Pages that link to "SR-3.6.4.3.2"
Jump to navigation
Jump to search
The following pages link to SR-3.6.4.3.2:
Displayed 50 items.
- ML021970092 (← links)
- RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces (← links)
- TSTF-13-12, Transmittal of TSTF-541, Revision 0, Add Exceptions to Surveillance Requirements When the Safety Function Is Being Performed (← links)
- TSTF-12-11, Transmittal of TSTF-540, Revision 0, Provide Completion Times in Lieu of Immediate Shutdown (RITSTF Initiative 6) (← links)
- RS-10-008, Clinton Power Station, Unit 1, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, (← links)
- ML18255A350 (← links)
- CNL-17-014, Application to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF)-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Pro (← links)
- GNRO-2018/00039, Report of Technical Specification Bases Changes (← links)
- RS-17-145, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control (← links)
- NMP2L2641, License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 0 (← links)
- GNRO-2014/00078, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month (← links)
- NL-14-1075, Technical Specifications. Part 4 of 4 (← links)
- RBG-47603, Revisions to the Technical Requirements Manual and the Technical Specifications Bases (← links)
- RS-07-118, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process (← links)
- RS-07-074, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process (← links)
- RS-06-141, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process (← links)
- ML19007A090 (← links)
- JAFP-19-0033, License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 0 (← links)
- L-MT-17-058, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control (← links)
- JAFP-17-0093, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (← links)
- NLS2017048, Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (← links)
- L-17-042, Request for Licensing Action to Revise the Technical Specifications (← links)
- GO2-17-022, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-522 Revision 0 (← links)
- GO2-16-047, License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revision 0 (← links)
- NLS2014087, License Amendment Request to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray Function (← links)
- RBG-47404, Unit 1, License Amendment Request 2013-17, Revision of the Ventilation Filter Testing Program and Associated Surveillance Requirements (← links)
- NG-12-0483, License Amendment Request (TSCR-142): Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hrs Per Month, Using Consolidated Line Item Improvement Process (← links)
- NG-12-0034, Supplemental Information to an Application to Adopt Technical Specifications Task Force Traveler TSTF-425, Revision 3, to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program (← links)
- RBG-47169, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases (← links)
- NLS2011026, License Amendment Request for Administrative Revisions to Technical Specifications and to Remove an Expired One-Time Exception to the Five-Year Test Frequency for a Single Safety Valve (← links)
- NL-07-2111, Technical Specifications Revision Request to the Ventilation Filter Testing Program (← links)
- ML19099A221 (← links)
- RS-13-137, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process (← links)
- NRC-13-0001, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line Item Improvement Process (← links)
- NRC-12-0071, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process (← links)
- TSTF-19-05, Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (← links)
- BSEP 08-0156, Request for License Amendment - Adoption of TSTF-478, Revision 2 - BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (← links)
- U-604193, Transmittal of Revision 16 to Technical Specification Bases (← links)
- U-603987, Transmittal of Revision 13 to Technical Specification Bases (← links)
- U-603781, Transmittal of Revision 10 to the Clinton Power Station Technical Specifications Bases (← links)
- TSTF-19-10, Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (← links)
- ML053070343 (← links)
- ML052980008 (← links)
- ML052940480 (← links)
- ML052800200 (← links)
- NLS2005061, Letter to Provide Changes to Plant Technical Specification Bases Implemented Without NRC Approval (← links)
- NLS2005030, License Amendment Request to Delete Temporary Notes from Technical Specifications (← links)
- ML050400083 (← links)
- ML20045B004 (← links)
- ML042940290 (← links)