IR 05000412/2004002
| ML040630169 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 03/02/2004 |
| From: | Rogge J NRC/RGN-I/DRS/EB |
| To: | Pearce L FirstEnergy Nuclear Operating Co |
| References | |
| IR-04-002 | |
| Download: ML040630169 (23) | |
Text
rch 2, 2004
SUBJECT:
BEAVER VALLEY POWER STATION, UNIT 2 - NRC TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000412/2004002
Dear Mr. Pearce:
On January 30, 2004, the NRC completed a triennial fire protection inspection at your Beaver Valley Power Station Unit 2 facility. The enclosed report documents the inspection findings that were discussed on January 30, 2004, with you and other members of your staff.
This inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection no findings of significance were identified.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARs) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
We appreciate your cooperation. Please contact me at 610-337-5146 if you have any questions regarding this letter.
Sincerely,
/RA/
John F. Rogge, Chief Electrical Branch Division of Reactor Safety Docket No. 50-412 License No. NPF-73
Enclosure:
NRC Inspection Report 05000412/2004002
Mr. L. William Pearce 2 w/Attachment: Supplemental Information
REGION 1 Docket No: 50-412 License No: NPF-73 Report No: 05000412/2004002 Licensee: FirstEnergy Nuclear Operating Company Facility: Beaver Valley Power Station, Unit 2 Location: Post Office Box 4 Shippingport, Pennsylvania 15077 Inspection Period: January 12 - 30, 2004 Inspectors: Larry Scholl, Senior Reactor Inspector, DRS (Team Leader)
Aniello Della Greca, Senior Reactor Inspector, DRS Keith Young, Senior Reactor Inspector, DRS Christopher Hott, Reactor Engineer (In-Training), DRS Approved by: John F. Rogge, Chief Electrical Branch Division of Reactor Safety Enclosure
SUMMARY OF FINDINGS IR 05000412/2004-002; 01/12/2004 - 01/30/2004; Beaver Valley Power Station Unit 2; Triennial Fire Protection Inspection.
The report covered a two week team inspection by specialist inspectors. The team identified one unresolved item. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 3, dated July 2000.
A. NRC-Identified Findings No findings of significance were identified.
B. Licensee-Identified Violations None ii Enclosure
Report Details Background This report presents the results of a triennial fire protection inspection conducted in accordance with NRC Inspection Procedure (IP) 71111.05, Fire Protection. The objective of the inspection was to assess whether FirstEnergy Nuclear Operating Company (FENOC) has implemented an adequate fire protection program and that post-fire safe shutdown capabilities have been established and are being properly maintained at the Beaver Valley Power Station (BVPS), Unit 2. The following fire areas (FAs) were selected for detailed review based on risk insights from the BVPS Unit 2 Individual Plant Examination (IPE) and Individual Plant Examination of External Events (IPEEE):
C Service Building Emergency Switchgear Room (FA SB-2)
C Primary Auxiliary Building (FA PA-4)
C Cable Tunnel (FA CT-1)
C Emergency Diesel Generator Room (FA DG-1)
This inspection was a reduced scope inspection in accordance with the March 6, 2003, revision to IP 71111.05, Fire Protection. Issues regarding equipment malfunction due to fire-induced failures of associated circuits were not inspected. Criteria for review of fire-induced circuit failures are currently the subject of a voluntary industry initiative. The definition of associated circuits of concern used was that contained in the March 22, 1982, memorandum from Mattson to Eisenhut, which clarified the requests for information made in NRC Generic Letter 81-12.
1. REACTOR SAFETY Cornerstones: Initiating Events, Mitigating Systems 1R05 Fire Protection
.1 Fire Area Boundaries and Barriers a. Inspection Scope The team walked down accessible portions of the selected fire areas to observe material condition and the adequacy of design of fire area boundaries, fire doors, and fire dampers. The team reviewed engineering evaluations, as well as surveillance and functional test procedures for selected items. The team also reviewed the licensee submittals and NRC safety evaluation reports (SERs) associated with fire protection features at Beaver Valley Power Station, Unit 2. Additionally, the team reviewed the design and qualification testing of selected barriers and reviewed surveillance procedures for structural fire barriers, penetration seals and structural steel. These reviews were performed to ensure that the passive fire barriers were properly maintained and met the licensing and design bases as described in the licensee submittals, NRC SERs, and the Beaver Valley Power Station Unit 2 Updated Final Safety Analysis Report (UFSAR).
b. Findings Enclosure
No findings of significance were identified.
.2 Post-Fire Safe Shutdown Lighting and Communications a. Inspection Scope The team observed the placement and coverage area of eight-hour emergency lights throughout the selected fire areas to evaluate their adequacy for illuminating access and egress pathways and any equipment requiring local operation for post-fire safe shutdown. The team also reviewed preventive maintenance procedures and various documents, including the vendor manual and surveillance tests, to determine if adequate surveillance testing and periodic battery replacements were in place to ensure reliable operation of the emergency lights.
The team reviewed radio repeater location, power sources and preventive maintenance procedures to ensure fire department and operator communications could be maintained for fire fighting and post-fire safe shutdown conditions.
b. Findings No findings of significance were identified.
.3 Programmatic Controls a. Inspection Scope During tours of the facility, the team observed the material condition of fire protection systems and equipment, the storage of permanent and transient combustible materials, and control of ignition sources. The team also reviewed the procedures that controlled hot-work activities and combustibles at the site. These reviews were accomplished to ensure that FENOC was maintaining the fire protection systems, controlling hot-work activities, and controlling combustible materials in accordance with the UFSAR, administrative procedures and other fire protection program procedures.
b. Findings No findings of significance were identified.
Enclosure
.4 Fire Detection Systems and Equipment a. Inspection Scope The team reviewed the adequacy of the fire detection systems in the selected plant fire areas. This included a walkdown of the systems and review of the type of installed detectors as shown per location drawings. The team also reviewed licensee submittals and the NRC SERs associated with the selected fire areas. These reviews were performed to ensure that the fire detection systems for the selected fire areas were installed in accordance with the design and licensing bases of the plant. Additionally, the team reviewed fire detection surveillance procedures to determine the adequacy of the fire detection component testing and to ensure that the detection system would function as required.
b. Findings No findings of significance were identified.
.5 Fixed Fire Suppression Systems a. Inspection Scope Carbon Dioxide Systems and Equipment The team reviewed the adequacy of the cable tunnel (FA CT-1) and diesel generator building (FA DG-1) total flooding carbon dioxide (CO2) systems by performing walkdowns of the systems and the room envelopes. The team also reviewed the design and installation specifications, NFPA 12, Standard on Carbon Dioxide Extinguishing Systems, initial discharge testing and the adequacy of surveillance procedures. These reviews were performed to ensure that the total flooding CO2 systems met the design and licensing bases as described in the licensee submittals and NRC SERs and that the system could perform its intended function in the event of a fire in either of these rooms.
b. Findings No findings of significance were identified.
.6 Manual Fire Suppression Capability b. Inspection Scope The team walked down selected standpipe systems and observed portable extinguishers to determine the material condition of the manual fire fighting equipment and verify locations as specified in the pre-fire plans and fire protection program documents. The team reviewed electric and diesel fire pump flow and pressure tests to ensure that the pumps were meeting their design requirements. The team also Enclosure
reviewed the fire main loop flow tests to ensure that the flow distribution circuits were able to meet the design requirements. The team inspected the fire brigades protective ensembles, self-contained breathing apparatus (SCBA), and various fire brigade equipment to determine operational readiness for fire fighting.
The team reviewed pre-fire plans and smoke removal plans for the selected fire areas to determine if appropriate information was provided to fire brigade members and plant operators to identify safe shutdown equipment and instrumentation, and to facilitate suppression of a fire that could impact safe shutdown.
The team performed in-plant walk downs to evaluate the physical configuration of electrical raceway and safe shutdown components in the selected fire areas to determine whether water from an inadvertent fire suppression system pipe rupture or from manual fire suppression activities in the selected areas could cause damage that could inhibit the ability to safely shut down the plant.
The team reviewed fire brigade initial training and continuing training course materials to verify appropriate training was being conducted for the station firefighting personnel.
Additionally, the team reviewed selected fire drills and critiques to ensure that drills were being conducted in risk significant areas.
The team reviewed the qualifications of several fire brigade leaders and members to ensure that they had met and maintained the requirements to be fire brigade leaders and members.
b. Findings No findings of significance were identified.
.7 Safe Shutdown Capability a. Inspection Scope The team reviewed the fire response procedures, alarm response procedures and operating procedures for the selected fire areas to evaluate the methods and equipment used to achieve safe shutdown following a fire. The team also reviewed valve operator number diagram (VOND) for post-fire safe shutdown systems to identify required components for establishing flow paths, to identify equipment required to isolate flow diversion paths, and to verify appropriate components were properly evaluated and included in the safe shutdown equipment list. The team also reviewed selected remote shutdown components and their control circuits to ensure that proper isolation was provided for remote shutdown capability, in the event of a fire affecting the control or relay room. The team performed field walkdowns to evaluate the protection of the equipment from the effects of fires.
Post-fire shutdown procedures for the selected areas were also reviewed to determine if appropriate information was provided to plant operators to identify protected equipment Enclosure
and instrumentation and if recovery actions specified in post-fire shutdown procedures considered manpower needs for performing required actions. The team also reviewed training lesson plans for the alternative shutdown procedures, discussed training with licensed operators, reviewed selected remote shutdown equipment tests, reviewed the adequacy of shift manning, and evaluated the accessibility of the alternative shutdown operating stations and required manual action locations.
Specific procedures reviewed for alternate safe shutdown from outside the control room included the following:
2OM-56.C.4.B, Unit Supervisor Procedure, Rev. 19 2OM-56.C.4.C, NCO Procedure, Rev. 13 2OM-56.C.4.D, Nuclear Operator #1 Procedure, Rev. 16 2OM-56.C.4.E, Nuclear Operator #2 Procedure, Rev. 15 2OM-56.C.4.F-1, ASP Activation, Rev. 10 A procedure walkdown was performed for selected portions of these procedures. The walkdown was performed by a licensed operating crew and focused primarily on the portion of the procedure associated with achieving stable hot shutdown conditions.
Plant operators were accompanied by NRC team members during the walkdown and the approximate time for critical steps, such as establishing makeup flow to the reactor vessel, were noted and evaluated to assess the ability of the operators to maintain plant parameters within procedural limits.
b. Findings No findings of significance were identified.
.8 Safe Shutdown Circuits a. Inspection Scope The team reviewed power and control cable routing for a sample of components required for post-fire safe shutdown to determine if the cables were properly evaluated as part of the safe shutdown analyses in the USAR.
The team reviewed electrical fuse and circuit breaker coordination studies to ensure equipment needed to conduct post-fire safe shutdown activities would not be impacted due to a lack of coordination. The team confirmed that coordination studies had addressed multiple faults due to fire. The team also reviewed the electrical isolation capability of selected equipment needed for post-fire safe shutdown to ensure that such equipment could be operated locally, if needed.
Due to the issuance of Change Notice 00-020 to Inspection Procedure 71111.05, Fire Protection, the team did not review associated circuit issues during this inspection.
This change notice has suspended this review pending completion of an industry initiative in this area.
Enclosure
b. Findings During review of condition report 03-08460, the team noted that FENOC identified that previous analyses failed to identify a vulnerability associated with high-low pressure interface valves, the power operated relief valves (PORVs). Specifically, FENOC had failed to identify the potential for spurious opening of the PORVs due to multiple cable-to- cable hot shorts caused by fire damage. Generic Letter 86-10 specifies that multiple hot shorts must be postulated for high-low pressure interface valves. Since certain associated circuit issues are the subject of a current industry initiative, this item is unresolved pending generic resolution of guidance for evaluating fire induced cable faults. FENOC has implemented interim compensatory measures pending resolution of this issue. Also, on February 13, 2004, FENOC submitted a proposed revision to a previously approved deviation to Branch Technical Position CMEB 9.5-1 to address this issue. (URI 05000412/2004002-01)
.9 Electrical Raceway Fire Barrier Systems (ERFBS)
a. Inspection Scope The team walked down accessible portions of the selected fire areas to observe material condition of the electrical raceway fire barrier systems. Additionally, the team selected the 3M Interam E-50 series fire protection material installation in the Primary Auxiliary Building/Elevation 755 (FA PA-4) for detailed review. The review included design and installation drawings, qualifications testing documents and engineering analyses for selected configurations. The NRC safety evaluations of fire protection features for Beaver Valley Power Station, Unit 2 were also reviewed by the team. This was accomplished to verify that the selected portions of the ERFBS system met their design and licensing bases.
b. Findings No findings of significance were identified.
Enclosure
4. OTHER ACTIVITIES 4OA2 Identification and Resolution of Problems
.1 Corrective Actions for Fire Protection Deficiencies a. Inspection Scope The team reviewed the open corrective maintenance work orders for fire protection and safe shutdown equipment, selected condition reports (CRs) for fire protection and safe shutdown issues and the third quarter (2003) Unit 2 fire protection systems health report to evaluate the prioritization for resolving fire protection related deficiencies and the effectiveness of corrective actions. Additionally, the team reviewed a recently completed Latent Issues Report (LIR) which focused on post-fire safe shutdown procedures for Unit 2. The team also reviewed recent Quality Assurance (QA) Audits and QA field observations of the fire protection program to determine if the licensee was identifying program deficiencies and implementing appropriate corrective actions.
b. Findings No findings of significance were identified.
4OA5 Other (Closed) URI 05000412/2003003-01: Verification and Validation of Post Fire Safe Shutdown Manual Actions Not Complete.
The team reviewed actions taken by FENOC to address issues associated with manual operator actions necessary to achieve safe shutdown following a fire. Items reviewed included safe shutdown procedures and manual operator action time line studies. The team also performed walkdowns of selected portions of the safe shutdown procedures with plant operators to assess the adequacy of the procedures and to evaluate the ability of operators to perform the manual actions in the times assumed in the safe shutdown analyses. The team concluded that FENOC had performed appropriate verification and validation of the manual actions and no violations of NRC requirements were identified during this review. This item is closed.
4OA6 Meetings, Including Exit
.1 Exit Meeting Summary The team presented their preliminary inspection results to Mr. William Pearce, and other members of the Beaver Valley Power Station Unit 2 staff at an exit meeting on January 20, 2003. No proprietary information was included in this inspection report.
Enclosure
SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel:
J. Belfiore Design Engineering T. Brown Fire Brigade Training P. Dearborn Design Engineering J. Devine Design Engineering A. Funkhouser Reactor Operator H. Kahl Design Engineering J. Maracek Regulatory Affairs D. Mickinac Regulatory Affairs J. Miller Unit 2 Fire Protection Engineer L. Miller Unit 1 Fire Protection Engineer M. Morgan QA Auditor F. Oberlitner Design Engineering D. Price Design Engineering J. Redman Design Engineering M. Ressler Design Engineering K. Troxler Design Engineering J. Wilcox Operations NRC Personnel:
R. Crlenjak, Deputy Director, Division of Reactor Safety J. Rogge, Chief, Electrical Branch, Division of Reactor Safety P. Cataldo, Senior Resident Inspector, Beaver Valley Power Station G. Smith, Resident Inspector, Beaver Valley Power Station LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED Opened 05000412/2004002-01 URI Potential for Spurious Opening of PORVs Due to Fire Induced Hot Shorts Closed 05000412/2003003-01 URI Verification and Validation of Post Fire Safe Shutdown Manual Actions Not Complete.
Attachment
A-2 SUPPLEMENTAL INFORMATION (Contd)
LIST OF ACRONYMS USED BVPS Beaver Valley Power Station CFR Code of Federal Regulations CO2 Carbon Dioxide CR Condition Report CT Cable Tunnel DG Diesel Generator DRS Division of Reactor Safety ERFBS Electrical Raceway Fire Barrier Systems FA Fire Area FENOC FirstEnergy Nuclear Operating Company IP Inspection Procedure IPE Individual Plant Examination IPEEE Individual Plant Examination of External Events IR Inspection Report LIR Latent Issues Report MCC Motor Control Center NFPA National Fire Protection Association NRC Nuclear Regulatory Commission PA Primary Auxiliary PAR Publicly Available Record P&ID Piping and Instrumentation Drawing PORV Power Operated Relief Valves QA Quality Assurance RHS Residual Heat Removal System SAR Safety Analysis Report SER Safety Evaluation Report SCBA Self-Contained Breathing Apparatus SDP Significance Determination Process SER Safety Evaluation Report UFSAR Updated Final Safety Analysis Report USAR Updated Safety Analysis Report VOND Valve Operator Number Diagram Attachment
A-3 LIST OF DOCUMENTS REVIEWED Fire Protection Licensing Documents Beaver Valley Power Station - Unit 2 Updated Final Safety Analysis Report Fire Protection Safe Shutdown Report, Beaver Valley Power Station Unit 2, Addendum 26 NUREG-1057, Safety Evaluation Report Related to the Operation of Beaver Valley Power Station, Unit 2, October 1985 NUREG-1057, Safety Evaluation Report Related to the Operation of Beaver Valley Power Station, Unit 2, Supplement No. 3, November 1986 NUREG-1057, Safety Evaluation Report Related to the Operation of Beaver Valley Power Station, Unit 2, May 1987 2DBD-33B, Design Basis Document for Fire Protection Systems, Rev. 5 Calculations/Engineering Evaluations 8700-DMC-3079, Fire Pump Minimum Operating Curve, Rev. 1 10080-B-085, Fire Hazards Analysis, Rev. 10 10080-B-438, Turbine Building, Under Operating Floor Sprinkler System, Conformance with NFPA - 850, Rev. 0 10080-DMC-3443, GL 86-10 Evaluation of Excessive Clearances Between Fire Rated Doors and Frames, Rev. 0 2BVS-174, Specification for CO2 and Halon Systems, August 18, 1987 ER-NRF-011, Engineering Evaluations of 3M Interam 50 Series Fire Barrier Configurations, November 2003 8700-DMC-3006, Low River Temperature Effects on Charging Pump Lube Oil, Rev. 0 10080-DEC-0240, Fire Protection Safe Shutdown Breaker Coordination Analysis, Rev. 0 10080-DMC-0811, BVPS2 Cycle 11 Appendix R Shutdown Margin Verification, Rev. 0 10080-E-120, 120V Fault Current Calculations for Protective Device Coordination, Rev. 2, and Addenda A1, A2 and A3 10080-E-122, Cable Operation at Elevated Temperature, Rev. 0 10080-E-207, Short Circuit Analysis, 125 VDC Class 1E DC System, Addenda A1, A2, & A3, dated 9/19/02 10080-E-208, Short Circuit Analysis, 125 VDC Normal DC Distribution System, Rev. 0 10080-E-240, Fire Protection Safe Shutdown Breaker Coordination Analysis, Rev. 0 Initial CO2 Testing SOV-2.33A.01, Main Plant Carbon Dioxide System Test (Fire Protection), Rev. 0 Attachment
LIST OF DOCUMENTS REVIEWED (Cont.) A-4 Procedures 1/2ADM-1900, Fire Protection, Rev. 7 1/2ADM-1902, Fire Brigade, Rev. 1 1/2ADM-2021, Control of Penetrations (Including HELB Doors), Rev. 2 1/2OM-56.4AA, Plant Fire Prevention Procedure, Rev. 1 1/2OM-56B.4AB, Fire Brigade and Fire Fighting Procedures, Rev. 1 2OM-56B.4.A, Safe Shutdown Following a Serious Fire in the Primary Auxiliary Building, Rev. 1 20M-56B.4.E, Safe Shutdown Following a Serious Fire in the Diesel Generator Building, Rev. 1 2OM-56B.4.I, Safe Shutdown Following a Serious Fire in the Service Building, Rev. 1 2OM-56C.4.D, Unit 2 Nuclear Operator #1 Procedure Step-by-Step, Rev. 16 2OM-56C.4.F-11, Operation of Primary Component Cooling Water Valves, Rev. 9 2OM-56C.4.F-18, Restoring Power Operation of Motorized Strainer (2SWS*STRM47), Rev. 0 1/2CMP-75-MCB-2E, Testing of ITE 480V Molded Case Circuit Breakers, Issue 4, Rev. 6 1/2PMP-E-36-015, ITE Medium Voltage Circuit Breaker Inspection and Test, Model 5HK-250/350, Issue 4, Rev. 10 1/2PMP-E-37-010, ITE Low Voltage Circuit Breaker Inspection and Test Model: K600S, K800S, K1600S, K2000S, Issue 4, Rev. 8 2-PMP-E-39-013, ITE Low Voltage DC Circuit Breaker Inspection and Test Model: K600, K800, K1600, Issue 4, Rev. 1 2OM-56C.4.B, Operating Procedure - Alternate Safe Shutdown from Outside Control Room, Rev. 19, Unit Supervisor Procedure 2OM-56C.4.C, Operating Procedure - Alternate Safe Shutdown from Outside Control Room, Rev. 13, NCO Procedure Surveillance Procedures OST 2.33.2, Fire Protection Hose Station Test, Rev. 8 1OST-33.7, Motor Driven Fire Pump Operation Test, Rev. 11, Completed November 22, 2003, and December 20, 2003 1OST-33.8, Diesel Driven Tire Pump Operation Test, Rev. 16, Completed November 29, 2003, and December 27, 2003 1-PMP-E-58-001, Maintenance of The ERF and ERFS Batteries, Rev. 8 1-PMP-E-58-002, Monthly Battery Inspection of ERFS Batteries, Rev. 2 1/2MI-C-58-010, Maintenance of Communication Battery, Rev. 1, Completed August 4, 2003, and January 26, 2004 1/2OM-56B.4A.B, Fire Brigade and Fire Fighting Procedures, Rev. 1 1/2OST-33.12, Fire Protection System Loop Flow Test, Rev. 9, Completed October 27, 2001, August 11, 2002, and September 11, 2003 1/2OST-33.31, Fire Brigade Test, Rev. 8 1/2OST-58E.1, RG Diesel Generator (RG-EG-1) Test, Rev. 24, Completed December 13, 2003, January 9, 2004, and January 10, 2004 1/2PMP-75VS-VNT-4M, Ventilation System Fire Damper Maintenance and Trip Check, Rev. 6, Completed February 21, 2002, April 3, 2002, November 12, 2003, November 16, 2003, November 26, 2003, December 31, 2003 2 BVT 1.33, Fire Rated Assemblies Visual Inspection, Rev. 7, Completed December 13, 2001, and December 5, 2003 Attachment
LIST OF DOCUMENTS REVIEWED (Cont.) A-5 2 OST-33.2A, Fire Protection System Monthly Hose Stations Test, Rev. 4, Completed November 16, 2003, and December 11, 2003 2 OST-33.2B, Fire Protection System Hose Stations Inspection, Flush, and Hose Replacement, Rev. 5, Completed December 3, 2003, and January 1, 2004 2 OST-33.13A, Smoke Detector Test, Rev. 8, Completed January 20, 2002, June 3, 2002, July 22, 2002, and January 19, 2003 2 OST-33.13C, Main Plant CO2 Zone Puff Tests, Rev. 9, Completed November 17, 2001, August 25, 2003, September 10, 2003, and January 6, 2004 2 OST-33.13H, CO2 System Heat Detector Test Operating Surveillance Test, CO2 System Heat Detector Test, Rev. 1, Completed December 11, 2001 and July 8, 2003 2 OST-33.16, Early Warning Smoke Detection Instrumentation Test, Completed August 11, 2002, January 8, 2003, and January 18, 2003 2 OST-33.16A, Early Warning Ultraviolet Detector Instrumentation Test, Rev. 5, Completed February 23, 2003, and September 12, 2003 2 PMP-38-EMERLGT-4E, Appendix R and Non-Appendix R Emergency Lighting Operability Test, Inspection and Repair, Rev. 6, Completed August 9, 2003 2-PMP-E-39-005, Maintenance of BAT-2-5 and BAT-2-6 Batteries, Rev. 5 2-PMP-E-39-006, Battery Inspection [BAT-2-5 and BAT-2-6], Rev. 2 2OST-45.2, Operating Surveillance Test - Alternate Shutdown Panel Instrumentation Channel Checks, Rev. 13, completed 12/8/03 2OST-45.2, Operating Surveillance Test - Alternate Shutdown Panel Instrumentation Channel Checks, Rev. 13, completed 1/5/04 2OST-45.9 (ISS1), Operating Surveillance Test - Alternate Shutdown Panel Checks, Issue 1, Rev. 8, completed 1/18/02 2OST-45.9, Operating Surveillance Test - Alternate Shutdown Panel Checks in Modes 1, 2, 3, Rev. 11, completed 8/28/03 Latent Issues Report Beaver Valley Power Station Unit 2 Fire Protection Safe Shutdown Latent Issues Report, September 15, 2003 Quality Assurance Self-Assessments and Field Observations BV-C-01-05, BVPS Fire Protection Program, June 14, 2001 BV-C-03-01, First Quarter, 2003 BV Assessment Report, May 9, 2003 BV-C-03-02, Second Quarter, 2003 BV Assessment Report, August 8, 2003 BV-C-03-03, Third Quarter, 2003 BV Assessment Report, November 25, 2003 BV32002118, Appendix R/Alternate Safe Shutdown Related Emergency Lights, June 24, 2002 BV32002131, Administrative Controls, July 2, 2002 BV32002326, Adequacy of Measures Established to Implement The Fire Protection Program, September 9, 2002 BV32002640, Pre-Fire Plans in The Control Rooms, June 11, 2002 BV32003107, Fire Protection Program and Prevention, Maintenance, Compensatory Measures, Impairments, Communication, October 14, 2003 BV32003873, Fire Protection Program Fire Hazards Analysis Review, July 1, 2003 Attachment
LIST OF DOCUMENTS REVIEWED (Cont.) A-6 Fire Qualification Test Reports Promotec, Final Report CTP 1063, ANI/MAERP Standard Method of Fire Tests of Cable and Pipe Penetration Fire Stops, January 21, 1985 Promotec, Final Report CTP 1092, Three Hour Qualification Test Internal and External Seals -
Aluminum Conduits, October 22, 1985 Promotec, Final Report CTP 1119, Three Hour Fire Qualification Test, December 16, 1986 Final Report 414186-969, Fire Tests 86-79 & 86-80, Qualification Fire Tests of 3M Interam E-50 Series Fire Protection Mat for 1-Hour Rated Electrical Raceways, September 1986 Drawings 12241-RE-37E-16, Concealed Conduit Sleeves Auxiliary Building, Rev. 16 14343-3, Schedule for DWG 14343, DAF-P-5171 Ver. MTD Fire Damper 14343-5, Multiblade Fire Damper Model DAF-P-5171Double Damper Vertical MTD, Rev. C-1 14631, Multiblade Fire Damper Model No. DAF-P-5171, Double Damper Horz. MTD, Rev. 14 14631-201, Notes and Spec. For DWG No. 14631 Multiblade Horiz. MTD Fire Damper, Rev. F 14631-900-1, Schedule for DWG 14631 Multiblade Horiz. MTD Fire DMPR., Rev. G 2601.337-844-082, Electrical Fire Seals, EL-1, 2, Rev. B 2601.337-844-083, Internal Conduit Fire Seals EC-1, 2, 3, 4, 5, 6, Rev. 3 10080-RE-1BC, One Line Diagram Essential Bus, Rev. 10 10080-RE-1BD, One Line Diagram Essential Bus, Rev. 27 10080-RE-34BQ, Cable Tray Identification Auxiliary Building EL 755-6", Rev. 7 10080-RE-34CX, Table For Fire Protection of Cables and Raceways, Rev. 8 10080-RE-64A - 64Q, CND Plan-Fire Detection 10080-RE-64AV, Cable Block Diagram - Fire Detection System Interfaces and Fire ALM Horn Supv. Panel, Rev. 3 10080-RE-65, Sh. 1-4, Lighting Plan Control Building 10080-RE-69, Sh. 1-4, Lighting Plan Auxiliary Building 10080-RE-265A - 265F, Egress Emerg. Lighting Plan and Details - Control Building 10080-RE-269, Sh. 1-4, Egress Emerg. Lighting Plan and Details Auxiliary Building 10080-RE-274B, Egress Emerg. LTG Plan Diesel Gen. Bldg and Valve Pit, Rev. 1 10080-RM-433-1A, Valve Oper. No. Diagram, WTR-Distribution Network, Rev. 16 10080-RM-433-1B, Valve Oper. No. Diagram, Fire Protection WTR-MISC. Buildings, Rev. 7 10080-RM-433-1C, Valve Oper. No. Diagram, Fire Protection Water-Aux. Building, Rev. 12 10080-RM-433-1D,Valve Oper. No. Diagram, Fire Protection Water Containment Building, Rev.
10080-RM-433-1E, Valve Oper. No. Diagram, Fire Protection Water-Turbine Building, Rev. 7 10080-RM-433-2A, Valve Oper. No. Diagram, CO2 Fire Protection System, Rev. 2 10080-RM-433-2B, Valve Oper. No. Diagram, CO2 Fire Protection System, Rev. 2 10080-E-5F, Elementary Diagram - 4160V - Reactor Coolant Pump 2RCS*P21A, Rev. 21 10080-E-5DA, Elementary Diagram - 4160V - Bus 2AE Supply ACB 2E7, Rev. 18 10080-E-5DB, Elementary Diagram - 4160V - Emergency Diesel Generator 2-1 ACB, Rev. 18 10080-E-5DE, Sh 1&2, Elementary Diagram - 4160V - Steam Gen. Aux. Pump - 2FWE* P23A 10080-E-5DF, Sh 1&2, Elementary Diagram - 4160V - Residual Ht. Removal Pp - 2RHS* P21A 10080-E-5DH, Sh 1&2, Elementary Diagram - 4160V - Primary Comp. Cool Pp - 2CCP* P21A 10080-E-5DL, Sh 1&2, Elementary Diagram - 4160V - Charging Pump - 2CHS* P21A 10080-E-5DN, Sh 1&2, Elementary Diagram - 4160V - Service Water Pump - 2SWP* P21A 10080-E-5DT, Elementary Diagram - 4160V - 480V Emergency Substation 2-8 Feeder, Rev. 9 10080-E-5DUH, Sh 1, Elementary Diagram - 4160V - Emerg. Bus 2AE Undervoltage, Rev. 19 Attachment
LIST OF DOCUMENTS REVIEWED (Cont.) A-7 10080-E-5DH, Elementary Diagram - 4160V - Residual Heat Removal Pp 2RHS*P21B, Rev. 18 10080-E-6BA, Elementary Diagram - 480V - Emerg. Substation 2-8 & 2-9 Supply ACB, Rev. 9 10080-E-6BW, Elementary Diagram - 480V - Emergency Switchgear Supply Fans, Rev. 17 10080-E-6DW, Sh 1 & 2, Elem. Diag. - 480V MCC Ckts - Component Cool Wtr Isolation Valves 10080-E-6EP, Sh 1 & 2, Elem. Diag. - 480V MCC Ckts - Diesel Gen. Bldg. Ventilation Fans 10080-E-6FT, Elem. Diag. - 480V MCC Ckts - Primary Component Cooling System, Rev. 14 10080-E-6GA, Sh 1 & 2, Elem. Diag. - 480V MCC Ckts - Service Water Pump Discharge Valves 10080-E-6GM, Sh 1 & 2, Elem. Diag. - 480V MCC Ckts - DG 2-1 Heat Exchanger Header Valve 10080-E-6HN, Elem. Diag. - 480V MCC Ckts - Safety Injection Accum Outlet Isol Valve, Rev. 21 10080-E-6HZ, Elem. Diag. - 480V MCC Ckts - Pressurizer Relief Block Valves, Rev. 17 10080-E-6JG, Elem. Diag. - 480V MCC Ckts - Charging Pp Min Flow Line Isol Valves, Rev. 19 10080-E-6JH, Elem. Diag. - 480V MCC Ckts - Charging Pp Min Flow Line Isol Valves, Rev. 13 10080-E-6JJ, Sh 1 & 2, Elem. Diag. - 480V MCC Ckts - Charging Pump Suction Valves 10080-E-6JL, Elem. Diag. - 480V MCC Ckts - Charging System Valves, Rev. 24 10080-E-6JN, Sh 1 & 2, Elem. Diag. - 480V MCC Ckts - Letdown Valves to Coolant Recovery 10080-E-6MZ, Elem. Diag. - 480V MCC Ckts - Boric Acid System, Rev. 16 10080-E-6NS, Elem. Diag. - 480V MCC Ckts - Diesel Generator Auxiliaries, Rev. 10 10080-E-6NT, Elem. Diag. - 480V MCC Ckts - Diesel Generator Auxiliaries, Rev. 10 10080-E-6QA, Elem. Diag. - 480V MCC Ckts - RCP Seal Water Injection Isolation Valves, Rev.
10080-E-6QD, Elem. Diag. - 480V MCC Ckts - Charging System Valves, Rev. 17 10080-E-6RG, Elem. Diag. - 480V MCC Ckts - CCP System Valves to RHS System, Rev. 11 10080-E-6RQ, Elem. Diag. - 480V MCC Ckts - Primary Component Coolant Valves, Rev. 7 10080-E-6RU, Sh 1 & 2, Elem. Diag. - 480V MCC Ckts - Residual Heat Removal Valves, Rev.
10080-E-6RV, Sh 1 & 2, Elem. Diag. - 480V MCC Ckts - Residual Heat Removal Valves 10080-E-6RW, Sh 1 -3, Elem. Diag. - 480V MCC Ckts - Residual Heat Removal Valves 10080-E-6UP, Elem. Diag. - 480V MCC Ckts - Control Room Supply Air Handling Unit, Rev. 14 10080-E-11J, Sh 1 - 3, Elem. Diag. - 125V DC & 120 V AV Miscellaneous Circuits 10080-E-11K, Sh 1 - 3, Elem. Diag. - 125V DC Ckts - Aux Feed Pump Steam Supply Valves 10080-E-11L, Sh 1 - 3, Elem. Diag. - 125V DC Ckts - Pressurizer Power Operated Relief Valves 10080-E-11Q, Sh 1 & 2, Elem. Diag. - Miscellaneous Circuits 10080-E-11K, Sh 1 - 3, Elem. Diag. - 125V DC Ckts - Aux Feed Pump Steam Supply Valves 10080-E-11AD, Elem. Diag. - Miscellaneous Circuits, Rev. 13 10080-E-11AF, Sh 1 - 4, Elem. Diag. - 125 V DC Miscellaneous Circuits 10080-E-11AJ, Sh 1 - 3, Elem. Diag. - Letdown Orifice Isolation Valves 10080-E-11AT, Elem. Diag. - Main Steam Bypass Valves, Rev. 7 10080-E-11AX, Elem. Diag. - Main Steam Bypass Valves, Rev. 7 10080-E-11BL, Elem. Diag. - Primary Component Cooling Water Isolation Valves, Rev. 10 10080-E-11BZ, Elem. Diag. - Miscellaneous Circuits, Rev. 3 10080-E-11CQ, Elem. Diag. - Control Room A/C System, Rev. 3 10080-E-11DV, Elem. Diag. - Emergency Switchgear Dampers, Rev. 4 10080-E-11FZ, Sh 1 - 6, Elem. Diag. - Miscellaneous Circuits 10080-E-11JA, Sh 1 & 2, Elem. Diag. - 125V DC Miscellaneous Circuits 10080-E-11JR, Elem. Diag. - Miscellaneous Circuits, Rev. 9 10080-E-11JS, Elem. Diag. - Miscellaneous Circuits, Rev. 13 10080-E-11JT, Elem. Diag. - Miscellaneous Circuits, Rev. 13 10080-E-11JU, Elem. Diag. - 125 V DC Ckts - Reactor Vent Head Isolation Valves, Rev. 5 10080-E-11JW, Elem. Diag. - 125 V DC Ckts - Reactor Vessel Hd Vent Throttle Valves, Rev. 5 10080-E-11LP, Sh 1 - 3, Elem. Diag. - Miscellaneous HVAC Circuits Alternate Shutdown Room Attachment
LIST OF DOCUMENTS REVIEWED (Cont.) A-8 10080-E-12A, Sh 1 - 3, Elem. Diag. - Diesel Generator 2-1 Auto Loading 10080-E-12D, Sh 1 & 2, Elem. Diag. - 125V DC Misc. Circuits Diesel Generator 2-1 Protection 10080-E-12F, Elem. Diag. - Diesel Generator 2-1, Rev. 16 10080-E-12G, Elem. Diag. - Diesel Generator 2-1, Rev. 5 10080-E-12H, Elem. Diag. - Diesel Generator 2-1, Rev. 11 10080-E-12J, Elem. Diag. - Diesel Generator 2-1, Rev. 10 10080-E-12P, Elem. Diag. - Diesel Generator 2-1 External Connection, Rev. 10 10080-LSK-26-1G, Logic Diagram - Charging Pumps, Rev. 13 10080-RE-1A, Main One Line Diagram, Sh 1, Rev. 16 10080-RE-1B, Main One Line Diagram, Sh 2, Rev. 15 10080-RE-1C, Equipment One Line Diagram, Rev. 12 10080-RE-1D, 4160V One Line Diagram, Sh 1, Rev. 9 10080-RE-1E, 4160V One Line Diagram, Sh 2, Rev. 9 10080-RE-1F, 4160V One Line Diagram, Sh 3, Rev. 19 10080-RE-1G, 480V US One Line Diagram, Sh 1, Rev. 14 10080-RE-1H, 480V US One Line Diagram, Sh 2, Rev. 12 10080-RE-1J, 480V US One Line Diagram, Sh 3, Rev. 12 10080-RE-1K, 480V MCC One Line Diagram, Sh 1, Rev. 15 10080-RE-1L, 480V MCC One Line Diagram, Sh 2, Rev. 18 10080-RE-1AN, 125V DC & 120V AC One Line Diagram, Rev. 8 10080-RE-1AR, 125V DC One Line Diagram, Sh 1, Rev. 19 10080-RE-1AS, 125V DC One Line Diagram, Sh 2, Rev. 20 10080-RE-1AT, 125V DC One Line Diagram, Sh 3, Rev. 15 10080-RE-1AX, Line Diagram, Vital Bus, Rev. 19 10080-RE-25CZ, Outline - Alternate Shutdown Transfer Relay Panel, Rev. 6 10080-RE-25DA, Outline - Auxiliary Isolation Relay Panel 258, Rev. 8 10080-RE-25DE, Front View - Emergency Shutdown Panel, Section 1, Rev. 6 10080-RE-25DF, Front View - Emergency Shutdown Panel, Section 2, Rev. 7 10080-RE-25DG, Front View - Emergency Shutdown Panel, Section 3, Rev. 5 10080-RE-25DH, Front View - Emergency Shutdown Panel, Section 4, Rev. 7 10080-RE-25EC, Front View - Transfer Relay Panels 281 & 282, Rev. 6 10080-RE-25GA, Front View Alternate Shutdown Panel, Sections 1 & 2, Rev. 8 10080-RE-27A, Arrangement - Main Control & Computer Room, Rev. 17 10080-RE-27D, Arrangement - Normal Switchgear Area - El. 760-6", Sh 1, Rev. 15 10080-RE-27E, Arrangement - Normal Switchgear Area - El. 760-6", Sh 2, Rev. 11 10080-RE-27F, Arrangement - Emergency Switchgear Area - El. 730-6", Sh 1, Rev. 13 10080-RE-27G, Arrangement - Emergency Switchgear Area - El. 730-6", Sh 2, Rev. 12 10080-RE-27H, Arrangement - Relay Room Cable Tunnel Aux Building, Rev. 8 10080-RE-27J, Arrangement - Rod Control Area, Sh 1, Rev. 8 10080-RE-27K, Arrangement - Rod Control Area, Sh 2, Rev. 9 10080-RE-46R, Conduit Plan - Rod Control Building - Plan Elev. 735-6", Rev. 12 10080-RM-407-1a & b, Valve Operator No. Diagram - Chemical & Volume Control 10080-RM-407-2, Valve Operator No. Diagram - Charging System VCT & Makeup, Rev. 13 10080-RM-407-3, Valve Operator No. Diagram - RCP Seal Water/Excess Letdown, Rev 9 10080-RM-407-5, Valve Operator No. Diagram - 2CHS*P21A, 21B, 21c Lube Oil System, Rev. 3 10080-RM-410-1, Valve Operator No. Diagram - Residual Heat Removal Piping, Rev. 10 10080-RM-413-1, Valve Operator No. Diagram - Recirculation Spray System, Rev. 7 10080-RM-413-2, Valve Operator No. Diagram - Quench Spray System, Rev. 9 10080-RM-415-1 to -7, Valve Operator No. Diagram - Primary Component Cooling Water 10080-RM-424-1 to 2b, Valve Operator No. Diagram - Main Feedwater System Attachment
LIST OF DOCUMENTS REVIEWED (Cont.) A-9 10080-RM-424-3, Valve Operator No. Diagram - Auxiliary Feedwater, Rev. 8 10080-RM-424-5, Valve Operator No. Diagram - Aux Feed Pumps Lube Oil System, Rev. 1 10080-TLD-002-009-01 to -03, Test Loop Diag. - Reactor Excore Instrumentation System -
Neutron Flux Monitoring Channel A 10080-TLD-006-020-01 to -02, Test Loop Diag. - Reactor Coolant System - Loop 1 Cold Leg Temperature 10080-TLD-006-021-01 to -02, Test Loop Diag. - Reactor Coolant System - Loop 1 Hot Leg Temperature 10080-TLD-006-024-01 to -02, Test Loop Diag. - Reactor Coolant System - Reactor Coolant Water Pressure 10080-TLD-006-025-01 to -02, Test Loop Diag. - Reactor Coolant System - Pressurizer 2RCS*PRE21 Level 10080-TLD-006-027-01 to -03, Test Loop Diag. - Reactor Coolant System - Reactor Vessel 2RCS*Rev. 21 Head Vent Throttle Valve Control, Rev. 4 10080-TLD-006-030-01 to -03, Test Loop Diag. - Reactor Coolant System - Reactor Coolant Loop 3 Hot Leg Pressure 10080-TLD-006-062-01 to -02, Test Loop Diag. - Reactor Coolant System - Reactor Coolant Loop2 Flow, Channel II 10080-TLD-006-128-01 to -06, Test Loop Diag. - Reactor Coolant System - Power Operated Relief Valve, Rev. 1 10080-TLD-007-064-01 to -02, Test Loop Diag. - Chemical & Volume Control System - Reactor Coolant Pump Seal Water Injection Filter Flow, Rev. 1 10080-TLD-007-073-01 to -04, Test Loop Diag. - Chemical & Volume Control System - Letdown Orifice Isolation Valve 2CHS*AOV200A 10080-TLD-007-076-01 to -04, Test Loop Diag. - Chemical & Volume Control System - Letdown Orifice Isolation Valve 10080-TLD-007-077-01 to -04, Test Loop Diag. - Chemical & Volume Control System - Letdown Orifice Isolation Valve 10080-TLD-007-089-01 to -08, Test Loop Diag. - Chemical & Volume Control System - Blender Boric Acid Feed Control Valve 2CHS*FCV113A 10080-TLD-007-094-01 to -07, Test Loop Diag. - Chemical & Volume Control System - Charging Pump Discharge Flow Control 10080-TLD-010-005-01 to -07, Test Loop Diag. - Residual Heat Removal System - Residual Heat Removal Heat Exchanger 2RHS*E21A Bypass Flow Control & Indication 10080-TLD-21A-005-01 to -03, Test Loop Diag. - Main Steam System - Main Stm Bypass Valve 10080-TLD-21A-013-01 to -06, Test Loop Diag. - Main Steam System - Steam Generator 2RCS*SG21C Steam Pressure Channel III 10080-TLD-21A-082-01 to -03, Test Loop Diag. - Main Steam System - Main Steam Line Trip Valve 10080-TLD-21A-090-01 to -08, Test Loop Diag. - Main Steam System - Atmospheric Steam Dump Valve 10080-TLD-21A-106-01 to -02, Test Loop Diag. - Main Steam System - Steam Generator 2RCS*SG21A Steam Pressure 10080-TLD-24A-053-01 to -02, Test Loop Diag. - Main Feedwater System - Steam Generator 2RCS*SG21A Wide Range Level 10080-TLD-24A-060-01 to -02, Test Loop Diag. - Main Feedwater System - Steam Generator 2RCS*SG21B Wide Range Level 10080-TLD-24B-035-01 to -04, Test Loop Diag. - Auxiliary Feed Water System - Steam Generator 2RCS*SG21C Auxiliary Feed Control Valve 2FWE*HVC100A 10080-TLD-24B-038-01 to -04, Test Loop Diag. - Auxiliary Feed Water System - Steam Attachment
LIST OF DOCUMENTS REVIEWED (Cont.) A-10 Generator 2RCS*SG21B Auxiliary Feedwater Flow Control Valve 10080-TLD-24C-002-01 to -03, Test Loop Diag. - Steam Generator Water Level Control System Steam Generator 2RCS*SG21A Feedwater Bypass Control 10080-TLD-24C-003-01 to -04, Test Loop Diag. - Steam Generator Water Level Control System Steam Generator 2RCS*SG21B Feedwater Control 10080-TLD-030-016-01 to -02, Test Loop Diag. - Service Water System - Clarified Water to Seal Water Header Isolation Valves 10080-TLD-44A-012-01 to -02, Test Loop Diag. - Control Building HVAC System - Control Room Exhaust Air Loop A Temperature Control 10080-TLD-44F-007-01 to -04, Test Loop Diag. - Secondary Plant Buildings HVAC System -
Emergency Switchgear Room Temperature Control Pre-Fire Plans 2PFP-AXLB-755, Primary Auxiliary Building Fire Areas PA-4, PA-6 and PA-7, Rev. 0 2PFP-CBLT-712, Cable Tunnel Fire Area CT-1, Rev. 0 2PFP-DGBX-732, Diesel Generator 2-1 Room Fire Area DG-1, Rev. 0 2PFP-SRVB-730, DF Switchgear Room Fire Area SB-2, Rev. 0 Fire Drills, Scenarios & Critiques Unit 2 Battery Room, Drills Completed September 4, 2002, September 11, 2002, and September 18, 2002 Unit 2 Cable Spreading Room, Drills Completed February 19, 2003, March 15, 2003, April 14, 2003, May 21, 2003, and June 18, 2003 Unit 2 Diesel Generator Building, Drills Completed November 19, 2003, and November 26, 2003 Fire Brigade/Operator Training FB-9337, Fire Brigade Training, Rev. 4 FB-9340, Fire Brigade Training Administrative Review, Rev. 4 FB-9342, Instructor Scenario Guidance For BVPS 2003 Fire Brigade Training 3SQS-56B.1, OM-56B Fire Prevention and Control, Rev. 3 2SQS-56C.1, Alternate Safe Shutdown, Rev. 2 Hot Work Permits Turbine Building 774 Above # 1 LP Turbine 2SVS-80 - September 14, 2003 2-RCBX-EC.692 - October 6, 2003 Turbine Basement 2 FWS-P21A - October 7, 2003 Turbine Basement 738 EL. - October 7, 2003 752 Turbine Mezz SE Corner - October 8, 2003 2-TRBB-752-762 Above LO RES South - October 8, 2003 Turbine Mezz - October 9, 2003 Fire Barrier Permits 1-SRVB-713, Wall Between CR Vent and Process Rooms 2-SRVB-760-2-5, BATT RM, August 28, 2003 Attachment
LIST OF DOCUMENTS REVIEWED (Cont.) A-11 Condition Reports 01-00144 01-01920 02-11303 03-08791 03-09249 03-11059 03-11059 03-08538 03-08923 03-08924 04-00522 03-11306 03-11243 03-08460 03-09247 04-00676 04-00766 04-00783 04-00413 04-00805 04-00849 04-00376 Work Orders 01-005123 01-005157 01-012602 01-012626 200025321 200025439 200028378 200029639 200042868 200042869 200042871 200042872 200046476 200046477 200079901 Miscellaneous Documents Fire Protection Impairments Report for Unit 2 Fire Protection System Health Report BVPS Unit 2, 2nd Quarter 2003 Fire Protection System Improvement Plan, 2nd Quarter 2003 Industry Operating Experience Program, Fire Protection System Design Deficiencies and Common-Mode Flooding of Emergency Core Cooling System Rooms at Washington Nuclear Project Unit 2, February 19, 1999 Letter Dated October 10, 1983, American Warming and Ventilation Inc. to Duquesne Light, Fire Dampers Letter Dated May 3, 1983, American Warming and Ventilation Inc. to Duquesne Light, Fire Dampers Letter Dated March 27, 1985, Duquesne Light to NRC, Fire Protection Letter Dated February 27, 1991, Holophane to Duquesne Light, E Light Batteries Root Cause Analysis Report, Fire in BV, Unit 2, Cold Chemistry Laboratory, May 4, 2001 SOER 85-5, Internal Flooding of Power Plant Buildings, September 9, 1986 Vendor Manual (E-Lights) 2501.931-852-001, 12 VDC Emergency Lights Installation and Maintenance Instructions, Rev. J Vendor Manual (Dampers) 90247-36, Fire Damper Certification as 1-1/2 Hour Fire Barrier, May 8, 1984 Vendor Manual (3M Installation Booklet), 3M Interam E-50 Series Fire Protection Mat, 1 Hour Flexible Wrap System For Electrical Raceways, June 19, 1987 Cable Block Diagrams Associated with Elementary Diagrams Listed under Drawings, Above Safety and Nonsafety-Related Panel Lists RTL# A1-080J, Fire Protection Safe Shutdown Report, Addendum 26, Appendix A4, Cable Routing Attachment