Pages that link to "Qualified Offsite Circuit"
Jump to navigation
Jump to search
The following pages link to Qualified Offsite Circuit:
Displayed 50 items.
- ML072830165 (← links)
- ML072320289 (← links)
- ML072200257 (← links)
- ML071730559 (← links)
- ML071710427 (← links)
- ML062840189 (← links)
- ML062350046 (← links)
- ML061240264 (← links)
- ML061240259 (← links)
- ML061210064 (← links)
- ML061210062 (← links)
- ML061000672 (← links)
- ML061000316 (← links)
- ML052580444 (← links)
- RA-18-0094, Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating (← links)
- ML18278A280 (← links)
- IR 05000327/2019010 (← links)
- ML18270A130 (← links)
- ML18065A911 (← links)
- ML18065A377 (← links)
- ML18065A375 (← links)
- RNP-RA/18-0050, Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change (← links)
- RNP-RA/17-0037, License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers (← links)
- AEP-NRC-2016-83, Emergency License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating (← links)
- CNL-15-078, Response to NRC Request for Additional Information Related to Application to Modify Technical Specifications Regarding AC Sources - Operating (TS-WBN-13-02) (← links)
- CNL-14-107, Response to NRC Request for Additional Information Related to Application to Modify Technical Specifications Regarding AC Sources - Operating (TS-WBN-13-02) (← links)
- CNL-14-015, Response to NRC Request for Additional Information Related to Application to Modify Technical Specifications Regarding AC Sources - Operating (TS-WBN-13-02) (← links)
- L-12-318, License Amendment Request for Adoption of TSTF-275-A, Revision 0, Clarify Requirement for EDG Start Signal on RPV Level - Low, Low, Low During RPV Cavity Flood-up, and TSTF-300-A, Revision 0 (← links)
- L-MT-11-022, 002 Monticello - Technical Requirements Manual, Revision 7 (← links)
- RBG-47801, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control (← links)
- NL-12-1552, Emergency Technical Specification Revision Request for 3.8.1 AC Sources - Operating (← links)
- NL-08-139, Reply to Request for Additional Information, Proposed Changes to Technical Specifications Regarding Diesel Generator Endurance Test Surveillance (← links)
- ML18365A373 (← links)
- RA-18-0229, Response to NRC Request for Additional Information Regarding License Amendment Request Proposing Changes to the Technical Specification 3.8.1 (← links)
- RA-19-0004, Response to NRC for Additional Information (RAI) Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.1 for Catawba Nuclear Station, Units 1 and 2 (← links)
- L-MT-17-058, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control (← links)
- JAFP-17-0093, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (← links)
- NLS2017048, Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (← links)
- GO2-13-043, Request for Technical Specification Interpretation Regarding the Offsite Power Supplies to the Onsite Class 1E AC Power Distribution System (← links)
- PNP 2012-097, Report to NRC of Changes to Technical Specifications Bases (← links)
- GO2-12-152, Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System (← links)
- PNP 2012-093, 90-Day Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System (← links)
- L-12-359, Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System. (← links)
- L-11-335, Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12. 2011 (← links)
- L-11-333, Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 2011 (← links)
- JAFP-11-0102, Application for Change to the Current Licensing Basis, Authorizing Use of on Load Tap Changers with the Reserve Station Service Transformers (← links)
- PNP 2011-032, Report to NRC of Changes of Technical Specifications Bases (← links)
- RNP-RA/11-0002, Transmittal of Technical Specifications Bases Revisions (← links)
- L-MT-10-008, Technical Requirements Manual (← links)
- L-09-074, License Amendment Request to Provide Consistency in Division 3 Emergency Diesel Generator Start Time Technical Specification Surveillance Requirements (← links)