Pages that link to "Radford Converse"
Jump to navigation
Jump to search
The following pages link to Radford Converse:
Displayed 50 items.
- ML20216H928 (← links)
- ML20215N680 (← links)
- ML20215N112 (← links)
- ML20215K163 (← links)
- ML20215H833 (← links)
- IR 05000333/1987016 (← links)
- ML20215D733 (← links)
- ML20215D271 (← links)
- ML20214T321 (← links)
- ML20214S770 (← links)
- ML20211K947 (← links)
- JAFP-87-0633, Monthly Operating Rept for Jul 1987 (← links)
- JAFP-87-0687, Forwards Effluent & Waste Disposal Semiannual Rept,Jan-June 1987. Revised Pages Consisting of Rev 5 to Offsite Dose Calculation Manual Also Encl (← links)
- JAFP-87-0995, Responds to NRC Re Violations Noted in Insp Rept 50-333/87-21 on 870901-1020.Corrective Actions:Comprehensive Review of SER Procedures Conducted,Procedures Revised & Improved & Detailed Training Increased (← links)
- JAFP-87-0975, Monthly Operating Rept for Nov 1987 (← links)
- JAFP-87-0903, Monthly Operating Rept for Oct 1987 (← links)
- JAFP-87-0905, Responds to Violations Noted in Insp Rept 50-333/87-14. Corrective Actions:Procedure EDP-28, Review of Plant- Specific Qualification Repts, Implemented to Improve Consistency of Facility Equipment Qualification Files (← links)
- JAFP-87-0860, Forwards Response to Weaknesses Identified in Appraisal of Radiation Protection & Chemistry Program Insp 50-333/87-18. Exempt Position Description of Radiation Protection Supervisor Revised (← links)
- JAFP-87-0814, Responds to NRC Re Violations Noted in Insp Rept 50-333/86-14.Corrective Actions:Nonconforming Electrical Cable Splices Respliced & Training in Spec IS-E-08 Re Electrical Termination & Splice Insulation Instituted (← links)
- JAFP-87-0800, Monthly Operating Rept for Sept 1987 (← links)
- JAFP-87-0550, Forwards EA Science & Technology Final Ja Fitzpatrick Nuclear Power Plant 1986 SPDES Annual Biological Monitoring Rept,May 1987 (← links)
- JAFP-87-0510, Submits Addl Info on Insp Followup Items Re Extremity Dosimeter Calibr,Qc & Calibr & Dosimetry Procedures,Per Insp Rept 50-333/86-06.Specific Test Data Showing Extremity Dosimeter Response to Cs-137 Photons Encl (← links)
- JAFP-87-0545, Monthly Operating Rept for June 1987 (← links)
- JAFP-87-0534, Reactor Containment Bldg Integrated Leakage Rate Test Types A,B & C Periodic Test (← links)
- JAFP-88-0004, Summary of Changes,Tests & Experiments Implemented at Plant During 1986,per Requirements of 10CFR50.59 (← links)
- JAFP-87-0365, Radiological Environ Surveillance Rept,1986,Part B: Radiological Rept (← links)
- JAFP-87-0393, Monthly Operating Rept for Apr 1987 (← links)
- JAFP-86-0833, Forwards Suppl to Response to IE Bulletin 85-003, Motor- Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings, Per 860729 Request.Util Waiting for Sept 1986 BWR Owners Group Rept Re Valves (← links)
- JAFP-86-0857, Monthly Operating Rept for Sept 1986 (← links)
- JAFP-87-0469, Responds to NRC Re Violations Noted in Insp Rept 50-333/86-06.Corrective Actions:Improved Algorithm Developed for Calculating Doses from Dosimeter Readings & Extremity Dosimetry Practices Reevaluated (← links)
- JAFP-86-0726, Forwards Semiannual Radioactive Effluent Release Rept, Jan- June 1986. Summary of Liquid,Gaseous & Solid Effluents Released,Description of Recent Changes to Offsite Dose Calcualtion Manual & Process Control Program Encl (← links)
- JAFP-86-1026, Monthly Operating Rept for Nov 1986 (← links)
- JAFP-87-0470, Monthly Operating Rept for May 1987 (← links)
- JAFP-87-0441, Forwards Cycle 8 Startup Test Rept,Per Reg Guide 10.1 & Tech Spec 6.9.A.1 (← links)
- JAFP-86-0742, Summarizes Util Response to IE Bulletin 85-003, Motor- Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Initial Response Submitted on 860514.Next Response to Be Submitted by 861001 (← links)
- JAFP-87-0419, Responds to NRC Re Violations Noted in Insp Rept 50-333/87-06.Corrective Actions:All Keys Inventoried & Entire Control Sys for nonsecurity-related Keys Reviewed & New Sys Established (← links)
- JAFP-86-0957, Monthly Operating Rept for Oct 1986 (← links)
- JAFP-87-0218, Monthly Operating Rept for Feb 1987 (← links)
- JAFP-85-0675, Forwards Primary Containment Integrated Leak Rate Test Schedule,Per 10CFR50 App J.Basis for Improved Leakage Performance of Containment & Isolation Valves Encl.Reasons for Continued Improvement Listed (← links)
- JAFP-87-0010, Monthly Operating Rept for Dec 1986 (← links)
- JAFP-86-0659, Monthly Operating Rept for Jul 1986 (← links)
- JAFP-86-0174, Forwards Effluent & Waste Disposal Semiannual Rept, Jul-Dec 1985 & Rev 2 to Offsite Dose Calculation Manual (← links)
- JAFP-86-1051, Responds to NRC Re Violations Noted in Insp Rept 50-333/86-13 on 860809-0929.Corrective Actions:Survey Smears Taken During Receipt of New Fuel Shipments Counted & Evaluated for Alpha Contamination (← links)
- JAFP-86-0479, Advises That Min Flow Logic Circuit for RHR Sys Not Susceptible to Single Failure,Per IE Bulletin 86-001,due to Removal of LPCI Loop Select Logic & Closure & Electrical Disabling of RHR cross-tie Valve (← links)
- JAFP-86-0492, Monthly Operating Rept for May 1986 (← links)
- ML20210V415 (← links)
- JAFP-86-0437, Forwards Response to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. No Valves Identified W/Design Differential Pressures Lower than Anticipated (← links)
- JAFP-87-0131, Monthly Operating Rept for Jan 1987 (← links)
- ML20210G678 (← links)
- JAFP-86-0747, Responds to NRC Re Violations Noted in Insp Rept 50-333/86-11.Corrective Actions:Interim Procedure Will Be Upgraded to Address Direct Turnover Purchases by 861201 & Storage Maint Administrative Program Will Be Developed (← links)