{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257 November 1, 2012
Mr. Joseph W. Shea Manager, Corp. Nuclear Licensing Programs Tennessee Valley Authority
1101 Market Street, LP 4B-C Chattanooga, TN 37402-2801
==SUBJECT:==
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE  EXAMINATIONS FOR SEQUOYAH NUCLEAR PLANT
==Dear Mr. Shea:==
In a letter dated July 11, 2012, your staff responded to Regulatory Issue Summary 2012-07 and requested we schedule initial license operator examinations for Sequoyah Nuclear Plant.
Based on your letter and following discussions with your staff, we have scheduled the requested examinations as follows:
Plant / Station 2013 2014 Date ApplicantsDate Applicants Sequoyah 5/13 8 NR NR  12/2 14  NR - None Requested On-site validation of the examinations is typically scheduled to occur approximately three weeks before each examination. If you have a need to change the dates of your scheduled exam(s) from that (those) listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.
We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks. If the number of applicants is reduced to less than ten (10) for any examination, please inform us as this will impact the examination schedule.
A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner=s name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates. If you have any questions concerning this information, please contact Mr. Malcolm Widmann, Chief, Operations Branch I, at 404-997-4550 or Mr. Mark Franke, Chief, Operations Branch II at
404-997-4436.
J. Shea 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC
=s public Web site at http://www.nrc.gov/reading-rm/adams.html. Sincerely,        /RA/
Terrence Reis, Director Division of Reactor Safety
Docket Nos.: 50-327, 50-327 License Nos.: DPR-77, DPR-79 cc:  (See page 3)
_________________________
G SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII;DRS RII:DRS RII:DRS RII:DRS    SIGNATURE RA RA RA RA    NAME SCHAAF WIDMANN FRANKE CHRISTENSEN    DATE 10/25/2012 11/1/2012 11/1/2012 11/1/2012 11/      /2012 11/      /2012 11/      /2012 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO J. Shea 3 cc: J. T. Carlin Site Vice President Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution
P. R. Simmons
Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution
J. W. Proffitt Manager Site Licensing Sequoyah Nuclear Plant Electronic Mail Distribution
C. D. Mackaman Tennessee Valley Authority Electronic Mail Distribution
Edward J. Vigluicci Assistant General Counsel Tennessee Valley Authority Electronic Mail Distribution
County Mayor Hamilton County Hamilton County Courthouse 208 Courthouse 625 Georgia Avenue
Chattanooga, TN  37402-2801
Tennessee Department of Environment &
Conservation Division of Radiological Health
401 Church Street
Nashville, TN  37243
Senior Resident Inspector U.S. Nuclear Regulatory Commission Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, TN  37379-3624
Ann Harris 341 Swing Loop
Rockwood, TN  37854
Tennessee Valley Authority ATTN: Ms. Coleen Ware Training Manager Sequoyah Nuclear Plant P. O. Box 200 Soddy-Daisy, TN 37384-2000
J. Shea 4 Letter to Joseph W. Shea from Terrence Reis dated November 1, 2012.
==SUBJECT:==
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE  EXAMINATIONS FOR SEQUOYAH NUCLEAR PLANT
Distribution
: ORA, RII T. Reis H. Christensen M. Widmann
M. Franke
K. Schaaf J. Vincent J. Kirby S. Shaeffer
J. McHale RIDSNRRDIRSIRIB Resource Document Control Desk - Licensing RIDSNRRDIRS PUBLIC R. Pascarelli, NRR ((Regulatory Conferences Only))
RidsNrrPMSequoyah Resource}}

Revision as of 19:51, 1 August 2018

Confirmation of Requested Initial Operator License Examinations for Sequoyah Nuclear Plant
ML12307A293
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/01/2012
From: Reis T
Division of Reactor Safety II
To: Shea J W
Tennessee Valley Authority
References
Download: ML12307A293 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 1, 2012

Mr. Joseph W. Shea Manager, Corp. Nuclear Licensing Programs Tennessee Valley Authority

1101 Market Street, LP 4B-C Chattanooga, TN 37402-2801

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR SEQUOYAH NUCLEAR PLANT

Dear Mr. Shea:

In a letter dated July 11, 2012, your staff responded to Regulatory Issue Summary 2012-07 and requested we schedule initial license operator examinations for Sequoyah Nuclear Plant.

Based on your letter and following discussions with your staff, we have scheduled the requested examinations as follows:

Plant / Station 2013 2014 Date ApplicantsDate Applicants Sequoyah 5/13 8 NR NR 12/2 14 NR - None Requested On-site validation of the examinations is typically scheduled to occur approximately three weeks before each examination. If you have a need to change the dates of your scheduled exam(s) from that (those) listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.

We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks. If the number of applicants is reduced to less than ten (10) for any examination, please inform us as this will impact the examination schedule.

A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner=s name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates. If you have any questions concerning this information, please contact Mr. Malcolm Widmann, Chief, Operations Branch I, at 404-997-4550 or Mr. Mark Franke, Chief, Operations Branch II at

404-997-4436.

J. Shea 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC

=s public Web site at http://www.nrc.gov/reading-rm/adams.html. Sincerely, /RA/

Terrence Reis, Director Division of Reactor Safety

Docket Nos.: 50-327, 50-327 License Nos.: DPR-77, DPR-79 cc: (See page 3)

_________________________

G SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII;DRS RII:DRS RII:DRS RII:DRS SIGNATURE RA RA RA RA NAME SCHAAF WIDMANN FRANKE CHRISTENSEN DATE 10/25/2012 11/1/2012 11/1/2012 11/1/2012 11/ /2012 11/ /2012 11/ /2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO J. Shea 3 cc: J. T. Carlin Site Vice President Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution

P. R. Simmons

Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution

J. W. Proffitt Manager Site Licensing Sequoyah Nuclear Plant Electronic Mail Distribution

C. D. Mackaman Tennessee Valley Authority Electronic Mail Distribution

Edward J. Vigluicci Assistant General Counsel Tennessee Valley Authority Electronic Mail Distribution

County Mayor Hamilton County Hamilton County Courthouse 208 Courthouse 625 Georgia Avenue

Chattanooga, TN 37402-2801

Tennessee Department of Environment &

Conservation Division of Radiological Health

401 Church Street

Nashville, TN 37243

Senior Resident Inspector U.S. Nuclear Regulatory Commission Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, TN 37379-3624

Ann Harris 341 Swing Loop

Rockwood, TN 37854

Tennessee Valley Authority ATTN: Ms. Coleen Ware Training Manager Sequoyah Nuclear Plant P. O. Box 200 Soddy-Daisy, TN 37384-2000

J. Shea 4 Letter to Joseph W. Shea from Terrence Reis dated November 1, 2012.

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR SEQUOYAH NUCLEAR PLANT

Distribution

ORA, RII T. Reis H. Christensen M. Widmann

M. Franke

K. Schaaf J. Vincent J. Kirby S. Shaeffer

J. McHale RIDSNRRDIRSIRIB Resource Document Control Desk - Licensing RIDSNRRDIRS PUBLIC R. Pascarelli, NRR ((Regulatory Conferences Only))

RidsNrrPMSequoyah Resource