IR 05000277/2012403: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:OFFIElAT USE ENtY SECURITY_REtATED INFORMATIONJanuary 23,2012Mr. Michael J. PacilioSenior Vice President, Exelon Generation Company, LLCPresident and Chief Nuclear Officer, Exelon Nuclear4300 Winfield Rd.Warrenville, lL 60555
{{#Wiki_filter:OFFIElAT USE ENtY SECURITY_REtATED INFORMATION January 23,2012 Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.Warrenville, lL 60555


SUBJECT: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - NRCSECURITY BASELINE INSPECTION REPORT O5OOO277 12012403 AND0500027812012403
SUBJECT: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - NRC SECURITY BASELINE INSPECTION REPORT O5OOO277 12012403 AND 0500027812012403


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
On January 13,2Q12, the U.S. Nuclear Regulatory Commission (NRC) completed a securitybaseline inspection at your Peach Bottom Atomic Power Station. The inspection covered one ormore of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process.The enclosed inspection report documents the inspection results, which were discussed onJanuary 19,2012, with Mr. Garey L. Stathes, Plant Manager, and other members of your staff.The inspection examined activities conducted under your licenses as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of yourlicenses. The inspectors reviewed selected procedures and records, observed activities, andinterviewed person nel.No findings were identified during this inspection.ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from thePublicly Available Records (PARS) component of NRG's Agencyride Documents Access andManagement System, (ADAMS). ADAMS is accessible from the NRC Website athttp://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated fromenclosure, this transmittal document is decontrolled.EFFIGIAT USE ONIY SEEURIW_REtATEP INFORMATIEN OFFIEIAT USE ENLY - SECURITY_REtATEB INFORMATION However, the materialenclosed herewith contains Security-Related lnformation in accordancewith 10 CFR 2.390(dX1) and its disclosure to unauthorized individuals could present a securityvulnerability. Therefore, the material in the enclosure will not be made available electronicallyfor public inspection in the NRC Public Document Room or from the NRC's AgencywideDocument Access and Management System (ADAMS). lf you choose to provide a responseand Security-Related lnformation is necessary to provide an acceptable response, please markyour entire response "security-Related Information-Withhold from public disclosure under 10CFR 2.390" in accordance with 10 CFR 2.390(dX1 ) and follow the instructions for withholding in10 CFR 2.390(bX1). In accordance with 10 CFR 2.390(bX1)(ii), the NRC is waiving the affidavitrequirements for your response.
On January 13,2Q12, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Peach Bottom Atomic Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process.The enclosed inspection report documents the inspection results, which were discussed on January 19,2012, with Mr. Garey L. Stathes, Plant Manager, and other members of your staff.The inspection examined activities conducted under your licenses as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your licenses.


Sincerely,/RNJames M. Trapp, ChiefPlant Support Branch 1Division of Reactor SafetyDocket Nos. 50-277, 50-278License Nos. DPR-44, DPR-56Nonpublic
The inspectors reviewed selected procedures and records, observed activities, and interviewed person nel.No findings were identified during this inspection.
 
ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRG's Agencyride Documents Access and Management System, (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Enclosure contains Sensitive Unclassified Non-Safeguards Information.
 
When separated from enclosure, this transmittal document is decontrolled.
 
EFFIGIAT USE ONIY SEEURIW_REtATEP INFORMATIEN OFFIEIAT USE ENLY - SECURITY_REtATEB INFORMATION However, the materialenclosed herewith contains Security-Related lnformation in accordance with 10 CFR 2.390(dX1)
and its disclosure to unauthorized individuals could present a security vulnerability.
 
Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Document Access and Management System (ADAMS). lf you choose to provide a response and Security-Related lnformation is necessary to provide an acceptable response, please mark your entire response "security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(dX1 ) and follow the instructions for withholding in 10 CFR 2.390(bX1).
 
In accordance with 10 CFR 2.390(bX1)(ii), the NRC is waiving the affidavit requirements for your response.
 
Sincerely,/RN James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-277, 50-278 License Nos. DPR-44, DPR-56 Nonpublic


===Enclosure:===
===Enclosure:===
I nspection Report 0500027 7 l 20 I 2403 a nd 05000 27 8 l 20 1 2403
I nspection Report 0500027 7 l 20 I 2403 a nd 05000 27 8 l 20 1 2403  


===w/Attachment:===
===w/Attachment:===
Supplemental lnformationcc w/encll w/OUO-SRlJ. Kovalchick, Manager, Site SecurityD. Allard, Director, PA DEPT. Levering, MD Emergency Response DirectorA. Lauland, Director, MD Office of Homeland SecurityG. Cannon, Director, PA Emergency Management Agency (PEMA)and Office of Homeland Security Advisorcc w/o encl: w/o OUO-SRI: Distribution via ListServoFFICIAt USE ONtY SEGURIW_REtATED INFERMATION OFFIEIAT USE ONIY SEEURITY_REIATED INFORMATION
Supplemental lnformation cc w/encll w/OUO-SRlJ. Kovalchick, Manager, Site Security D. Allard, Director, PA DEP T. Levering, MD Emergency Response Director A. Lauland, Director, MD Office of Homeland Security G. Cannon, Director, PA Emergency Management Agency (PEMA)and Office of Homeland Security Advisor cc w/o encl: w/o OUO-SRI: Distribution via ListServ oFFICIAt USE ONtY SEGURIW_REtATED INFERMATION OFFIEIAT USE ONIY SEEURITY_REIATED INFORMATION
}}
}}

Revision as of 18:45, 30 July 2018

Peach Bottom Atomic Power Station, Units 2 and 3 - NRC Security Baseline Inspection Report 05000277-12-403 and 05000278-12-403 (Letter Only)
ML12024A017
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/23/2012
From: Trapp J M
Reactor Projects Branch 1
To: Pacilio M J
Exelon Nuclear
References
IR-12-403
Download: ML12024A017 (4)


Text

OFFIElAT USE ENtY SECURITY_REtATED INFORMATION January 23,2012 Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.Warrenville, lL 60555

SUBJECT: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - NRC SECURITY BASELINE INSPECTION REPORT O5OOO277 12012403 AND 0500027812012403

Dear Mr. Pacilio:

On January 13,2Q12, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Peach Bottom Atomic Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process.The enclosed inspection report documents the inspection results, which were discussed on January 19,2012, with Mr. Garey L. Stathes, Plant Manager, and other members of your staff.The inspection examined activities conducted under your licenses as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your licenses.

The inspectors reviewed selected procedures and records, observed activities, and interviewed person nel.No findings were identified during this inspection.

ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRG's Agencyride Documents Access and Management System, (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Enclosure contains Sensitive Unclassified Non-Safeguards Information.

When separated from enclosure, this transmittal document is decontrolled.

EFFIGIAT USE ONIY SEEURIW_REtATEP INFORMATIEN OFFIEIAT USE ENLY - SECURITY_REtATEB INFORMATION However, the materialenclosed herewith contains Security-Related lnformation in accordance with 10 CFR 2.390(dX1)

and its disclosure to unauthorized individuals could present a security vulnerability.

Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Document Access and Management System (ADAMS). lf you choose to provide a response and Security-Related lnformation is necessary to provide an acceptable response, please mark your entire response "security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(dX1 ) and follow the instructions for withholding in 10 CFR 2.390(bX1).

In accordance with 10 CFR 2.390(bX1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,/RN James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-277, 50-278 License Nos. DPR-44, DPR-56 Nonpublic

Enclosure:

I nspection Report 0500027 7 l 20 I 2403 a nd 05000 27 8 l 20 1 2403

w/Attachment:

Supplemental lnformation cc w/encll w/OUO-SRlJ. Kovalchick, Manager, Site Security D. Allard, Director, PA DEP T. Levering, MD Emergency Response Director A. Lauland, Director, MD Office of Homeland Security G. Cannon, Director, PA Emergency Management Agency (PEMA)and Office of Homeland Security Advisor cc w/o encl: w/o OUO-SRI: Distribution via ListServ oFFICIAt USE ONtY SEGURIW_REtATED INFERMATION OFFIEIAT USE ONIY SEEURITY_REIATED INFORMATION