Pages that link to "SR-3.6.1.3.5"
Jump to navigation
Jump to search
The following pages link to SR-3.6.1.3.5:
Displayed 50 items.
- ML071200046 (← links)
- ML071090069 (← links)
- ML070920458 (← links)
- ML070920450 (← links)
- ML063050377 (← links)
- ML063040629 (← links)
- ML062780135 (← links)
- ML062490253 (← links)
- ML062350046 (← links)
- ML061310062 (← links)
- ML061240255 (← links)
- ML060520052 (← links)
- ML053570309 (← links)
- ML053560185 (← links)
- ML052570461 (← links)
- ML021970092 (← links)
- NRC-16-0036, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Pro (← links)
- TSTF-14-17, Technical Specification Task Force - Response to NRC Request for Additional Information Regarding TSTF-454, Revision, Extend PCIV Completion Times (NEDC-33046) and Submittal of TSTF-454, Revision 3 (← links)
- RS-10-008, Clinton Power Station, Unit 1, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, (← links)
- TSTF-05-15, TSTF-454, Revision 1, Extend PCIV Completion Times (NEDC-33046) (← links)
- ML18267A341 (← links)
- RS-17-145, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control (← links)
- GNRO-2016/00062, License Amendment Request (LAR) for One Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass (← links)
- NL-18-0206, Supplement to Application to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control (← links)
- RBG-47801, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control (← links)
- RBG-47603, Revisions to the Technical Requirements Manual and the Technical Specifications Bases (← links)
- RS-07-074, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process (← links)
- RBG-46633, Submittals of Revisions to Technical Requirements Manual and Technical Specification Bases (← links)
- RBG-46552, License Amendment Request, Leakage Rate Testing of Containment Purge Valves (← links)
- ML19007A090 (← links)
- ML19065A200 (← links)
- GO2-17-124, Final Technical Specification Markup and Clean Pages for Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3 (← links)
- L-MT-16-031, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Code (← links)
- GO2-16-086, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3 (← links)
- GO2-15-152, Response to Second Request for Additional Information on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 3 (← links)
- GNRO-2015/00026, Application to Revise Technical Specifications for Permanent Extension of Type C Leak Rate Testing Frequency and Reduction of Type B and C Grace Intervals (← links)
- GO2-15-055, Submittal of Fourth 10-Year Inservice Testing (IST) Program Plan (← links)
- NG-12-0034, Supplemental Information to an Application to Adopt Technical Specifications Task Force Traveler TSTF-425, Revision 3, to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program (← links)
- GO2-08-122, Supplement to Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves (← links)
- RBG-46842, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases (← links)
- GO2-07-111, License Amendment Request for Proposed Changes to Columbia Technical Specifications: Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves (← links)
- ML19094A799 (← links)
- L-MT-06-054, Supplemental Submittal Regarding Full Scope Application of an Alternative Source Term (AST) (← links)
- U-604396, Transmittal of Revision 19 to the Clinton Power Station Technical Specification Bases (← links)
- U-603859, Transmittal of Revision 11 to the Clinton Power Station Technical Specification Bases (← links)
- U-603781, Transmittal of Revision 10 to the Clinton Power Station Technical Specifications Bases (← links)
- ML19280A037 (← links)
- ML19280A036 (← links)
- ML19279A001 (← links)
- ML19277G085 (← links)