Pages that link to "ASME Code Case OMN-16"
Jump to navigation
Jump to search
The following pages link to ASME Code Case OMN-16:
Displayed 35 items.
- DCL-18-105, Submittal of the Fourth Ten-Year Interval Inservice Testing (1ST) Program Plan, Revision 1 (← links)
- 2CAN042001, Withdrawal of Inservice Testing Requests for Alternative (← links)
- NOC-AE-20003730, Withdrawal of Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-02) (← links)
- ML20128J902 (← links)
- NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval (← links)
- ML20303A260 (← links)
- ML20280A757 (← links)
- 2CAN112005, Unit 2 - Inservice Testing Plan for the Fifth 10-Year Interval (← links)
- WBL-20-049, Augmented Inservice Test Program, Revision 2 (← links)
- ML22151A164 (← links)
- ML22203A112 (← links)
- CNL-22-079, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RP-12 (← links)
- ML22201A126 (← links)
- IR 05000282/2022002 (← links)
- ML22222A173 (← links)
- ML20120A629 (← links)
- ML22284A007 (← links)
- ML22196A063 (← links)
- L-23-175, Submittal of Fifth Ten Year Inservice Testing Program (← links)
- ML23285A092 (← links)
- ML23283A024 (← links)
- GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing (← links)
- ML24124A000 (← links)
- ML24240A355 (← links)
- ML24250A106 (← links)
- RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests (← links)
- ML23291A006 (← links)
- ML24344A274 (← links)
- ML19156A174 (← links)
- ML16285A013 (← links)
- ML16285A012 (← links)
- L-16-200, Proposed Alternatives and Relief Requests Associated with the Inservice Testing Program 10-Year Update (← links)
- L-PI-14-015, 10 CFR 50.55a Requests RR-01, RR-03. RR-05, RR-06 and RR-07 Associated with the Fifth Ten-Year Interval for the Inservice Test Program (← links)
- L-MT-11-055, 10CFR50.55a Requests Associated with the Fifth Inservice Testing Ten-Year Lnterval (← links)
- L-2025-076, Pump and Valve Inservice Testing (1ST) Program and the Safety- Related Snubber Program Plan for the Sixth Interval (← links)