Pages that link to "Operational convenience"
Jump to navigation
Jump to search
The following pages link to Operational convenience:
Displayed 50 items.
- RC-14-0086, Technical Specification Bases Revision Updated Through May 2014 (← links)
- RS-12-149, Response to Request for Additional Information Regarding Relief Requests Associated with the Fifth Inservice Testing Interval (← links)
- L-2010-115, 10 CFR 50.59 Summary Report Changes, Tests, and Experiments Implemented as Allowed by 10 CFR 50.59 for the Period Covering May 11, 2008 Through December 4, 2009 (← links)
- PLA-6530, Response to Request for Additional Information on Time Extension of Technical Specification 3.8.1 Allowable Completion Time for Offsite AC Circuits (← links)
- L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 (← links)
- L-06-149, Improved Technical Specification (ITS) Conversion License Amendment Request (← links)
- RNP-RA/06-0033, Transmittal of Technical Specifications Bases Revisions (← links)
- ML19011A059 (← links)
- ML19011A058 (← links)
- ML18361A845 (← links)
- ML18353A458 (← links)
- TMI-12-168, Submittal of Relief Requests Associated with the Fifth Inservice Testing (IST) Interval (← links)
- ML18323A368 (← links)
- ML19023A066 (← links)
- ML18130A081 (← links)
- LR-N18-0059, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (← links)
- RA-18-018, Submittal of Changes to Technical Specifications Bases (← links)
- ONS-2018-013, Technical Specification Bases Changes (← links)
- LR-N17-0170, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate (← links)
- RA-17-072, License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition (← links)
- L-2017-116, Response to Request for Additional Information Regarding License Amendment Request to Revise the Technical Specifications (TS) for the Reactor Protection System (RPS) Power Rate-of-Change Instrumentation and Add New TS 3.0.5 (← links)
- NG-17-0086, Transmittal of Revision 24 of the DAEC Updated Final Safety Analysis Report and the Current DAEC Technical Specifications Bases (← links)
- RS-16-228, License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition (← links)
- CNL-16-164, Application to Modify Technical Specifications to Extend Surveillance Requirement Intervals for AC Sources (WBN-TS-16-024) (← links)
- GO2-16-125, Seventh Six-Month Status Update Report for the Implementation of NRC Order EA-12-049, Mitigation Strategies for Beyond Design Basis External Events (← links)
- L-MT-16-031, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Code (← links)
- GO2-16-037, Sixth Six-Month Status Update Report for the Implementation of NRC Order EA-12-049, Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- CP-201501050, Revision to Relief Request T-1, Inservice Testing Program for Application of an Alternative to the ASME OM Code Frequency Specifications (2004 Edition of Asmeom Code, 2006 Addenda (← links)
- BVY 15-055, Revision of Technical Specifications Bases Pages (← links)
- GO2-15-124, Fifth Six-Month Status Update Report for the Implementation of Nuclear Regulatory Commission Order EA-12-049 Mitigation Strategies for Beyond Design Basis External Events (← links)
- PNP 2015-024, Requests Relief of Proposed Alternatives for the Fifth 10-Year Inservice Test Interval (← links)
- GO2-15-055, Submittal of Fourth 10-Year Inservice Testing (IST) Program Plan (← links)
- NLS2015026, Fifth Ten-Year Interval Pump and Valve Inservice Testing Program Relief Requests (← links)
- ML19050A439 (← links)
- RA-17-0026, Application to Adopt ASME Code OMN-20 for Pump and Valve Inservice Testing (← links)
- NG-15-0003, Fifth Ten-Year Interval Inservice Testing Program Relief Requests (← links)
- PNP 2014-088, Report to NRC of Changes to Technical Specifications Bases (← links)
- BVY 14-010, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition (← links)
- ULNRC-06035, CFR 50.55a(a)(3) Requests for Relief from ASME OM Code Pump and Valve Testing Requirements Regarding the Frequency of Inservice Tests (← links)
- NL-13-1648, Response to Supplemental Information Needed for Acceptance of License Amendment Request for Technical Specification 3.7.14 Completion Time (← links)
- RC-13-0069, Request Relief from ASME Code Requirements in VCSNS 4th Ten Year Inservice Inspection Interval (← links)
- RS-13-007, Response to Request for Additional Information Regarding the Use of an Auxiliary Feedwater Cross-tie Between Units (← links)
- HNP-12-130, Transmittal of Technical Specifications Bases (← links)
- SBK-L-12054, Response to Request for Additional Information Regarding License Amendment Request 10-02, Application for Change to the Technical Specifications for the Containment Enclosure Emergency Air Cleanup System (← links)
- L-2011-498, Units, 3 & 4 - 10 CFR 50.59 Summary Report of Changes, Tests and Experiments for Period Covering 12/04/2009 Through 05/16/2011 and Updated Technical Specification Bases (← links)
- LIC-11-0036, (Fcs), Unit No.1, FCS / OPPD Cyber Security Plan, License Amendment Request (Revised) (← links)
- JAFP-11-0035, Response to Requests for Additional Information (Rais) and Revision to the Jaf Cyber Security Plan (← links)
- RS-16-205, Relief Requests Associated with the Fourth Interval Inservice Testing Program (← links)
- NLS2010029, Technical Specifications Bases Changes (← links)
- L-MT-10-008, Technical Requirements Manual (← links)