ML13319A932: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 25: Line 25:
List of Figures              List of Tables ACRONYMS & ABBREVIATIONS  
List of Figures              List of Tables ACRONYMS & ABBREVIATIONS  


1 PURPOSE 2 TEST OBJECTIVES 3 TECHNICAL APPROACH 3.1 TEST MODULE  Dimension inmm3.2 TEST VARIABLES   
1 PURPOSE 2 TEST OBJECTIVES 3 TECHNICAL APPROACH 3.1 TEST MODULE  Dimension in mm3.2 TEST VARIABLES   
* * * * *
* * * * *
* Run Fiber TypeWater ChemistryTemperature  
* Run Fiber TypeWater ChemistryTemperature  


0.00.1 0.2 0.3 0.4 0.5 0.6 0.7 0.80.91.00123456Debris Fraction Transported to StrainerPool Turnovers  
0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 0123456Debris Fraction Transported to StrainerPool Turnovers  


4 TEST PROTOCOLS 4.1 OVERALL TEST APPROACH 4.2 TEST APPARATUS 4.3 FIBER PREPARATION 4.4 TEST TANK PREPARATION * *   
4 TEST PROTOCOLS 4.1 OVERALL TEST APPROACH 4.2 TEST APPARATUS 4.3 FIBER PREPARATION 4.4 TEST TANK PREPARATION * *   

Revision as of 19:37, 13 July 2018

CCNPP-BPPlan-002, Rev 0E, Small Scale Debris Bypass-Penetration Test Plan for Calvert Cliffs Nuclear Power Plant.
ML13319A932
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 11/11/2013
From: Plont A, Zigler G
Constellation Energy Group
To:
Office of Nuclear Reactor Regulation
Morgan N S
Shared Package
ML13319A601 List:
References
CCNPP-BPPlan-002, Rev 0E
Download: ML13319A932 (18)


Text

SMALL SCALE DEBRIS BY-PASS/PENETRATION TEST PLAN FOR CALVERT CLIFFS NUCLEAR POWER PLANT

REVISION HISTORY LOG

Table of Contents

List of Figures List of Tables ACRONYMS & ABBREVIATIONS

1 PURPOSE 2 TEST OBJECTIVES 3 TECHNICAL APPROACH 3.1 TEST MODULE Dimension in mm3.2 TEST VARIABLES

  • * * * *
  • Run Fiber TypeWater ChemistryTemperature

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 0123456Debris Fraction Transported to StrainerPool Turnovers

4 TEST PROTOCOLS 4.1 OVERALL TEST APPROACH 4.2 TEST APPARATUS 4.3 FIBER PREPARATION 4.4 TEST TANK PREPARATION * *

  • 4.5 HYDRAULIC TEST CONDITIONS 4.6 TEST CONTROL

4.7 FILTER BAG PROCESSING 5 TEST ACCEPTANCE CRITERIA 6 TEST DOCUMENTATION AND RECORDS

7 DEBRIS HANDLING REQUIREMENTS 8 QUALITY ASSURANCE REQUIREMENTS 9 REFERENCES