Pages that link to "Regulatory Guide 1.140"
Jump to navigation
Jump to search
The following pages link to Regulatory Guide 1.140:
Displayed 50 items.
- ML060230015 (← links)
- ML18085A628 (← links)
- ML18093A903 (← links)
- LR-N17-0088, Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 14, Initial Test Program (← links)
- LR-N17-0088, Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 1, Introduction and General Description of Plant (← links)
- NL-17-0534, Joseph M. Farley Nuclear Plant, Updated Final Safety Analysis Report, Revision 27, Chapter 3, Part 1 (← links)
- RS-16-248, Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Appendix a - Application of NRC Regulatory Guides (← links)
- RS-16-248, Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program (← links)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Section 10.3 Through Section 15.1 (← links)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (← links)
- WM 16-0008, Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, Chapter 11.0 - Radioactive Waste Management (← links)
- NRC-16-0034, Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report. Appendix a (← links)
- RS-14-338, Byron, Units 1 and 2, and Braidwood, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 15, Updated Fire Protection Report (Fpr), Amendment 26, Chapter 14 - Initial Test Program (← links)
- NL-16-109, Indian Point 2 Technical Requirements Manual (← links)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 14.0 - Initial Test Program (← links)
- NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Requirements Manual (← links)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 9 - Auxiliary Systems (← links)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 1 - Introduction and General Description of Plant (← links)
- ML17226A146 (← links)
- ML17226A108 (← links)
- RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 9 - Auxiliary Systems (← links)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 14.0 - Initial Test Program (← links)
- ML11221A287 (← links)
- ML103160518 (← links)
- ML101610379 (← links)
- ML101370702 (← links)
- ML101370404 (← links)
- ML100191725 (← links)
- ML093570513 (← links)
- ML093370381 (← links)
- ML092470334 (← links)
- ML091400716 (← links)
- ML091330444 (← links)
- ML090340746 (← links)
- ML081500330 (← links)
- ML073330005 (← links)
- ML011710150 (redirect page) (← links)
- Regulatory Guide 1.140 (← links)
- ML24016A033 (← links)
- ML25085A417 (← links)
- ML18018A575 (← links)
- ML18057A480 (← links)
- ML18047A127 (← links)
- ML18031A562 (← links)
- ML17304A855 (← links)
- ML17303A987 (← links)
- ML17299A561 (← links)
- ML12298A116 (← links)
- ML12298A071 (← links)
- ML11273A060 (← links)
- ML11273A057 (← links)
- ML11244A045 (← links)
- ML020790125 (← links)