Pages that link to "SR-3.6.1.1.1"
Jump to navigation
Jump to search
The following pages link to SR-3.6.1.1.1:
Displayed 50 items.
- ML021970092 (← links)
- RS-10-008, Clinton Power Station, Unit 1, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, (← links)
- TSTF-08-10, Transmittal of TSTF-507, Revision 0, CLIIP Traveler to Increase Standardization (← links)
- GNRO-2018/00039, Report of Technical Specification Bases Changes (← links)
- GNRO-2016/00062, License Amendment Request (LAR) for One Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass (← links)
- GNRO-2015/00063, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications for Containment Leak Rate Testing (← links)
- GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (← links)
- GNRO-2012/00031, Supplemental Information - License Conditions, Extended Power Uprate (← links)
- GNRO-2011/00092, Supplemental Information Pertaining to Extended Power Uprate (← links)
- GNRO-2011/00076, License Amendment Request Criticality Safety Analysis and Technical Specification 4.3.1, Criticality (← links)
- GNRO-2011/00033, Supplemental Information Extended Power Uprate (← links)
- RS-16-187, Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (← links)
- PLA-7334, Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-425 (← links)
- RBG-47603, Revisions to the Technical Requirements Manual and the Technical Specifications Bases (← links)
- RS-07-118, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process (← links)
- RS-07-074, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process (← links)
- RS-06-141, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process (← links)
- PLA-6020, Proposed Amendment No. 287 and Proposed Amendment No. 255: Revision to Technical Specifications 5.5.6 & 5.5.12 (← links)
- NLS2006010, Request for Exemption from Certain Requirements of 10 CFR 50, Appendix J and Corresponding Change to Technical Specifications 5.5.12, Primary Containment Leakage Rate Testing Program, Cooper Nuclear Station (← links)
- ML19007A090 (← links)
- ML19065A200 (← links)
- ML19064B369 (← links)
- RA-18-0148, License Amendment Request to Revise Units 1 and 2 Technical Specification 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (← links)
- L-18-046, License Amendment Request to Extend Containment Leakage Test Frequency (← links)
- RS-17-051, Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (← links)
- GO2-17-009, License Amendment Request - Revise Technical Specification 5.5.12 for Permanent Extension of Type a Test and Type C Leak Rate Test Frequencies (← links)
- JAFP-16-0129, License Amendment Request to Revise Technical Specifications Section 5.5.6 for Extension of Type a and Type C Leak Rate Test Frequencies (← links)
- NG-15-0234, License Amendment Request (TSCR-143) to Extend Containment Leakage Test Frequency (← links)
- JAFP-15-0098, License Amendment Request to Revise Technical Specifications Section 5.5.6 for Extension of Type a and Type C Leak Rate Test Frequencies (← links)
- GNRO-2015/00026, Application to Revise Technical Specifications for Permanent Extension of Type C Leak Rate Testing Frequency and Reduction of Type B and C Grace Intervals (← links)
- NG-12-0034, Supplemental Information to an Application to Adopt Technical Specifications Task Force Traveler TSTF-425, Revision 3, to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program (← links)
- NLS2011026, License Amendment Request for Administrative Revisions to Technical Specifications and to Remove an Expired One-Time Exception to the Five-Year Test Frequency for a Single Safety Valve (← links)
- NLS2010029, Technical Specifications Bases Changes (← links)
- L-09-218, Submittal of Technical Specification Bases, Revision 7 (← links)
- RBG-46842, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases (← links)
- ML19066A008 (← links)
- ML19094A799 (← links)
- NLS2007036, Technical Specification Bases Changes (← links)
- ML17214A350 (← links)
- BSEP 06-0044, Submittal of Technical Specification Bases Revisions (← links)
- GO2-06-061, Request for Amendment to Technical Specifications Surveillance Requirements for the Suppression Chamber-to-Drywell Vacuum Breakers and the Drywell-to-Suppression Chamber Bypass Leakage Test (← links)
- U-604396, Transmittal of Revision 19 to the Clinton Power Station Technical Specification Bases (← links)
- U-603859, Transmittal of Revision 11 to the Clinton Power Station Technical Specification Bases (← links)
- GNRO-2005/00053, Technical Specification Bases Update to the NRC for Period Dated August 23, 2005 (← links)
- NLS2005030, License Amendment Request to Delete Temporary Notes from Technical Specifications (← links)
- ML043570214 (← links)
- ML041540472 (← links)
- ML040330740 (← links)
- U-603640, Transmittal of Revision 8 to the Technical Specification Bases (← links)
- ML032530038 (← links)