{{#Wiki_filter:1Davis-Besse Nuclear Power Plant Annual Assessment Meeting/Open HouseReactor Oversight Process -2012Nuclear Regulatory Commission -Region III Lisle, IllinoisJune 11, 2013 2 Purpose of Today's Meeting*A public forum for discussion of Davis-Besse Nuclear Power Plant's
performance in 2012*NRC personnel will be available to answer questions on NRC activities and identified licensee performance
issues 2 3 Our Mission To license and regulate the nation's civilian use of byproduct, source, and special nuclear
materials to ensure
adequate protection of public health and safety, promote the
common defense and security, and protect the
environment.
4 NRC Performance Goals*Safety:  Ensure adequate protection of public health and safety and the
environment.*Security:  Ensure adequate protection in the secure use and management of
radioactive materials.
3 5 Some Nuclear Facts*102 nuclear power plants supply about 20 percent of the electricity in the U.S.*Nuclear materials are used in medicine for diagnosis and cancer treatment.*Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices, and
irradiators.
6The NRC Regulates*Nuclear reactors-commercial power reactors, research and test reactors, new reactor designs*Nuclear materials-nuclear reactor fuel, radioactive materials for medical, industrial, and academic use*Nuclear waste-transportation, storage and disposal of nuclear material and waste, decommissioning of nuclear facilities*Nuclear security-physical security of nuclear facilities and materials from sabotage or attacks 4 7What We Do -Nuclear WasteThe NRC regulates:-Storage of spent reactor fuel in fuel pools or dry
storage casks, and-Any national spent fuel storage
site.8What We Do -Nuclear Security NRC Requires:-Well-armed and well-trained security forces,-Surveillance and perimeter patrols,-State-of-the-art site access equipment and
controls,-Physical barriers and detection zones, and-Intrusion detection systems and alarm
stations.
5 9What We Don'tDo*Regulate nuclear weapons, military reactors, or space vehicle reactors *Own or operate nuclear power plants
*Regulate some radioactive materials, such as X-rays and naturally
occurring radon 10 How We Regulate*Establish rules and regulations*Issue licenses
*Provide oversight through inspection, enforcement, and evaluation of
operational experience*Conduct research to provide support for regulatory decisions*Respond to events and emergencies 6 11Assurance of Plant Safety*Require "defense-in-depth"*Require long-term maintenance of equipment*Require continual training of operators*Verify compliance with regulations 12 Reactor Oversight ProcessSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance AreasSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance Areas 7 13Action Matrix ConceptIncreasing Safety SignificanceIncreasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory ActionsLicenseeResponseRegulatoryResponseDegradedCornerstoneMultiple/Rep.DegradedCornerstoneUnacceptablePerformance 14Examples of Baseline Inspections*Equipment Alignment    ~80 hrs/yr *Triennial Fire Protection  ~250 hrs every 3 yrs*Operator Response    ~125 hrs/yr
*Emergency Preparedness  ~80 hrs/yr
*Rad Release Controls    ~110 hrs every 2 yrs*Worker Radiation Protection  ~95 hrs/yr*Corrective Action Program ~250 hrs every 2 yrs*Corrective Action Case Reviews  ~60 hrs/yr 8NRC Inspection ActivitiesReactor Oversight Process 157165 total hours expended by NRC in 2012 on Reactor Oversight Process activities 2862 inspector hours of direct inspection activity677 inspector hours reviewing and observing
plant operating status2052 inspector hours of preparation for and documentation of inspection activities 1574 hours for other Reactor Oversight Process elements (e.g., assessments and
communications)Davis-BesseNuclear Power PlantNRC Inspection Activities 2012 16 2 resident inspectors on site -resident inspectors produced four quarterly inspection reports and walked through the plant daily21 regional inspectors participated in various
inspections 3 major team inspectionsShield Building Cracking Root Cause
EvaluationTriennial Component Design Basis InspectionBiennial Licensed Oper ator RequalificationDavis-BesseNuclear Power Plant 9NRC Annual Assessment SummaryFENOC operated the plant safely and in a manner that preserved the public health and safety and protected the
environment.Davis-Besse was in the Regulatory Response Column of the NRC's Action
Matrix for the last quarter of 2012.No Substantive Cross-Cutting Issues
were identifiedDavis-BesseNuclear Power Plant 17 18National Summary of Plant Performance Status as of 12/31/2012Licensee Response  81 Regulatory Response  18 Degraded Cornerstone  3 Multiple/Repetitive Deg. Cornerstone1 Unacceptable  0 IMC 0350 Oversight1 Total104 10 19 Significance Threshold Performance Indicators Green:Only Baseline InspectionWhite:Increases NRC oversight
Yellow:Increases NRC oversight Red:Increases NRC oversight Inspection Findings Green:Very low safety issueWhite:Low to moderate safety issue
Yellow:Substantial safety issue Red:High safety issue Davis-Besse PIs and FindingsJanuary1throughDecember31,2012 20 All Green Performance Indicators 7 Green Inspection Findings 1 Greater-than-Green Finding
in Security 11 21 National Summary*Performance Indicato r Results for 2012*-Green 6926-White23
-Yellow 0-Red 0*PIs are counted per plant per quarter*Total Inspection Findings in 2012#-Green 914-White16
-Yellow 1-Red 1# Finding data current as of 3/04/2013 NRC Inspection Findings Davis-Besse Nuclear Power Plant SomeExamplesofActualFindings 22Human performance error caused momentary loss of a channel of Radiation Monitoring on Station Ventilation Exhaust Seismic monitoring equipment removed from service without the knowledge of On-Shift Operations CrewPlant design did not maintain required separation between redundant safety-related Direct Current Systems 12NRC Inspection Plans for 2013 23NRC Plans Baseline Inspections at Davis-Besse Nuclear Power Plant for 2013. This includes the following team inspections:Triennial Fire Protection  (completed In
March)Graded Emergency Plan Exercise (conducted in  May)Biennial Problem Identification and
Resolution Initial review of Steam Generator
Replacement Activities NRC Security Inspection Plans 2013On August 10, 2012, NRC identified one or more "greater-than-green"/blue Security Cornerstone inputs NRC will follow Reactor Oversight Process Action Matrix for plants in
Regulatory Response ColumnSecurity Inspection Plans were discussed with licensee at a non-public
meeting 24 13 25 Open to the Public*The NRC places a high priority on keeping the public and stakeholders informed of its
activities. *At www.nrc.gov, you can:-Find public meeting dates and transcripts;-Read NRC testimony, speeches, press releases, and policy decisions; and -Access the agency's Electronic Reading Room to find NRC publications and documents.
26 Contacting the NRC*Report an emergency-(301) 816-5100 (call collect)*Report a safety concern    -(800) 695-7403  -Allegation@nrc.gov*General information or questions-www.nrc.gov
-Select "What We Do" for Public Affairs 14 Actions in Response to the Japan Nuclear Accident*Actions in response to Japan Nuclear Accident Website: http://www.nrc.gov/japan/japan-info.html*Mailbox for comments on staff actions:
JLD_Public.Resource@nrc.gov*Office of Public Affairs Point of Contact:
OPA.resource@nrc.gov or 301-415-8200 27 28 NRC Representatives-V. Mitlyng Public Affairs Officer-(630) 829-9662-P. Chandrathil Public Affairs Officer-(630) 829-9663D. Kimble Senior Resident Inspector-(419) 244-4494T. Briley Resident Inspector-(419) 244-4494J. CameronBranch Chief, Region III-(630) 829-9833 15NRC Social Media Channels*Blog:http://public-blog.nrc-gateway.gov/*Flickr:http://www.flickr.com/photos/nrcgov/*Twitter:https://twitter.com/#!/nrcgov*YouTube: http://www.youtube.com/user/NRCgov*RSS:http://www.nrc.gov/public-involve/listserver.html#rss 29 30 Reference Sources*Reactor Oversight Process-http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/in dex.html*Public Electronic Reading Room-http://www.nrc.gov/reading-rm.html*Public Document Room-1-800-397-4209 (Toll Free) 16Nuclear Regulatory Commission -Region III Lisle, IllinoisJune 11, 2013 Davis-BesseOnce Through Steam Generator Replacement Outage/
Refueling Outage 18 NRC Inspection Activities
*Scheduled for First Quarter of  2014
*Opening will be made in Shield Building and Containment
*NRC will inspect various pre-outage and outage activities
*Inspectors from NRC regional office will supplement the assigned two resident inspectors FENOC/Davis-BesseSteam Generator Replacement 32 17 Steam Generator ReplacementNRC Inspection Plans*Inspection Objectives:Verify that:-engineering evaluations and design changes are in conformance with facility license, codes, regulations-removal and replacement activities maintain adequate nuclear and radiological safety-post-installation test program is adequate and satisfactorily implemented 33 Steam Generator ReplacementNRC Inspection Plans*Major Inspection Activities
:Design and Planning-Engineering evaluations, design changes, modifications-Steam Generator lifting and rigging
-Radiation Protection program controls,  planning, preparations-Security considerations -affected barriers Steam Generator Removal / Replacement-Cutting, welding / non-destructive examinations
-Lifting / rigging activities
-Containment opening
-Radiation protection controls implementation Post-installation Testing-Testing program and implementation 34 18 Davis-Besse Major Components to be Replaced 35*Steam Generators
*Hot Legs*Reactor Coolant Pump MotorsShield Building and Containment Opening 36 19Shield Building Opening 37 Note:The 2014 Steam Generator replacement opening is completely encompassed by the 2011 Reactor Pressure Vessel Head replacement opening.}}

Revision as of 00:04, 17 July 2018

Davis-Besse Nuclear Power Plant June 11, 2013 NRC Presentation
ML13157A064
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/06/2013
From:
NRC/RGN-III
To:
References
Download: ML13157A064 (19)


Text

1Davis-Besse Nuclear Power Plant Annual Assessment Meeting/Open HouseReactor Oversight Process -2012Nuclear Regulatory Commission -Region III Lisle, IllinoisJune 11, 2013 2 Purpose of Today's Meeting*A public forum for discussion of Davis-Besse Nuclear Power Plant's

performance in 2012*NRC personnel will be available to answer questions on NRC activities and identified licensee performance

issues 2 3 Our Mission To license and regulate the nation's civilian use of byproduct, source, and special nuclear

materials to ensure

adequate protection of public health and safety, promote the

common defense and security, and protect the

environment.

4 NRC Performance Goals*Safety: Ensure adequate protection of public health and safety and the

environment.*Security: Ensure adequate protection in the secure use and management of

radioactive materials.

3 5 Some Nuclear Facts*102 nuclear power plants supply about 20 percent of the electricity in the U.S.*Nuclear materials are used in medicine for diagnosis and cancer treatment.*Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices, and

irradiators.

6The NRC Regulates*Nuclear reactors-commercial power reactors, research and test reactors, new reactor designs*Nuclear materials-nuclear reactor fuel, radioactive materials for medical, industrial, and academic use*Nuclear waste-transportation, storage and disposal of nuclear material and waste, decommissioning of nuclear facilities*Nuclear security-physical security of nuclear facilities and materials from sabotage or attacks 4 7What We Do -Nuclear WasteThe NRC regulates:-Storage of spent reactor fuel in fuel pools or dry

storage casks, and-Any national spent fuel storage

site.8What We Do -Nuclear Security NRC Requires:-Well-armed and well-trained security forces,-Surveillance and perimeter patrols,-State-of-the-art site access equipment and

controls,-Physical barriers and detection zones, and-Intrusion detection systems and alarm

stations.

5 9What We Don'tDo*Regulate nuclear weapons, military reactors, or space vehicle reactors *Own or operate nuclear power plants

  • Regulate some radioactive materials, such as X-rays and naturally

occurring radon 10 How We Regulate*Establish rules and regulations*Issue licenses

  • Provide oversight through inspection, enforcement, and evaluation of

operational experience*Conduct research to provide support for regulatory decisions*Respond to events and emergencies 6 11Assurance of Plant Safety*Require "defense-in-depth"*Require long-term maintenance of equipment*Require continual training of operators*Verify compliance with regulations 12 Reactor Oversight ProcessSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance AreasSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance Areas 7 13Action Matrix ConceptIncreasing Safety SignificanceIncreasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory ActionsLicenseeResponseRegulatoryResponseDegradedCornerstoneMultiple/Rep.DegradedCornerstoneUnacceptablePerformance 14Examples of Baseline Inspections*Equipment Alignment ~80 hrs/yr *Triennial Fire Protection ~250 hrs every 3 yrs*Operator Response ~125 hrs/yr

  • Emergency Preparedness ~80 hrs/yr
  • Rad Release Controls ~110 hrs every 2 yrs*Worker Radiation Protection ~95 hrs/yr*Corrective Action Program ~250 hrs every 2 yrs*Corrective Action Case Reviews ~60 hrs/yr 8NRC Inspection ActivitiesReactor Oversight Process 157165 total hours expended by NRC in 2012 on Reactor Oversight Process activities 2862 inspector hours of direct inspection activity677 inspector hours reviewing and observing

plant operating status2052 inspector hours of preparation for and documentation of inspection activities 1574 hours0.0182 days <br />0.437 hours <br />0.0026 weeks <br />5.98907e-4 months <br /> for other Reactor Oversight Process elements (e.g., assessments and

communications)Davis-BesseNuclear Power PlantNRC Inspection Activities 2012 16 2 resident inspectors on site -resident inspectors produced four quarterly inspection reports and walked through the plant daily21 regional inspectors participated in various

inspections 3 major team inspectionsShield Building Cracking Root Cause

EvaluationTriennial Component Design Basis InspectionBiennial Licensed Oper ator RequalificationDavis-BesseNuclear Power Plant 9NRC Annual Assessment SummaryFENOC operated the plant safely and in a manner that preserved the public health and safety and protected the

environment.Davis-Besse was in the Regulatory Response Column of the NRC's Action

Matrix for the last quarter of 2012.No Substantive Cross-Cutting Issues

were identifiedDavis-BesseNuclear Power Plant 17 18National Summary of Plant Performance Status as of 12/31/2012Licensee Response 81 Regulatory Response 18 Degraded Cornerstone 3 Multiple/Repetitive Deg. Cornerstone1 Unacceptable 0 IMC 0350 Oversight1 Total104 10 19 Significance Threshold Performance Indicators Green:Only Baseline InspectionWhite:Increases NRC oversight

Yellow:Increases NRC oversight Red:Increases NRC oversight Inspection Findings Green:Very low safety issueWhite:Low to moderate safety issue

Yellow:Substantial safety issue Red:High safety issue Davis-Besse PIs and FindingsJanuary1throughDecember31,2012 20 All Green Performance Indicators 7 Green Inspection Findings 1 Greater-than-Green Finding

in Security 11 21 National Summary*Performance Indicato r Results for 2012*-Green 6926-White23

-Yellow 0-Red 0*PIs are counted per plant per quarter*Total Inspection Findings in 2012#-Green 914-White16

-Yellow 1-Red 1# Finding data current as of 3/04/2013 NRC Inspection Findings Davis-Besse Nuclear Power Plant SomeExamplesofActualFindings 22Human performance error caused momentary loss of a channel of Radiation Monitoring on Station Ventilation Exhaust Seismic monitoring equipment removed from service without the knowledge of On-Shift Operations CrewPlant design did not maintain required separation between redundant safety-related Direct Current Systems 12NRC Inspection Plans for 2013 23NRC Plans Baseline Inspections at Davis-Besse Nuclear Power Plant for 2013. This includes the following team inspections:Triennial Fire Protection (completed In

March)Graded Emergency Plan Exercise (conducted in May)Biennial Problem Identification and

Resolution Initial review of Steam Generator

Replacement Activities NRC Security Inspection Plans 2013On August 10, 2012, NRC identified one or more "greater-than-green"/blue Security Cornerstone inputs NRC will follow Reactor Oversight Process Action Matrix for plants in

Regulatory Response ColumnSecurity Inspection Plans were discussed with licensee at a non-public

meeting 24 13 25 Open to the Public*The NRC places a high priority on keeping the public and stakeholders informed of its

activities. *At www.nrc.gov, you can:-Find public meeting dates and transcripts;-Read NRC testimony, speeches, press releases, and policy decisions; and -Access the agency's Electronic Reading Room to find NRC publications and documents.

26 Contacting the NRC*Report an emergency-(301) 816-5100 (call collect)*Report a safety concern -(800) 695-7403 -Allegation@nrc.gov*General information or questions-www.nrc.gov

-Select "What We Do" for Public Affairs 14 Actions in Response to the Japan Nuclear Accident*Actions in response to Japan Nuclear Accident Website: http://www.nrc.gov/japan/japan-info.html*Mailbox for comments on staff actions:

JLD_Public.Resource@nrc.gov*Office of Public Affairs Point of Contact:

OPA.resource@nrc.gov or 301-415-8200 27 28 NRC Representatives-V. Mitlyng Public Affairs Officer-(630) 829-9662-P. Chandrathil Public Affairs Officer-(630) 829-9663D. Kimble Senior Resident Inspector-(419) 244-4494T. Briley Resident Inspector-(419) 244-4494J. CameronBranch Chief, Region III-(630) 829-9833 15NRC Social Media Channels*Blog:http://public-blog.nrc-gateway.gov/*Flickr:http://www.flickr.com/photos/nrcgov/*Twitter:https://twitter.com/#!/nrcgov*YouTube: http://www.youtube.com/user/NRCgov*RSS:http://www.nrc.gov/public-involve/listserver.html#rss 29 30 Reference Sources*Reactor Oversight Process-http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/in dex.html*Public Electronic Reading Room-http://www.nrc.gov/reading-rm.html*Public Document Room-1-800-397-4209 (Toll Free) 16Nuclear Regulatory Commission -Region III Lisle, IllinoisJune 11, 2013 Davis-BesseOnce Through Steam Generator Replacement Outage/

Refueling Outage 18 NRC Inspection Activities

  • Scheduled for First Quarter of 2014
  • NRC will inspect various pre-outage and outage activities
  • Inspectors from NRC regional office will supplement the assigned two resident inspectors FENOC/Davis-BesseSteam Generator Replacement 32 17 Steam Generator ReplacementNRC Inspection Plans*Inspection Objectives:Verify that:-engineering evaluations and design changes are in conformance with facility license, codes, regulations-removal and replacement activities maintain adequate nuclear and radiological safety-post-installation test program is adequate and satisfactorily implemented 33 Steam Generator ReplacementNRC Inspection Plans*Major Inspection Activities
Design and Planning-Engineering evaluations, design changes, modifications-Steam Generator lifting and rigging

-Radiation Protection program controls, planning, preparations-Security considerations -affected barriers Steam Generator Removal / Replacement-Cutting, welding / non-destructive examinations

-Lifting / rigging activities

-Containment opening

-Radiation protection controls implementation Post-installation Testing-Testing program and implementation 34 18 Davis-Besse Major Components to be Replaced 35*Steam Generators