Pages that link to "EOP-TRIP-2"
Jump to navigation
Jump to search
The following pages link to EOP-TRIP-2:
Displayed 8 items.
- 05000272/LER-1993-004-01, :on 930216,automatic Reactor Trip Occurred Due to Overtemperature Delta Temp Signal.Caused by Equipment Failure.Module Output Gain Selector Switch 1QM411B Cleaned & Exercised & Capacitors Replaced (← links)
- 05000311/LER-1993-002-01, :on 930128,pumps Tripped on Low Suction Pressure.Caused by Equipment Failure.Loose SGFP Master Controller Test Jack Repaired & Other Jacks in SGFP Speed Control Loop Inspected & Repaired as Required (← links)
- 05000272/LER-1993-002, :on 920116,manual Reactor Trip Initiated When 12 SGFP Tripped Due to Turbine Trip FW Isolation Signal. Caused by Equipment Failure.Faulty Turbine Bypass Sys Components Replaced (← links)
- 05000311/LER-1992-009-01, :on 920514,during Plant Startup,Sg 23 Reactor Tripped.Caused by Personnel Error.Licensee Intends to Review BF19 & BF40 Valves Position,Repair SG Feedwater Control & Repair 21TB10 Valve Positioner (← links)
- 05000311/LER-1992-007-01, :on 920426,reactor Trip Occurred on SG 24 Low Low Level During Startup Following Sixth Refueling Outage. Caused by Mgt/Qa Deficiency.Maint Mgt Will Evaluate Need for Addl Administrative Controls (← links)
- 05000272/LER-1991-024, :on 910616,reactor Trip from 100% Power Occurred.Caused by Lightning Strike.Engineering Review & Review of Lightning Protection Features Initiated & Damage to Phase B Gsu Transformer Repaired (← links)
- 05000272/LER-1990-030-01, :on 900910,trip on Steam Generator 13 lo-lo Level Occurred Due to Personnel Error (← links)
- IR 05000272/1990007 (← links)