{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV Rafael Flores, Senior Vice President and Chief Nuclear Officer Luminant Generation Company LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 June 30, 2011 SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000445/2011004; 05000446/2011004) AND REQUEST FOR INFORMATION Dear Mr. Flores: On August 15, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion of the Gas Accumulation Management in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Temporary Instruction at your Comanche Peak Nuclear Power Plant, Units 1 and 2. This inspection will be performed in accordance with NRC Temporary Instruction (TI) 2515/177. Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. The documents have been divided into two groups. * The first group lists information necessary for our initial inspection scoping and in-office preparation activities. This information should be separated by information request number, especially if provided electronically (e.g., folder with the information request number). This information should be available to the inspector no later than August 1, 2011. Upon review of these documents, the inspectors will select additional documentation for review upon arrival. By August 10, 2011, the inspector will communicate the initial selected samples. * The second group of documents requested is needed to support our onsite inspection activities. This set of documents should be available to the inspector on August 15, 2011. It is also requested that corrective action documents and responses to questions developed during the inspection be provided to the inspector as the documents are generated. We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Gary Merka of your licensing organization. If there are any questions about this inspection or the materia! requested, please contact the inspector, Matt Young, at 817-276-6545 or by email at | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY | ||
-2 -This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room). Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89 Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety Enclosure: Management of Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Temporary Instruction Document Request cc w/encl: Distribution via ListServ for Comanche Peak | COMMISSION | ||
MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSTRUCTION DOCUMENT REQUEST inspection Report: On-site Inspection Dates: Inspection Procedure: Lead InspectorlTeam Leader: 05000445/2011004; 05000446/2011004 August 15-19, 2011 TI 2515/177, "Management of Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" Matt Young 817 -276-6545 Matt.young@nrc.gov The following information should be sent to the Region IV office in hard copy or electronic format (ims.certrec.com or compact disc, preferred), in care of Matt Young, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection weeks. Also, we request that you categorize the documents in your response with the numbered list below. Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the inspector as soon as possible. I. Information Requested By August 1, 2011 1. List of corrective action program documents (with a short description) associated with Generic Letter (GL) 2008-01, voids in piping, and pressure transients for the previous three years. 2. List of changes (with a short description and tracking number) to the final safety analysis report (FSAR), technical specifications, technical specification bases, and technical requirements manual associated with the resolution of GL 2008-01. 3. List of calculations associated with GL 2008-01, including calculations that have been changed or created in response to GL 2008-01 (with a short description of the calculation and the change). 4. List (with a short description) of gas intrusion mechanisms that apply to the plant and the affected system locations (e.g. identify the source, conditions, and expected void locations). 5. List of the suction piping sections identified as susceptible to gas accumulation (the list should identify the corresponding system). -1 -Enclosure | REGION IV Rafael Flores, Senior Vice President | ||
6. List of the discharge piping sections identified as susceptible to gas accumulation (the list should identify the corresponding system). 7. Copies of isometric drawings of the emergency core cooling, residual heat removal, and containment spray systems (hard-copies are preferred). 8. Copies of piping and instrumentation diagrams (P&IDs) of the emergency core cooling, residual heat removal, and containment spray systems (hard-copies are preferred). 9. Copies of program documents and procedures developed to implement the resolution of GL 2008-01. 10. List of actions that were completed in response to GL 2008-01. 11. Copies of the modification packages for hardware modifications as part of the resolution of GL 2008-01. 12. Design basis documents of the emergency core cooling, residual heat removal, and containment spray systems. 13. Design basis documents of keep-full systems of the emergency core cooling, residual heat removal, and containment spray systems. 14. System walkdown reports associated with the resolution of GL 2008-01. 15. If applicable, provide a list of inaccessible locations where plant walkdowns of the emergency core cooling, residual heat removal, and containment spray systems have not been completed. Include an explanation of why each area is considered inaccessible. 16. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the results of the last two surveillances for the emergency core cooling, residual heat removal, and containment spray systems. 17. Copies of procedures used for detecting and determining void volumes. 18. Copies of procedures used for filling and venting. 19. Copies of trends of periodic venting results. 20. Copies of the engineering evaluations performed for all identified voids in the past three years. 21. Basis for the void acceptance criteria (e.g. calculation). If applicable, provide the justification for any deviation from the void acceptance criteria established by the Office of Nuclear Reactor Regulation (NRR). 22. Copy of any void transport analyses. -2 -Enclosure | and Chief Nuclear Officer Luminant Generation | ||
23. Copy of vortexing calculations associated with systems under the scope of GL 2008-01. 24. Copies of self-assessments associated with the implementation of the GL 2008-01 program. II. Information Requested By August 15,2011 25. Copies of the selected corrective action program documents. 26. Copies of the selected licensing and design basis document changes. 27. Copies of the selected calculations. 28. Copies of training documents that ensure that personnel are aware of gas-related concerns. 29. Copies of corrective action program implementing procedures. 30. Electronic copies of the current technical specifications, technical specification bases, final safety analysis report, and technical requirements manual. -3 -Enclosure | Company LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 | ||
June 30, 2011 SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -NOTIFICATION | |||
OF INSPECTION (NRC INSPECTION | |||
REPORT 05000445/2011004; | |||
05000446/2011004) | |||
AND REQUEST FOR INFORMATION | |||
Dear Mr. Flores: On August 15, 2011, the U.S. Nuclear Regulatory | |||
Commission (NRC) will begin the onsite portion of the Gas Accumulation | |||
Management | |||
in Emergency | |||
Core Cooling, Decay Heat Removal, and Containment | |||
Spray Systems Temporary | |||
Instruction | |||
at your Comanche Peak Nuclear Power Plant, Units 1 and 2. This inspection | |||
will be performed | |||
in accordance | |||
with NRC Temporary | |||
Instruction (TI) 2515/177. | |||
Experience | |||
has shown that this inspection | |||
is resource intensive | |||
both for the NRC inspectors | |||
and your staff. In order to minimize the impact to your onsite resources | |||
and to ensure a productive | |||
inspection, we have enclosed a request for documents | |||
needed for this inspection. | |||
The documents | |||
have been divided into two groups. * The first group lists information | |||
necessary | |||
for our initial inspection | |||
scoping and in-office | |||
preparation | |||
activities. | |||
This information | |||
should be separated | |||
by information | |||
request number, especially | |||
if provided electronically (e.g., folder with the information | |||
request number). This information | |||
should be available | |||
to the inspector | |||
no later than August 1, 2011. Upon review of these documents, the inspectors | |||
will select additional | |||
documentation | |||
for review upon arrival. By August 10, 2011, the inspector | |||
will communicate | |||
the initial selected samples. * The second group of documents | |||
requested | |||
is needed to support our onsite inspection | |||
activities. | |||
This set of documents | |||
should be available | |||
to the inspector | |||
on August 15, 2011. It is also requested | |||
that corrective | |||
action documents | |||
and responses | |||
to questions | |||
developed | |||
during the inspection | |||
be provided to the inspector | |||
as the documents | |||
are generated. | |||
We have discussed | |||
the schedule for these inspection | |||
activities | |||
with your staff and understand | |||
that our regulatory | |||
contact for this inspection | |||
will be Gary Merka of your licensing | |||
organization. | |||
If there are any questions | |||
about this inspection | |||
or the materia! requested, please contact the inspector, Matt Young, at 817-276-6545 | |||
or by email at | |||
-2 -This letter does not contain new or amended information | |||
collection | |||
requirements | |||
subject to the Paperwork | |||
Reduction | |||
Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | |||
collection | |||
requirements | |||
were approved by the Office of Management | |||
and Budget, control number 3150-0011. | |||
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information | |||
or an information | |||
collection | |||
requirement | |||
unless the requesting | |||
document displays a currently | |||
valid Office of Management | |||
and Budget control number. In accordance | |||
with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure | |||
will be available | |||
electronically | |||
for public inspection | |||
in the NRC Public Document Room or from the Publicly Available | |||
Records (PARS) component | |||
of NRC's document system (ADAMS). ADAMS is accessible | |||
from the NRC Web site at (the Public Electronic | |||
Reading Room). Dockets: 50-445; 50-446 Licenses: | |||
NPF-87; NPF-89 Thomas R. Farnholtz, Chief Engineering | |||
Branch 1 Division of Reactor Safety Enclosure: | |||
Management | |||
of Gas Accumulation | |||
in Emergency | |||
Core Cooling, Decay Heat Removal, and Containment | |||
Spray Systems Temporary | |||
Instruction | |||
Document Request cc w/encl: Distribution | |||
via ListServ for Comanche Peak | |||
MANAGEMENT | |||
OF GAS ACCUMULATION | |||
IN EMERGENCY | |||
CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT | |||
SPRAY SYSTEMS TEMPORARY | |||
INSTRUCTION | |||
DOCUMENT REQUEST inspection | |||
Report: On-site Inspection | |||
Dates: Inspection | |||
Procedure: | |||
Lead InspectorlTeam | |||
Leader: 05000445/2011004; | |||
05000446/2011004 | |||
August 15-19, 2011 TI 2515/177, "Management | |||
of Gas Accumulation | |||
in Emergency | |||
Core Cooling, Decay Heat Removal, and Containment | |||
Spray Systems" Matt Young 817 -276-6545 | |||
Matt.young@nrc.gov | |||
The following | |||
information | |||
should be sent to the Region IV office in hard copy or electronic | |||
format (ims.certrec.com | |||
or compact disc, preferred), in care of Matt Young, to facilitate | |||
the selection | |||
of specific items that will be reviewed during the onsite inspection | |||
week. The inspector | |||
will select specific items from the information | |||
requested | |||
below and then request from your staff additional | |||
documents | |||
needed during the onsite inspection | |||
weeks. Also, we request that you categorize | |||
the documents | |||
in your response with the numbered list below. Please provide requested | |||
documentation | |||
electronically | |||
if possible. | |||
If requested | |||
documents | |||
are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation | |||
during the first day of the onsite inspection. | |||
If you have any questions | |||
regarding | |||
this information | |||
request, please call the inspector | |||
as soon as possible. | |||
I. Information | |||
Requested | |||
By August 1, 2011 1. List of corrective | |||
action program documents (with a short description) | |||
associated | |||
with Generic Letter (GL) 2008-01, voids in piping, and pressure transients | |||
for the previous three years. 2. List of changes (with a short description | |||
and tracking number) to the final safety analysis report (FSAR), technical | |||
specifications, technical | |||
specification | |||
bases, and technical | |||
requirements | |||
manual associated | |||
with the resolution | |||
of GL 2008-01. 3. List of calculations | |||
associated | |||
with GL 2008-01, including | |||
calculations | |||
that have been changed or created in response to GL 2008-01 (with a short description | |||
of the calculation | |||
and the change). 4. List (with a short description) | |||
of gas intrusion | |||
mechanisms | |||
that apply to the plant and the affected system locations (e.g. identify the source, conditions, and expected void locations). | |||
5. List of the suction piping sections identified | |||
as susceptible | |||
to gas accumulation (the list should identify the corresponding | |||
system). -1 -Enclosure | |||
6. List of the discharge | |||
piping sections identified | |||
as susceptible | |||
to gas accumulation (the list should identify the corresponding | |||
system). 7. Copies of isometric | |||
drawings of the emergency | |||
core cooling, residual heat removal, and containment | |||
spray systems (hard-copies | |||
are preferred). | |||
8. Copies of piping and instrumentation | |||
diagrams (P&IDs) of the emergency | |||
core cooling, residual heat removal, and containment | |||
spray systems (hard-copies | |||
are preferred). | |||
9. Copies of program documents | |||
and procedures | |||
developed | |||
to implement | |||
the resolution | |||
of GL 2008-01. 10. List of actions that were completed | |||
in response to GL 2008-01. 11. Copies of the modification | |||
packages for hardware modifications | |||
as part of the resolution | |||
of GL 2008-01. 12. Design basis documents | |||
of the emergency | |||
core cooling, residual heat removal, and containment | |||
spray systems. 13. Design basis documents | |||
of keep-full | |||
systems of the emergency | |||
core cooling, residual heat removal, and containment | |||
spray systems. 14. System walkdown reports associated | |||
with the resolution | |||
of GL 2008-01. 15. If applicable, provide a list of inaccessible | |||
locations | |||
where plant walkdowns | |||
of the emergency | |||
core cooling, residual heat removal, and containment | |||
spray systems have not been completed. | |||
Include an explanation | |||
of why each area is considered | |||
inaccessible. | |||
16. Copies of surveillance | |||
procedures | |||
associated | |||
with the resolution | |||
of GL 2008-01 and the results of the last two surveillances | |||
for the emergency | |||
core cooling, residual heat removal, and containment | |||
spray systems. 17. Copies of procedures | |||
used for detecting | |||
and determining | |||
void volumes. 18. Copies of procedures | |||
used for filling and venting. 19. Copies of trends of periodic venting results. 20. Copies of the engineering | |||
evaluations | |||
performed | |||
for all identified | |||
voids in the past three years. 21. Basis for the void acceptance | |||
criteria (e.g. calculation). | |||
If applicable, provide the justification | |||
for any deviation | |||
from the void acceptance | |||
criteria established | |||
by the Office of Nuclear Reactor Regulation (NRR). 22. Copy of any void transport | |||
analyses. -2 -Enclosure | |||
23. Copy of vortexing | |||
calculations | |||
associated | |||
with systems under the scope of GL 2008-01. 24. Copies of self-assessments | |||
associated | |||
with the implementation | |||
of the GL 2008-01 program. II. Information | |||
Requested | |||
By August 15,2011 25. Copies of the selected corrective | |||
action program documents. | |||
26. Copies of the selected licensing | |||
and design basis document changes. 27. Copies of the selected calculations. | |||
28. Copies of training documents | |||
that ensure that personnel | |||
are aware of gas-related | |||
concerns. | |||
29. Copies of corrective | |||
action program implementing | |||
procedures. | |||
30. Electronic copies | |||
of the current technical | |||
specifications, technical | |||
specification | |||
bases, final safety analysis report, and technical | |||
requirements | |||
manual. -3 -Enclosure | |||
}} | }} | ||
Revision as of 11:18, 5 August 2018
| ML11181A076 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 06/30/2011 |
| From: | Thomas Farnholtz Region 4 Engineering Branch 1 |
| To: | Flores R Luminant Generation Co |
| References | |
| IR-11-004 | |
| Download: ML11181A076 (5) | |
See also: IR 05000445/2011004
Text
UNITED STATES NUCLEAR REGULATORY
COMMISSION
REGION IV Rafael Flores, Senior Vice President
and Chief Nuclear Officer Luminant Generation
Company LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125
June 30, 2011 SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -NOTIFICATION
OF INSPECTION (NRC INSPECTION
REPORT 05000445/2011004;
AND REQUEST FOR INFORMATION
Dear Mr. Flores: On August 15, 2011, the U.S. Nuclear Regulatory
Commission (NRC) will begin the onsite portion of the Gas Accumulation
Management
in Emergency
Core Cooling, Decay Heat Removal, and Containment
Spray Systems Temporary
Instruction
at your Comanche Peak Nuclear Power Plant, Units 1 and 2. This inspection
will be performed
in accordance
with NRC Temporary
Instruction (TI) 2515/177.
Experience
has shown that this inspection
is resource intensive
both for the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources
and to ensure a productive
inspection, we have enclosed a request for documents
needed for this inspection.
The documents
have been divided into two groups. * The first group lists information
necessary
for our initial inspection
scoping and in-office
preparation
activities.
This information
should be separated
by information
request number, especially
if provided electronically (e.g., folder with the information
request number). This information
should be available
to the inspector
no later than August 1, 2011. Upon review of these documents, the inspectors
will select additional
documentation
for review upon arrival. By August 10, 2011, the inspector
will communicate
the initial selected samples. * The second group of documents
requested
is needed to support our onsite inspection
activities.
This set of documents
should be available
to the inspector
on August 15, 2011. It is also requested
that corrective
action documents
and responses
to questions
developed
during the inspection
be provided to the inspector
as the documents
are generated.
We have discussed
the schedule for these inspection
activities
with your staff and understand
that our regulatory
contact for this inspection
will be Gary Merka of your licensing
organization.
If there are any questions
about this inspection
or the materia! requested, please contact the inspector, Matt Young, at 817-276-6545
or by email at
-2 -This letter does not contain new or amended information
collection
requirements
subject to the Paperwork
Reduction
Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection
requirements
were approved by the Office of Management
and Budget, control number 3150-0011.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information
or an information
collection
requirement
unless the requesting
document displays a currently
valid Office of Management
and Budget control number. In accordance
with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure
will be available
electronically
for public inspection
in the NRC Public Document Room or from the Publicly Available
Records (PARS) component
of NRC's document system (ADAMS). ADAMS is accessible
from the NRC Web site at (the Public Electronic
Reading Room). Dockets: 50-445; 50-446 Licenses:
NPF-87; NPF-89 Thomas R. Farnholtz, Chief Engineering
Branch 1 Division of Reactor Safety Enclosure:
Management
in Emergency
Core Cooling, Decay Heat Removal, and Containment
Spray Systems Temporary
Instruction
Document Request cc w/encl: Distribution
via ListServ for Comanche Peak
MANAGEMENT
IN EMERGENCY
CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT
SPRAY SYSTEMS TEMPORARY
INSTRUCTION
DOCUMENT REQUEST inspection
Report: On-site Inspection
Dates: Inspection
Procedure:
Lead InspectorlTeam
Leader: 05000445/2011004;
August 15-19, 2011 TI 2515/177, "Management
in Emergency
Core Cooling, Decay Heat Removal, and Containment
Spray Systems" Matt Young 817 -276-6545
Matt.young@nrc.gov
The following
information
should be sent to the Region IV office in hard copy or electronic
format (ims.certrec.com
or compact disc, preferred), in care of Matt Young, to facilitate
the selection
of specific items that will be reviewed during the onsite inspection
week. The inspector
will select specific items from the information
requested
below and then request from your staff additional
documents
needed during the onsite inspection
weeks. Also, we request that you categorize
the documents
in your response with the numbered list below. Please provide requested
documentation
electronically
if possible.
If requested
documents
are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation
during the first day of the onsite inspection.
If you have any questions
regarding
this information
request, please call the inspector
as soon as possible.
I. Information
Requested
By August 1, 2011 1. List of corrective
action program documents (with a short description)
associated
with Generic Letter (GL) 2008-01, voids in piping, and pressure transients
for the previous three years. 2. List of changes (with a short description
and tracking number) to the final safety analysis report (FSAR), technical
specifications, technical
specification
bases, and technical
requirements
manual associated
with the resolution
of GL 2008-01. 3. List of calculations
associated
with GL 2008-01, including
calculations
that have been changed or created in response to GL 2008-01 (with a short description
of the calculation
and the change). 4. List (with a short description)
of gas intrusion
mechanisms
that apply to the plant and the affected system locations (e.g. identify the source, conditions, and expected void locations).
5. List of the suction piping sections identified
as susceptible
to gas accumulation (the list should identify the corresponding
system). -1 -Enclosure
6. List of the discharge
piping sections identified
as susceptible
to gas accumulation (the list should identify the corresponding
system). 7. Copies of isometric
drawings of the emergency
core cooling, residual heat removal, and containment
spray systems (hard-copies
are preferred).
8. Copies of piping and instrumentation
diagrams (P&IDs) of the emergency
core cooling, residual heat removal, and containment
spray systems (hard-copies
are preferred).
9. Copies of program documents
and procedures
developed
to implement
the resolution
of GL 2008-01. 10. List of actions that were completed
in response to GL 2008-01. 11. Copies of the modification
packages for hardware modifications
as part of the resolution
of GL 2008-01. 12. Design basis documents
of the emergency
core cooling, residual heat removal, and containment
spray systems. 13. Design basis documents
of keep-full
systems of the emergency
core cooling, residual heat removal, and containment
spray systems. 14. System walkdown reports associated
with the resolution
of GL 2008-01. 15. If applicable, provide a list of inaccessible
locations
where plant walkdowns
of the emergency
core cooling, residual heat removal, and containment
spray systems have not been completed.
Include an explanation
of why each area is considered
inaccessible.
16. Copies of surveillance
procedures
associated
with the resolution
of GL 2008-01 and the results of the last two surveillances
for the emergency
core cooling, residual heat removal, and containment
spray systems. 17. Copies of procedures
used for detecting
and determining
void volumes. 18. Copies of procedures
used for filling and venting. 19. Copies of trends of periodic venting results. 20. Copies of the engineering
evaluations
performed
for all identified
voids in the past three years. 21. Basis for the void acceptance
criteria (e.g. calculation).
If applicable, provide the justification
for any deviation
from the void acceptance
criteria established
by the Office of Nuclear Reactor Regulation (NRR). 22. Copy of any void transport
analyses. -2 -Enclosure
23. Copy of vortexing
calculations
associated
with systems under the scope of GL 2008-01. 24. Copies of self-assessments
associated
with the implementation
of the GL 2008-01 program. II. Information
Requested
By August 15,2011 25. Copies of the selected corrective
action program documents.
26. Copies of the selected licensing
and design basis document changes. 27. Copies of the selected calculations.
28. Copies of training documents
that ensure that personnel
are aware of gas-related
concerns.
29. Copies of corrective
action program implementing
procedures.
30. Electronic copies
of the current technical
specifications, technical
specification
bases, final safety analysis report, and technical
requirements
manual. -3 -Enclosure