ML13226A248: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:


==SUBJECT:==
==SUBJECT:==
QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2, NOTIFICATION OF NRC INSPECTION Dear Mr.
QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2, NOTIFICATION OF NRC INSPECTION  
Pacilio: In a telephone conversation on August 9, 2013, Mr. D. McNeil, Senior Operations Engineer
 
, and Mr. M. DeVault, Quad Cities Training Director
==Dear Mr. Pacilio:==
, made arrangements for the U. S. Nuclear Regulatory Commission (
In a telephone conversation on August 9, 2013 , Mr. D. McNeil , Senior Operations Engineer , and M r. M. DeVault, Quad Cities Training Director
NRC) to conduct an inspection using Temporary Instruction (TI) 2515-186, "Inspection of Procedures and Processes for Responding to Potential Aircraft Threats," at Quad Cities Nuclear Power Station, Units 1 and 2
, made arrangements for the U. S. Nuclear Regulatory Commission (NRC) to conduct an inspection using Temporary Instruction (TI) 2515-186 , "Inspection of Procedures and Processes for Responding to Potential Aircraft Threats ," at Quad Cities Nu c l ear Power Station, Units 1 and 2
. This inspection is planned for the week of September 23, 2013. The NRC inspector will require a shift manager
. Th i s inspection is planned for the week of September 23 , 2013. The NRC inspector will require a shift manager
-qualified individual
-qualified individual , qualified unit supervisors
, qualified unit supervisors
, and a qualified security shift supervisor for a table
, and a qualified security shift supervisor for a table
-top scenario to allow inspection of TI 2515-186 attributes
-top scenario to allow inspection of TI 2515-186 attributes
Line 37: Line 36:
-rm/adams.html (the Public Electronic Reading Room).
-rm/adams.html (the Public Electronic Reading Room).
If there are any questions about this inspection or the material requested, please contact the lead inspector, D. McNeil at (630) 829
If there are any questions about this inspection or the material requested, please contact the lead inspector, D. McNeil at (630) 829
-9737 or I can be reached at (630) 829
-9 737 or I can be reached at (630) 829-9 707. Sincerely, /RA/  Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50
-9707. Sincerely,
  /RA/  Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50
-254 and 50
-254 and 50
-265 License Nos. DPR
-265 License Nos. DPR
Line 46: Line 43:
Ž M. Pacilio      In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
Ž M. Pacilio      In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
-rm/adams.html (the Public Electronic Reading Room).
If there are any questions about this inspection or the material requested, please contact the lead inspector
If there are any questions about this inspection or the material requested, please contact the lead inspector , D. McNeil at (630) 829
, D. McNeil at (630) 829
-9737 or I can be reached at (630) 829-9 707. Sincerely, /RA/  Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50
-9737 or I can be reached at (630) 829
-9707. Sincerely,
  /RA/  Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50
-254 and 50-265 License Nos.
-254 and 50-265 License Nos.
DPR-29 and DPR
DPR-29 and DPR
Line 58: Line 52:
-2 Resource RidsNrrPMQuadCities Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano
-2 Resource RidsNrrPMQuadCities Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano


Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME:  Ltr 081313 Quad Cities Notice (DRM).docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII  RIII RIII  RIII  NAME DMcNeil:bl HPeterson DATE 08/13/13 08/13/13  OFFICIAL RECORD COPY}}
Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME:  Ltr 081313 Quad Cities Notice (DRM).docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII  RI II RIII  RIII  NAME DMcNeil:bl HPeterson   DATE 08/13/13 08/13/13  OFFICIAL RECORD COPY}}

Revision as of 01:14, 14 July 2018

Quad Cities Nuclear Power Station, Units 1 and 2, Notification of NRC Inspection
ML13226A248
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 08/13/2013
From: Hironori Peterson
Operations Branch III
To: Pacilio M J
Exelon Generation Co, Exelon Nuclear
Dell McNeil
References
Download: ML13226A248 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532

-4352 August 13, 2013 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2, NOTIFICATION OF NRC INSPECTION

Dear Mr. Pacilio:

In a telephone conversation on August 9, 2013 , Mr. D. McNeil , Senior Operations Engineer , and M r. M. DeVault, Quad Cities Training Director

, made arrangements for the U. S. Nuclear Regulatory Commission (NRC) to conduct an inspection using Temporary Instruction (TI) 2515-186 , "Inspection of Procedures and Processes for Responding to Potential Aircraft Threats ," at Quad Cities Nu c l ear Power Station, Units 1 and 2

. Th i s inspection is planned for the week of September 23 , 2013. The NRC inspector will require a shift manager

-qualified individual , qualified unit supervisors

, and a qualified security shift supervisor for a table

-top scenario to allow inspection of TI 2515-186 attributes

. Additionally, in order to minimize the impact to your onsite resources and to ensure a productive inspection for both sides, please have available the procedures that would be followed when responding to an aircraft threat and any related lesson plans pertinent to the inspection. Additionally, the inspector needs to review your aircraft threat procedure and a list of corrective action reports regarding security and licensed operator issues

, the week before the inspection.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).

Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number

.

M. Pacilio In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

If there are any questions about this inspection or the material requested, please contact the lead inspector, D. McNeil at (630) 829

-9 737 or I can be reached at (630) 829-9 707. Sincerely, /RA/ Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50

-254 and 50

-265 License Nos. DPR

-29 and DPR

-30 cc: Distribution via ListServ

Ž M. Pacilio In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

If there are any questions about this inspection or the material requested, please contact the lead inspector , D. McNeil at (630) 829

-9737 or I can be reached at (630) 829-9 707. Sincerely, /RA/ Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50

-254 and 50-265 License Nos.

DPR-29 and DPR

-30 cc: Distribution via ListServ

Ž DISTRIBUTION

Vivian Campbell RidsNrrDorlLpl3

-2 Resource RidsNrrPMQuadCities Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano

Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: Ltr 081313 Quad Cities Notice (DRM).docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RI II RIII RIII NAME DMcNeil:bl HPeterson DATE 08/13/13 08/13/13 OFFICIAL RECORD COPY