Pages that link to "TS-6.9.1.1"
Jump to navigation
Jump to search
The following pages link to TS-6.9.1.1:
Displayed 50 items.
- LR-N17-0174, Steam Generator Tube Inspection Report - Twenty-Second Refueling Outage (2R22) (← links)
- L-2017-072, Submittal of Cycle 23 Startup Report (← links)
- LR-N17-0009, Steam Generator Tube Inspection Report - Twenty-fourth Refueling Outage (1R24) (← links)
- L-2015-265, Cycle 22 Core Operating Limits Report (← links)
- L-2015-200, FPL Records - Letters L-2003-255 and L-2013-218 (← links)
- LR-N14-0232, Steam Generator Tube - Inspection Report - Twentieth Refueling Outage (2R20) (← links)
- LR-N14-0107, RAI Response to the Steam Generator Tube Inspection Report - Twenty-second Refueling Outage (1R22) (← links)
- L-2014-091, Cycle 21 Core Operating Limits Report (← links)
- LR-N13-0259, Steam Generator Tube Inspection Report - Twenty-Second Refueling Outage (1R22) (← links)
- L-2013-227, Extended Power Uprate Cycle 27 Startup Report-Supplement 1 (← links)
- L-2013-226, Extended Power Uprate Cycle 26 Startup Report - Supplement 3 (← links)
- L-2013-180, Extended Power Uprate Cycle 26 Startup Report - Supplement 2 (← links)
- L-2013-165, Extended Power Uprate Cycle 24 Startup Report, Revision 1 (← links)
- LR-N13-0122, Steam Generator Tube Inspection Report - Nineteenth Refueling Outage (2R19) (← links)
- L-2013-088, Extended Power Uprate Cycle 20 Startup Report (← links)
- L-2013-073, Extended Power Uprate Cycle 26 Startup Report, Supplement 1 (← links)
- L-2012-426, Extended Power Uprate Cycle 26 Startup Report (← links)
- L-2012-382, Extended Power Uprate Cycle 24 Startup Report (← links)
- L-2012-367, Cycle 20 Core Operating Limits Report (← links)
- HNP-12-094, Cycle 18 Startup Test Report (← links)
- L-2011-066, Cycle 19 Core Operating Limits Report (← links)
- L-2011-019, Cycle 25 Sartup Report (← links)
- L-2017-060, License Amendment Request 249: Elimination of Certain Technical Specification Reporting Requirements, Revised Action for Emergency Core Cooling System, and Changes to Administrative Technical Specifications (← links)
- LR-N17-0115, Response to RAI Re Steam Generator Tube Inspection Report (← links)
- LR-N18-0057, Pressure and Temperature Limits Report, Revision 1 (← links)
- LR-N17-0049, Submittal of Cycle 21 Summary of Report of Plant Startup in Accordance with the Requirements of Technical Specification 6.9.1.1 (← links)
- L-2016-008, Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle (← links)
- LR-N12-0108, Unit 1 - License Amendment Request: Revision to Technical Specification (TS) 6.8.4.i, Steam Generator (SG) Program, and TS 6.9.1.10, Steam Generator Tube Inspection Report, for a Permanent Alternate Repair Criteria (← links)
- L-2011-213, Cycle 26 Startup Report (← links)
- LR-N11-0022, Technical Specifications 6.9.1.1 and 6.9.1.3 (← links)
- L-2008-052, Cycle 17 Reactor Startup Physics Testing Report (← links)
- L-2007-121, Cycle 21 Startup Physics Testing Report (← links)
- L-2006-128, Cycle 16 Core Operating Limits Report (← links)
- RA-19-0123, License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications (← links)
- W3F1-2017-0064, Startup and Power Escalation Report for Cycle 22 (← links)
- W3F1-2014-0024, 10CFR 50.46 Significant Change Report for the Waterford 3 ECCS Performance Analysis Due to Implementation of the Replacement Steam Generators (← links)
- ML19211A289 (← links)
- L-2005-232, Cycle 20 Core Operating Limits Report (← links)
- LR-N05-0403, Cycle 15 Startup Test Report Summary - Salem Generating Station, Unit 2 (← links)
- ML051440207 (← links)
- ML051390217 (← links)
- LR-N05-0257, General Electric Fuel (GE14) Startup Report (← links)
- L-2005-103, Cycle 15 Startup Physics Testing Report (← links)
- ML19324B748 (← links)
- ML19327A726 (← links)
- ML20029A308 (← links)
- ML17139B588 (← links)
- ML20046D406 (← links)
- ML20046D381 (← links)
- ML041540457 (← links)