Pages that link to "AREVA NP"
← AREVA NP
Jump to navigation
Jump to search
The following pages link to AREVA NP:
Displayed 50 items.
- DCL-14-028, Areva Calculation No. 32-9219780-000, Diablo Canyon Unit 2 Pressurizer Safety/Relief Nozzle Weld Overlay Structural Analysis. (← links)
- DCL-14-028, Areva Calculation No. 32-9221082-000, Diablo Canyon Unit 2 Pressurizer Spray Nozzle Laminar Flaw Analysis. (← links)
- DCL-14-028, Areva Calculation No. 32-9221080-000, Diablo Canyon Unit 2 Pressurizer Safety/Relief Nozzles Laminar/Planar Flaw Analysis. (← links)
- NL-13-156, 51-9195289-000, Flood Hazard Reevaluation Report Required by 10 CFR 50.54 (F) Near-Term Task Force Recommendation 2.1. Page 3-106 Through Page A-5, Enclosure to NL-13-156 (← links)
- NL-13-156, 51-9195289-000, Flood Hazard Reevaluation Report Required by 10 CFR 50.54 (F) Near-Term Task Force Recommendation 2.1. Page 3-58 Through Page 3-105, Enclosure to NL-13-156 (← links)
- NL-13-156, 51-9195289-000, Flood Hazard Reevaluation Report Required by 10 CFR 50.54 (F) Near-Term Task Force Recommendation 2.1. Cover Through Page 3-57, Enclosure to NL-13-156 (← links)
- DCL-13-021, Areva Calculation 32-9200249-000, Diablo Canyon Power Plant Unit 2 Pzr Safety and Spray Nozzles Planar Flaw Analysis - Non Proprietary (← links)
- DCL-13-021, Areva Affidavit for Areva Calculations 32-9199805-000, Diablo Canyon Power Plant Unit 2 Pzr Safety and Spray Nozzles Planar Flaw Analysis (Proprietary) and 32-9199937-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer N (← links)
- DCL-13-021, Areva Calculation 32-9200291-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer Nozzles (Non-Proprietary) (← links)
- RS-13-046, Attachment 3, Areva Np Inc., Affidavit of Gayle F. Elliott (← links)
- L-2012-072, ANP-2903Q2(NP), Rev 0, St. Lucie, Unit 1 - EPU Cycle Realistic Large Break LOCA Summary Report with Zr-4 Fuel Cladding, Attachment 3 (← links)
- L-2012-072, ANP-3067, Rev. 1, St. Lucie, Unit 1 EPU - Information to Support NRC Review of RCS Depressurization with Pressurizer Overfill (← links)
- ML12053A333 (← links)
- ML11350A240 (← links)
- ML12251A146 (← links)
- ML12251A145 (← links)
- ML12251A144 (← links)
- L-2011-342, ANP-3028(NP), Revision 0, St. Lucie Plant, Unit 1 EPU RAIs - Nuclear Performance & Code (Snpb) (← links)
- L-2011-311, ANP-3019NP, Revision 0, St. Lucie Unit 1 EPU - Information to Support NRC Review of Steam Generator Tube Rupture, Attachment 2 (← links)
- L-2011-206, ANP-3000(NP), Rev. 0, St. Lucie Nuclear, Unit 1 - EPU-Information to Support License Amendment Request, Attachment 6 (← links)
- ML103570361 (← links)
- L-2010-259, St. Lucie, Unit 1 - Extended Power Uprate Licensing Report, Attachment 5, Appendix C, ANP-2903(NP), Revision 0, EPU Cycle Realistic Large Break LOCA Summary Report with Zr-4 Fuel Cladding (← links)
- ML103560434 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 05; Westinghouse & Areva Affidavits for Attachment 4 (← links)
- ML103560181 (← links)
- ML103260322 (← links)
- ML102870905 (← links)
- ML102780679 (← links)
- ML101520116 (← links)
- ML101400407 (← links)
- ML101400406 (← links)
- ML101400405 (← links)
- ML101160516 (← links)
- ML101160515 (← links)
- ML101160496 (← links)
- ML101160299 (← links)
- ML101160211 (← links)
- ML101160210 (← links)
- L-2010-078, ANP-2903(NP), Rev. 0, St. Lucie Nuclear Plant Unit 1 EPU Cycle Realistic Large Break LOCA Summary Report with Zr-4 Fuel Cladding. (← links)
- ML101160197 (← links)
- ML101160183 (← links)
- ML101160164 (← links)
- ML101160155 (← links)
- ML101160154 (← links)
- ML101160152 (← links)
- ML101110148 (← links)
- ML100890593 (← links)
- ML100830053 (← links)
- ML093500565 (← links)
- ML093500532 (← links)