reactor Reactor Operator.

Operator.

    • EPP-8 EPP-8 has has been been completed completed through through Step Step 28.

28.

    • CV CV Pressure Pressure is is at at its its maximum maximum valuevalue reached reached during during the the transient.

transient.

INITIATING CUE:

INITIATING The CRSS has directed you to continue with EPP-8 until the SI Accumulators Accumulators have been isolated.

2008 NRC SIM 2008 NRC SIM ee NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Job Performance Job Performance Measure Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:

Facility: HB ROBINSON HB ROBINSON Task Task No.:

No.: 01015100501 01015100501 Task Title:

Task Title: Remove N-44 Remove from service N-44 from service lAW lAW OWP-OWP- JPM JPM No.:

No.: 2008 2008 NRC NRC SIM SIM f 011.

011.

KIA

Reference:

K/A

Reference:

015 A4.02 015 A4.02 3.9/3.9 3.9/3.9 015 A4.03 015 A4.03 3.8/3.9 3.8/3.9 Examinee:

Examinee: NRC NRC Examiner:

Examiner:

Facility Evaluator:

Facility Evaluator: Date:

Date:

Method of testing:

Method Simulated Performance:

Simulated Performance: Actual Performance:

Performance: X Classroom - - - Simulator -- X - Plant READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: ** The plant is operating at 100% RTP.

  • No equipment is out of service.

l&C has requested a clearance on N-44 to replace the high voltage

  • I&C power supply.
  • This clearance and work scope will render the N-44 input to QPTR inoperable.
  • The CRSS has completed the required pre-job briefing.
  • Reactor Reactor Engineering Engineering hashas been contacted contacted to perform aa Flux Flux Map.

Map.

Task Task Standard:

Standard: Power Power Range Range Channel Channel Nl-44 NI-44 removed removed from from service lAW OWP-0i service AW OWP-011, 1, NI-4.

NI-4.

Required Required Materials:

Materials: OWP-01 OWP-011, 1, Nl-4 NI-4 ERFIS ERFIS Computer Computer General General

References:

References:

OWP-01 OWP-011, 1, Nl-4 NI-4 2008 2008 NRC NRC SIM SIM If NUREG NUREG 1021, Revision 99 1021, Revision

Appendix CC Appendix Job Performance Job Performance Measure Measure Form Form E8-C-1 ES-C-i Worksheet Worksheet Handouts:

Handouts: OWP-Oll, NI-4 OWP-011, Nl-4 Initiating Cue:

Initiating Cue: You are You are directed directed by the CRSS by the CRSS to to remove remove N-44 from service N-44 from service lAW lAW OWP-011, OWP-01 1, NI-NI-4.

4.

Time Critical Time Critical Task:

Task: NO NO Validation Time:

Validation Time: minutes 10 minutes 10 SIMULATOR SETUP SIMULATOR

1. IC#616.

1.IC # 616.

2. SON: 006_JPM_S6.
3. OP RO at RO ERFI8 ERRS terminal and OP QP BOP at BOP ERFI8 ERFIS terminal.

2008 NRC 2008 NRC SIM 81M ff NUREG 1021, NUREG 1021, Revision Revision 99

Appendix C Appendix C Page 33 of Page of 10 10 Form ES-C-1 Form ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION (Denote Critical (Denote Critical Steps Steps with an an asterisk) asterisk)

START TIME:____

STARTTIME: __

Performance Step: 11 Performance Remove NI-44 Remove NI-44 from ERFIS ERFIS scan: NIN0044A NINOO44A REMOVED REMOVED Standard: Nl-44 removed from ERFIS scan.

NI-44 Examiners Note:

Examiner's Note: Removal from scan can be performed Removal performed by the following actions:

- Select F3 =MENU on the bottom of the ERFIS screen

=

- Select ADMIN (ADMINISTRATIVE FUNCTIONS MENU)

- Select DR (DEURES (DEL/RES POINT FROMrrO FROM/TO SCAN OR ALARM)

- Select DELETE SCAN

- ENTER POINT POINTID ID Removal from scan can be performed by the following actions:

- If candidate knows the Turn On Code (TOC), he can type in DR and hit ENTER to go directly to the DR screen

- Select DELETE SCAN

- ENTER POINTID POINT ID APP-005-D6, Delta Flux Warning I Status will be received and aa printout initiated for the CAOC Alarm Report.

CHANNEL "CHANNEL #4 NOW OUT OF SERVICE with reading noted as 0000 ??

??"

Comment:

2008 NRC 2008 SIM ff NRC SIM NUREG 1021, NUREG 1021, Revision Revision 99

Appendix C Appendix C Page 44 of Page of 10 10 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 22 DROPPED ROD DROPPED ROD MODE MODE switch:

switch: BYPASS.

BYPASS.

Standard:

Standard: On Nl-44 drawer, On NI-44 drawer, NI-44 NI-44 DROPPED DROPPED RODROD MODE MODE switch switch selected selected to BYPASS.

to BYPASS.

Examiners Note:

Examiner's APP-005-D4, NIS TRIP/DROP ROD BYPASS will alarm when a Dropped Rod Mode switch is placed placed in BYPASS.

BYPASS.

DROPPED ROD DROPPED ROD BYPASS BYPASS on the NI-44 NI-44 drawer front will ILLUMINATE.

Comment:

Performance Step: 3 NIS ROD DROP BYPASS NI-44 Nl-44 Status Light: ILLUMINATED.

Standard: The candidate observes the NIS ROD DROP BYPASS NI-44 status light on RTGB Section B is illuminated.

Examiners Note:

Examiner's Comment:

2008 NRC 2008 NRC SIM SIM ff NUREG 1021, NUREG 1021, Revision Revision 99

Appendix CC Appendix Page 55 of Page of 10 10 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 44 NI-44 OUT NI-44 OUT OF SERVICE TRIP OF SERVICE TRIP SWITCH:

SWITCH: TRIPPED.

TRIPPED.

Standard:

Standard: In the In the rear rear of N 1-44 cabinet, of NI-44 cabinet, the the candidate candidate positions positions the the NI-44 N 1-44 OUT OUT OF SERVICE OF SERVICE TRIP TRIP SWITCH SWITCH to to the the TRIPPED TRIPPED position.

position. (Toggle (Toggle switch in switch in the the UP UP position) position)

Examiners Note:

Examiner's Note: Operator determines Operator determines that that independent independent verification verification is not required is not required due to due to the bistable status the bistable status light light is not illuminated is not illuminated prior prior to to positioning the NI-44 positioning NI-44 OUT OUT OF SERVICE TRIP SWITCH. SWITCH.

This trips the 108% High the 108% Flux bistable for NI-44.

High Flux Comment:

Performance Step: 5 Bistable light HI POW RANGE HI FLUX NC44R: ILLUMINATED. ILLUMINATED.

Standard: The candidate determines that bistable light HI POW RANGE HI FLUX NC44R is illuminated on Bistable Status Panel B.

Examiners Examiner's Note: APP-005-A4 APP-005-A4,, PR SINGLE CH HI RANGE ALERT will be received when bistable is actuated.

OVERPOWE OVERPOWER R TRIP HIGH HIGH RANGE light on on NI-44 NI-44 drawer front will illuminate illuminate Comment:

Comment:

2008 NRC 2008 NRC SIM SIM ff NUREG 1021, NUREG 1021, Revision Revision 99

Appendix CC Appendix Page 66 of Page of 10 10 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 66 ROD STOP ROD STOP BYASS BYASS switch:

switch: BYPASS BYPASS PR PR 44.

44.

Standard:

Standard: On the Miscellaneous On the Miscellaneous Control Control and and Indication Indication Panel, Panel, the the candidate candidate places the ROD STOP places the ROD STOP BYPASSBYPASS switch switch to to the the BYPASS BYPASS PR PR 44 44 position.

position.

Examiners Note:

Examiner's Note:

Comment:

Comment:

    • Performance Step: 7 COMPARATOR CHANNEL DEFEAT switch: Select PR 44.

COMPARATOR Standard: On the Comparator and Rate drawer, the candidate places the COMPARATOR CHANNEL DEFEAT switch to select PR 44 COMPARATOR position.

COMPARAT COMPARATOR OR DEFEAT light illuminates on the drawer above the switch.

Examiners Examiner's Note:

Comment:

Comment:

2008 2008 NRC SIM ff NRC SIM NUREG NUREG 1021,1021, Revision Revision 99

Appendix CC Appendix Page 77 of Page of 10 10 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 88 DETECTOR CURRENT DETECTOR CURRENT COMPARATOR COMPARATOR Drawer: Drawer:

UPPER SECTION UPPER SECTION Switch:

Switch: Select Select PR PR 44.

44.

Standard:

Standard: On the Detector On the Detector Current Current Comparator Comparator drawer, drawer, the the candidate candidate selects selects PR 44 with the PR 44 with the Upper Section Upper Section switch.

switch.

CHANNEL DEFEAT CHANNEL DEFEAT light light for for Upper Upper Section Section illuminates illuminates when when switch is switch is selected selected out out ofof NORMAL.

NORMAL.

Examiners Note:

Examiner's Note:

Comment:

    • Performance Step: 9 Performance DETECTOR CURRENT COMPARATOR COMPARATOR Drawer:

LOWER SECTION Switch: Select PR 44.

Standard: On the Detector Current Comparator drawer, the candidate selects PR 44 with the Lower Section switch.

CHANNEL DEFEAT light for Lower Section illuminates when switch is selected out of NORMAL.

Examiners Examiner's Note:

Comment:

Comment:

2008 NRC 2008 NRC SIMf SIM f NUREG 1021, NUREG 1021, Revision Revision 99

Appendix CC Appendix Page 88 of Page of 10 10 Form ES-C-1 Form ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 10 10 NI-44 INSTRUMENT NI-44 INSTRUMENT POWER POWER FUSES: FUSES: REMOVED.

REMOVED.

Standard:

Standard: Candidate determines Candidate determines that that this this step step isis not not required required and and N/As.

N/As.

Examiners Cue:

Examiner's Cue: IfIf candidate candidate asks, asks, inform inform him that I&C him that I&C personnel personnel will will deenergize the deenergize the drawer after AS drawer after AS FOUND FOUND readings readings are are taken.

taken.

Examiners Note:

Examiner's Note: This action is This action N/A ifif power is NtA power is is>> P-10 P-b or or the the reactor reactor is is in in Modes 3 through 6 (ITS Table 3.3.1-1).

Modes Comment:

    • Performance Step: 11 Bistable light LOW POW RANGE HI FLUX NC44P:

ILLUMINATED.

ILLUMINATED.

Standard: Candidate determines that this step can be signed or N/A'd. N/Ad.

Examiners Examiner's Cue:

Examiners Examiner's Note: This bistable is normally in the tripped condition (ILLUMINA (ILLUMINATED) TED) at this power level. level. The candidate may sign for the step or N/A NtA the step.

Comment:

Terminating Terminating Cue:

Cue: N-44 N-44 has been removed has been removed from from service service lAW lAW OWP-01 OWP-011, NI-4.

1, Nl-4.

STOP TIME:

STOP TIME:

2008 2008 NRC SIM ff NRC SIM NUREG 1021, NUREG 1021, Revision Revision 99

Appendix C Appendix C Page 99 of Page of 10 10 Form ES-C-1 Form ES-C1 VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job Performance Job Performance Measure Measure No.:

No.: 2008 NRC 2008 NRC SIM SIM ff Examinees Name:

Examinee's Name:

Date Performed:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Examiner's Signature: Date:


2008 2008 NRC NRC SIM SIM ff NUREG 1021, NUREG 1021, Revision Revision 99

Appendix C Appendix C Page 10 Page 10 of of 10 10 Form Form ES-C-1 ES-C-i CUE SHEET JPM CUE JPM SHEET INITIAL CONDITIONS:

INITIAL CONDITIONS: The plant

    • The plant isis operating operating at at 100%

100% RTP.

RTP.

    • No No equipment is is out of of service.
    • I&C I&C has has requested requested a clearance on N-44 N-44 to replace replace the high high voltage power voltage power supply.

supply.

    • This This clearance clearance and work scope will render the the N-44 N-44 input input to QPTR inoperable.
  • You are the BOP operator.
  • The CRSS has completed the required required pre-job briefing.
  • Reactor Engineering has been contacted to perform a Flux Map.

INITIATING CUE: You are directed by the CRSS to remove N-44 from service lAW OWP-0ii, NI-4.

OWP-011, 2008 NRC 2008 NRC SIM SIM ff NUREG 1021, NUREG 1021, Revision Revision 99

Appendix CC Appendix Job Performance Job Per[ormance Measure Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:

Facility: HB ROBINSON HB ROBINSON Task Task No.:

No.: 01000106705 01000106705 Task Title:

Task Title: Respond to Respond to aa Loss Loss of of CCW CCW lAW lAW AOP-AOP- JPM JPM No.:

No.: 2008 NRC 2008 NRC SIMSIM gg 014.

014.

KIA

Reference:

K/A

Reference:

008 K1 .02 008 K1.02 3.3/3.4 3.3/3.4 008 K3.03 008 K3.03 4.1/4.2 4.1/4.2 026 AK3.03 026 AK3.03 4.0/4.2 4.0/4.2 Examinee:

Examinee: NRC NRC Examiner:

Examiner:

Facility Evaluator:

Facility Evaluator: Date:

Date:

Method of Method of testing:

testing:

Performance:

Simulated Performance: Actual Performance:

Performance: X Classroom - - - Simulator -- X - Plant READ TO THE EXAMINEE READ EXAM INEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • The plant is operating at 100% 100% power.
  • No equipment is out of service.
  • You are the Reactor operator.

Task Task Standard:

Standard: AOP-014 actions taken taken to to ensure ensure the the RCPs RCPs areare not not damaged.

damaged.

Required Required Materials:

Materials: AOP-014, AOP-014, COMPONEN COMPONENT T COOLING COOLING WATERWATER SYSTEM SYSTEM MALFUNCT MALFUNCTION, ION, Revision Revision 24 24 General General

References:

References:

APP-OOi-A4 APP-001-A4 AOP-014, AOP-014, COMPONEN COMPONENT COOLING WATER T COOLING WATER SYSTEM SYSTEM MALFUNCT MALFUNCTION, ION, Revision Revision 24 24 Handouts:

Handouts: None None Initiating Initiating Cue:

Cue: The The CRSS CRSS isis involved involved with with aa security security situation situation and and has has told told you you to to take take the the necessary necessary actions actions for for any any alarm alarm conditions conditions that that might might arise.

arise.

Time Time Critical Critical Task:

Task: NO NO 2008 2008 NRC NRC SIM SIM gg NUREG 1021, NUREG 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Job Performance Measure Job Performance Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Validation Time:

Validation Time: minutes 15 minutes 15 SIMULATOR SETUP SIMULATOR SETUP

1. IC
1. IC#6i7
  1. 617
2. SCN:
2. 006_JPM_S7 SON: 006_JPM_S7
3. On cue from the Chief Examiner, insert
3. insert a 2000 GPM GPM CCW COW piping piping rupture inside inside the CV.

2008 2008 NRCNRC SIM SIM gg NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 33 of Page of 13 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION (Denote Critical (Denote Critical Steps Steps with with an an asterisk) asterisk)

START TIME:

START TIME: _ __

Performance Step:

Performance Step: 11 Candidate refers Candidate refers to to APP-001-A4.

APP-OO1 -A4.

Standard:

Standard: Candidate observes Candidate observes rapidly lowering CCW rapidly lowering CCW Surge Surge Tank Tank level.

level.

recommended action from APP-001-A4 Candidate takes recommended APP-OO1 -A4 and enters AOP-014, CCW enters CCW System System Malfunction Malfunction Examiners Note:

Examiner's Comment:

Performance Step: 2 Implement The EALs. (Step 1) 1)

Standard: Candidate notifies supervision of EAL implementat implementation.

ion.

Examiners Examiner's Note:

Note: Candidate is Candidate not responsible for implementin is not implementing g EAL5 EALs Comment:

Comment:

2008 NRC SIM 2008 NRC SIM gg NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 44 of Page of 13 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 33 Make PA Make PA Announcement Announcement For For Procedure Procedure Entry.

Entry.

Standard:

Standard: Candidate makes Candidate announcement for makes announcement for AOP-014 AOP-014 entry entry using using the the system.

PA system.

PA Examiners Note:

Examiner's Note:

Comment:

Comment:

    • Performance Step: 4 Performance Go To Appropriate Section For Indicated Malfunction. (Step 2)

Standard: Candidate proceeds to Section A based on loss of CCW inventory.

Examiners Note:

Examiner's Comment:

  • Performance Step:

Step: 55 Determine ifif pump pump cavitation isis occurring occurring or imminent:

  • Check Check Surge Tank Level <5%. < 5%.

OR OR

  • Check CCW Pump Check COW Pump Discharge Discharge Pressure Pressure (Local)

(Local) AND AND Flow -WIDE Flow -WIDE OSCILLATI OSCILLATIONS.ONS.

Standard:

Standard: Candidate determines Candidate that COW determines that Surge Tank CCW Surge Tank is 5% level is << 5% level and and that pump cavitation that pump is imminent.

cavitation is imminent.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 NRC 2008 NRC SIM SIM gg NUREG 1021, Revision NUREG 1021, Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 55 of Page 13 of 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 66 Check Reactor Check Reactor CRITICAL.

CRITICAL. (Step (Step 2) 2)

Standard:

Standard: Candidate determines Candidate determines that that the the Reactor Reactor isis critical.

critical.

Examiners Note:

Examiner's Note:

Comment:

Comment:

    • Performance Step: 7 Performance Verify the Reactor is Tripped. (Step 3)

Standard: Candidate depresses the Reactor Trip pushbutton to trip the Reactor and verify the Reactor is tripped.

Examiners Note:

Examiner's Comment:

  • Performance Step: 88 Stop ALL RCPs. (Step 4) 4)

Standard:

Standard: Candidate stops stops ALL Reactor Coolant Coolant Pumps Pumps using using the Control switches switches on the RTGB.

on the RTGB.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 NRC 2008 NRC SIMg SIM g NUREG 1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 66 of Page 13 of 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 99 Go To PATH-1 Go To PATH-i while while continuing continuing with with this this procedure.

procedure. (Step (Step 5) 5)

Standard:

Standard: Candidate informs Candidate informs CRSS CRSS to to enter enter PATH-1 PATH-i while while the the Candidate Candidate continues in continues in AOP-014.

AOP-0i4.

Examiners Cue:

Examiner's Cue: Cue or acknowledge Cue or acknowledge the the candidate candidate that that the the CRSS CRSS andand the the BOP will BOP will continue continue in PATH-i and in PATH-1 and the the RO will continue in RO will continue in AOP-01 4.

AOP-014.

Comment:

    • Performance Step: 10 Lockout CCW Pumps:
  • Place AND hold all CCW Pump switches in STOP position.
  • Check APP-001-F5, APP-OOi -F5, CCW PMP LO PRESS, ILLUMINATED.
  • Release CCW Pump Switches.

Standard: Candidate places ALL CCW pump switches to STOP and holds them while verifying APP-OOi APP-001-F5-F5 is illuminated.

Examiners Examiner's Note: The Candidate may ask and receive assistance from the BOP to hold one of the CCW Pump switches. switches.

Comment:

2008 NRC 2008 NRC SIMg SIM g NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 77 of Page 13 of 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 11 11 Dispatch Operator Dispatch Operator To To Perform Perform Attachment Attachment 3, CCW Leak 3, CCW Leak Search, Search, While Continuing While Continuing With Procedure. (Step With Procedure. (Step 11) 11)

Standard:

Standard: Candidate contacts Candidate contacts the the AO to perform AO to perform Attachment Attachment toto identify identify the the source of source of the the leak.

leak.

Examiners Note:

Examiner's Note:

Comment:

    • Performance Step: 12 Check CV For CCW Break Using Control Room Indications.

i2.a)

(Step 12.a)

Standard: Candidate monitors ERFIS trends and CV WATER LEVEL (White Sump Lights) and determines that CV water level has increased.

Examiners Note:

Examiner's CV Water level increase from - 4.00 inches to 8 inches and stabilize.

Bottom white lights for CV Keyway Sump are illuminated.

Comment:

2008 NRC 2008 NRC SIMg SIM g NUREG 1021, Revision NUREG 1021, 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 88 of Page of 13 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 13 13 Check CV Check location of CV location of CCW CCW break.

break. (Step (Step 12.b) 12.b)

Standard:

Standard: Candidate determines Candidate determines that that CCW CCW leak leak isis in in the the CV.

CV.

Examiners Note:

Examiner's Note:

Comment:

Comment:

Performance Step: 14 Inform personnel performing leak search that the leak location is 1 2.c) in the CV. (Step 12.c)

Standard: Candidate informs AO performing leak search of leak in CV.

Examiners Note:

Examiner's Comment:

2008 NRC 2008 NRC SIM SIM gg NUREG 1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 99 of Page of 13 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance 15 Step: 15 Determine RCP Determine RCP alarm alarm status.

status. (Step (Step 13) 13)

Standard:

Standard: Candidate Candidate recognizes recognizes that:

that:

    • APP-OO1-B1, RCP APP-001-B1, RCP BRG BRG COOL WTR LO COOL WTR LO FLOW, FLOW, isis illuminated.

illuminated.

    • APP-OOi-B3, RCP APP-001-B3, RCP A BEARING BEARING HIHI TEMP, TEMP, isis NOT NOT illuminated.

illuminated.

    • APP-OOi-D3, RCP APP-001-D3, RCP BB BEARING BEARING HIHI TEMP, isis NOT NOT illuminated.

illuminated.

    • APP-OO1-F3, RCP C APP-001-F3, BEARING HI C BEARING HI TEMP, is NOT NOT illuminated.

Examiners Note:

Examiner's Comment:

Performance Step: 16 Check Reactor CRITICAL. (Step 14)

Standard: Candidate determines that the Reactor is NOT critical.

Examiners Note:

Examiner's Comment:

2008 NRC SIM 2008 NRC SIM gg NUREG 1021, Revision NUREG 1021, 9, Supplement Revision 9, Supplement 11

Appendix C Appendix C Page 10 Page of 13 10 of 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 17 17 Verify Control Verify Control Rods Rods are Tripped. (Step are Tripped. (Step 14.a i4a RNO)

RNO)

Standard: Candidate verifies ALL Control Candidate Control Rods Rods are inserted.

inserted.

Examiners Note:

Examiner's Comment:

Performance Step: 18 Stop ALL RCPs. (Step 14.b RNO)

Standard: Candidate verifies that ALL Reactor Coolant Pumps are stopped.

Examiners Note:

Examiner's Comment:

2008 NRC 2008 NRC SIM SIM gg NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 1 1 of Page 11 of 13 13 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 19 19 Close The Close The Following 18)

(Step 18)

Following Valves Valves To To Isolate Isolate CCW COW To To The The RCPs:

RCPs:

(Step

    • CC-716A, CC-71 6A, CCW CCW TO TO RCP RCP ISOISO
    • CC-716B, CC-716B, CCW CCW TO TO RCP RCP ISOISO
    • CC-735, THERM BAR CC-735, THERM BAR OUT OUT ISO ISO
    • FCV-626, FCV-626, THERM BAR BAR FLOW FLOW CO CONTNT Standard: Candidate uses Candidate uses RTGB switches switches to close close the the following valves:

valves:

  • 00-735, THERM BAR OUT ISO CC-735,
  • FCV-626, THERM BAR FLOW CONT Examiners Cue:

Examiner's Comment:

Termination: CCW valves are CCW are closed to isolate CCW piping rupture in CV.

isolate CCW STOP STOP TIME:

TIME:

2008 NRC SIMg 2008 NRC SIM g NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix C Appendix C Page 12 Page 12 of of 13 13 Form Form ES-C-1 ES-C1 VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job Performance Job Performance Measure Measure No.:

No.: 2008 NRC 2008 NRC SIM SIM 9g Examinees Name:

Examinee's Name:

Date Performed:

Date Performed:

Facility Evaluator:

Facility Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature:

Examiner's Date:


2008 2008 NRC NRC SIMg SIM g NUREG 1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 13 Page of 13 13 of 13 Form Form ES-C-1 ESC-1 CUE SHEET JPM CUE JPM SHEET INITIAL CONDITIONS:

INITIAL CONDITIONS: ** The plant isis operating The plant operating atat 100%

100% power.

power.

    • No No equipment equipment isis outout of of service.

service.

    • You are the You are the Reactor Reactor operator.

operator.

INITIATING CUE:

INITIATING CUE: The CRSS is is involved involved with a security situation and has has told you to take the necessary actions for any alarm conditions that might arise.

2008 NRC 2008 NRC SIMg SIM g NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Job Job Performance Performance Measure Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:

Facility: HB ROBINSON HB ROBINSON Task No.:

Task No.: 01000101405 01000101405 Task Title:

Task Title: Limit Radiation Limit Radiation Exposure Exposure in in Response Response JPM No.:

JPM No.: 2008 NRC 2008 NRC SIM SIM hh Radiation Alarm lAW to Radiation lAW AOP-005.

AOP-005.

KIA

Reference:

K/A

Reference:

072 A 072 .01 3.4/3.6 Al1.01 3.4/3.6 Examinee: NRC Examiner:

Facility Evaluator:

Facility Evaluator: Date:

Date:

Method of testing:

Simulated Performance: Actual Performance: xX Classroom ---

Simulator X

_.:...:X_ Plant READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • The plant is at 100% power.

AOP-0i6, EXCESSIVE PRIMARY PLANT LEAKAGE, is being

  • An unscheduled Containment entry is in progress to determine the leak location.
  • APP-036-L5, CV PERSONNEL HATCH DOOR OPEN, is ILLUMINATED.

Task Standard: Actions of AOP-005, Attachment 12, 12, have been completed satisfactorily.

Required Materials: APP-036-D8, Revision 62 AOP-005, Revision 27 General

References:

General

References:

APP-036-D8, Revision 62 62 AOP-005, AOP-005, Revision Revision 27 27 Handouts:

Handouts: AOP-005, Revision AOP-005, Revision 27 27 Initiating Initiating Cue:

Cue: You are You are the the Control Control Room Room Operator.

Operator. Respond Respond to to plant plant conditions.

conditions.

2008 NRC 2008 NRC SIMSIM hh NUREG iO2i, NUREG 1021, Revision Revision 9,9, Supplement Supplement i1

Appendix C Appendix C Job Performance Job Performance Measure Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Time Critical Time Critical Task:

Task: NO NO Validation Time: 12 minutes 12 minutes SIMULATOR SETUP i.

1. IC#6i3.

IC # 613.

2. SCN: 006_JPM_S3.
3. R-i 1/12 selector switch is in the CV position.

Verify that the R-11/12 2008 2008 NRC NRC SIM SIM hh NUREG 1021, NUREG 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 33 of Page of 14 14 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION (Denote Critical (Denote Critical Steps with an Steps with an asterisk) asterisk)

START TIME:

START TIME: _ __

Performance Step:

Performance Step: 11 Locates proper Locates proper procedure procedure and required information.

and required information.

Standard:

Standard: Locates APP-036-D8, Locates APP-036-D8, PROCESSPROCESS MONITOR MONITOR HI HI RAD.

PAD.

Examiners Note:

Examiner's Note: PR-i Point RR-1 Point #11

  1. 11 (R-12)

(R-i 2) is is in in alarm.

alarm.

Comment:

Performance Step: 2 Determine process channel in alarm condition.

Standard: Determines alarming channel is R-12, R-i2, CV AIR AND PLANT RADIOACTIVE GAS.

VENT RADIOACTIVE Examiners Note:

Examiner's Comment:

Performance Performance Step: 3 IF IF the cause of the alarm alarm is known to be the movement of radioactive material material or is an expected alarm is an due to actions under alarm due under operator control, control, THEN THEN no no further actions for this APP APP are are required. (Step (Step 1)1) (NO)

(NO)

Standard:

Standard: The cause The for the cause for alarm is the alarm is not not known and personnel inside known and inside the the CV are CV are currently currently searching searching for for the leak source.

the leak source.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 NRC 2008 NRC SIM SIM hh NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 44 of Page of 14 14 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 44 Observe affected Observe affected radiation radiation monitor monitor for for radiation radiation levels levels and and evidence of evidence of short short term term spiking.

spiking. (Step (Step 2)

2) (NO)

(NO)

Standard:

Standard: R-i2 isis in R-12 in high high alarm and no alarm and no appearance appearance of of short short term term spiking spiking isis noted.

noted.

Examiners Note:

Examiner's Note:

Comment:

Performance Step: 5 IF short term spiking is evidenced, THEN allow the indicated level to decrease prior to performing Step 4. (Step 3)

Standard: No short term spiking is observed.

Examiners Note:

Examiner's Comment:

  • Performance Performance Step:

Step: 66 Determine ifif the alarm alarm is is valid by momentarily depressing the ALARM/RESET ALARM/RESET pushbutton pushbutton for R-12 R-12 monitor monitor (Step (Step 4.4).

4.4).

Standard:

Standard: Candidate depresses the Candidate depresses the RED ALARM/RESET pushbutton RED ALARM/RESET pushbutton Examiners Examiner's Note:

Note: This action This action will cause the will cause the RED RED light light and APP-036-DB to and APP-036-DB to extinguish.

extinguish.

Comment:

Comment:

2008 2008 NRC NRC SIM SIM hh NUREG 1021, NUREG 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 55 of Page of 14 14 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 77 IF the alarm IF the alarm returns, returns, THEN THEN refer refer to to AOP-005 AOP-005 (Step(Step 4.5).

4.5).

Standard:

Standard: APP-036-D8 and APP-036-DB and the the RED RED ALARM/RESET ALARM/RESET module module onon R-12 R-12 monitor returns, monitor returns, thus thus the the alarm alarm is is valid.

valid.

Examiners Note:

Examiner's Note:

Comment:

Performance Step: 8 announcement for procedure entry into AOP-005 due Make PA announcement to an R-12 alarm.

Standard: Candidate makes PA announcement announcement for AOP-005 entry due to R-i2 alarm.

R-12 Examiners Examiner's Note:

Comment:

Performance Performance Step:

Step: 99 Use non-perform non-performed ed attachments listed below for Radiation Monitors Monitors in in alarm.

alarm.

Standard:

Standard: Candidate Candidate selects selects Attachment Attachment 12 12 due due toto R-1 R-12 in alarm.

2 in alarm.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 NRC SIM 200B NRC SIM hh NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 66 of Page of 14 14 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 10 10 Check R-11/12 Check R-1 1/12 selector selector switch switch - SELECTED SELECTED TO TO CVCV (Step (Step 1).

1).

Standard:

Standard: Candidate locates Candidate locates selector selector switch switch onon the the Radiation Radiation Monitoring Monitoring Panel and Panel checks that and checks that the the switch switch isis selected selected to to the the CV CV position.

position.

Examiners Note:

Examiner's Note: There is There is an illuminated white light an illuminated light above above the switch switch that that is is labeled as labeled CV.

as CV.

Comment:

Comment:

Performance Step: 11 Check RCS temperature - Greater than 200 degrees F.

Standard: Unit is at 100% power. RCS Tavg is 575.9 degrees F.

Examiners Note:

Examiner's Comment:

Performance Performance Step:

Step: 12 12 Check EOP network Check network procedures IMPLEMENTED.

procedures -IMPLEMENTED.

Standard:

Standard: Candidate determines Candidate determines that EOP procedures that EOP procedures havehave NOT NOT been been implemented implemented and and proceeds proceeds to to Step Step 5.5.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 NRC 2008 NRC SIM SIM hh NUREG NUREG 1021, 1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 77 of Page of 14 14 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 13 13 Check personnel-IN Check personnel IN CV.

CV. (Step (Step 5) 5)

Standard:

Standard: Determines that Determines that personnel personnel are are presently presently in in CV CV from from the the initial initial conditions.

conditions.

Examiners Note:

Examiner's Note: APP-036-L5, CVCV PERSONNEL PERSONNEL HATCH HATCH DOOR DOOR OPEN, OPEN, is is illuminated.

Comment:

    • Performance Step: 14 Place VLC switch to EMERG position. (Step 6)

Standard: VLC switch placed in the EMERG position.

Examiners Examiner's Note:

Comment:

2008 2008 NRC SIM hh NRC SIM NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 88 of Page of 14 14 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 15 15 Depress and Depress and Hold Hold CV CV Evacuation Evacuation Horn Horn pushbutton pushbutton for for 15 15 seconds. (Step seconds. (Step 7) 7)

Standard:

Standard: Depresses and Depresses and holds holds CV CV evacuation evacuation horn horn pushbutton pushbutton for for 15 15 seconds seconds Examiners Note:

Examiner's Note:

Comment:

    • Performance Step: 16 Announce the following over Plant PA System:

ATTENTION ALL PERSONNEL. ATTENTION ALL PERSONNEL. A HIGH RADIATION ALARM HAS BEEN RECEIVED ON CV VENT PROCESS MONITOR R-12. ALL NON-ESSENTIAL PERSONNEL EVACUATE CV UNTIL FURTHER NOTICE. (Step 8)

Standard: Announces condition requiring CV evacuation, stating that alarm is on R-12.

Examiners Examiner's Note:

Comment:

2008 NRC 2008 NRC SIM SIM hh NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 99 of Page 14 of 14 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 17 17 Repeat CV Repeat CV Evacuation Evacuation announcement announcement over over PA PA System.

System. (Step (Step 9) 9)

Standard:

Standard: Candidate repeats Candidate repeats announcement.

announcement.

Examiners Note:

Examiner's Note:

Comment:

Comment:

Performance Step: 18 Place VLC switch to NORM position. (Step 10)

Standard: Returns VLC switch to NORM position.

Examiners Note:

Examiner's Comment:

2008 NRC 2008 NRC SIM SIM hh NUREG 1021, Revision NUREG 1021, 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 10 Page 10 of of 14 14 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 19 19 Check Containment Check Containment Ventilation Ventilation Isolation Isolation valves valves closed.

closed. (Step (Step 11) ii)

Standard:

Standard: Determines Containment Determines Containment Ventilation Ventilation Isolation Isolation valves valves closed closed byby valve position valve position indication indication and/or and/or status status lights.

lights.

Examiners Note:

Examiner's Note: Containment Ventilation Containment Ventilation Isolation Isolation Panel Panel Status Status Lights Lights will will be be pink with valves pink with valves in in the proper position.

the proper position.

Individual valves Individual valves can can be observed on be observed on the the RTGB RTGB for for position position indication.

indication.

Amber lights lit lit for for the CV Ventilation Isolation Isolation Signal Relay Relay V-1 and V-2 on V-i and on the bottom bottom of of the Radiation Radiation Monitoring Monitoring Panel.

Purge valves V12-6, V12-7, V12-8, V12-9 CV Purge CV Pressure Reliefs V12-10, V12-11 Vi 2-11 CV Vacuum Reliefs V12-12, V12-13 Vi 2-13 Comment:

  • Performance Step: 20 Place the following CV IODINE REMOVAL FAN control switches to PREPURGE position: HVE-3 and HVE-4. (Step 12)

Standard: Places switches for HVE-3 and HVE-4 to PREPURGE position and verifies proper operation by fan and damper indication.

Examiners Examiner's Note: RTGB indications indications for [IVE-3 HVE-3 and 4: Fans Fans ON by by RED RED lights lights illuminated illuminated and and PREPURGE PREPURGE alignedaligned by by YELLOW lightslights illuminated.

illuminated.

Comment:

Comment:

2008 NRC 2008 NRC SIM SIM hh NUREG NUREG 1021,1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 11 Page 11 of of 14 14 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 21 21 Request RC Request RC to to perform perform aa background background radiation radiation check check atat Radiation Monitors Radiation Monitors R-11 R-1i and and R-12.

R-12. (Step (Step 13) 13)

Standard:

Standard: Contacts RC Contacts RC personnel personnel to to perform perform background background checks checks atat the the radiation monitors.

radiation monitors.

Examiners Cue:

Examiner's Cue: RC personnel RC personnel willwill perform perform background background radiation radiation checks checks at at R-11 and R-11 R-12.

and R-12.

Comment:

Comment:

Performance Step: 22 Determine if Primary System leakage is occurring. (Step 14)

Standard:

Standard: Determines that leakage is occurring.

Examiners Note:

Examiner's Initial conditions stated entry had been made into AOP-016 to determine the location of the RCS leakage.

Comment:

Performance Performance Step:

Step: 23 23 Go Go ToTo the the Main Main Body, Step 11b, Body, Step of this b, of this procedure.

procedure. (Step (Step 16) 16)

Standard:

Standard: Proceeds Proceeds to to Main Main Body, Body, Step Step 11b, b, of of AOP-005.

AOP-OOS.

Examiners Examiner's Note:

Note:

Comment:

Comment:

2008 NRC SIM 2008 NRC SIM hh NUREG NUREG 1021, Revision 9,9, Supplement 1021, Revision Supplement 11

Appendix CC Appendix Page 12 Page 12 of 14 of 14 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 24 24 Use non-performed Use non-performed attachments attachments listed listed below below for for radiation radiation monitors inin alarm monitors alarm - NONE NONE to to be addressed.

be addressed.

Standard:

Standard: R-1 2 attachment R-12 attachment hashas already already been been addressed addressed and and there there are are no no other Radiation other Radiation monitors monitors inin alarm, alarm, thus thus none none are are remaining remaining toto be be addressed.

addressed.

Examiners Note:

Examiner's Note:

Comment:

Comment:

Performance Step: 25 Implement the EALs. (Main Body, Step 2)

Standard:

Standard: Informs the SSO of the need to implement the EALs.

Examiners Note:

Examiner's acknowledges the information provided.

SSO acknowledges Comment:

END END OFTASK OF TASK Termination: AOP-005 actions actions for an R-12 for an R-12 alarm havehave been been completed completed.

STOP STOP TIME:

TIME:

2008 2008 NRC NRC SIM SIM hh NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Page 13 Page 13 of of 14 14 Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job Performance Job Performance Measure Measure No.:

No.: 2008 NRC 2008 NRC SIM SIM hh Examinees Name:

Examinee's Name:

Date Performed:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Examiner's Signature: Date:


2008 NRC SIM 2008 NRC SIM hh 1021, Revision NUREG 1021, NUREG Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 14 Page 14 of 14 of 14 Form Form ES-C-1 ES-C-i JPM CUE JPM CUE SHEET SHEET INITIAL CONDITIONS:

INITIAL CONDITIONS: The plant

    • The plant isis at at 100%

100% power.

power.

    • AOP-016, AOP-016, EXCESSIVE EXCESSIVE PRIMARY PRIMARY PLANT PLANT LEAKAGE, LEAKAGE, isis being being performed.

performed.

    • An An unscheduled unscheduled Containment Containment entry is in entry is in progress progress to to determine determine the the leak location.

leak location.

    • APP-036-LS, APP-036-L5, CV CV PERSONNEL PERSONNEL HATCH HATCH DOOR DOOR OPEN, OPEN, is is ILLUMINATED.

ILLUMINATED.

INITIATING CUE: You are the Control Room Operator. Respond to plant conditions.

2008 2008 NRC NRC SIM SIM hh NUREG 1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Job Performance Job Performance Measure Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:

Facility: HB ROBINSON HB ROBINSON Task No.:

Task No.: 01311100906 01311100906 Task Title:

Task Title: Trip the Reactor Trip the Reactor from from the the Rod Drive MG Rod Drive MG JPM No.:

JPM No.: 2008 2008 NRCNRC In-Plant In-Plant ii Room Set Room Set K/A

Reference:

KIA

Reference:

029 EA 029 EA1.li 3.9/4.1 1.11 3.9/4.1 029 EA1.12 029 EA1.12 4.1/4.0 4.1/4.0 Examinee:

Examinee: NRC Examiner:

NRC Examiner:

Facility Evaluator:

Facility Evaluator: Date:

Date:

Method of testing:

Method Simulated Performance:

Simulated Performance: xX Actual Performance:

Actual Performance:

Classroom _ _ _ Simulator

- - - Plant xX READ TO THE EXAMINEE READ II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: ** You are the Inside AO.

  • Plant is operating at 100% RTP.
  • The Reactor cannot be tripped from the Control Room.
  • FRP-S.1, RESPONSE TO NUCLEAR POWER GENERATION/ATWS, is being implemented implemented..

Task Standard: BOTH Rod Drive Motor Generator Circuit Breakers A "A" and B "B" are opened locally.

Required Materials:

Materials: FRP-S.1, FRP-S.1, RESPONSE TO TO NUCLEAR NUCLEAR POWER POWER GENERATION/ATWS, GENERATION/ATWS, Rev. Rev. 17.

17.

General

References:

General

References:

FRP-S.i, FRP-S.1, RESPONSE TO TO NUCLEAR NUCLEAR POWER POWER GENERATION/ATWS, GENERATION/ATWS, Rev. Rev. 17.

17.

Initiating Initiating Cue:

Cue: The The CRSS CRSS directs you to directs you to the Rod Drive the Rod Drive MG MG Set Set Room Room to to trip trip the the following following breakers:

breakers: Reactor Trip Breakers Reactor Trip "A" and Breakers A and B "B" and and Rod Drive Motor Rod Drive Motor Generator Generator A "A"

and and B Circuit Breakers.

"B" Circuit Breakers.

Time Critical Task:

Time Critical Task: YES YES Validation Validation Time:Time: 55 minutes minutes 2008 NRC 2008 NRC IP IP i i NUREG 1021, NUREG 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 22 of Page of 88 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION (Denote Critical (Denote Critical Steps with an Steps with an asterisk) asterisk)

EXAMINERS NOTE:

EXAMINER'S NOTE: FRP-S.1, Steps FRP-S.1, Steps 11 and and 22 areare immediate immediate action action steps and steps and the the AOs AOs wouldwould be be expected expected to to execute these steps execute steps from memory memory without without procedure in procedure in hand.

hand.

These immediate These immediate action steps are represented represented by Steps 1, 1,2,3 2, 3 and 4 of this JPM, thus Steps Steps 11 through 4 are time critical steps.

START TIME: _ _ __ TIME CRITICAL START TIME: _ _ _ __

Performance Step: 1 1 Trip Reactor Trip Breaker "A". A.

Standard: Simulates tripping Reactor Trip Breaker "A" A by depressing the trip button in the center of the breaker.

Examiners Note:

Examiner's As Found position of the breaker is CLOSED with RED CLOSED flag in the breaker status window.

Examiners Examiner's Cue: After the candidate candidate locates and describes I simulates simulates how the breaker breaker would be tripped open, open, inform inform the candidate candidate the breaker breaker trip pushbutton pushbutton in in the center of of the cubicle door door has has been been pressed pressed and and the breaker breaker RED RED CLOSED CLOSED flag remains in in the breakers the breaker's status status window.

window.

Comment:

Comment:

2008 2008 NRC NRC lP IP i i NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 33 of Page of 88 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 22 Trip Reactor Trip Reactor Trip Trip Breaker Breaker "B".

B.

Standard:

Standard: Reactor Trip Breaker Simulates tripping Reactor Breaker "B" B by by depressing depressing the trip button in the center of the breaker.

breaker.

Examiners Note:

Examiner's As Found position of the breaker is CLOSED with RED CLOSED flag in the breaker status window.

Examiners Cue:

Examiner's After the candidate locates and describes I simulates how the breaker would be tripped open, inform the candidate the breaker trip pushbutton in the center of the cubicle door has been pressed and the breaker RED CLOSED flag remains in breakers status window.

the breaker's Comment:

2008 NRC 2008 NRC lPIP Ii NUREG NUREG 1021,1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix C Appendix C Page 44 of Page of 88 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 33 Trip Motor Generator Trip Motor Generator "A" A Circuit Circuit Breaker.

Breaker.

Standard:

Standard: Simulates tripping Simulates tripping Motor Motor Generator Generator "A" A Circuit Circuit Breaker.

Breaker.

Examiners Note:

Examiner's As Found position of the breaker is CLOSED with RED CLOSED CLOSED flag in the breaker status window or indication on the MG MG Set Set panel has the RED light illuminated and and the GREEN GREEN light extinguished.

extinguished.

BOTH Motor Generator Circuit Breakers "A" A and "B" B must be tripped locally for a success path in this JPM.

Examiners Cue:

Examiner's After the candidate locates and describes I simulates how the breaker would be tripped open, inform the candidate the breaker trip pushbutton in the center of the cubicle door has been pressed and the breaker OPEN GREEN flag has breakers status window. Noise was heard appeared in the breaker's as the breaker re-positioned.

OR The operator may choose to trip the breaker with the pistol grip switch on the MG Set panel. After locating and describing how the breaker would be tripped using the pistol grip switch, inform the candidate that the pistol grip switch has been taken to the TRIP position and the RED light is extinguished and the GREEN light is illuminated.

Noise was heard as the breaker re-positioned.

Comment:

2008 2008 NRC NRC IPIP ii NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 55 of Page of 88 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 44 Trip Motor Trip Generator "B" Motor Generator B Circuit Circuit Breaker.

Breaker.

Standard:

Standard: Simulates tripping Simulates tripping Motor Motor Generator Generator "B"B Circuit Circuit Breaker.

Breaker.

Examiners Note:

Examiner's Note: As Found position As Found position ofof the the breaker breaker isis CLOSED CLOSED withwith RED RED CLOSED CLOSED flag in flag in the breaker status the breaker status window window or indication on or indication on the the MG MG Set Set panel has panel the RED has the light illuminated RED light illuminated and and the the GREEN GREEN light light extinguished.

extinguished.

BOTH Motor BOTH Motor Generator Circuit Breakers Breakers "A"A and "B" B must bebe locally for aa success tripped locally success path in this JPM. JPM.

Examiners Cue:

Examiner's After the candidate locates and describes II simulates how the breaker would be tripped open, inform the candidate the breaker trip pushbutton in the center of the cubicle door has been pressed and the breaker OPEN GREEN flag has breakers status window. Noise was heard appeared in the breaker's re-positioned.

as the breaker re-positioned.

OR The operator may choose to trip the breaker with the pistol grip switch on the MG Set panel. After locating and describing how the breaker would be tripped using the pistol grip switch, inform the candidate that the pistol grip switch has been taken to the TRIP position and the RED light is extinguished and the GREEN light is illuminated.

Noise was heard as the breaker re-positionedre-positioned..

Comment:

TIME TIME CRITICAL CRITICAL STOPSTOP TIME:

TIME: _ _ _ __

2008 NRC IP 2008 NRC IP i i NUREG NUREG 1021, 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 66 of Page of 88 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 55 Inform the Inform the Control Control Room Room thatthat Motor Motor Generator Generator "A" A and and "B" B Circuit Circuit Breakers have Breakers have been been tripped tripped open open and and that that Reactor Reactor Trip Trip Breakers Breakers A and "A" and "B" would NOT B would NOT open.

open.

Standard:

Standard: Contacts the Contacts the Control Control Room Room and and reports reports that that Motor Motor Generator Generator "A" A

and "8" and B Circuit Circuit Breakers Breakers have have been been tripped tripped open open and and that that Reactor Trip Reactor Trip Breakers Breakers "A" A and and "B" B would would NOT NOT open.

open.

Examiners Cue:

Examiner's Cue: As the As the CRSS, CRSS, acknowledge acknowledge the the candidate's candidates report.

report.

Examiners Note:

Examiner's Note:

Comment:

END OFOFTASK TASK Termination: Rod Drive Drive MG Set Circuit Breakers A MG Set "A" and B "B" are are tripped open.

open.

STOP TIME:

STOP TIME:

2008 NRC lP 2008 NRC IP I i NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 77 of Page of 88 Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job Performance Job Performance Measure Measure No.:

No.: 2008 NRC 2008 NRC IP IP ii Examinees Name:

Examinee's Name:

Examiners Name:

Examiner's Name:

Date Performed:

Date Performed:

Facility Evaluator:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Documentation:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Examiner's Signature:

Signature: Date:


2008 2008 NRCNRC IP IP i i NUREG 1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 88 of Page of 88 Form Form ES-C-1 ES-C1 JPM CUE JPM CUE SHEET SHEET INITIAL CONDITIONS:

INITIAL CONDITIONS: ** You are You are thethe Inside Inside AO.

AO.

    • Plant isis operating Plant operating atat 100%

100% RTP.

RTP.

    • The Reactor cannot The Reactor cannot be be tripped tripped from from the the Control Control Room.

Room.

    • FRP-S.1, RESPONSE FRP-S.1, RESPONSE TO TO NUCLEAR NUCLEAR POWERPOWER GENERATION/ATWS, isis being GENERATION/ATWS, being implemented.

implemented.

INITIATING CUE:

INITIATING CUE: The CRSS The CRSS directs directs you you to the Rod to the Drive MG Rod Drive MG SetSet Room Room toto trip trip the the following breakers:

following breakers: Reactor Reactor Trip Trip Breakers Breakers "A" A and and "B" B and and Rod Rod Drive Drive Motor Generator "A" and "B" A and B Circuit Breakers.

Breakers.

2008 2008 NRC IP i i NRC IP NUREG 1021, NUREG 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix C Appendix C Job Performance Measure Job Performance Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:

Facility: HB ROBINSON HB ROBINSON Task No.:

Task No.: 04010100101 04010100101 Task Title:

Task Title: Energize PZR Energize PZR Heaters Heaters from from Emergency Emergency JPM No.:

JPM No.: 2008 2008 NRC NRC In-Plant In-Plant j Busses (Turbine Building Busses (Turbine Building Actions)

Actions) lAW lAW EPP-21.

EPP-21.

K/A

Reference:

KIA

Reference:

027 AA 027 AA11.05 3.3/3.2

.05 3.3/3.2 AA11.21 056 AA 056 .21 3.3/3.3 3.3/3.3 Examinee:

Examinee: Examiner:

NRC Examiner:

NRC Facility Evaluator:

Facility Evaluator: Date:

Date:

Method of testing:

Method Performance:

Simulated Performance: xX Performance:

Actual Performance:

Classroom - - - Simulator - - - Plant xX READ TO THE EXAMINEE READ II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • The plant has experienced a loss of offsite AC power.
  • implemented.

EOP Network has been implemented.

  • EPP-4, REACTOR TRIP RESPONSE, RESPONSE, has directed the implementation implementation of EPP-21, ENERGIZING PRESSURIZ PRESSURIZER ER HEATERS FROM EMERGENCY BUSSES.
  • You are the Outside AO.
  • Emergency Bus E-1 is powered by EDG A. "A".
  • You have have been given Key # 69, PZR "PZR Heater Breaker Arm Switch Switch" and aa set of large fuse pullers.
  • The The breakers breakers listed listed in in Step # 33 cannot bebe verified verified 6pen open from the RTGB.

Task Task Standard:

Standard: Align breakers Align breakers in in preparation preparation forfor energizing energizing PZR PZR Backup Backup Heater Heater Group Group AA lAW lAW EPP-21.

EPP-21.

Required Required Materials:

Materials: EPP-21, EPP-21, ENERGIZING ENERGIZING PRESSURIZ PRESSURIZER ER HEATERS HEATERS FROM FROM EMERGENCY EMERGENCY BUSSES, BUSSES, Rev. Rev. 15.

15.

Key Key ## 6969 Large Fuse Pullers Large Fuse Pullers General

References:

General

References:

EPP-21, EPP-21, ENERGIZING ENERGIZING PRESSURIZ PRESSURIZER ER HEATERS HEATERS FROM FROM EMERGENCY EMERGENCY BUSSES, BUSSES, Rev. Rev. 15.

15.

2008 2008 NRC NRC IPjIP j NUREG 1021, Revision NUREG 1021, 9, Supplement Revision 9, Supplement 11

Appendix C Appendix C Job PerFormance Measure Job Performance Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Initiating Cue:

Initiating Cue: The CRSS The CRSS has has directed directed you you to to perform perform the the Turbine Building actions Turbine Building actions required required to to energize PZR energize PZR Heaters Heaters from from the the emergency emergency busbus inin accordance accordance with with EPP-21, EPP-2i, Steps 33 through Steps through 6.

6.

Time Critical Time Critical Task:

Task: NO NO Validation Time:

Validation Time: minutes 20 minutes 20 2008 2008 NRC NRC IP IP jj NUREG 1021, NUREG 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 33 of Page of 10 10 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION (Denote Critical (Denote Critical Steps Steps with with an an asterisk) asterisk)

START TIME:

START TIME: _ __

Performance Step:

Performance Step: 11 Obtain aa copy Obtain copy ofof the the appropriate appropriate procedure.

procedure.

Standard:

Standard: Candidate obtains Candidate obtains copy copy ofof EPP-21 EPP-21 from from the the lAO lAO office, office, WCC, WCC, Control Room Control Room or or other other valid valid location.

location.

Examiners Note:

Examiner's Note:

Examiners Cue:

Examiner's Cue: candidate states When candidate states they need need toto obtain obtain aa copy copy of of EPP-EPP 21, ask him where to locate one. If correct, provide him with a copy of EPP-21.

Comment:

    • Performance Step: 2 Performance Verify OPEN SST-2A TO 480V SYSTEM BKR 52/1 52/i B. (Step 3, First Bullet)

Standard: Breaker 52/i 52/1 B opened by depressing the trip pushbutton in the center of the breaker cubicle door.

Examiners Examiner's Note: As Found position of the breaker is CLOSED with RED CLOSED flag in the breaker status window.

Examiners Examiner's Cue:

Cue: After the the candidate candidate locates and and describes describes I simulates simulates howhow the breaker the breaker would would be be tripped open, inform tripped open, inform thethe candidate candidate the the breaker trip pushbutton breaker trip pushbutton in in the the center center ofof the the cubicle cubicle door door has has been been pressed pressed and and thethe breaker breaker OPEN GREEN flag OPEN GREEN flag has has appeared appeared in the breakers in the breaker's status status window.

window. NoiseNoise was was heard heard as the breaker as the breaker re-positioned re-positioned..

Comment:

Comment:

2008 2008 NRC NRC IPj IP j NUREG 1021, Revision NUREG 1021, Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 44 of Page of 10 10 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 33 Verify OPEN Verify OPEN 480V480V BUS BUS 11 MAIN MAIN BKR BKR 52/2B.

52/2B. (Step (Step 3, 3, Second Second Bullet)

Bullet)

Standard:

Standard: Breaker 52/2B Breaker 52/2B opened opened by depressing the by depressing the trip trip pushbutton pushbutton in in the the center of center of the breaker cubicle the breaker cubicle door.

door.

Examiners Note:

Examiner's Note: As Found As Found position position of of the the breaker breaker is is OPEN OPEN with with GREEN GREEN OPENOPEN flag in the breaker status flag in the breaker status window.

window.

Examiners Cue:

Examiner's Breaker indicates OPEN with GREEN flag in breaker status window.

Comment:

Performance Step: 4 Verify OPEN 480V BUS 1-2A i-2A TIE BKR 5215B.

52/5B. (Step 3, Third Bullet)

Standard: Breaker 5215B 52/5B opened by by depressing depressing the trip pushbutton in in the center of the breaker cubicle door.

Examiners Examiner's Note: As Found Found position of the breaker is OPEN with GREEN GREEN OPENOPEN flag in in the breaker status window.

Examiners Examiner's Cue:Cue: Breaker Breaker indicates indicates OPEN OPEN withwith GREEN GREEN flagflag inin breaker breaker status status window.

window.

Comment:

Comment:

2008 NRC 2008 NRC IP IP j j NUREG 1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Page 55 of Page of 10 10 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step:

Performance Step: 55 Verify OPEN Verify OPEN 480V480V BUS BUS E1 El MAIN MAIN BKR BKR 52/18B.

52/i8B. (Step (Step 3, 3, Fourth Fourth Bullet)

Bullet)

Standard:

Standard: Breaker 52/18B Breaker 52/i 8B opened opened by by depressing depressing the the trip trip pushbutton pushbutton located in located in the center of the center breaker cubicle of the breaker cubicle door.

Examiners Note:

Examiner's Note: Found position of the breaker is OPEN with GREEN OPEN As Found flag inin the the breaker breaker status window.

Examiners Cue:

Examiner's Breaker indicates OPEN with GREEN flag in breaker status window.

Comment:

Performance Step: 6 Obtain the following: (Step 4)

  • Key ##6969 to PZR HEATER BKR ARM SWITCH
  • Large Fuse Pullers Standard: Obtain the key and large fuse pullers.

Examiners Examiner's Note: Key and large fuse pullers were obtained during the initial conditions.

Examiners Examiner's Cue: Ensure that the candidate is clear that the initial conditions provided the necessary materials.

Comment:

NOTE: 4160V NOTE: 4160V Breaker 52113 is Breaker 52/13 is locally locally opened opened by by rotating rotating the the switch switch counterclock counterclockwisewise to the TRIP position the TRIP and then position and then pulled pulled out to lock.

out to lock.

2008 2008 NRC NRC lPj IP j NUREG 1021, Revision NUREG 1021, Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 66 of Page of 10 10 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 77 Locally open Locally open andand Pull-To-Lock Pull-To-Lock STATION STATION SERVICE SERVICE TRANSFORMER 2A TRANSFORMER 2A and and 2F BKR 52/13 2F BKR 52/13 (4160V (41 60V Bus Bus 2, 2, CMPT-CMPT 13). (Step 13). (Step 5) 5)

Standard:

Standard: Breaker 52/13 Breaker 52/13 opened opened by turning the by turning the breaker breaker control control switch switch counterclockwise to counterclockwise to the the TRIP TRIP position position and and placed placed inin Pull-To-Lock Pull-To-Lock (Located on (Located 4160V Bus on 4160V Bus 2,2, CMPT CMPT-13).

-13).

Examiners Note:

Examiner's Note: As Found As Found position position of the breaker of the breaker is CLOSED with is CLOSED with RED RED CLOSED CLOSED indicator light illuminated indicator light illuminated on the breaker cubicle door.

IfIf candidate candidate decides decides to looklook at at the breaker breaker by by opening opening the cubicle cubicle door, the as found position of the breaker is CLOSED with with RED RED CLOSED flag on the breaker status window.

Examiners Cue:

Examiner's After the candidate locates and describes I simulates how the breaker would be tripped open, inform the candidate the breaker control switch has been rotated counterclockwisecounterclockwise and the RED CLOSED indicator has extinguished and the GREEN OPEN indicator has illuminated. Noise was heard as the breaker re-positioned.

re-positioned.

Comment:

2008 2008 NRC NRC IPIP j j NUREG NUREG 1021,1021, Revision 9, Supplement Revision 9, Supplement 11

Appendix CC Appendix Page 77 of Page of 10 10 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 88 Perform the Perform the following:

following: (Step (Step 6)6)

a. Locally verify
a. Locally verify the the following following breakers breakers at at 480V 480V BusBus 11 -

OPEN OPEN

    • Pressurizer Heater Pressurizer Heater Backup Backup Group Group AA (CMPT-2C)

(CMPT-2C)

    • Feed to Feed to MCC-1 MCC-i (CMPT-3A)

(CMPT-3A)

    • CV Polar Crane CV Polar Crane Power Power Supply Supply (CMPT-3B)

(CMPT-3B)

    • Feed to Feed to PP-63 PP-63 (CMPT (CMPT-3C)

-3C)

    • Construction Facilities Construction Facilities Main Main Disconnect Disconnect (CMPT-(CMPT 4B)
    • Spent Fuel Spent Fuel Pit Pit Cooling Cooling Pump Pump B B (CMPT-4C)

(CMPT-4C)

  • Condenser Vacuum Pump A (CMPT-5C)
b. Remove breaker control power fuses from Condenser Vacuum Pump A. (CMPT-5C)

Standard: a. All 480V Bus 11 breakers verified OPEN by checking for GREEN OPEN indication or by depressing the TRIP pushbutton in the center of the breaker cubicle door to place the breaker in the OPEN position.

b. Breaker door is opened and control power fuses are removed from Condenser Vacuum Pump A. (CMPT-5C)

Examiners Examiner's Note: As Found position of the following breakers is CLOSED with RED CLOSED indicator light illuminated illuminated on the breaker cubicle cubicle door:

door:

- Feed Feed toto MCC-i MCC-1 (CMPT-2C)

- Feed Feed toto PP-63 PP-63 (CMPT-3C)

(CMPT-3C)

- Construction Construction Facilities Facilities Main Main Disconnect Disconnect (CMPT (CMPT 4B)4B)

The The remaining remaining breaker breaker positions positions may may be be OPEN OPEN or or CLOSED, CLOSED, depending depending on on whether whether they they were were operating operating for for plant plant needs needs at at the the time of time of the the loss of power.

loss of power.

2008 2008 NRC NRC IPj IP j NUREG 1021, NUREG 1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 88 of Page of 10 10 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION Examiners Cue:

Examiner's Cue: a. When

a. When the the breakers breakers areare located, located, and and the the candidate candidate hashas simulated pushing the simulated pushing the TRIP TRIP pushbutton, pushbutton, informinform the the candidate that candidate that GREEN GREEN OPENOPEN indication indication is is visible.

visible.

b. Once
b. Once the the candidate candidate has has determined determined andand identified identified the the proper 480V breaker proper 480V breaker cubiclecubicle to to remove remove the the control control power fuses, power fuses, present present himhim with with the the breaker breaker cubicle cubicle picture and picture and allow allow him him to to identify identify the the fuses fuses and and the the removal process.

removal process. When When thethe fuses fuses are are identified, identified, inform the inform the candidate candidate that that they they are are removed.

removed.

Comment:

Comment:

Performance Step:

Performance Step: 9 Inform the CRSS that the Turbine Building Inform Building actions of EPP-21 EPP-21,,

Steps 3 through 6 have been completed as directed.

Standard:

Standard: Candidate contacts the Control Room and informs the CRSS that the Turbine Building portions of EPP-21 have been completed as directed.

Examiners Note:

Examiner's Note:

Examiners Examiner's Cue: CRSS acknowledge acknowledges s the report.

Comment:

Comment:

END END OFTASK OF TASK Termination:

Termination: EPP-21 EPP-21 Steps Steps 33 through have been through 66 have been completed completed as as directed.

directed.

STOP STOP TIME:

TIME:

2008 2008 NRC NRC IPIPj j NUREG NUREG 1021,1021, Revision Revision 9,9, Supplement Supplement 11

Appendix CC Appendix Page 99 of Page 10 of 10 Form Form ES-C-1 ES-C-i VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job Performance Measure Job Performance Measure No.:

No.: 2008 NRC 2008 IP ij NRC IP Examinees Name:

Examinee's Name:

Examiners Name:

Examiner's Name:

Performed:

Date Performed:

Date Facility Evaluator:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Documentation:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Examiner's Signature:

Signature: Date:

Date:


2008 NRC 2008 NRC IPj IP j NUREG 1021, Revision NUREG 1021, Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 10 Page 10 of of 10 10 Form Form ES-C-1 ES-C-i JPM CUE JPM CUE SHEET SHEET INITIAL CONDITIONS:

INITIAL CONDITIONS: ** The plant The plant has has experienced experienced aa loss loss of of offsite offsite AC AC power.

power.

    • EOP Network EOP Network has has been been implemented.

implemented.

    • EPP-4, REACTOR EPP-4, REACTOR TRIP TRIP RESPONSE, RESPONSE, has has directed directed the the implementati implementation of EPP-21, on of EPP-21, ENERGIZING ENERGIZING PRESSURIZER PRESSURIZER HEATERS FROM HEATERS FROM EMERGENCY EMERGENCY BUSSES. BUSSES.
    • You are You the Outside are the Outside AO.

AD.

    • Emergency Bus Emergency Bus E-1 E-i is is powered powered by by EDG EDG "A".

A.

    • You have You have been been given given Key Key ## 69, PZR Heater 69, "PZR Heater Breaker Breaker Arm Arm Switch and Switch" and aa set set of of large large fuse fuse pullers.

pullers.

  • The breakers listed in Step # 3 cannot be verified open open from RTGB.

the RTGB.

INITIATING CUE:

INITIATING The CRSS has directed you to perform the Turbine Building actions required to energize PZR Heaters from the emergency EPP-21,, Steps 3 through 6.

bus in accordance with EPP-21 2008 NRC lPj 2008 NRC IP j NUREG NUREG 1021, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Appendix C Job Performance Job Performance Measure Measure Form Form ES-C-1 ES-C-i Worksheet Worksheet Facility:

Facility: HB ROBINSON HB ROBINSON Task No.:

Task No.: 04064100901 04064100901 Task Title:

Task Title: Manually Start Manually Start EDG EDG Using Air Start Using Air Start JPM No.:

JPM No.: 2008 2008 NRC NRC In-Plant In-Plant kk Solenoids Solenoids KIA

Reference:

K/A

Reference:

064 A3.01 064 A3.01 4.1/4.0 4.1/4.0 056 AK3.02 4.4/4.7 056 AK3.02 4.4/4.7 056 AA2.14 4.4/4.6 056 AA2.14 4.4/4.6 Examinee:

Examinee: Examiner:

NRC Examiner:

NRC Facility Evaluator:

Facility Evaluator: Date:

Date:

Method of Method of testing:

testing:

Simulated Performance:

Simulated Performance: xX Performance:

Actual Performance:

Simulator Classroom - - - Simulator Plant X READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

  • You are the Inside AO.
  • The unit has experienced a total loss of onsite and offsite power.
  • EPP-1, LOSS OF ALL AC POWER, has been implemented. implemented.

Task Standard: Start EDG EDG A locally and energize 480V "A" locally 480V BusBus E-1 Required Required Materials:

Materials: EPP-i, EPP-1, Revision 38 38 General

References:

General

References:

EPP-1, EPP-1, Revision Revision 38 38 Initiating Initiating Cue:

Cue: The The CRSS CRSS has has dispatched dispatched you you to to perform perform EPP-i, EPP-1, starting starting at at Step Step 110.b.

0.b.

RNO.

RNO.

Time Critical Time Critical Task:

Task: NO NO Validation Validation Time: Time: 12 12 minutes minutes 2008 2008 NRC NRC IP IP kk NUREG 1021, NUREG 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix CC Appendix Page 22 of Page of 88 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION (Denote Critical (Denote Critical Steps with an Steps with an asterisk) asterisk)

START TIME: _ _

STARTTIME:

    • Performance Step:

Performance Step: 11 Place the Place the EDG EDG Control Control Switch Switch inin the the LOCAL LOCAL position.

position.

Standard:

Standard: Candidate locates Candidate locates and simulates placing and simulates placing the the EDG EDG "A"A LOCAL LOCAL /I REMOTE CONTROL REMOTE CONTROL switch switch in in the LOCAL position.

the LOCAL position.

Examiners Cue:

Examiner's EDG "A" EDG A LOCAL LOCAL II REMOTE REMOTE CONTROL CONTROL switch is is rotated rotated to the LOCAL position position and the Local Local Control WHITE light light is is ILLUMINATED.

ILLUMINATED.

Comment:

    • Performance Step: 2 Depress the Local Engine START pushbutton.

Standard: Candidate simulates depressing the Local Engine START pushbutton on the EDG "A" A Engine Control Panel.

Examiners Cue:

Examiner's EDO A EDG "A" does NOT start.

Comment:

2008 2008 NRC NRC IPIP kk NUREG NUREG 1021,1021, Revision Revision 9, 9, Supplement Supplement i1

Appendix CC Appendix Page 33 of Page of 88 Form Form ES-C-1 ES-C-i PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 33 the affected IfIf the affected EDG did NOT EDG did start from NOT start from the the Engine Engine Control Control Panel, Panel, Then perform the Then perform the following following atat the the EDG EDG Hand Hand Start Start valves:

valves:

Remove the Remove the locking locking pin pin from the Hand from the Hand Start Start valves valves Lock Lock Bar Bar and and remove the remove the Lock Lock Bar.

Bar.

Standard:

Standard: Candidate simulates Candidate simulates removing removing the the locking locking pin pin from from the the Hand Hand Start valves Start valves Lock Lock BarBar and and removing removing the the Lock Lock Bar Bar from from valves valves DA-41 and DA-41 and DA-42.

DA-42.

Examiners Cue:

Examiner's Locking pin from the Hand Start valves Lock Bar is removed Locking and the Lock Bar from valves DA-41 and DA-42 is removed. removed.

Comment:

    • Performance Step: 4 If the affected EDG did NOT start from the Engine Control Panel, Then perform the following at the EDG Hand Start valves:

Pull down and hold either of the EDG Hand Start valves until the EDG starts:

  • DA-4i DA-41
  • DA-42 Standard:

Standard: Candidate selectsselects oneone of the Hand Hand Start Start valves valves and and simulates pulling down down on the handle until until the EDG starts.

Examiners Examiner's Cue:

Cue: EDG EDG A "A" has started and has started and is is running running at at 900 900 RPM.

RPM.

Comment:

Comment:

2008 NRC 2008 NRC IP IP kk NUREG NUREG iO2i, 1021, Revision Revision 9, 9, Supplement Supplement 11

Appendix C Page 4 of 8 ES-C-i Form ES-C-1 PERFORMANCE INFORMATION PERFORMANCE INFORMATION Performance Step: 5 IfIf either EDG has started, Then Go To Step 11.ii.

Standard: EDG "A" A started and candidate proceeds to Step 11 ii..

Examiners Note:

Examiner's Comment:

Performance Step: 6 Check either Emergency Bus E-1 E-i or E ENERGIZED.

Standard: Candidate observes indication on the EDG "A" A Generator Control Panel and notes that 480V Bus E-1 is NOT energized.

Examiners Cue:

Examiner's GENERATOR AC VOLTS indicates 480 Volts.

EMERGENCY BUS AC VOLTS indicates 0 Volts.

NORMAL BUS AC VOLTS INDICATES 0 Volts.

GENERATOR HERTZ indicates 60 Hz.

If candidate requests information from the Control Room, inform him that neither Emergency Bus is energized.

Comment:

2008 NRC IP k NUREG 1021, 1021, Revision 9, Supplement 1a1!

Appendix C C Page 55 of 88 Form ES-C-i ES-C-1 PERFORMANCE INFORMATION INFORMATION

  • Performance Step: 7 Verify the following for any running EDG:
  • EMERG GEN VOLTS - APPROXIMATELY 480 VOLTS.

-

AND

  • BRKR 52/17B, EMERG DG A TO BUS El E1 - CLOSED.

Standard: Candidate observes that EDG A GENERATOR AC VOLTS "A" GENERATOR indicates - 480 Volts.

Candidate closes EDG A "A" Output breaker at the EDG Generator Control Panel by placing EDG OUTPUT BKR 52Ii7B 52/17B control switch to the CLOSE position.

Indications on the EDG Generator Control panel include Generator AC Volts, Emergency Bus AC Volts and Normal Bus AC Volts.

Inform candidate that EDG Generator AC Volts is 480 Volts.

Inform candidate that breaker 52117B indication has the GREEN OPEN light illuminated and the RED CLOSED light extinguished when the breaker control switch is located.

Inform candidate that breaker 52117B indication has the RED CLOSED light illuminated and the GREEN OPEN light extinguished when the breaker control switch is placed in the closed position.

Generator AC KW indicates 400 KW.

Examiner's Examiners Cue:

Comment:

2008 NRC IP k NUREG 1021, Revision 9, Supplement 11

Appendix CC Appendix Page 66 of Page of 88 Form ES-C-i Form ES-C-1 PERFORMA PERFORMANCE NCE INFORMAT INFORMATION ION Performance Step:

Performance Step: 88 Emergency Bus either Emergency IfIf either Bus is energized, Then is energized, To Step Go To Then Go Step 12.

12.

Standard:

Standard: 480V Bus 480V E-1 is Bus E-1 energized at is energized at ~ 480 Volts with 480 Volts EDG A with EDG "A" supplying supplying the bus.

the bus.

Examiner's Cue:

Examiners Cue: Inform the Inform candidate that the candidate that EMERGENC EMERGENCY Y BUS BUS ACAC VOLTS VOLTS indicates 480 indicates 480 Volts and and that Emergency Bus that Emergency E-1 is Bus E-1 is energized.

energized.

Comment:

ENDOFTAS END OF TASK K A started and 480V Bus E-1 energized.

Termination: EDG "A" STOP TIME:

2008 2008 NRC NRC IPIP kk NUREG 1021, NUREG Revision 9, 1021, Revision Supplement 11 9, Supplement

Appendix C Appendix C Page 77 of Page of 88 Form ES-C-1 Form ES-C-1 VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job Performance Job Performance Measure Measure No.:

No.: 2008 2008 NRC NRC IP IP kk Examinee's Name:

Examinees Name:

Examiner's Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Examiners Signature: Date:


2008 2008 NRC NRC IPIP kk NUREG NUREG 1021, Revision 9, 1021, Revision Supplement 11 9, Supplement

Appendix CC Appendix Page Page 88ofof88 Form ES-C-i Form ES-C-1 JPM CUE JPM CUE SHEET SHEET INITIAL CONDITION INITIAL CONDITIONS:S: ** You are You are the Inside AO.

the Inside AO.

    • The unit The experienced aa total has experienced unit has loss of total loss of onsite offsite power.

and offsite onsite and power.

    • EPP-1, LOSS OF EPP-1, LOSS ALL AC POWER, has been OF ALL AC POWER, has been implemented. implemented .
    • Emergency Generator B Diesel Generator Emergency Diesel out of "8" isis out of service for scheduled service for scheduled maintenance maintenance to to replace replace the the fuel fuel oil oil filters.

filters.

    • Emergency Generator A Diesel Generator Emergency Diesel failed to "A" failed to start.

start.

INITIATING CUE:

INITIATING CUE: The CRSS The dispatched you has dispatched CRSS has you to perform EPP-i, to perform starting at EPP-1, starting Step iO.b.

at Step 10.b.

RNa.

RNO.

2008 NRC 2008 NRC IPIP kk NUREG 1021, NUREG 1021, Revision Supplement11 Revision 9,9, Supplement

Appendix CC Appendix Job Performance Job Performance Measure Measure Form Form ES-C-i ES-C-1 Worksheet Worksheet Facility:

Facility: HB ROBINSON HB ROBINSON Task No.:

Task No.: 04064100901 04064100901 Task Title:

Task Title: Manually Start Manually Using Air EDG Using Start EDG Air Start Start JPM No.:

JPM No.: 2008 NRC In-Plant 2008 NRC In-Plant kk Solenoids Solenoids KJA

Reference:

K/A

Reference:

A3.01 4.1/4.0 064 A3.0i 064 4.1/4.0 056 AK3.02 4.4/4.7 056 AK3.02 4.4/4.7 056 AA2.14 056 AA2.14 4.4/4.6 4.4/4.6 Examinee:

Examinee: NRC Examiner:

NRC Examiner:

Facility Evaluator:

Facility Evaluator: Date:

Date:

Method of Method of testing:

testing:

Performance::

Simulated Performance x X Performance::

Actual Performance Classroom - - - Simulator --- Plant x X

READ TO THE EXAMINEE II will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: ** You are the Inside AO.

  • The unit has experienced a total loss of onsite and offsite power.
  • EPP-1, LOSS OF ALL AC POWER, has been implemented. implemented.

Task Task Standard: Start EDG EDG "AnA locally locally and energize 480V Bus E-1 Bus E-1 Required Required Materials:

Materials: EPP-1, EPP-i, Revision 38 General General

References:

References:

EPP-1, EPP-1, Revision Revision 3838 Initiating nitiating Cue:Cue: The The CRSS CRSS hashas dispatched dispatched you you to to perform perform EPP-1, EPP-1, starting at Step starting at lOb.

Step 10.b.

RNO.

RNO.

Time Time Critical Critical Task:

Task: NO NO Validation Validation Time:Time: 12 12 minutes minutes 2008 2008 NRCNRC IP IP kk NUREG NUREG 1021, Revision 9, 1021, Revision Supplement 1I 9, Supplement

Appendix CC Appendix Page 22 of Page of 88 Form Form ES-C-i ES-C-1 PERFORMANCE PERFORMA NCE INFORMAT INFORMATION ION (Denote Critical (Denote Critical Steps Steps with an asterisk) with an asterisk)

START TIME:

START TIME: _ _

    • Performance Step:

Performance Step: I1 Place the Place EDG Control the EDG Switch inin the Control Switch LOCAL position.

the LOCAL position.

Standard:

Standard: Candidate locates Candidate simulates placing and simulates locates and the EDG placing the EDG A LOCAL //

"A" LOCAL CONTROL switch REMOTE CONTROL REMOTE in the switch in LOCAL position.

the LOCAL position.

Examiner's Cue:

Examiners EDG A EDG REMOTE CONTROL switch "A" LOCAL I REMOTE switch isis rotated to the LOCAL the LOCAL position position and and the the Local Local Control WHITE WHITE light is light is ILLUMINATED.

ILLUMINAT ED.

Comment:

    • Performance Step: 2 Depress the Local Engine START pushbutton.

Standard: Candidate simulates depressing the Local Engine START pushbutton on the EDG "A" A Engine Control Panel.

Examiner's Examiners Cue: EDG "A" NOT start.

A does NOT Comment:

Comment:

2008 2008 NRC NRC IP IP kk NUREG 1021, NUREG 1021, Revision Supplement 11 Revision 9,9, Supplement

Appendix CC Appendix Page 33 of Page of 88 Form ES-C-i Form ES-C-1 PERFORMANCE INFORMATION PERFORMANCE INFORMATION

    • Performance Step:

Performance Step: 33 IfIf the the affected EDG did affected EDG from the start from NOT start did NOT the Engine Control Panel, Engine Control Panel, Then perform Then following at the following perform the at the EDG Hand the EDG Start valves:

Hand Start valves:

Remove the Remove the locking pin from locking pin the Hand from the Hand Start valves Lock Start valves Bar and Lock Bar and remove the remove Lock Bar.

the Lock Bar.

Standard:

Standard: simulates removing Candidate simulates Candidate removing the locking pin the locking from the pin from the Hand Hand Start Start valves valves Lock Lock Bar Bar and and removing removing the the Lock Lock Bar Bar from from valves valves DA-41 and DA-41 and DA-42.

DA-42.

Examiner's Cue:

Examiners Locking pin pin from thethe Hand valves Lock Bar Start valves Hand Start Bar is is removed and the and the Lock Lock BarBar from valves DA-41 and valves DA-41 DA-42 is and DA-42 is removed.

Comment:

    • Performance Step: 4 If the affected EDG did NOT start from the Engine Control Panel, Then perform the following at the EDG Hand Start valves:

Pull down and hold either of the EDG Hand Start valves until the EDG starts:

  • DA-41
  • DA-42 Standard: Candidate selects one of the Hand Start valves and simulates pulling down on the handle until the EDG starts.

Examiner's Examiners Cue:

Cue: EDG EDG "A" A has has started and is running at 900 is running RPM.

900 RPM.

Comment:

Comment:

2008 2008 NRC NRC IPlP kk NUREG 1021, NUREG Revision 9, 1021, Revision Supplement 11 9, Supplement

Appendix CC Appendix Page of 88 Page 44 of Form ES-C-i Form ES-C-1 PERFORMANCE PERFORMA NCE INFORMAT INFORMATION ION Performance Step:

Performance Step: 55 either EDG IfIf either EDG has started, Then has started, Go To Then Go Step 11.

To Step 11.

Standard:

Standard: EDG A EDG "A" started proceeds to candidate proceeds and candidate started and Step 11.

to Step 11.

Examiner's Note:

Examiners Note:

Comment:

Comment:

Performance Step: 66 Check either Emergency Bus E-i ENERGIZED..

E-1 or E ENERGIZED Standard: Candidate observes indication on the EDG A "A" Generator Control Panel and notes that 480V Bus E-1 is NOT energized.

Examiner's Examiners Cue: GENERATOR AC VOLTS indicates 480 Volts.

GENERATOR EMERGENCY BUS AC VOLTS indicates 0 Volts.

EMERGENCY NORMAL BUS AC VOLTS INDICATES 0 Volts.

GENERATOR HERTZ indicates 60 Hz.

GENERATOR If candidate requests information from the Control Room, inform him that neither Emergency Bus is energized.

Comment:

2008 2008 NRC NRC IP IP kk NUREG 1021, Revision NUREG 1021, Supplement 11 Revision 9,9, Supplement

Appendix CC Appendix Page 55of Page of88 Form ES-C-i Form ES-C-1 PERFORMANCE PERFORMA NCE INFORMAT INFORMATION ION

  • Performance Step:

Performance Step: 77 Verify the Verify following for the following for any running EDG:

any running EDG:

    • EMERG GEN EMERG VOLTS - APPROXIM GEN VOLTS - ATELY 480 APPROXIMATELY 480 VOLTS.

VOLTS.

AND AND

    • BRKR EMERG DG 52/17B, EMERG BRKR 52117B, BUS El TO BUS DG AA TO E1 - CLOSED.

CLOSED.

Standard:

Standard: Candidate observes Candidate EDG A that EDG observes that "A" GENERATO GENERATOR AC VOLTS R AC VOLTS indicates - 480 indicates 480 Volts.

Volts.

Candidate closes Candidate "A" Output EDG A closes EDG at the breaker at Output breaker EDG Generator the EDG Generator Control Panel Control Panel by by placing placing EDG EDG OUTPUT OUTPUT BKR BKR 52117B 52/17B control control switch to switch CLOSE position.

the CLOSE to the position.

Indications on Indications the EDG on the Generator Control EDG Generator panel include Control panel include Generator Generator AC AC Volts, Emergency Emergency Bus Bus AC AC Volts Volts and and Normal Normal Bus AC Volts.

Inform candidate that EDG Generator AC Volts is 480 Volts.

Inform candidate that breaker 52117B 52/17B indication has the GREEN OPEN light illuminated and the RED CLOSED light extinguished when the breaker control switch is located.

Inform candidate that breaker 52/17B 521178 indication has the RED RED CLOSED light illuminated and the GREEN OPEN light extinguished when the breaker control switch is placed in in the closed position.

Generator AC KW indicates 400 KW.

Examiner's Examiners Cue:

Cue:

Comment:

Comment:

2008 2008 NRC NRC IPIP kk NUREG 1021, NUREG 1021, Revision Supplement 11 Revision 9,9, Supplement

Appendix C Appendix C Page 66 of Page of 88 Form ES-C-i Form ES-C-1 PERFORMA PERFORMANCE NCE INFORMAT INFORMATION ION Step: 88 Performance Step: Emergency Bus either Emergency IfIf either Bus is energized, Then is energized, Go To Step Then Go Step 12.

12.

Standard:

Standard: 480V Bus E-i "A" supplying 480 Volts with EDG A E-1 is energized at - 480 the bus.bus.

Examiner's Cue:

Examiners Inform the candidate that EMERGENC EMERGENCY Y BUS AC VOLTS indicates 480 Volts and that Emergency Bus E-1 is energized.

Comment:

END OF TASK Termination: EDG "A" A started and 480V Bus E-1 energized.

STOP TIME:

2008 2008 NRC NRC IPP kk NUREG 1021, NUREG Revision 9, i021, Revision Supplement 11 9, Supplement

Appendix C Appendix C Page 77 of Page of 88 Form ES-C-I Form ES-C-1 VERIFICATION OF VERIFICATION OF COMPLETION COMPLETION Job Performance Job Performance Measure Measure No.:

No.: 2008 NRC IP 2008 NRC IP kk Examinee's Name:

Examinees Name:

Examiner's Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Examiners Signature:

Signature: Date:

Date:


2008 2008 NRC NRC IPP kk NUREG NUREG 1021, Revision 9, 1021, Revision Supplement 11 9, Supplement

AppendixCC Appendix Page88ofof88 Page Form ES-C-i Form ES-C-1 JPM CUE JPM CUESHEET SHEET INITIAL CONDITION INITIAL CONDITIONS:

S: ** You arethe You are InsideAO.

the Inside AO.

    • The unit The unit has experienced aatotal has experienced loss of total loss ofonsite offsite power.

and offsite onsite and power.

    • LOSS OF EPP-1, LOSS EPP-1, OF ALL ALL AC POWER, has AC POWER, been implemented has been implemented. .
    • Emergency Diesel Emergency GeneratorB Diesel Generator "8" isis out ofservice out of for scheduled servicefor scheduled maintenance to maintenance to replace the fuel replace the oil filters.

fuel oil filters.

    • Generator A Diesel Generator Emergency Diesel Emergency failed to "A" failed to start.

start.

INITIATING CUE:

CUE: The CRSS The CRSS has you to dispatched you has dispatched to perform EPP-1, starting perform EPP-1, Step lOb.

at Step starting at 10.b.

INITIATING RNa.

RNO.

2008 NUREG NUREG 1021, Supplement1i Revision9,9, Supplement 1021, Revision 2008NRC NRCIPIPkk