Pages that link to "TS-4.4.1.2"
Jump to navigation
Jump to search
The following pages link to TS-4.4.1.2:
Displayed 50 items.
- ML20150D186 (← links)
- ML20149E597 (← links)
- ML20149E588 (← links)
- ML20149E191 (← links)
- ML20205R868 (← links)
- ML20205R863 (← links)
- IR 05000373/1988022 (← links)
- ML20207J917 (← links)
- ML20206R258 (← links)
- ML20206G400 (← links)
- ML20207S442 (← links)
- ML20207Q420 (← links)
- ML20214P163 (← links)
- ML20245A286 (← links)
- ML20245A228 (← links)
- IR 05000313/1988047 (← links)
- ML20238B675 (← links)
- ML20248E937 (← links)
- ML20248E922 (← links)
- IR 05000324/1989020 (← links)
- ML20245H885 (← links)
- ML20236H378 (← links)
- ML20235Y607 (← links)
- ML20235Q511 (← links)
- IR 05000312/1987001 (← links)
- 0CAN038901, Requests That Violation Noted in Insp Repts 50-313/88-47 & 50-368/88-47 Be Clarified or Rescinded (← links)
- 1CAN128603, Proposed Tech Specs,Incorporating Administrative Changes to Clarify Ambiguities,Remove Outdated Requirements & Provide Consistency (← links)
- ML20210T759 (← links)
- ML20210S023 (← links)
- U-601239, Application for Amend to License NPF-62,revising Tech Spec to Support Cycle 2 in Max Extended Operating Domain & W/ Reduced Feedwater Temps.Supporting Documentation Encl.Fee paid.NEDC-31546P Withheld (← links)
- ST-HL-AE-1901, Forwards Justifications & Specific Data Re Proposed Draft Rev 2 to Tech Specs,Including Markups of Affected Sections (← links)
- CEO-88-002, Application for Proposed Amend 130 to License DPR-54,adding Operating Requirements Designed to Provide Proper Limitations & Conditions on Reactor Bldg Pressure Equalization Operations During Power Operation.Fee Paid (← links)
- AECM-84-0229, Forwards Program Completion Rept Re Conclusion of Tech Spec Review Program.Rept Documents That Thorough & in-depth Engineering,Operations & Licensing Review of Tech Specs Conducted Per Programmatic Commitments (← links)
- AECM-83-0422, Application for Amend to License NPF-13,proposing Tech Spec Changes to Enhance Clarity or Provide Consistency W/Plant Design & Operation,Per NRC 821020 Confirmation of Action Ltr.Detailed Description of Proposed Changes Encl (← links)
- ML20056A021 (← links)
- ML20247L331 (← links)
- ML20246P302 (← links)
- ML20246P285 (← links)
- 05000325/LER-1989-011, :on 890404,determined That Reactor Jet Pump Once Per 24 H Operability Surveillance Had Been Missed Prior to Entering Operation Condition 2.Caused by Inadequate Review of Surveillance Rept (← links)
- ML20245F903 (← links)
- 05000312/LER-1985-027, :on 851214,licensee Discovered That Testing Requirements for Containment Personnel Air Lock Seals Not in Accordance W/Tech Spec 4.4.1.2.5.(c).Caused by Technicians Not Adhering to Procedures.Retest Conducted on 851216 (← links)
- 05000324/LER-1986-025-01, :on 861120,determined That 861119 Surveillance of Reactor Jet Pump Missed.Caused by Personnel Error. Surveillance Performed Satisfactorily.Personnel Disciplined & Training Initiated (← links)
- 05000416/LER-1986-031, :on 860901,prior to Changing from Startup to Run,Aprm Flow Channels Not Checked as Required by Startup Integrated Operating Instruction.Caused by Technician Error in Interpreting Procedure.Procedure Revised (← links)
- ML20214U261 (← links)
- 05000312/LER-1987-017, :on 870209 & 0320,discrepancies in Local Leak Rate Test (LLRT) Discovered.Caused by Personnel Error.Tech Specs,Updated Sar,Integrated Leak Rate Tests & LLRT Will Be Revised to Reflect Addl Test Requirements (← links)
- 05000324/LER-1986-025, :on 861119,determined That Surveillance Testing for Reactor Jet Pump Not Performed.Caused by Personnel Error.Personnel Involved discplined.Real-time Training Completed (← links)
- ML20210G168 (← links)
- ML20206F471 (← links)
- ML20155D786 (← links)
- ML20147H358 (← links)