{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV Rafael Flores, Senior Vice President and Chief Nuclear Officer Luminant Generation Company LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 June 30, 2011 SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000445/2011004; 05000446/2011004) AND REQUEST FOR INFORMATION Dear Mr. Flores: On August 15, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion of the Gas Accumulation Management in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Temporary Instruction at your Comanche Peak Nuclear Power Plant, Units 1 and 2. This inspection will be performed in accordance with NRC Temporary Instruction (TI) 2515/177. Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. The documents have been divided into two groups. * The first group lists information necessary for our initial inspection scoping and in-office preparation activities. This information should be separated by information request number, especially if provided electronically (e.g., folder with the information request number). This information should be available to the inspector no later than August 1, 2011. Upon review of these documents, the inspectors will select additional documentation for review upon arrival. By August 10, 2011, the inspector will communicate the initial selected samples. * The second group of documents requested is needed to support our onsite inspection activities. This set of documents should be available to the inspector on August 15, 2011. It is also requested that corrective action documents and responses to questions developed during the inspection be provided to the inspector as the documents are generated. We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Gary Merka of your licensing organization. If there are any questions about this inspection or the materia! requested, please contact the inspector, Matt Young, at 817-276-6545 or by email at   
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY  
-2 -This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room). Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89 Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety Enclosure: Management of Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Temporary Instruction Document Request cc w/encl: Distribution via ListServ for Comanche Peak   
COMMISSION  
MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSTRUCTION DOCUMENT REQUEST inspection Report: On-site Inspection Dates: Inspection Procedure: Lead InspectorlTeam Leader: 05000445/2011004; 05000446/2011004 August 15-19, 2011 TI 2515/177, "Management of Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" Matt Young 817 -276-6545 Matt.young@nrc.gov The following information should be sent to the Region IV office in hard copy or electronic format (ims.certrec.com or compact disc, preferred), in care of Matt Young, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection weeks. Also, we request that you categorize the documents in your response with the numbered list below. Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the inspector as soon as possible. I. Information Requested By August 1, 2011 1. List of corrective action program documents (with a short description) associated with Generic Letter (GL) 2008-01, voids in piping, and pressure transients for the previous three years. 2. List of changes (with a short description and tracking number) to the final safety analysis report (FSAR), technical specifications, technical specification bases, and technical requirements manual associated with the resolution of GL 2008-01. 3. List of calculations associated with GL 2008-01, including calculations that have been changed or created in response to GL 2008-01 (with a short description of the calculation and the change). 4. List (with a short description) of gas intrusion mechanisms that apply to the plant and the affected system locations (e.g. identify the source, conditions, and expected void locations). 5. List of the suction piping sections identified as susceptible to gas accumulation (the list should identify the corresponding system). -1 -Enclosure   
REGION IV Rafael Flores, Senior Vice President  
6. List of the discharge piping sections identified as susceptible to gas accumulation (the list should identify the corresponding system). 7. Copies of isometric drawings of the emergency core cooling, residual heat removal, and containment spray systems (hard-copies are preferred). 8. Copies of piping and instrumentation diagrams (P&IDs) of the emergency core cooling, residual heat removal, and containment spray systems (hard-copies are preferred). 9. Copies of program documents and procedures developed to implement the resolution of GL 2008-01. 10. List of actions that were completed in response to GL 2008-01. 11. Copies of the modification packages for hardware modifications as part of the resolution of GL 2008-01. 12. Design basis documents of the emergency core cooling, residual heat removal, and containment spray systems. 13. Design basis documents of keep-full systems of the emergency core cooling, residual heat removal, and containment spray systems. 14. System walkdown reports associated with the resolution of GL 2008-01. 15. If applicable, provide a list of inaccessible locations where plant walkdowns of the emergency core cooling, residual heat removal, and containment spray systems have not been completed. Include an explanation of why each area is considered inaccessible. 16. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the results of the last two surveillances for the emergency core cooling, residual heat removal, and containment spray systems. 17. Copies of procedures used for detecting and determining void volumes. 18. Copies of procedures used for filling and venting. 19. Copies of trends of periodic venting results. 20. Copies of the engineering evaluations performed for all identified voids in the past three years. 21. Basis for the void acceptance criteria (e.g. calculation). If applicable, provide the justification for any deviation from the void acceptance criteria established by the Office of Nuclear Reactor Regulation (NRR). 22. Copy of any void transport analyses. -2 -Enclosure   
and Chief Nuclear Officer Luminant Generation  
23. Copy of vortexing calculations associated with systems under the scope of GL 2008-01. 24. Copies of self-assessments associated with the implementation of the GL 2008-01 program. II. Information Requested By August 15,2011 25. Copies of the selected corrective action program documents. 26. Copies of the selected licensing and design basis document changes. 27. Copies of the selected calculations. 28. Copies of training documents that ensure that personnel are aware of gas-related concerns. 29. Copies of corrective action program implementing procedures. 30. Electronic copies of the current technical specifications, technical specification bases, final safety analysis report, and technical requirements manual. -3 -Enclosure
Company LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125  
 
June 30, 2011 SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -NOTIFICATION  
OF INSPECTION (NRC INSPECTION  
REPORT 05000445/2011004;  
05000446/2011004)  
AND REQUEST FOR INFORMATION  
Dear Mr. Flores: On August 15, 2011, the U.S. Nuclear Regulatory  
Commission (NRC) will begin the onsite portion of the Gas Accumulation  
Management  
in Emergency  
Core Cooling, Decay Heat Removal, and Containment  
Spray Systems Temporary  
Instruction  
at your Comanche Peak Nuclear Power Plant, Units 1 and 2. This inspection  
will be performed  
in accordance  
with NRC Temporary  
Instruction (TI) 2515/177.  
Experience  
has shown that this inspection  
is resource intensive  
both for the NRC inspectors  
and your staff. In order to minimize the impact to your onsite resources  
and to ensure a productive  
inspection, we have enclosed a request for documents  
needed for this inspection.  
The documents  
have been divided into two groups. * The first group lists information  
necessary  
for our initial inspection  
scoping and in-office  
preparation  
activities.  
This information  
should be separated  
by information  
request number, especially  
if provided electronically (e.g., folder with the information  
request number). This information  
should be available  
to the inspector  
no later than August 1, 2011. Upon review of these documents, the inspectors  
will select additional  
documentation  
for review upon arrival. By August 10, 2011, the inspector  
will communicate  
the initial selected samples. * The second group of documents  
requested  
is needed to support our onsite inspection  
activities.  
This set of documents  
should be available  
to the inspector  
on August 15, 2011. It is also requested  
that corrective  
action documents  
and responses  
to questions  
developed  
during the inspection  
be provided to the inspector  
as the documents  
are generated.  
We have discussed  
the schedule for these inspection  
activities  
with your staff and understand  
that our regulatory  
contact for this inspection  
will be Gary Merka of your licensing  
organization.  
If there are any questions  
about this inspection  
or the materia! requested, please contact the inspector, Matt Young, at 817-276-6545  
or by email at   
-2 -This letter does not contain new or amended information  
collection  
requirements  
subject to the Paperwork  
Reduction  
Act of 1995 (44 U.S.C. 3501 et seq.). Existing information  
collection  
requirements  
were approved by the Office of Management  
and Budget, control number 3150-0011.  
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information  
or an information  
collection  
requirement  
unless the requesting  
document displays a currently  
valid Office of Management  
and Budget control number. In accordance  
with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure  
will be available  
electronically  
for public inspection  
in the NRC Public Document Room or from the Publicly Available  
Records (PARS) component  
of NRC's document system (ADAMS). ADAMS is accessible  
from the NRC Web site at (the Public Electronic  
Reading Room). Dockets: 50-445; 50-446 Licenses:  
NPF-87; NPF-89 Thomas R. Farnholtz, Chief Engineering  
Branch 1 Division of Reactor Safety Enclosure:  
Management  
of Gas Accumulation  
in Emergency  
Core Cooling, Decay Heat Removal, and Containment  
Spray Systems Temporary  
Instruction  
Document Request cc w/encl: Distribution  
via ListServ for Comanche Peak   
MANAGEMENT  
OF GAS ACCUMULATION  
IN EMERGENCY  
CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT  
SPRAY SYSTEMS TEMPORARY  
INSTRUCTION  
DOCUMENT REQUEST inspection  
Report: On-site Inspection  
Dates: Inspection  
Procedure:  
Lead InspectorlTeam  
Leader: 05000445/2011004;  
05000446/2011004  
August 15-19, 2011 TI 2515/177, "Management  
of Gas Accumulation  
in Emergency  
Core Cooling, Decay Heat Removal, and Containment  
Spray Systems" Matt Young 817 -276-6545  
Matt.young@nrc.gov  
The following  
information  
should be sent to the Region IV office in hard copy or electronic  
format (ims.certrec.com  
or compact disc, preferred), in care of Matt Young, to facilitate  
the selection  
of specific items that will be reviewed during the onsite inspection  
week. The inspector  
will select specific items from the information  
requested  
below and then request from your staff additional  
documents  
needed during the onsite inspection  
weeks. Also, we request that you categorize  
the documents  
in your response with the numbered list below. Please provide requested  
documentation  
electronically  
if possible.  
If requested  
documents  
are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation  
during the first day of the onsite inspection.  
If you have any questions  
regarding  
this information  
request, please call the inspector  
as soon as possible.  
I. Information  
Requested  
By August 1, 2011 1. List of corrective  
action program documents (with a short description)  
associated  
with Generic Letter (GL) 2008-01, voids in piping, and pressure transients  
for the previous three years. 2. List of changes (with a short description  
and tracking number) to the final safety analysis report (FSAR), technical  
specifications, technical  
specification  
bases, and technical  
requirements  
manual associated  
with the resolution  
of GL 2008-01. 3. List of calculations  
associated  
with GL 2008-01, including  
calculations  
that have been changed or created in response to GL 2008-01 (with a short description  
of the calculation  
and the change). 4. List (with a short description)  
of gas intrusion  
mechanisms  
that apply to the plant and the affected system locations (e.g. identify the source, conditions, and expected void locations).  
5. List of the suction piping sections identified  
as susceptible  
to gas accumulation (the list should identify the corresponding  
system). -1 -Enclosure   
6. List of the discharge  
piping sections identified  
as susceptible  
to gas accumulation (the list should identify the corresponding  
system). 7. Copies of isometric  
drawings of the emergency  
core cooling, residual heat removal, and containment  
spray systems (hard-copies  
are preferred).  
8. Copies of piping and instrumentation  
diagrams (P&IDs) of the emergency  
core cooling, residual heat removal, and containment  
spray systems (hard-copies  
are preferred).  
9. Copies of program documents  
and procedures  
developed  
to implement  
the resolution  
of GL 2008-01. 10. List of actions that were completed  
in response to GL 2008-01. 11. Copies of the modification  
packages for hardware modifications  
as part of the resolution  
of GL 2008-01. 12. Design basis documents  
of the emergency  
core cooling, residual heat removal, and containment  
spray systems. 13. Design basis documents  
of keep-full  
systems of the emergency  
core cooling, residual heat removal, and containment  
spray systems. 14. System walkdown reports associated  
with the resolution  
of GL 2008-01. 15. If applicable, provide a list of inaccessible  
locations  
where plant walkdowns  
of the emergency  
core cooling, residual heat removal, and containment  
spray systems have not been completed.  
Include an explanation  
of why each area is considered  
inaccessible.  
16. Copies of surveillance  
procedures  
associated  
with the resolution  
of GL 2008-01 and the results of the last two surveillances  
for the emergency  
core cooling, residual heat removal, and containment  
spray systems. 17. Copies of procedures  
used for detecting  
and determining  
void volumes. 18. Copies of procedures  
used for filling and venting. 19. Copies of trends of periodic venting results. 20. Copies of the engineering  
evaluations  
performed  
for all identified  
voids in the past three years. 21. Basis for the void acceptance  
criteria (e.g. calculation).  
If applicable, provide the justification  
for any deviation  
from the void acceptance  
criteria established  
by the Office of Nuclear Reactor Regulation (NRR). 22. Copy of any void transport  
analyses. -2 -Enclosure   
23. Copy of vortexing  
calculations  
associated  
with systems under the scope of GL 2008-01. 24. Copies of self-assessments  
associated  
with the implementation  
of the GL 2008-01 program. II. Information  
Requested  
By August 15,2011 25. Copies of the selected corrective  
action program documents.  
26. Copies of the selected licensing  
and design basis document changes. 27. Copies of the selected calculations.  
28. Copies of training documents  
that ensure that personnel  
are aware of gas-related  
concerns.  
29. Copies of corrective  
action program implementing  
procedures.  
30. Electronic copies  
of the current technical  
specifications, technical  
specification  
bases, final safety analysis report, and technical  
requirements  
manual. -3 -Enclosure
}}
}}

Revision as of 11:18, 5 August 2018

Comanche Peak Nuclear Power Plant, Units 1 and 2 - Notification of Inspection (NRC Inspection Report 05000445/2011004, 05000446/2011004) and Request for Information
ML11181A076
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/30/2011
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Flores R
Luminant Generation Co
References
IR-11-004
Download: ML11181A076 (5)


See also: IR 05000445/2011004

Text

UNITED STATES NUCLEAR REGULATORY

COMMISSION

REGION IV Rafael Flores, Senior Vice President

and Chief Nuclear Officer Luminant Generation

Company LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125

June 30, 2011 SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -NOTIFICATION

OF INSPECTION (NRC INSPECTION

REPORT 05000445/2011004;

05000446/2011004)

AND REQUEST FOR INFORMATION

Dear Mr. Flores: On August 15, 2011, the U.S. Nuclear Regulatory

Commission (NRC) will begin the onsite portion of the Gas Accumulation

Management

in Emergency

Core Cooling, Decay Heat Removal, and Containment

Spray Systems Temporary

Instruction

at your Comanche Peak Nuclear Power Plant, Units 1 and 2. This inspection

will be performed

in accordance

with NRC Temporary

Instruction (TI) 2515/177.

Experience

has shown that this inspection

is resource intensive

both for the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources

and to ensure a productive

inspection, we have enclosed a request for documents

needed for this inspection.

The documents

have been divided into two groups. * The first group lists information

necessary

for our initial inspection

scoping and in-office

preparation

activities.

This information

should be separated

by information

request number, especially

if provided electronically (e.g., folder with the information

request number). This information

should be available

to the inspector

no later than August 1, 2011. Upon review of these documents, the inspectors

will select additional

documentation

for review upon arrival. By August 10, 2011, the inspector

will communicate

the initial selected samples. * The second group of documents

requested

is needed to support our onsite inspection

activities.

This set of documents

should be available

to the inspector

on August 15, 2011. It is also requested

that corrective

action documents

and responses

to questions

developed

during the inspection

be provided to the inspector

as the documents

are generated.

We have discussed

the schedule for these inspection

activities

with your staff and understand

that our regulatory

contact for this inspection

will be Gary Merka of your licensing

organization.

If there are any questions

about this inspection

or the materia! requested, please contact the inspector, Matt Young, at 817-276-6545

or by email at

-2 -This letter does not contain new or amended information

collection

requirements

subject to the Paperwork

Reduction

Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection

requirements

were approved by the Office of Management

and Budget, control number 3150-0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information

or an information

collection

requirement

unless the requesting

document displays a currently

valid Office of Management

and Budget control number. In accordance

with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure

will be available

electronically

for public inspection

in the NRC Public Document Room or from the Publicly Available

Records (PARS) component

of NRC's document system (ADAMS). ADAMS is accessible

from the NRC Web site at (the Public Electronic

Reading Room). Dockets: 50-445; 50-446 Licenses:

NPF-87; NPF-89 Thomas R. Farnholtz, Chief Engineering

Branch 1 Division of Reactor Safety Enclosure:

Management

of Gas Accumulation

in Emergency

Core Cooling, Decay Heat Removal, and Containment

Spray Systems Temporary

Instruction

Document Request cc w/encl: Distribution

via ListServ for Comanche Peak

MANAGEMENT

OF GAS ACCUMULATION

IN EMERGENCY

CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT

SPRAY SYSTEMS TEMPORARY

INSTRUCTION

DOCUMENT REQUEST inspection

Report: On-site Inspection

Dates: Inspection

Procedure:

Lead InspectorlTeam

Leader: 05000445/2011004;

05000446/2011004

August 15-19, 2011 TI 2515/177, "Management

of Gas Accumulation

in Emergency

Core Cooling, Decay Heat Removal, and Containment

Spray Systems" Matt Young 817 -276-6545

Matt.young@nrc.gov

The following

information

should be sent to the Region IV office in hard copy or electronic

format (ims.certrec.com

or compact disc, preferred), in care of Matt Young, to facilitate

the selection

of specific items that will be reviewed during the onsite inspection

week. The inspector

will select specific items from the information

requested

below and then request from your staff additional

documents

needed during the onsite inspection

weeks. Also, we request that you categorize

the documents

in your response with the numbered list below. Please provide requested

documentation

electronically

if possible.

If requested

documents

are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation

during the first day of the onsite inspection.

If you have any questions

regarding

this information

request, please call the inspector

as soon as possible.

I. Information

Requested

By August 1, 2011 1. List of corrective

action program documents (with a short description)

associated

with Generic Letter (GL) 2008-01, voids in piping, and pressure transients

for the previous three years. 2. List of changes (with a short description

and tracking number) to the final safety analysis report (FSAR), technical

specifications, technical

specification

bases, and technical

requirements

manual associated

with the resolution

of GL 2008-01. 3. List of calculations

associated

with GL 2008-01, including

calculations

that have been changed or created in response to GL 2008-01 (with a short description

of the calculation

and the change). 4. List (with a short description)

of gas intrusion

mechanisms

that apply to the plant and the affected system locations (e.g. identify the source, conditions, and expected void locations).

5. List of the suction piping sections identified

as susceptible

to gas accumulation (the list should identify the corresponding

system). -1 -Enclosure

6. List of the discharge

piping sections identified

as susceptible

to gas accumulation (the list should identify the corresponding

system). 7. Copies of isometric

drawings of the emergency

core cooling, residual heat removal, and containment

spray systems (hard-copies

are preferred).

8. Copies of piping and instrumentation

diagrams (P&IDs) of the emergency

core cooling, residual heat removal, and containment

spray systems (hard-copies

are preferred).

9. Copies of program documents

and procedures

developed

to implement

the resolution

of GL 2008-01. 10. List of actions that were completed

in response to GL 2008-01. 11. Copies of the modification

packages for hardware modifications

as part of the resolution

of GL 2008-01. 12. Design basis documents

of the emergency

core cooling, residual heat removal, and containment

spray systems. 13. Design basis documents

of keep-full

systems of the emergency

core cooling, residual heat removal, and containment

spray systems. 14. System walkdown reports associated

with the resolution

of GL 2008-01. 15. If applicable, provide a list of inaccessible

locations

where plant walkdowns

of the emergency

core cooling, residual heat removal, and containment

spray systems have not been completed.

Include an explanation

of why each area is considered

inaccessible.

16. Copies of surveillance

procedures

associated

with the resolution

of GL 2008-01 and the results of the last two surveillances

for the emergency

core cooling, residual heat removal, and containment

spray systems. 17. Copies of procedures

used for detecting

and determining

void volumes. 18. Copies of procedures

used for filling and venting. 19. Copies of trends of periodic venting results. 20. Copies of the engineering

evaluations

performed

for all identified

voids in the past three years. 21. Basis for the void acceptance

criteria (e.g. calculation).

If applicable, provide the justification

for any deviation

from the void acceptance

criteria established

by the Office of Nuclear Reactor Regulation (NRR). 22. Copy of any void transport

analyses. -2 -Enclosure

23. Copy of vortexing

calculations

associated

with systems under the scope of GL 2008-01. 24. Copies of self-assessments

associated

with the implementation

of the GL 2008-01 program. II. Information

Requested

By August 15,2011 25. Copies of the selected corrective

action program documents.

26. Copies of the selected licensing

and design basis document changes. 27. Copies of the selected calculations.

28. Copies of training documents

that ensure that personnel

are aware of gas-related

concerns.

29. Copies of corrective

action program implementing

procedures.

30. Electronic copies

of the current technical

specifications, technical

specification

bases, final safety analysis report, and technical

requirements

manual. -3 -Enclosure