Text
December 7, 2006Administrative JudgeAdministrative JudgeAlex S. Karlin, ChairmanDr. Thomas S. Elleman Atomic Safety and Licensing Board PanelAtomic Safety and Licensing Board Panel Mail Stop T-3 F235207 Creedmoor Road, #101 U.S. Nuclear Regulatory CommissionRaleigh, NC 27612 Washington, DC 20555-0001Washington, DC 20555-0001Administrative JudgeDr. Richard E. Wardwell Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001In the Matter ofENTERGY NUCLEAR OPERATIONS, INC.(Vermont Yankee Nuclear Power Station)Docket No. 50-271-LR; ASLBP No. 06-849-03-LR
Dear Administrative Judges:
The NRC Staff hereby provides its monthly status report and notice that it has updated thehearing file for this proceeding pursuant to 10 C.F.R. § 2.336(d). An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1. The Staff is also producing, as Attachment 2, updates to its privilege logs as required by 10 C.F.R. § 2.336(b)(5), and is continuing to preserve and maintain all privileged documents during the pendency of this proceeding. Also attached are the Affidavit of Jonathan G. Rowley, as required by 10 C.F.R. § 2.336(c), and the Declaration of Pao-Tsin Kuo, Acting Director of the Division of License Renewal, formally invoking the deliberative process privilege.Please note that the first 46 documents included in the attached hearing file supplement aredrawings that were included as attachments to a January 25, 2006 letter from Entergy to the NRC. This letter was identified in the Staff's initial hearing file index (Document No.00-088),
but the attached drawings were not individually identified. While the attachments were publicly available in an ADAMS package associated with the identified letter, the Staff has listed each of the attachments individually in this hearing file supplement. There have been no changes to the Staff's projected review schedule as submitted to theBoard on October 25, 2006. It is the Staff's understanding that the Plant License Renewal Subcommittee of the Advisory Committee on Reactor Safeguards (ACRS) has scheduled its meeting on Vermont Yankee's proposed license renewal for May 2, 2007, with the full ACRS meeting scheduled for the month of September 2007. The Staff is not aware of the schedule for the publication of any resulting ACRS report.Sincerely,/RA/Steven C. HamrickCounsel for NRC Staff
Enclosures:
Hearing File IndexPrivilege Log - Deliberative Process Affidavit of Jonathan G. Rowley Declaration of Pao-Tsin Kuocc:Service List Page 1 of 7ATTACHMENT 1 VERMONT YANKEE LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURESHEARING FILE INDEXSupplement 1 - December 7, 2006ID #AccessionNumberDocument DateTitle/Description:01-001ML0605303963/29/2005Drawing LRA-G-191155, "Piping and Instrument Symbols".01-002ML0605304183/29/2005Drawing LRA-G-191160-SH-04, "Flow Diagram Instrument Air System," Sheet 4.01-003ML0605304263/29/2005Drawing LRA-G-191160-SH-06, "Flow Diagram Service Air Service," Sheet 6.
01-004ML0605306323/29/2005Drawing LRA-G-191162-SH-02, "Flow Diagram Miscellaneous Systems FuelOil," Sheet 2.01-005ML0605306363/29/2005Drawing LRA-G-191163-SH-01, "Flow Diagram Fire Protection System InnerLoop," Sheet 1.01-006ML0605306413/29/2005Drawing LRA-G-191163-SH-02, "Flow Diagram Fire Protection System OuterLoop," Sheet 2.01-007ML0605306473/29/2005Drawing LRA-G-191163-SH-04, "Control Room Bldg Cable Vault East & WestSwitchgear Rooms," Sheet 4.01-008ML0605306543/29/2005Drawing LRA-G-191165, "Flow Diagram Sampling System - Sheet 2".
01-009ML0605304283/29/2005Drawing LRA-G-191169-SH-01, "Flow Diagram High Pressure Coolant InjectionSystem".01-010ML0605304293/29/2005Drawing LRA-G-191169-SH-02, "Flow Diagram High Pressure Coolant InjectionSystem".01-011ML0605304683/29/2005Drawing LRA-G-191171, "Flow Diagram Standby Liquid Control System".
01-012ML0605306793/29/2005Drawing LRA-G-191178-SH-01, "Flow Diagram Reactor Water Clean-UpSystem," Sheet 1.
ID #AccessionNumberDocument DateTitle/Description:Page 2 of 701-013ML0605306803/29/2005Drawing LRA-G-191237-SH-01, "HVAC - Flow Diagram Turbine, Service &Control Room Buildings," Sheet 1.01-014ML0605306843/29/2005Drawing LRA-G-191248, HVAC-Equipment Room Sheet No. 3".
01-015ML0605306853/29/2005Drawing LRA-G-191267-SH-01, "Flow Diagram Nuclear Boiler VesselInstrumentation," Sheet 1.01-016ML0605306873/29/2005Drawing LRA-G-191267-SH-02, "Flow Diagram Nuclear Boiler VesselInstrumentation," Sheet 2.01-017ML0605306464/1/2005Drawing LRA-G-191163-SH-03, "Flow Diagram Fire Protection System LowPressure Co2," Sheet 3.01-018ML0605304744/1/2005Drawing LRA-G-191173-SH-01, "Flow Diagram Fuel Pool Cooling & CleanupSystem," Sheet 1.01-019ML0605304104/4/2005Drawing LRA-G-191159-SH-03, "Flow Diagram RCW Cooling Water System,"Sheet 3.01-020ML0605304114/4/2005Drawing LRA-G-191159-SH-05, "Flow Diagram Recirculation Pump CoolingWater," Sheet 5.01-021ML0605306824/4/2005Drawing LRA-G-191237-SH-02, "HVAC - Flow Diagram Turbine, Service &Control Room Buildings," Sheet 2.01-022ML0605306834/4/2005Drawing LRA-G-191238, "HVAC-Flow Diagram Reactor Building".
01-023ML0605304794/14/2005Drawing LRA-G-191174-SH-01, "Flow Diagram Reactor Core Isolation CoolingSystem," Sheet 1.01-024ML0605304824/14/2005Drawing LRA-G-191174-SH-02, "Flow Diagram Reactor Core Isolation CoolingSystem, " Sheet 2.01-025ML0605306774/14/2005Drawing LRA-G-191176-SH-01, "Flow Diagram Condensate & DemineralizedWater Transfer System," Sheet 1.
ID #AccessionNumberDocument DateTitle/Description:Page 3 of 701-026ML0605304654/29/2005Drawing LRA-G-191170, "Flow Diagram Control Rod Drive Hydraulic System".01-027ML0605303887/1/2005Drawing LRA-5920-4147, "Schematic Air/Jacket Coolant System".
01-028ML0605303937/1/2005Drawing LRA-5920-4150, "Schematic Lube Oil System".
01-029ML0605304277/1/2005Drawing LRA-G-191160-07, "Flow Diagram Diesel Generator Starting AirSystem," Sheet 7.01-030ML0605303808/15/2005Drawing LRA-33600-A-00217, "Engineering Flow Diagram Turbine Bldg AreaOff Gas Modification".01-031ML0605304018/15/2005Drawing LRA-G-191156, "Flow Diagram Main, Extraction & Auxiliary SteamSystems".01-032ML0605304148/15/2005Drawing LRA-G-191160-SH-03, "Flow Diagram Instrument Air System," Sheet 3.01-033ML0605304258/15/2005Drawing LRA-G-191160-SH-05, "Flow Diagram Service Air System," Sheet 5.
01-034ML0605304848/15/2005Drawing LRA-G-191175-SH-01, "Flow Diagram Primary Containment &Atmosphere Control System," Sheet 1.01-035ML0605304878/15/2005Drawing LRA-G-191175-SH-02, "Nitrogen Supply System Flow Diagram," Sheet 2.01-036ML0605306788/15/2005Drawing LRA-G-191177-SH-01, "Flow Diagram - Radwaste System," Sheet 1.
01-037ML0605306888/15/2005Drawing LRA-VY-E-75-002, "Engineering Flow Diagram ContainmentAtmosphere Dilution System (CAD)".01-038ML06053040410/31/2005Drawing LRA-G-191159-SH-01, "Flow Diagram Service Water System," Sheet 1.01-039ML06053047110/31/2005Drawing LRA-G-191172, "Flow Diagram Residual Heat Removal System".
ID #AccessionNumberDocument DateTitle/Description:Page 4 of 701-040ML06053047610/31/2005Drawing LRA-G-191173-SH-02, "Flow Diagram Fuel Pool & Clean Up System,"Sheet 2.01-041ML06053040611/1/2005Drawing LRA-G-191159-SH-02, "Flow Diagram Service Water System," Sheet 2.01-042ML06053038511/15/2005Drawing LRA-5920-00870, "HPCI Turbine Oil Piping Diagram".
01-043ML06053062911/15/2005Drawing LRA-G-191160-SH-08, Flow Diagram Instrument Air System," Sheet 8.
01-044ML06053065011/15/2005Drawing LRA-G-191164, "Flow Diagram Sampling System - Sheet 1".
01-045ML06053065711/15/2005Drawing LRA-G-191168, "Flow Diagram Core Spray System".
01-046ML06053065611/21/2005Drawing LRA-G-191167, "Flow Diagram Nuclear Boiler".
01-047ML0629204349/27/2006EMAIL: (PA) Fwd: Request for Clarification on VY RAI Responses.
01-048ML0629202709/30/2006EMAIL: (PA) VY 2006 DMR's to Date.
01-049ML06292042310/3/2006(E-Mail) Cooling Tower Report for VY.
01-050ML06292041710/3/2006(E-Mail) Current air cert and fishway temperature table from 2003 annual report.
01-051ML06292035810/3/2006(E-Mail) Thermophillic 01-052ML06292035210/3/2006(E-Mail) Vermont Yankee License Renewal 01-053ML06292026510/3/2006EMAIL: (PA) FW Waste Minimization Plan.
01-054ML06292038510/5/2006(E-Mail) Current IDP permit.
01-055ML06292037210/5/2006(E-Mail) VY cooling tower operation.
01-056ML06292037710/5/2006(E-Mail) VY Drift.
01-057ML06284059510/10/2006Request for Additional Information for the Review of Vermont Yankee NuclearPower Station License Renewal Application.
ID #AccessionNumberDocument DateTitle/Description:Page 5 of 701-058ML06292039110/11/2006(E-Mail) Additional temperature data request - VY.01-059ML06292032910/12/2006EMAIL: (PA) Ecological Report 31 [April 2002].
01-060ML06292006910/12/2006Email: (PA) VY Annual Ecological Reports from the 1980's [1981]
01-061ML06298024910/12/2006EMAIL: (PA) VY Annual Ecological Reports from the 1980's [1983].
01-062ML06279007110/12/2006Summary of a Telephone Conference Call Held on September 14, 2006,Between the U.S. NRC and Entergy Nuclear Operations, Inc, Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application.01-063ML06278012210/12/2006Summary of a Telephone Conference Call Held on September 19, 2006,between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc.01-064ML06292042810/17/2006Email: (PA) CD of VY ecology studies from 1980's.
01-065ML06296030110/17/2006Vermont Yankee - License Renewal Application, Amendment 16.
01-066ML06292007510/17/2006VY Annual Ecological Reports from the 1980's [1985]
01-067ML06312009510/18/2006E-mail: (PA-LR) FW: LRA Amendment 16.
01-068ML06312009310/20/2006E-mail: (PA-LR) Copy of SAMA Response.
01-069ML06312010910/20/2006E-mail: (PA-LR) Copy of VHS RAI Response.
01-070ML06312009910/20/2006E-mail: (PA-LR) Re: Copy of SAMA Response.
01-071ML06299014210/20/2006Vermont Yankee - License Renewal Application, Amendment No. 17.
01-072ML06299015510/20/2006Vermont Yankee - License Renewal Application, Amendment No. 18, Responseto Request for Clarification of SAMA RAI Responses.
ID #AccessionNumberDocument DateTitle/Description:Page 6 of 701-073ML06292003410/27/2006Summary of a Telephone Conference Call Held on September 25, 2006,Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application.01-074ML06296012510/27/2006Summary of Telephone Conference Call held on September 27, 2006, betweenthe U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc.,
Concerning Information Pertaining to the VY Nuclear Power Station LRA.01-075ML06303057610/30/2006Issuance of Environmental Scoping Summary Report Associated with the Staff'sReview of the Application by Entergy Nuclear Operations, Inc. For Renewal of the Operating License for Vermont Yankee Nuclear Power Station (TAC No.
MC9670)01-076ML06297031810/30/2006Vermont Yankee Nuclear Power Station License Renewal Application Review.
01-077ML06312010610/31/2006E-mail: (PA-LR) VYNPS License Renewal Amendment 19.
01-078ML06311007110/31/2006Vermont Yankee License Renewal Application, Amendment 19.
01-079ML06312010411/1/2006E-mail: (PR-LA) FW: Telecon Summary for review.
01-080ML06334022711/2/2006EMAIL: (PA-LR) Entergy Nuclear Cultural Resources Protection Plan.
01-081ML06313008211/2/2006Email: (NPA-PD-LR) Re: Clarification of Part 12, Subpart D Exemption.
01-082ML06305061911/6/2006Summary of a Telephone Conference Call Held on October 10, 2006, Betweenthe NRC and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application.01-083ML06317008011/6/2006Vermont Yankee License Renewal Application, Amendment 21 Response toRequest for Clarification of SAMA RAIs.01-084ML06334022511/7/2006EMAIL: (PA-LR) Re: NRC Request for Meeting with VDH ID #AccessionNumberDocument DateTitle/Description:Page 7 of 701-085ML06324016311/9/2006Vermont Yankee License Renewal Application, Amendment 20.01-086ML06340045311/9/2006E-Mail: (NPA-PD-LR) VYNPS License Renewal Application Am. 20, VermontYankee.01-087ML06334022011/13/2006EMAIL: (PA-LR) Re: NRC Request for Meeting with VDH (W. Irwin Response).
01-088ML06334022311/13/2006EMAIL: (PA-LR) Re: NRC Request for Meeting with VDH [R. Emch response].
01-089ML06312049611/21/2006Summary of Telephone Conference Call Held on October 12, 2006, Betweenthe U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc.,
Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application Page 1 of 10ATTACHMENT 2VERMONT YANKEE LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURESPRIVILEGE LOG - DELIBERATIVE PROCESS PRIVILEGESupplement 1 - December 7, 2006Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRCStaff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.Doc No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage Count DP-01-01ML062850564InformationSystemsLabs, Inc,NRC/NRR/ADRO/DLR/R LRCRevised Sections3.0 and 4.0 Inputfor the SafetyEvaluation for theVermont YankeeNuclear PowerStation LicenseRenewalApplication.10/11/2006SafetyEvaluationReportRowley J G,NRC/NRR/ADRO/DLR/RLRBMemorandumContaining ProposedSafety EvaluationSections 3.0 and 4.0 424 DP-01-02ML062840607Jung I C,NRC/NRR/ADES/DE/EE EBSafety EvaluationInput for VermontYankee LicenseRenewalApplication,Section 2.5 (TACNO. MC9668)10/11/2006Memoranda,SafetyEvaluationZimmerman J,NRC/NRR/ADRO/DLR/RLRBMemorandumContaining ProposedSafety EvaluationSection 2.5 6 DP-01-03ML063130089Flemming JL, NRCEMAIL: (NPA-PD-LR) RE: Report 31attached [from J.Flemming].10/13/2006E-MailPatton T L,ArgonneNational Lab(ANL)E-mail Discussion ofTextual Changes toEIS RegardingRenewed DischargePermit 2 Doc No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 2 of 10 DP-01-04ML063130094Patton T L,ArgonneNational Lab(ANL)EMAIL: (NPA-PD-LR) RE: Report 31attached.10/13/2006E-MailFlemming J L, NRC E-mail Discussion ofTextual Changes toEIS RegardingRenewed DischargePermit 2 DP-01-05ML062910428Emch R L, NRC(E-mail) TheScoping Comment
& Response under discussion10/16/2006E-MailLaGory K E,ArgonneNational Lab(ANL)Proposed Responseto Scoping Commenton Endangered Species 2 DP-01-06ML062910429LaGory K E,ArgonneNational Lab(ANL)The ScopingComment &Response under discussion toRichard Emch fromKirk LaGory10/16/2006E-MailEmch R L, NRCProposed Revision toResponse to ScopingComment onEndangered Species 3 DP-01-07ML063130324Huang J,Legin Group,IncE-MAIL: (NPA-PD-LR) Final Task 1Deliverable forVermont Yankee SER.10/18/2006E-Mail,SafetyEvaluationReportRowley J G,NRC/NRRPreliminary DraftVersion of SafetyEvaluation Report 1 DP-01-08ML063130081Emch R L, NRCEMAIL: (NPA-AC-LR) ScopingReport.10/18/2006E-Mail,Report,Miscellaneou sMiller D S,Moret E N,ArgonneNational Lab(ANL)Draft Version ofScoping SummaryReport 69 Doc No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 3 of 10 DP-01-09ML063130086Emch R L, NRCEMAIL: (NPA-PD-LR) draft letter toVELCO.10/23/2006E-MailDavis J,O'Rourke D,Wescott K,ArgonneNational Lab(ANL), NRCE-mail with AttachedDraft Version ofLetter to VermontDivision of HistoricPreservation 5 DP-01-10ML063130070Young R M, NRCEMAIL: (NPA-PD-LR) WP File forVermont Yankee DSER.10/23/2006E-Mail,SafetyEvaluationReport, DraftRowley J G, NRCE-mail With AttachedProposed SafetyEvaluation Section 2 42 DP-01-11ML062930015Weerakkody S D,NRC/NRR/ADRA/DRA/A FPBSafety EvaluationInput Regardingthe LicenseRenewalApplication -Vermont YankeeNuclear PowerStation - FireProtection (TACNo. MC9668).10/23/2006Memoranda,SafetyEvaluationReportZimmerman J I,NRC/NRR/ADRO/DLR/RLRBMemorandumContaining ProposedSafety EvaluationSections 2.3.3.8 and2.3.3.9 18 DP-01-12ML063130090Palla R L, NRCEMAIL: (NPA-PD-LR) Fwd: VYresponses.10/25/2006E-MailEmch R L, NRC Discussion ofAdequacy andCompleteness ofSAMA RAI Responses 4 Doc No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 4 of 10 DP-01-13ML063130078Nguyen D T, NRCEmail: (NPA-PD-LR) Re: VHSresponses from VY.10/25/2006E-MailMorgan M J,Rowley J G, NRC Discussion ofAdequacy andCompleteness of RAI ResponsesRegarding ElectricalCircuits and Vernon Dam 3 DP-01-14ML063130101Morgan M J, NRCEMAIL: (NPA-PD-LR) Fwd: Re:Questions ReQuad Cities.10/27/2006E-MailRowley J G, NRCDiscussion of How toApply LessonsLearned from QuadCities to VermontYankee re: SteamDryer 5 DP-01-15ML063130097Rubin M P, NRCEMAIL: (NPA-PD-LR) Re: Fwd: VYresponses.10/27/2006E-MailEmch R L,Palla R L, NRC Discussion ofAdequacy andCompleteness ofSAMA RAI Responses 4 Doc No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 5 of 10 DP-01-16ML063040144Hamzehee H G,NRC/NRR/ADES/DE/EQ VBDraft SafetyEvaluationRegarding theEntergy NuclearVermont Yankee,LLC, LicenseRenewalApplication for theVermont YankeeNuclear PowerStation, DatedJanuary 29, 200610/30/2006Draft SafetyEvaluationReport(DSER),MemorandaKuo P T,NRC/NRR/ADRO/DLRMemorandumContaining ProposedSafety EvaluationSections 2.0 and 3.1 40 DP-01-17ML063130068Nguyen D T, NRCEmail: (NPA-PD-LR) Re: Fwd:VYNPS RAI 3.6.2-2-N-08-1.10/30/2006E-MailHsu K R, NRCDiscussion ofAdequacy ofResponse to RAI3.6.2-2-N-08-1 andAttached DraftSection 3.6 of SER.
33 DP-01-18ML063340235Palla B,NRC/NRREMAIL: (NPA-PD-LR) Fwd: UpdatedVY TER.10/31/2006E-Mail,Report,TechnicalEmch R L,NRC/NRRE-mail with AttachedDraft Version ofAppendix G (SAMAMitigationAlternatives) to theDSEIS 40 DP-01-19ML063130102Galletti G S, NRCEMAIL: (NPA-PD-LR) SE Input.10/31/2006E-Mail,MemorandaRowley J G, NRCE-mail ContainingProposed SafetyEvaluation Sections2.0 and 3.1 42 Doc No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 6 of 10 DP-01-20ML063100170Mitchell M A,NRC/NRR/ADES/DCI/CV IBVermont YankeeLicense RenewalApplication FinalSafety EvaluationReport SectionsOn The AgingManagementProgram For The Reactor Vessel(TAC NO.MC9668).11/2/2006Memoranda,SafetyEvaluationReportAuluck R C,NRC/NRR/ADRO/DLR/RLRBMemorandumContaining ProposedSafety EvaluationSection 3.0.3.2 6 DP-01-21ML063100042Mitchell M A,NRC/NRR/ADES/DCI/CV IBVermont YankeeLicense RenewalApplication FinalSafety EvaluationReport SectionsOn The AgingManagementReviews For The Reactor VesselAnd Its InternalComponents (TACNO. MC9668).11/2/2006Final SafetyEvaluationReport(FSER),MemorandaAuluck R,NRC/NRR/ADRO/DLR/RLRBMemorandumContaining ProposedSafety EvaluationSection 3.1.2.3 5 DP-01-22ML063410353CheruvenkiG S, NRCE-Mail: (NPA-PD-LR) Ses - VermontYankee - LRA,Vermont Yankee.11/2/2006E-MailRowley J G, NRCE-mail With AttachedSafety EvaluationSections 3.1.2-1 and3.1.2-2 14 Doc No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 7 of 10 DP-01-23ML063340229Palla B,NRC/NRREMAIL: (NPA-PD-LR) VY SAMAChapter 5.11/8/2006E-MailEmch R L, MuirJ M, NRC/NRRDraft DSEIS Section5.2 SAMA 8 DP-01-24ML063410351Morgan M J, NRCE-Mail: (NPA-PD-LR) Fwd: RE:Clarification of Part12, Subpart Dexemption,Vermont Yankee.11/13/2006E-MailRowley J G,NRC/NRR/ADRO/DLR/RLRBStaff Discussion ofScoping Impact ofInspectionExemption forVernon Dam 4 DP-01-25ML063410348Schoppy JG, NRCE-Mail: (NPA-PD-LR) that DamInspection,Vermont Yankee11/13/2006E-MailRowley J G, NRCStaff Discussion ofScoping Impact ofInspectionExemption forVernon Dam 2 DP-01-26ML063400516Emch R L, NRCE-Mail: (NPA-PD-LR) Fwd: Re:Chapters 2 & 4 ofVY attached,Vermont Yankee,From: RichardEmch, To: JessieMuir.11/16/2006E-MailMuir J M, NRCStaff ProposedRevision of DSEISLanguage 3 DP-01-27ML063400469Muir J M,NRC/NRRE-Mail: (NPA-PD-LR) Fwd: VY SER,Vermont Yankee.11/16/2006E-Mail,MemorandaEmch R L,NRC/NRRE-mail with AttachedDraft Version ofAppendix G (SAMAMitigationAlternatives) to theDSEIS 42 Doc No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 8 of 10 DP-01-28ML063400462Schaaf R G,NRC/NRR/A DROE-Mail: (NPA-PD-LR) Re: Chapters 2& 4 of VY attached,Vermont Yankee.11/16/2006E-MailEmch R L,NRC/NRR/ADR OStaff ProposedRevision of DSEISLanguage 3 DP-01-29ML063400460Palla R L, NRCE-Mail: (NPA-PD-LR) VYConcurrenceVersion, VermontYankee.11/16/2006E-MailEmch R L,NRC/NRR/ADR OE-mail with AttachedDraft Version ofAppendix G (SAMAMitigationAlternatives) to theDSEIS 40 DP-01-30ML063210401Rubin M P,NRC/NRR/ADRA/DRA/A PLAEvaluation ofSevere AccidentMitigationAlternatives forLicense Renewalof Vermont YankeeNuclear PowerStation.11/17/2006Memoranda,Report,Miscellaneou sFranovich R L,NRC/NRR/ADRO/DLR/REBBE-mail with AttachedDraft Version ofAppendix G (SAMAMitigationAlternatives) to theDSEIS 39 DP-01-31ML063400538Rodriguez V M,NRC/NRR/ADRO/DLRE-Mail: (NPA-PD-LR) Shell - Section2.1, VermontYankee.11/17/2006E-MailRowley J G,NRC/NRR/ADRO/DLRE-mail With AttachedShell Version ofSafety Evaluation 13 DP-01-32ML063400465Schaaf R,NRC/NRR/A DROE-Mail: (NPA-PD-LR) Fwd: Re:Chapters 2 & 4 ofVY attached,Vermont Yankee.11/20/2006E-MailMuir J M,NRC/NRR/ADR OStaff ProposedRevision of DSEISLanguage 3 Doc No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 9 of 10 DP-01-33ML063400505Moret E N,ArgonneNational Lab(ANL)E-Mail: (NPA-PD-LR) VT YankeeFigures, VermontYankee, 11/21/06,From: Ellen Moret,To: Jessie Muir,11:38am.11/21/2006E-Mail,Environmental ImpactStatement,MapMuir J M,NRC/NRR/ADR OE-mail With AttachedMap Proposed forInclusion as a Figurein DSEIS 5 DP-01-34ML063400508Moret E N,ArgonneNational Lab(ANL)E-Mail: (NPA-PD-LR) VT YankeeFigures, VermontYankee, 11/21/06,From: Ellen Moret,To: Jessie Muir,11:44am.11/21/2006E-Mail,Environmental ImpactStatement,Graphics inclCharts andTables, MapMuir J M,NRC/NRR/ADR OE-mail With AttachedMap Proposed forInclusion as a Figurein DSEIS 8 DP-01-35ML063400545Moret E N,ArgonneNational Lab(ANL)E-Mail: (NPA-PD-LR) VT YankeeFigures, VermontYankee, 11/21/06,From: Ellen Moret,To: Jessie Muir.11/21/2006E-Mail,Environmental ImpactStatement,Graphics inclCharts andTables, MapMuir J M, NRCE-mail With AttachedMap Proposed forInclusion as a Figurein DSEIS 12 DP-01-36ML063400454Moret E N,ArgonneNational Lab(ANL)E-Mail: (NPA-PD-LR) FW: Pg4-41,Vermont Yankee.11/22/2006E-MailMuir J M,NRC/NRR/ADRO/DLRE-mail With AttachedMap Proposed forInclusion as a Figurein DSEIS 4 Doc No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 10 of 10 DP-01-37ML063410170Morgan M J, NRCE-Mail: (NPA-PD-LR) Fwd: RE:Clarification of Part12, Subpart Dexemption,Vermont Yankee.11/22/2006E-MailRowley J G,NRC/NRR/ADRO/DLR/RLRB Discussion ofAcceptability ofLicense RenewalAmendment 19- RAI Response 4 DP-01-38ML063410166Hoang D V,NRC/NRR/ADRO/DLRE-Mail: (NPA-PD-LR) VYNPS: inputreport and SERinput, VermontYankee.11/22/2006E-MailHsu K R,Rowley J G,Tran L N,NRC/NRR/ADRO/DLRE-mail With AttachedDraft Version ofSafety EvaluationSection 3.0.3.3.6-Structures MonitoringVernon Dam 8
December 7, 2006UNITED STATES OF AMERICANUCLEAR REGULATORY COMMISSIONBEFORE THE ATOMIC SAFETY AND LICENSING BOARDIn the Matter of)
)ENTERGY NUCLEAR VERMONT YANKEE,)Docket No. 50-271-LR LLC, and ENTERGY NUCLEAR)
OPERATIONS, INC.)ASLBP No. 06-849-03-LR
)(Vermont Yankee Nuclear Power Station))AFFIDAVIT OF JONATHAN G. ROWLEY CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(c) I, Jonathan G. Rowley, do hereby state as follows:1.I am employed as a Project Manager in the Division of License Renewal in theNuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation. I serve as a project manager for the Vermont Yankee Nuclear Power Station's license renewal application
("LRA"). 2.I hereby certify that all relevant materials required to be disclosed pursuant to10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that thedisclosures are accurate and complete as of the date of this certification.3.I declare under penalty of perjury that the foregoing is true and correct to the bestof my knowledge, information and belief.Original Signed By:
_______________________Jonathan G. RowleyExecuted in Rockville, MDthis 7th day of December, 2006 December 7, 2006UNITED STATES OF AMERICANUCLEAR REGULATORY COMMISSIONBEFORE THE ATOMIC SAFETY AND LICENSING BOARDIn the Matter of)
)ENTERGY NUCLEAR VERMONT YANKEE,)Docket No. 50-271-LR LLC, and ENTERGY NUCLEAR)
OPERATIONS, INC.)ASLBP No. 06-849-03-LR
)(Vermont Yankee Nuclear Power Station))DECLARATION OF PAO-TSIN KUOI, Pao-Tsin Kuo, do hereby state as follows:1. I am employed as the Acting Director of the Division of Licensing Renewal("DLR") in the Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation
("NRR"). My supervisory responsibilities include oversight of the NRC Staff's review and evaluation of the Vermont Yankee Nuclear Power Station license renewal application.2. As part of their responsibilities in preparing the hearing file and mandatorydisclosures for these proceedings, NRC staff members under my supervision identified several documents as privileged because they contained information concerning the Staff's deliberative process. Those documents are listed in Attachment 2 to the December 7, 2006, submission of the Staff's Hearing File.3. I have personally reviewed the documents identified as privileged in Attachment2, and have determined, in accordance with the guidance set forth in Management Directive 3.4, that they contain predecisional information concerning the Staff's review of the license renewal application. All documents contain either the Staff's analyses, recommendations, opinions, or evaluations, and may not necessarily reflect the final agency position with respect to the matters discussed therein. Each of the documents comprises part of the deliberative process necessary to the Staff's review of the pending license renewal application.4. Further, I have determined that disclosure of these documents could result inharm to the agency, in that it would (a) prematurely disclose the preliminary views of individual Staff members and/or the Staff prior to reaching a final agency decision, and could thus create confusion as to the actual policy or views of the NRC Staff; (b) hinder the efficiency of the Staff, in that forced disclosure of its internal discussions on an unresolved issue would tend to chill allfuture deliberations and would interfere with the Staff's ability to engage in a free exchange of opinions and analyses prior to publishing its final review documents; and (c) imply or suggest incorrectly that the opinions of the Staff members involved in these communications are actually the final decisions of the agency, while no such final decision has yet been made.5. Accordingly, I formally invoke the deliberative process privilege with respect toeach of the documents listed in Attachment 2 to the December 7, 2006 submission of the Staff's Hearing File.6. I declare under penalty of perjury that the foregoing is true and correct to thebest of my knowledge, information and belief. Original Signed By:
_______________________Pao-Tsin KuoExecuted in Rockville, MDthis 7th day of December, 2006 UNITED STATES OF AMERICANUCLEAR REGULATORY COMMISSIONBEFORE THE ATOMIC SAFETY AND LICENSING BOARDIn the Matter of)
)ENTERGY NUCLEAR VERMONT YANKEE,)Docket No. 50-271-LR LLC, and ENTERGY NUCLEAR)
OPERATIONS, INC.)ASLBP No. 06-849-03-LR
)(Vermont Yankee Nuclear Power Station))CERTIFICATE OF SERVICEI hereby certify that copies of the NRC Staff letter dated December 7, 2006, providing notice ofthe availability of the hearing file, with attachments, together with the affidavit of Jonathan G.
Rowley and the declaration of Pao-Tsin Kuo in the above-captioned proceeding have been served on the following by electronic mail with copies by deposit in the NRC's internal mail system or, as indicated by an asterisk, by electronic mail with copies by U.S. mail, first class, this 7th day of December 2006.Administrative JudgeAlex S. Karlin, Chair Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: ask2@nrc.govAdministrative JudgeThomas S. Elleman*
Atomic Safety and Licensing Board Panel 5207 Creedmoor Road, #101 Raleigh, NC 27612 E-mail: elleman@eos.ncsu.eduOffice of Commission AppellateAdjudication Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: OCAAmail@nrc.govAdministrative JudgeRichard E. Wardwell Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: rew@nrc.govOffice of the SecretaryAttn: Rulemaking and Adjudications Staff Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: hearingdocket@nrc.govSarah Hofmann, Esq.* Director of Public Advocacy Department of Public Service 112 State Street - Drawer 20 Montpelier, VT 05620-2601 E-mail: sarah.hofmann@state.vt.us Diane Curran, Esq.*Harmon, Curran, Spielberg
& Eisenberg, L.L.P.
1726 M Street, NW., Suite 600 Washington, DC 20036 E-mail: dcurran@harmoncurran.comRonald A. Shems, Esq.*Karen Tyler, Esq.
Shems Dunkiel Kassel & Saunders, PLLC 91 College Street Burlington, VT 05401 E-mail: rshems@sdkslaw.com Ktyler@sdkslaw.comJennifer J. Patterson, Esq.*Office of the New Hampshire Attorney General 33 Capitol Street Concord, NH 03301 E-mail: jennifer.patterson@doj.nh.govMarcia Carpentier, Esq.Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: mxc7@nrc.govAnthony Z. Roisman, Esq.* National Legal Scholars Law Firm 84 East Thetford Rd.
Lyme, NH 03768 E-mail: aroisman@nationallegalscholars.comMatthew Brock, Esq.*Assistant Attorney General Office of the Massachusetts Attorney General Environmental Protection Division One Ashburton Place, Room 1813 Boston, MA 02108-1598 E-mail: matthew.brock@ago.state.ma.usDavid R. Lewis, Esq.*Matias F. Travieso-Diaz Pillsbury Winthrop Shaw Pittman LLP 2300 N Street, NW Washington, DC 20037-1128 E-mail: david.lewis@pillsburylaw.com matias.travieso-diaz@pillsburylaw.com
/RA/ Steven C. Hamrick Counsel for NRC Staff