Pages that link to "Regulatory Guide 1.184"
Jump to navigation
Jump to search
The following pages link to Regulatory Guide 1.184:
Displayed 50 items.
- ML22277A011 (← links)
- ML22277A010 (← links)
- ML22277A009 (← links)
- ML22277A008 (← links)
- ML22277A007 (← links)
- ML22277A006 (← links)
- ML22277A005 (← links)
- ML22277A004 (← links)
- ML22277A003 (← links)
- ML22277A001 (← links)
- SECY-22-0107, Enclosure 1 - Status of the Decommissioning Program - 2022 Annual Report (← links)
- ML23093A031 (← links)
- L-23-061, Submittal of the Decommissioning Funding Status Reports (← links)
- NG-23-0002, 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report (← links)
- NUREG-0750 Volume 96, Nuclear Regulatory Commission Issuances: Opinions and Decisions of the Nuclear Regulatory Commission with Selected Orders (July 1, 2022 - December 31, 2022) (← links)
- TMI-23-004, Updated Site-Specific Decommissioning Cost Estimate for Three Mile Island Nuclear Station, Unit 1 (← links)
- ML23113A005 (← links)
- ML23157A101 (← links)
- NRC-23-0021, ISFSI, Decommissioning Funding Plan Update (← links)
- ML23235A180 (← links)
- ML23184A108 (← links)
- ML23248A346 (← links)
- PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 (← links)
- ML23265A150 (← links)
- ML23263A001 (← links)
- ML23335A023 (← links)
- SECY-23-0098, Enclosure 1 - Status of the Decommissioning Program 2023 Annual Report (← links)
- ML23339A136 (← links)
- ML23339A134 (← links)
- NUREG-2266, Environmental Evaluation of Accident Tolerant Fuels with Increased Enrichment and Higher Burnup Levels Final Report (← links)
- NRC-24-0044, Enrico Fermi 1 License Expiration - 10 CFR 50.51 (Continuation of License) (← links)
- LR-N24-0040, Attachment 3: Decommissioning Cost Analysis for Peach Bottom Atomic Power Station, Units 2 and 3 (← links)
- PNP 2024-006, Notification of Changes in Accordance with 10 CFR 50.82(a)(7) (← links)
- PNP 2024-001, License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations (← links)
- NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan (← links)
- ML24226A012 (← links)
- ML24299A062 (← links)
- ML24309A303 (← links)
- ML24309A302 (← links)
- OIG-24-A-01, Inspector General’S Assessment of the Most Serious Management and Performance Challenges Facing the U.S. Nuclear Regulatory Commission in Fiscal Year 2024 (← links)
- CY-23-010, Independent Spent Fuel Storage Installation, Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2) (← links)
- ML23072A082 (← links)
- ML23072A029 (← links)
- ML23061A053 (← links)
- RS-24-124, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 (← links)
- ML24318C273 (← links)
- ML21098A245 (← links)
- OIG-21-A-01, Inspector Generals Assessment of the Most Serious Management and Performance Challenges Facing the Nuclear Regulatory Commission in Fiscal Year 2021 (← links)
- ML24358A075 (← links)
- AEP-NRC-2024-86, Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation (← links)