{{#Wiki_filter:tFENOC- Beaver Valley Power StationI-- P.O. Box 4FirstEnergy Nuclear Operating Company Shippingport, PA 15077Eric A. Larson 724-682-5234 Site Vice President Fax: 724-643-8069 March 2, 2015L-1 5-046 10 CFR 50, Appendix E, Section VIATTN: Document Control DeskU.S. Nuclear Regulatory Commission Washington, DC 20555-0001
{{#Wiki_filter:t FENOC- Beaver Valley Power Station I-- P.O. Box 4 FirstEnergy Nuclear Operating Company Shippingport, PA 15077 Eric A. Larson 724-682-5234 Site Vice President Fax: 724-643-8069 March 2, 2015 L-1 5-046 10 CFR 50, Appendix E, Section VI ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Beaver Valley Power Station, Unit No. 1Docket No. 50-334, License No. DPR-66Emergency Response Data System Data Point Library UpdateIn accordance with reporting requirement 10 CFR 50, Appendix E, Section VI.3.a, updatesof the Emergency Response Data System (ERDS) Data Point Library (DPL) for BeaverValley Power Station, Unit No. 1 (BV1) are provided.
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Emergency Response Data System Data Point Library Update In accordance with reporting requirement 10 CFR 50, Appendix E, Section VI.3.a, updates of the Emergency Response Data System (ERDS) Data Point Library (DPL) for Beaver Valley Power Station, Unit No. 1 (BV1) are provided.
The attachment includes the requireddetails of the changes, and the enclosure provides copies of the updated DPL pages.There are no regulatory commitments contained in this letter. If there are any questions orif additional information is required, please contact Mr. William C. Cothen, Manager -Regulatory Compliance, at 724-682-4284.
The attachment includes the required details of the changes, and the enclosure provides copies of the updated DPL pages.There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. William C. Cothen, Manager -Regulatory Compliance, at 724-682-4284.
Sincerely, Eric A. Larson
Sincerely, Eric A. Larson  


==Attachment:==
==Attachment:==


Summary of Changes to Data Point Library
Summary of Changes to Data Point Library  


==Enclosure:==
==Enclosure:==


Beaver Valley Power Station ERDS Data Point Library, Updated Pagescc: NRC Region I Administrator NRC Resident Inspector NRC Project Manager (w/o enclosure)
Beaver Valley Power Station ERDS Data Point Library, Updated Pages cc: NRC Region I Administrator NRC Resident Inspector NRC Project Manager (w/o enclosure)
Director BRP/DEPSite BRP/DEP Representative Attachment L- 15-046Summary of Changes to Data Point LibraryPage 1 of 5Reactor DPL Point Description of Change(s)
Director BRP/DEP Site BRP/DEP Representative Attachment L- 15-046 Summary of Changes to Data Point Library Page 1 of 5 Reactor DPL Point Description of Change(s)Unit BV1 XR005 Date: Changed to "02/02/2015" PlantSpec Point Desc: Changed to "IRM-VS-109 LRNGM" Engr Units/Dig States: "CPM" to "lVCi/sec" Engr Units Conversion:
UnitBV1 XR005 Date: Changed to "02/02/2015" PlantSpec Point Desc: Changed to "IRM-VS-109 LRNGM"Engr Units/Dig States: "CPM" to "lVCi/sec" Engr Units Conversion:
to "Xe 133 CF = cps/pCi/cc" Minimum Instrument Range: Changed to "2.9E+01" Maximum Instrument Range: Changed to "2.9E+05" Alarm/Trip Set Points: Changed to "Alert=7.92E+02, High=1.584E+03" Unique System Desc.: Changed to 1 minute average data. System design is such that either the 1RM-VS-109 low range or high range noble gas monitor for each pathway will be in service. At a concentration of 1E-02 tICi/cc on the low range monitor, flow will normally swap to the high range monitor. The minimum and maximum instrument ranges listed are based on system software parameter limitations and pathway ODCM release flow rate. In addition, the maximum range is based on a release concentration of 1E-02 VICi/cc, limited by the automatic swap to the high range monitor.Note: Because actual pathway release flow rate may vary, the"Minimum Instrument Range" and "Maximum Instrument Range" may not reflect the actual instrument ranges. Site dose assessment corrects the pCi/s for source term and flow rate differences depending on selected default source term and decay period. IRM-1VS-109 monitors for low range noble gases at the discharge of the Auxiliary Building shielded area exhaust fans and at the discharge of the Containment Refueling Purge and Exhaust fan (during refueling).
to "Xe 133 CF = cps/pCi/cc" Minimum Instrument Range: Changed to "2.9E+01" Maximum Instrument Range: Changed to "2.9E+05" Alarm/Trip Set Points: Changed to "Alert=7.92E+02, High=1.584E+03" Unique System Desc.: Changed to 1 minute average data. Systemdesign is such that either the 1RM-VS-109 low range or highrange noble gas monitor for each pathway will be in service.
It provides alarms to warn the operator of abnormal releases and provides input to calculate integrated release data.BV1 XR006 Date: Changed to "02/02/2015" Unique System Desc.: "Point deleted per ECP 10-0150" Clear all other fields except Date, Reactor Unit, Data Feeder, Point ID Attachment L-1 5-046 Summary of Changes to Data Point Library Page 2 of 5 BV1 XR007 Date: Changed to "02/02/2015" Plant Spec Point Desc: Changed to "IRM-VS-109 HRNGM" Engr Units/Dig States: "CPM" to "pCi/sec" Engr Units Conversion:
At aconcentration of 1E-02 tICi/cc on the low range monitor, flow willnormally swap to the high range monitor.
to "Xe 133 CF = amps/ltCi/cc" Minimum Instrument Range: Changed to "1.8E+03" Maximum Insbnsmet Range: Changed to "7.9+12" Alarm/Trip Set Points: Changed to "Alert=5.28E+05, High=1.18E+06" Unique System Desc.: Changed to I minute average data.System design is such that either the 1RM-VS-109 low range or high range noble gas monitor for each pathway will be in service. At a concentration of 1E-02 pCi/cc on the low range monitor, flow will normally swap to the high range monitor.The minimum and maximum instrument ranges listed are based on Xe-133 and pathway ODCM release flow rate.Note: Because actual pathway release flow rate may vary, the"Minimum Instrument Range" and "Maximum Instrument Range" may not reflect the actual instrument ranges. Site dose assessment corrects the pCi/s for source term and flow rate differences depending on selected default source term and decay period. IRM-IVS-109 monitors for high range noble gases at the discharge of the Auxiliary Building shielded area exhaust fans and at the discharge of the Containment Refueling Purge and Exhaust fan (during refueling).
The minimum andmaximum instrument ranges listed are based on system softwareparameter limitations and pathway ODCM release flow rate. Inaddition, the maximum range is based on a release concentration of 1E-02 VICi/cc, limited by the automatic swap to the high rangemonitor.Note: Because actual pathway release flow rate may vary, the"Minimum Instrument Range" and "Maximum Instrument Range"may not reflect the actual instrument ranges. Site dose assessment corrects the pCi/s for source term and flow rate differences depending on selected default source term and decay period. IRM-1VS-109 monitors for low range noble gases at the discharge of theAuxiliary Building shielded area exhaust fans and at the discharge ofthe Containment Refueling Purge and Exhaust fan (during refueling).
Site dose assessment corrects the pCi/s for source term and flow rate differences depending on selected default source term and decay period. It provides alarms to warn the operator of abnormal releases and provides input to calculate integrated release data.BV1 XRO09 Date: Changed to "02/02/2015" Plant Spec Point Desc: Changed to "lRM-VS-110 LRNGM" Engr Units/Dig States: "CPM" to "pCi/sec" Engr Units Conversion:
It provides alarms to warn the operator of abnormal releases andprovides input to calculate integrated release data.BV1 XR006 Date: Changed to "02/02/2015" Unique System Desc.: "Point deleted per ECP 10-0150"Clear all other fields except Date, Reactor Unit, Data Feeder, Point ID Attachment L-1 5-046Summary of Changes to Data Point LibraryPage 2 of 5BV1 XR007 Date: Changed to "02/02/2015" Plant Spec Point Desc: Changed to "IRM-VS-109 HRNGM"Engr Units/Dig States: "CPM" to "pCi/sec" Engr Units Conversion:
to "Xe 133 CF = cps/pCi/cc" Minimum Instrument Range: Changed to "2.3E+01" Maximum Insbument Range: Changed to "2.3E+05" Alarm/Trip Set Points: Changed to "Alert=1.137E+03, High=2.274E+03" Unique System Desc.: Changed to 1 minute average data. System design is such that either the 1RM-VS-110 low range or high range noble gas monitor for each pathway will be in service. At a concentration of 1E-02 pCi/cc on the low range monitor, flow will normally swap to the high range monitor. The minimum and maximum instrument ranges listed are based on system Attachment L-1 5-046 Summary of Changes to Data Point Library Page 3 of 5 BV1 XR009 (cont.)software parameter limitations and pathway ODCM release flow rate. In addition, the maximum range is based on a release concentration of 1E-02 pCi/cc, limited by the automatic swap to the high range monitor.Note: Because actual pathway release flow rate may vary, the"Minimum Instrument Range" and "Maximum Instrument Range" may not reflect the actual instrument ranges. Site dose assessment corrects the pCi/s for source term and flow rate differences depending on selected default source term and decay period. iRM-1VS-110 monitors for low range noble gases at the discharge of the Leak Collection Area Exhaust Fans before the Elevated Release Vent.It provides alarms to warn the operator of abnormal releases and provides input to calculate integrated release data.BV1 XR010 Date: Changed to "02/02/2015" Unique System Desc.: "Point deleted per ECP 10-0150" Clear all other fields except Date, Reactor Unit, Data Feeder, Point ID BV1 XR011 Date: Changed to "02/02/2015" Plant Spec Point Desc: Changed to "lRM-VS-110 HRNGM" Engr Units/Dig States: "CPM" to "pCi/sec" Engr Units Conversion:
to "Xe 133 CF = amps/ltCi/cc" Minimum Instrument Range: Changed to "1.8E+03" Maximum Insbnsmet Range: Changed to "7.9+12"Alarm/Trip Set Points: Changed to "Alert=5.28E+05, High=1.18E+06" Unique System Desc.: Changed to I minute average data.System design is such that either the 1RM-VS-109 low range orhigh range noble gas monitor for each pathway will be inservice.
to "Xe 133 CF = amps/pCi/cc" Minimum hislwnent Range: Changed to "1.5E+03" Maximum InsbuTnt Range: Changed to "6.3E+12" Alarm/Trip Set Points: Changed to "Alert=7.58E+05, High 1.56E+06" Unique System Desc.: Changed to 1 minute average data.System design is such that either the 1RM-VS-110 low range or high range noble gas monitor for each pathway will be in service. At a concentration of 1E-02 IpCi/cc on the low range monitor, flow will normally swap to the high range monitor. The minimum and maximum instrument ranges listed are based on Xe-133 and pathway ODCM release flow rate.Note: Because actual pathway release flow rate may vary, the"Minimum Instrument Range" and "Maximum Instrument Range" may not reflect the actual instrument ranges. Site dose assessment corrects the tICi/s for source term and flow rate differences depending on selected default source term and decay period. 1RM-VS-110 monitors for high range noble gases at the discharge of the Leak Collection Area Exhaust Fans before the Elevated Release Vent. Site dose assessment corrects the pCi/s for source term and flow rate Attachment L-1 5-046 Summary of Changes to Data Point Library Page 4 of 5 BV1 XRO11 (cont.) differences depending on selected default source term and decay period. It provides alarms to warn the operator of abnormal releases and provides input to calculate integrated release data.BV1 XR013 Date: Changed to "02/02/2015" Plant Spec Point Desc: Changed to "IRM-GW-109 LRNGM" Engr Units/Dig States: "CPM" to "VOCi/sec" Engr Units Conversion:
At a concentration of 1E-02 pCi/cc on the low rangemonitor, flow will normally swap to the high range monitor.The minimum and maximum instrument ranges listed arebased on Xe-133 and pathway ODCM release flow rate.Note: Because actual pathway release flow rate may vary, the"Minimum Instrument Range" and "Maximum Instrument Range"may not reflect the actual instrument ranges. Site dose assessment corrects the pCi/s for source term and flow rate differences depending on selected default source term and decay period. IRM-IVS-109 monitors for high range noble gases at the discharge of theAuxiliary Building shielded area exhaust fans and at the discharge ofthe Containment Refueling Purge and Exhaust fan (duringrefueling).
to "Xe 133 CF = cps/pCi/cc" Minimum Instrument Range: Changed to "6.8E-01" Maximum Instrument Range: Changed to "6.8E+03" Alarm/Trip Set Points: Changed to "Normally N/A" Unique System Desc.: Changed to I minute average data. System design is such that either the 1RM-GW-109 low range or high range noble gas monitor for each pathway will be in service. At a concentration of 1E-02 IiCi/cc on the low range monitor, flow will normally swap to the high range monitor. The minimum and maximum instrument ranges listed are based on system software parameter limitations and pathway ODCM release flow rate. In addition, the maximum range is based on a release concentration of 1 E-02 VCi/cc, limited by the automatic swap to the high range monitor.Note: Because actual pathway release flow rate may vary, the"Minimum Instrument Range" and "Maximum Instrument Range" may not reflect the actual instrument ranges. Site dose assessment corrects the pCi/s for source term and flow rate differences depending on selected default source term and decay period. RM-1GW-109 monitors for low range noble gases at the discharge of the Gaseous Waste Disposal Blowers. It provides alarms to warn the operator of abnormal releases and provides input to calculate integrated release data.BV1 XR014 Date: Changed to "02/02/2015" Unique System Desc.: "Point deleted per ECP 10-0150" Clear all other fields except Date, Reactor Unit, Data Feeder, Point ID BV1 XR015 Date: Changed to "02/02/2015" Plant Spec Point Desc: Changed to "1RM-GW-109 HRNGM" Engr Units/Dig States: "CPM" to "pCi/sec" Engr Units Conversion:
Site dose assessment corrects the pCi/s for source termand flow rate differences depending on selected default sourceterm and decay period. It provides alarms to warn the operator ofabnormal releases and provides input to calculate integrated release data.BV1 XRO09 Date: Changed to "02/02/2015" Plant Spec Point Desc: Changed to "lRM-VS-110 LRNGM"Engr Units/Dig States: "CPM" to "pCi/sec" Engr Units Conversion:
to "Xe 133 CF = amps/pCi/cc" Minimum Instrument Range: Changed to "4.3E+01" Maximum Instrument Range: Changed to "1.8E+11" Alarm/Trip Set Points: Changed to "Alert=3.27E+05, High=6.55E+05" Unique System Desc.: Changed to 1 minute average data. System design is such that either the 1RM-GW-109 low range or high range Attachment L-1 5-046 Summary of Changes to Data Point Library Page 5 of 5 BV1 XRO15 (cont.)noble gas monitor for each pathway will be in service. At a concentration of 1E-02 tiCi/cc on the low range monitor, flow will normally swap to the high range monitor. Minimum and maximum instrument ranges listed are based on Xe-133 and pathway ODCM release flow rate.Note: Because actual pathway release flow rate may vary, the"Minimum Instrument Range" and "Maximum Instrument Range" may not reflect the actual instrument ranges. Site dose assessment corrects the IiCi/s for source term and flow rate differences depending on selected default source term and decay period. IRM-1GW-109 monitors for high range noble gases at the discharge of the Auxiliary Building shielded area exhaust fans and at the discharge of the Gaseous Waste Disposal Blower. Site dose assessment corrects the VCi/s for source term and flow rate differences depending on selected default source term and decay period. It provides alarms to warn the operator of abnormal releases and provides input to calculate integrated release data.
to "Xe 133 CF = cps/pCi/cc" Minimum Instrument Range: Changed to "2.3E+01" Maximum Insbument Range: Changed to "2.3E+05" Alarm/Trip Set Points: Changed to "Alert=1.137E+03, High=2.274E+03" Unique System Desc.: Changed to 1 minute average data. Systemdesign is such that either the 1RM-VS-110 low range or highrange noble gas monitor for each pathway will be in service.
Enclosure L-1 5-046 Beaver Valley Power Station ERDS Data Point Library, Updated Pages (9 pages follow)
At aconcentration of 1E-02 pCi/cc on the low range monitor, flowwill normally swap to the high range monitor.
BEAVER VALLEY POWER STATION ERDS DATA POINT LIBRARY Date: 202(2015 Reactor Unit: BV1 Data Feeder: ARERAS NRC ERDS Parameter:
The minimumand maximum instrument ranges listed are based on system Attachment L-1 5-046Summary of Changes to Data Point LibraryPage 3 of 5BV1XR009 (cont.)software parameter limitations and pathway ODCM release flowrate. In addition, the maximum range is based on a releaseconcentration of 1E-02 pCi/cc, limited by the automatic swap tothe high range monitor.Note: Because actual pathway release flow rate may vary, the"Minimum Instrument Range" and "Maximum Instrument Range"may not reflect the actual instrument ranges. Site dose assessment corrects the pCi/s for source term and flow rate differences depending on selected default source term and decay period. iRM-1VS-110 monitors for low range noble gases at the discharge of theLeak Collection Area Exhaust Fans before the Elevated Release Vent.It provides alarms to warn the operator of abnormal releases andprovides input to calculate integrated release data.BV1 XR010 Date: Changed to "02/02/2015" Unique System Desc.: "Point deleted per ECP 10-0150"Clear all other fields except Date, Reactor Unit, Data Feeder, Point IDBV1 XR011 Date: Changed to "02/02/2015" Plant Spec Point Desc: Changed to "lRM-VS-110 HRNGM"Engr Units/Dig States: "CPM" to "pCi/sec" Engr Units Conversion:
EFF-GAS-RAD1 Point ID: XRO05 Plant Spec Point Desc.: 1RM-VS-109 LRNGM Generic/Cond Desc.: RADIOACTIVITY OF RELEASED GASSES Analog/Digital:
to "Xe 133 CF = amps/pCi/cc" Minimum hislwnent Range: Changed to "1.5E+03" Maximum InsbuTnt Range: Changed to "6.3E+12" Alarm/Trip Set Points: Changed to "Alert=7.58E+05, High1.56E+06" Unique System Desc.: Changed to 1 minute average data.System design is such that either the 1RM-VS-110 low rangeor high range noble gas monitor for each pathway will bein service.
A Engr Units/Dig States: uCi/sec Engr Units Conversion:
At a concentration of 1E-02 IpCi/cc on the lowrange monitor, flow will normally swap to the high rangemonitor.
Xe133 CF = cpsluClIcc Minimum Instr Range: 2.9E+01 Maximum Instr Range: 2.9E+05 Zero Point  
The minimum and maximum instrument rangeslisted are based on Xe-133 and pathway ODCM release flowrate.Note: Because actual pathway release flow rate may vary, the"Minimum Instrument Range" and "Maximum Instrument Range" maynot reflect the actual instrument ranges. Site dose assessment corrects the tICi/s for source term and flow rate differences depending on selected default source term and decay period. 1RM-VS-110 monitors for high range noble gases at the discharge of the LeakCollection Area Exhaust Fans before the Elevated Release Vent. Sitedose assessment corrects the pCi/s for source term and flow rate Attachment L-1 5-046Summary of Changes to Data Point LibraryPage 4 of 5BV1 XRO11 (cont.) differences depending on selected default source term and decayperiod. It provides alarms to warn the operator of abnormal releasesand provides input to calculate integrated release data.BV1 XR013 Date: Changed to "02/02/2015" Plant Spec Point Desc: Changed to "IRM-GW-109 LRNGM"Engr Units/Dig States: "CPM" to "VOCi/sec" Engr Units Conversion:
to "Xe 133 CF = cps/pCi/cc" Minimum Instrument Range: Changed to "6.8E-01" Maximum Instrument Range: Changed to "6.8E+03" Alarm/Trip Set Points: Changed to "Normally N/A"Unique System Desc.: Changed to I minute average data. Systemdesign is such that either the 1RM-GW-109 low range or highrange noble gas monitor for each pathway will be in service.
At aconcentration of 1E-02 IiCi/cc on the low range monitor, flow willnormally swap to the high range monitor.
The minimum andmaximum instrument ranges listed are based on system softwareparameter limitations and pathway ODCM release flow rate. Inaddition, the maximum range is based on a release concentration of1 E-02 VCi/cc, limited by the automatic swap to the high rangemonitor.Note: Because actual pathway release flow rate may vary, the"Minimum Instrument Range" and "Maximum Instrument Range"may not reflect the actual instrument ranges. Site dose assessment corrects the pCi/s for source term and flow rate differences depending on selected default source term and decay period. RM-1GW-109 monitors for low range noble gases at the discharge of theGaseous Waste Disposal Blowers.
It provides alarms to warn theoperator of abnormal releases and provides input to calculate integrated release data.BV1 XR014 Date: Changed to "02/02/2015" Unique System Desc.: "Point deleted per ECP 10-0150"Clear all other fields except Date, Reactor Unit, Data Feeder, Point IDBV1 XR015 Date: Changed to "02/02/2015" Plant Spec Point Desc: Changed to "1RM-GW-109 HRNGM"Engr Units/Dig States: "CPM" to "pCi/sec" Engr Units Conversion:
to "Xe 133 CF = amps/pCi/cc" Minimum Instrument Range: Changed to "4.3E+01" Maximum Instrument Range: Changed to "1.8E+11" Alarm/Trip Set Points: Changed to "Alert=3.27E+05, High=6.55E+05" Unique System Desc.: Changed to 1 minute average data. Systemdesign is such that either the 1RM-GW-109 low range or high range Attachment L-1 5-046Summary of Changes to Data Point LibraryPage 5 of 5BV1XRO15 (cont.)noble gas monitor for each pathway will be in service.
At aconcentration of 1E-02 tiCi/cc on the low range monitor, flow willnormally swap to the high range monitor.
Minimum and maximuminstrument ranges listed are based on Xe-133 and pathway ODCMrelease flow rate.Note: Because actual pathway release flow rate may vary, the"Minimum Instrument Range" and "Maximum Instrument Range"may not reflect the actual instrument ranges. Site dose assessment corrects the IiCi/s for source term and flow rate differences depending on selected default source term and decay period. IRM-1GW-109 monitors for high range noble gases at the discharge ofthe Auxiliary Building shielded area exhaust fans and at thedischarge of the Gaseous Waste Disposal Blower. Site doseassessment corrects the VCi/s for source term and flow ratedifferences depending on selected default source term and decayperiod. It provides alarms to warn the operator of abnormalreleases and provides input to calculate integrated release data.
Enclosure L-1 5-046Beaver Valley Power Station ERDS Data Point Library, Updated Pages(9 pages follow)
BEAVER VALLEY POWER STATIONERDS DATA POINT LIBRARYDate: 202(2015Reactor Unit: BV1Data Feeder: ARERASNRC ERDS Parameter:
EFF-GAS-RAD1 Point ID: XRO05Plant Spec Point Desc.: 1RM-VS-109 LRNGMGeneric/Cond Desc.: RADIOACTIVITY OF RELEASED GASSESAnalog/Digital:
AEngr Units/Dig States: uCi/secEngr Units Conversion:
Xe133 CF = cpsluClIcc Minimum Instr Range: 2.9E+01Maximum Instr Range: 2.9E+05Zero Point  


==Reference:==
==Reference:==


N/AReference Point Notes: N/APROC orSENS: SNumber of Sensors:
N/A Reference Point Notes: N/A PROC orSENS: S Number of Sensors: 1 How Processed:
1How Processed:
Sensor Location: Alarm/Trip Set Points: NI Detector Power Supply Cut-Off Power Level: NI Detector Power Supply Turn-ON Power Level: Instrument Failure Mode: Temperature Compensation for DP Transmitters:
Sensor Location:
Level Reference Leg: Unique System Desc.: N/A SEE UNIQUE SYSTEM DESCRIPTION FIELD Alert=7.92E+2, High=1.584E+3 N/A N/A DEPENDS ON FAILURE MODE N N/A 1 minute average data. System design is such that either the RM-1VS-109 low range or high range noble gas monitor for each pathway will be in service. At a concentration of 1 E-2 uCi/cc on the low range monitor, flow will normally swap to the high range monitor. The listed minimum and maximum instrument ranges listed are based on system software parameter limitations and pathway ODCM release flow rate. In addition, the maximum range is based on a release concentration of 1 E-2 uCi/cc, limited by the automatic swap to the high range monitor. Note Because actual pathway release flow rate may vary, the "Minimum Instr Range" and "Maximum Instr Range" may not reflect the actual instrument ranges. Site dose assessment corrects the uCi/s for source term and flow rate differences depending on selected default source term and decay period. RM-1VS-109 monitors for low range noble gases at the discharge of the Auxiliary Building shielded area exhaust fans and at the discharge of the Containment Refueling Purge and Exhaust fan (during refueling).
Alarm/Trip Set Points:NI Detector Power Supply Cut-Off Power Level:NI Detector Power Supply Turn-ON Power Level:Instrument Failure Mode:Temperature Compensation for DP Transmitters:
Provides alarms to warn the operator of abnormal releases and provides input to calculate integrated release data.1-78 BEAVER VALLEY POWER STATION ERDS DATA POINT LIBRARY Date: Reactor Unit: Data Feeder.NRC ERDS Parameter:
Level Reference Leg:Unique System Desc.:N/ASEE UNIQUE SYSTEM DESCRIPTION FIELDAlert=7.92E+2, High=1.584E+3 N/AN/ADEPENDS ON FAILURE MODENN/A1 minute average data. System design is such that either the RM-1VS-109 low range or high range noble gas monitor for each pathway will be inservice.
Point ID: Plant Spec Point Desc.: Generic/Cond Desc.: Analog/Digital:
At a concentration of 1 E-2 uCi/cc on the low range monitor, flow willnormally swap to the high range monitor.
Engr Units/Dig States: Engr Units Conversion:
The listed minimum and maximuminstrument ranges listed are based on system software parameter limitations and pathway ODCM release flow rate. In addition, the maximum range isbased on a release concentration of 1 E-2 uCi/cc, limited by the automatic swap to the high range monitor.
Minimum Instr Range: Maximum Instr Range: Zero Point  
Note Because actual pathway release flowrate may vary, the "Minimum Instr Range" and "Maximum Instr Range" maynot reflect the actual instrument ranges. Site dose assessment corrects theuCi/s for source term and flow rate differences depending on selected defaultsource term and decay period. RM-1VS-109 monitors for low range noblegases at the discharge of the Auxiliary Building shielded area exhaust fansand at the discharge of the Containment Refueling Purge and Exhaust fan(during refueling).
Provides alarms to warn the operator of abnormal releasesand provides input to calculate integrated release data.1-78 BEAVER VALLEY POWER STATIONERDS DATA POINT LIBRARYDate:Reactor Unit:Data Feeder.NRC ERDS Parameter:
Point ID:Plant Spec Point Desc.:Generic/Cond Desc.:Analog/Digital:
Engr Units/Dig States:Engr Units Conversion:
Minimum Instr Range:Maximum Instr Range:Zero Point  


==Reference:==
==Reference:==


Reference Point Notes:PROC or SENS:Number of Sensors:How Processed:
Reference Point Notes: PROC or SENS: Number of Sensors: How Processed:
Sensor Location:
Sensor Location: Alarm/Trip Set Points: NI Detector Power Supply Cut-Off Power Level: NI Detector Power Supply Turn-ON Power Level: Instrument Failure Mode: Temperature Compensation for DP Transmitters:
Alarm/Trip Set Points:NI Detector Power Supply Cut-Off Power Level:NI Detector Power Supply Turn-ON Power Level:Instrument Failure Mode:Temperature Compensation for DP Transmitters:
Level Reference Leg: Unique System Desc.: 2/2/2015 BV1 ARERAS XR006 point deleted per ECP 10-0150 1-79 BEAVER VALLEY POWER STATION ERDS DATA POINT LIBRARY Date: 2/2/2015 Reactor Unit: BV1 Data Feeder: ARERAS NRC ERDS Parameter:
Level Reference Leg:Unique System Desc.:2/2/2015BV1ARERASXR006point deleted per ECP 10-01501-79 BEAVER VALLEY POWER STATIONERDS DATA POINT LIBRARYDate: 2/2/2015Reactor Unit: BV1Data Feeder: ARERASNRC ERDS Parameter:
EFF-GAS-RAD3 Point ID: XR007 Plant Spec Point Desc.: 1RM-VS-109 HRNGM Generic/Cond Desc.: RADIOACTIVITY OF RELEASED GASSES Analog/Digital:
EFF-GAS-RAD3 Point ID: XR007Plant Spec Point Desc.: 1RM-VS-109 HRNGMGeneric/Cond Desc.: RADIOACTIVITY OF RELEASED GASSESAnalog/Digital:
A Engr Units/Dig States: uCVsec Engr Units Conversion:
AEngr Units/Dig States: uCVsecEngr Units Conversion:
Xe133 CF = amps/uCI/cc Minimum Instr Range: 1.8E+03 Maximum Instr Range: 7.9E+12 Zero Point  
Xe133 CF = amps/uCI/cc Minimum Instr Range: 1.8E+03Maximum Instr Range: 7.9E+12Zero Point  


==Reference:==
==Reference:==


N/AReference Point Notes: NIAPROC or SENS: SNumber of Sensors:
N/A Reference Point Notes: NIA PROC or SENS: S Number of Sensors: 1 How Processed:
1How Processed:
N/A Sensor Location:
N/ASensor Location:
SEE UNIQUE SYSTEM DESCRIPTION FIELD Alarm/Trip Set Points: Alert=5.28E+5, High=1.18E+6 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-ON Power Level: N/A Instrument Failure Mode: DEPENDS ON FAILURE MODE Temperature Compensation for DP Transmitters:
SEE UNIQUE SYSTEM DESCRIPTION FIELDAlarm/Trip Set Points: Alert=5.28E+5, High=1.18E+6 NI Detector Power Supply Cut-Off Power Level: N/ANI Detector Power Supply Turn-ON Power Level: N/AInstrument Failure Mode: DEPENDS ON FAILURE MODETemperature Compensation for DP Transmitters:
N Level Reference Leg: N/A Unique System Desc.: 1 minute average data. System design is such that either the RM-IVS-109 low range or high range noble gas monitor for each pathway will be in service. At a concentration of 1E-2 uCi/cc on the low range monitor, flow will normally swap to the high range monitor. Minimum and maximum instrument ranges listed are based on Xe-133 and pathway ODCM release flow rate.Maximum range is based on monitor parameter setting and ODCM release flow rate. Note Because actual pathway release flow rate may vary, the"Minimum Instr Range" and "Maximum Instr Range" may not reflect the actual instrument ranges. Site dose assessment corrects the uCi/s for source term and flow rate differences depending on selected default source term and decay period. RM-1VS-109 monitors for high range noble gases at the discharge of the Auxiliary Building shielded area exhaust fans and at the discharge of the Containment Refueling Purge and Exhaust fan (during refueling).
NLevel Reference Leg: N/AUnique System Desc.: 1 minute average data. System design is such that either the RM-IVS-109 low range or high range noble gas monitor for each pathway will be inservice.
Site dose assessment corrects the uCi/s for source term and flow rate differences depending on selected default source term and decay period. Provides alarms to wam the operator of abnormal releases and orovides inout to calculate inteurated release data.1-80 BEAVER VALLEY POWER STATION ERDS DATA POINT LIBRARY Date: Reactor Unit: Data Feeder: 2/2/2015 BVi ARERAS NRC ERDS Parameter:
At a concentration of 1E-2 uCi/cc on the low range monitor, flow willnormally swap to the high range monitor.
EFF-GAS-RAD4 Point ID: XR009 Plant Spec Point Desc.: 1RM-VS-110 LRNGM Generic/Cond Desc.: RADIOACTIVITY OF RELEASED GASSES Analog/Digital:
Minimum and maximum instrument ranges listed are based on Xe-133 and pathway ODCM release flow rate.Maximum range is based on monitor parameter setting and ODCM releaseflow rate. Note Because actual pathway release flow rate may vary, the"Minimum Instr Range" and "Maximum Instr Range" may not reflect theactual instrument ranges. Site dose assessment corrects the uCi/s forsource term and flow rate differences depending on selected default sourceterm and decay period. RM-1VS-109 monitors for high range noble gases atthe discharge of the Auxiliary Building shielded area exhaust fans and at thedischarge of the Containment Refueling Purge and Exhaust fan (duringrefueling).
A Engr Units/Dig States: uCi/sec Engr Units Conversion:
Site dose assessment corrects the uCi/s for source term and flowrate differences depending on selected default source term and decayperiod. Provides alarms to wam the operator of abnormal releases andorovides inout to calculate inteurated release data.1-80 BEAVER VALLEY POWER STATIONERDS DATA POINT LIBRARYDate:Reactor Unit:Data Feeder:2/2/2015BViARERASNRC ERDS Parameter:
Xe133 CF = cps/uCi/cc Minimum Instr Range: 2.3E+01 Maximum Instr Range: 2.3E+05 Zero Point  
EFF-GAS-RAD4 Point ID: XR009Plant Spec Point Desc.: 1RM-VS-110 LRNGMGeneric/Cond Desc.: RADIOACTIVITY OF RELEASED GASSESAnalog/Digital:
AEngr Units/Dig States: uCi/secEngr Units Conversion:
Xe133 CF = cps/uCi/cc Minimum Instr Range: 2.3E+01Maximum Instr Range: 2.3E+05Zero Point  


==Reference:==
==Reference:==


N/AReference Point Notes: N/APROC orSENS: SNumber of Sensors:
N/A Reference Point Notes: N/A PROC orSENS: S Number of Sensors: 1 How Processed:
1How Processed:
N/A Sensor Location:
N/ASensor Location:
SEE UNIQUE SYSTEM DESCRIPTION FIELD Alarm/Trip Set Points: Alert=1.137E3, High=2.274E+3 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-ON Power Level: N/A Instrument Failure Mode: DEPENDS ON FAILURE MODE Temperature Compensation for DP Transmitters:
SEE UNIQUE SYSTEM DESCRIPTION FIELDAlarm/Trip Set Points: Alert=1.137E3, High=2.274E+3 NI Detector Power Supply Cut-Off Power Level: N/ANI Detector Power Supply Turn-ON Power Level: N/AInstrument Failure Mode: DEPENDS ON FAILURE MODETemperature Compensation for DP Transmitters:
N Level Reference Leg: N/A Unique System Desc.: 1 minute average data. System design is such that either the RM-1VS-i 10 low range or high range noble gas monitor for each pathway will be in service, At a concentration of 1 E-2 uCVcc on the low range monitor, flow will normally swap to the high range monitor. The listed minimum and maximum instrument ranges listed are based on system software parameter limitations and pathway ODCM release flow rate. In addition, the maximum range is based on a release concentration of 1E-2 uCi/cc, limited by the automatic swap to the high range monitor. Note Because actual pathway release flow rate may vary, the "Minimum Instr Range" and "Maximum Instr Range" may not reflect the actual instrument ranges. Site dose assessment corrects the uCil/s for source term and flow rate differences depending on selected default source term and decay period. RM-1VS-1 10 monitors for low range noble gases at the discharge of the Leak Collection Area Exhaust Fans before the Elevated Release Vent. Provides alarms to warn the operator of abnormal releases and provides input to calculate Integrated release data.1-81 BEAVER VALLEY POWER STATION ERDS DATA POINT LIBRARY Date: Reactor Unit: Data Feeder: NRC ERDS Parameter.
NLevel Reference Leg: N/AUnique System Desc.:1 minute average data. System design is such that either the RM-1VS-i 10low range or high range noble gas monitor for each pathway will be inservice, At a concentration of 1 E-2 uCVcc on the low range monitor, flow willnormally swap to the high range monitor.
Point ID: Plant Spec Point Desc.: Generic/Cond Desc.: Analog/Digital:
The listed minimum and maximuminstrument ranges listed are based on system software parameter limitations and pathway ODCM release flow rate. In addition, the maximum range isbased on a release concentration of 1E-2 uCi/cc, limited by the automatic swap to the high range monitor.
Engr Units/Dig States: Engr Units Conversion:
Note Because actual pathway release flowrate may vary, the "Minimum Instr Range" and "Maximum Instr Range" maynot reflect the actual instrument ranges. Site dose assessment corrects theuCil/s for source term and flow rate differences depending on selected defaultsource term and decay period. RM-1VS-1 10 monitors for low range noblegases at the discharge of the Leak Collection Area Exhaust Fans before theElevated Release Vent. Provides alarms to warn the operator of abnormalreleases and provides input to calculate Integrated release data.1-81 BEAVER VALLEY POWER STATIONERDS DATA POINT LIBRARYDate:Reactor Unit:Data Feeder:NRC ERDS Parameter.
Minimum Instr Range: Maximum Instr Range: Zero Point  
Point ID:Plant Spec Point Desc.:Generic/Cond Desc.:Analog/Digital:
Engr Units/Dig States:Engr Units Conversion:
Minimum Instr Range:Maximum Instr Range:Zero Point  


==Reference:==
==Reference:==


Reference Point Notes:PROC or SENS:Number of Sensors:How Processed:
Reference Point Notes: PROC or SENS: Number of Sensors: How Processed:
Sensor Location:
Sensor Location: Alarm/Trip Set Points: NI Detector Power Supply Cut-Off Power Level: NI Detector Power Supply Turn-ON Power Level: Instrument Failure Mode: Temperature Compensation for DP Transmitters:
Alarm/Trip Set Points:NI Detector Power Supply Cut-Off Power Level:NI Detector Power Supply Turn-ON Power Level:Instrument Failure Mode:Temperature Compensation for DP Transmitters:
Level Reference Leg: Unique System Desc.: 2/2/2015 BV1 ARERAS XR010 point deleted per ECP 10-0150 1-82 BEAVER VALLEY POWER STATION ERDS DATA POINT LIBRARY Date: 212/2015 Reactor Unit: BV1 Data Feeder: ARERAS NRC ERDS Parameter:
Level Reference Leg:Unique System Desc.:2/2/2015BV1ARERASXR010point deleted per ECP 10-01501-82 BEAVER VALLEY POWER STATIONERDS DATA POINT LIBRARYDate: 212/2015Reactor Unit: BV1Data Feeder: ARERASNRC ERDS Parameter:
EFF-GAS-RAD6 Point ID: XR01 1 Plant Spec Point Desc.: 1RM-VS-110 HRNGM Generic/Cond Desc.: RADIOACTIVITY OF RELEASED GASSES Analog/Digital:
EFF-GAS-RAD6 Point ID: XR01 1Plant Spec Point Desc.: 1RM-VS-110 HRNGMGeneric/Cond Desc.: RADIOACTIVITY OF RELEASED GASSESAnalog/Digital:
A Engr Units/Dig States: uCVsec Engr Units Conversion:
AEngr Units/Dig States: uCVsecEngr Units Conversion:
Xe133 CF = amps/uCI/cc Minimum Instr Range: 1.5E+3 Maximum Instr Range: 6.3E+12 Zero Point  
Xe133 CF = amps/uCI/cc Minimum Instr Range: 1.5E+3Maximum Instr Range: 6.3E+12Zero Point  


==Reference:==
==Reference:==


N/AReference Point Notes: N/APROC orSENS: SNumber of Sensors:
N/A Reference Point Notes: N/A PROC orSENS: S Number of Sensors: 1 How Processed:
1How Processed:
N/A Sensor Location:
N/ASensor Location:
SEE UNIQUE SYSTEM DESCRIPTION FIELD Alarm/Trip Set Points: Alert=7.58E+5, High=1.56E+6 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-ON Power Level: N/A Instrument Failure Mode: DEPENDS ON FAILURE MODE Temperature Compensation for DP Transmitters:
SEE UNIQUE SYSTEM DESCRIPTION FIELDAlarm/Trip Set Points: Alert=7.58E+5, High=1.56E+6 NI Detector Power Supply Cut-Off Power Level: N/ANI Detector Power Supply Turn-ON Power Level: N/AInstrument Failure Mode: DEPENDS ON FAILURE MODETemperature Compensation for DP Transmitters:
N Level Reference Leg: N/A Unique System Desc.: 1 minute average data. System design is such that either the RM-1VS-110 low range or high range noble gas monitor for each pathway will be in service. At a concentration of 1 E-2 uCi/cc on the low range monitor, flow will normally swap to the high range monitor. Minimum and maximum instrument ranges listed are based on Xe-1 33 and pathway ODCM release flow rate.Maximum range is based on monitor parameter setting and ODCM release flow rate. Note Because actual pathway release flow rate may vary, the"Minimum Instr Range" and "Maximum Instr Range" may not reflect the actual instrument ranges. Site dose assessment corrects the uCils for source term and flow rate differences depending on selected default source term and decay period. RM-1VS-110 monitors for high range noble gases at the discharge of the Leak Collection Area Exhaust Fans before the Elevated Release Vent. Site dose assessment corrects the uCi/s for source term and flow rate differences depending on selected default source term and decay period. Provides alarms to wam the operator of abnormal releases and provides input to calculate integrated release data.1-83 BEAVER VALLEY POWER STATION ERDS DATA POINT LIBRARY Date: 2/2/2015 Reactor Unit: BV1 Data Feeder: ARERAS NRC ERDS Parameter:
NLevel Reference Leg: N/AUnique System Desc.:1 minute average data. System design is such that either the RM-1VS-110 low range or high range noble gas monitor for each pathway will be inservice.
EXTRA15 Point ID: XR013 Plant Spec Point Desc.: Generic/Cond Desc.: 1RM-GW-109 LRNGM RADIOACTIVITY OF RELEASED GASSES Analog/Digital:
At a concentration of 1 E-2 uCi/cc on the low range monitor, flow willnormally swap to the high range monitor.
A Engr Units/Dig States: uCi/sec Engr Units Conversion:
Minimum and maximum instrument ranges listed are based on Xe-1 33 and pathway ODCM release flow rate.Maximum range is based on monitor parameter setting and ODCM releaseflow rate. Note Because actual pathway release flow rate may vary, the"Minimum Instr Range" and "Maximum Instr Range" may not reflect theactual instrument ranges. Site dose assessment corrects the uCils forsource term and flow rate differences depending on selected default sourceterm and decay period. RM-1VS-110 monitors for high range noble gases atthe discharge of the Leak Collection Area Exhaust Fans before the ElevatedRelease Vent. Site dose assessment corrects the uCi/s for source term andflow rate differences depending on selected default source term and decayperiod. Provides alarms to wam the operator of abnormal releases andprovides input to calculate integrated release data.1-83 BEAVER VALLEY POWER STATIONERDS DATA POINT LIBRARYDate: 2/2/2015Reactor Unit: BV1Data Feeder: ARERASNRC ERDS Parameter:
Xe133 CF = cps/uCI/cc Minimum Instr Range: 6.8E-1 Maximum Instr Range: 6.8E+3 Zero Point  
EXTRA15Point ID: XR013Plant Spec Point Desc.:Generic/Cond Desc.:1RM-GW-109 LRNGMRADIOACTIVITY OF RELEASED GASSESAnalog/Digital:
AEngr Units/Dig States:uCi/secEngr Units Conversion:
Xe133 CF = cps/uCI/cc Minimum Instr Range: 6.8E-1Maximum Instr Range: 6.8E+3Zero Point  


==Reference:==
==Reference:==


N/AReference Point Notes: N/APROC orSENS: SNumber of Sensors:
N/A Reference Point Notes: N/A PROC orSENS: S Number of Sensors: 1 How Processed:
1How Processed:
N/A Sensor Location:
N/ASensor Location:
SEE UNIQUE SYSTEM DESCRIPTION FIELD Alarm/Trip Set Points: Normally n/a NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-ON Power Level: N/A Instrument Failure Mode: DEPENDS ON FAILURE MODE Temperature Compensation for DP Transmitters:
SEE UNIQUE SYSTEM DESCRIPTION FIELDAlarm/Trip Set Points: Normally n/aNI Detector Power Supply Cut-Off Power Level: N/ANI Detector Power Supply Turn-ON Power Level: N/AInstrument Failure Mode: DEPENDS ON FAILURE MODETemperature Compensation for DP Transmitters:
N Level Reference Leg: N/A Unique System Desc.: 1 minute average data. System design is such that either the RM-1GW-109 low range or high range noble gas monitor for each pathway will be in service. At a concentration of 1 E-2 uCi/cc on the low range monitor, flow will normally swap to the high range monitor. The listed minimum and maximum instrument ranges listed are based on system software parameter limitations and pathway ODCM release flow rate. In addition, the maximum range is based on a release concentration of 1 E-2 uCi/cc, limited by the automatic swap to the high range monitor. Note Because actual pathway release flow rate may vary, the "Minimum Instr Range" and "Maximum Instr Range" may not reflect the actual instrument ranges. Site dose assessment corrects the uCi/s for source term and flow rate differences depending on selected default source term and decay period. RM-1GW-109 monitors for low range noble gases at the discharge of the Gaseous Waste Disposal Blowers. Provides alarms to warn the operator of abnormal releases and provides input to calculate integrated release data.1-84  
NLevel Reference Leg: N/AUnique System Desc.:1 minute average data. System design is such that either the RM-1GW-109 low range or high range noble gas monitor for each pathway will be inservice.
.BEAVER VALLEY POWER STATION ERDS DATA POINT LIBRARY Date: Reactor Unit: Data Feeder: NRC ERDS Parameter:
At a concentration of 1 E-2 uCi/cc on the low range monitor, flow willnormally swap to the high range monitor.
Point ID: Plant Spec Point Desc.: GenerictCond Desc.: Analog/Digital:
The listed minimum and maximuminstrument ranges listed are based on system software parameter limitations and pathway ODCM release flow rate. In addition, the maximum range isbased on a release concentration of 1 E-2 uCi/cc, limited by the automatic swap to the high range monitor.
Engr Units/Dig States: Engr Units Conversion:
Note Because actual pathway release flowrate may vary, the "Minimum Instr Range" and "Maximum Instr Range" maynot reflect the actual instrument ranges. Site dose assessment corrects theuCi/s for source term and flow rate differences depending on selected defaultsource term and decay period. RM-1GW-109 monitors for low range noblegases at the discharge of the Gaseous Waste Disposal Blowers.
Minimum Instr Range: Maximum Instr Range: Zero Point  
Providesalarms to warn the operator of abnormal releases and provides input tocalculate integrated release data.1-84  
.BEAVER VALLEY POWER STATIONERDS DATA POINT LIBRARYDate:Reactor Unit:Data Feeder:NRC ERDS Parameter:
Point ID:Plant Spec Point Desc.:GenerictCond Desc.:Analog/Digital:
Engr Units/Dig States:Engr Units Conversion:
Minimum Instr Range:Maximum Instr Range:Zero Point  


==Reference:==
==Reference:==


Reference Point Notes:PROC or SENS:Number of Sensors:How Processed:
Reference Point Notes: PROC or SENS: Number of Sensors: How Processed:
Sensor Location:
Sensor Location: Alarm/Trip Set Points: NI Detector Power Supply Cut-Off Power Level: NI Detector Power Supply Turn-ON Power Level: Instrument Failure Mode: Temperature Compensation for DP Transmitters:
Alarm/Trip Set Points:NI Detector Power Supply Cut-Off Power Level:NI Detector Power Supply Turn-ON Power Level:Instrument Failure Mode:Temperature Compensation for DP Transmitters:
Level Reference Leg: Unique System Desc.: 2/2/2015 BV1 ARERAS XR014 point deleted per ECP 10-0150 1-85 BEAVER VALLEY POWER STATION ERDS DATA POINT LIBRARY Date: 2/2/2015 Reactor Unit: BV1 Data Feeder: ARERAS NRC ERDS Parameter:
Level Reference Leg:Unique System Desc.:2/2/2015BV1ARERASXR014point deleted per ECP 10-01501-85 BEAVER VALLEY POWER STATIONERDS DATA POINT LIBRARYDate: 2/2/2015Reactor Unit: BV1Data Feeder: ARERASNRC ERDS Parameter:
EXTRA17 Point ID: XR015 Plant Spec Point Desc.: 1RM-GW-109 HRNGM Generic/Cond Desc.: RADIOACTIVITY OF RELEASED GASSES Analog/Digital:
EXTRA17Point ID: XR015Plant Spec Point Desc.: 1RM-GW-109 HRNGMGeneric/Cond Desc.: RADIOACTIVITY OF RELEASED GASSESAnalog/Digital:
A Engr Units/Dig States: Engr Units Conversion:
AEngr Units/Dig States:Engr Units Conversion:
Minimum Instr Range: Maximum Instr Range: Zero Point  
Minimum Instr Range:Maximum Instr Range:Zero Point  


==Reference:==
==Reference:==


Reference Point Notes:PROC or SENS:Number of Sensors:How Processed:
Reference Point Notes: PROC or SENS: Number of Sensors: How Processed:
uCi/secXe133 CF = amps/uCI/cc 4.3E+11.8E+11N/AN/AS1N/ASensor Location:
uCi/sec Xe133 CF = amps/uCI/cc 4.3E+1 1.8E+11 N/A N/A S 1 N/A Sensor Location:
SEE UNIQUE SYSTEM DESCRIPTION FIELDAlarm/Trip Set Points: Alert=3.27E+5, High=6.55E+5 NI Detector Power Supply Cut-Off Power Level: N/ANI Detector Power Supply Turn-ON Power Level: N/AInstrument Failure Mode: DEPENDS ON FAILURE MODETemperature Compensation for DP Transmitters:
SEE UNIQUE SYSTEM DESCRIPTION FIELD Alarm/Trip Set Points: Alert=3.27E+5, High=6.55E+5 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-ON Power Level: N/A Instrument Failure Mode: DEPENDS ON FAILURE MODE Temperature Compensation for DP Transmitters:
NLevel Reference Leg: N/AUnique System Desc.:1 minute average data. System design is such that either the RM-1GW-109 low range or high range noble gas monitor for each pathway will be inservice.
N Level Reference Leg: N/A Unique System Desc.: 1 minute average data. System design is such that either the RM-1GW-109 low range or high range noble gas monitor for each pathway will be in service. At a concentration of IE-2 uCi/cc on the low range monitor, flow will normally swap to the high range monitor. Minimum and maximum instrument ranges listed are based on Xe-133 and pathway ODCM release flow rate.Maximum range is based on monitor parameter setting and ODCM release flow rate. Note Because actual pathway release flow rate may vary, the"Minimum Instr Range" and "Maximum Instr Range" may not reflect the actual instrument ranges. Site dose assessment corrects the uCi/s for source term and flow rate differences depending on selected default source term and decay period. RM-1GW-109 monitors for high range noble gases at the discharge of the Auxiliary Building shielded area exhaust fans and at the discharge of the Gaseous Waste Disposal Blower. Site dose assessment corrects the uCi/s for source term and flow rate differences depending on selected default source term and decay period. Provides alarms to warn the operator of abnormal releases and provides input to calculate integrated release data.1-86}}
At a concentration of IE-2 uCi/cc on the low range monitor, flow willnormally swap to the high range monitor.
Minimum and maximum instrument ranges listed are based on Xe-133 and pathway ODCM release flow rate.Maximum range is based on monitor parameter setting and ODCM releaseflow rate. Note Because actual pathway release flow rate may vary, the"Minimum Instr Range" and "Maximum Instr Range" may not reflect theactual instrument ranges. Site dose assessment corrects the uCi/s forsource term and flow rate differences depending on selected default sourceterm and decay period. RM-1GW-109 monitors for high range noble gases atthe discharge of the Auxiliary Building shielded area exhaust fans and at thedischarge of the Gaseous Waste Disposal Blower. Site dose assessment corrects the uCi/s for source term and flow rate differences depending onselected default source term and decay period. Provides alarms to warn theoperator of abnormal releases and provides input to calculate integrated release data.1-86}}

Revision as of 06:21, 9 July 2018

Beaver Valley, Unit 1, Emergency Response Data System Data Point Library Update
ML15065A221
Person / Time
Site: Beaver Valley
Issue date: 03/02/2015
From: Larson E A
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-15-046
Download: ML15065A221 (16)


Text

t FENOC- Beaver Valley Power Station I-- P.O. Box 4 FirstEnergy Nuclear Operating Company Shippingport, PA 15077 Eric A. Larson 724-682-5234 Site Vice President Fax: 724-643-8069 March 2, 2015 L-1 5-046 10 CFR 50, Appendix E, Section VI ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Emergency Response Data System Data Point Library Update In accordance with reporting requirement 10 CFR 50, Appendix E, Section VI.3.a, updates of the Emergency Response Data System (ERDS) Data Point Library (DPL) for Beaver Valley Power Station, Unit No. 1 (BV1) are provided.

The attachment includes the required details of the changes, and the enclosure provides copies of the updated DPL pages.There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. William C. Cothen, Manager -Regulatory Compliance, at 724-682-4284.

Sincerely, Eric A. Larson

Attachment:

Summary of Changes to Data Point Library

Enclosure:

Beaver Valley Power Station ERDS Data Point Library, Updated Pages cc: NRC Region I Administrator NRC Resident Inspector NRC Project Manager (w/o enclosure)

Director BRP/DEP Site BRP/DEP Representative Attachment L- 15-046 Summary of Changes to Data Point Library Page 1 of 5 Reactor DPL Point Description of Change(s)Unit BV1 XR005 Date: Changed to "02/02/2015" PlantSpec Point Desc: Changed to "IRM-VS-109 LRNGM" Engr Units/Dig States: "CPM" to "lVCi/sec" Engr Units Conversion:

to "Xe 133 CF = cps/pCi/cc" Minimum Instrument Range: Changed to "2.9E+01" Maximum Instrument Range: Changed to "2.9E+05" Alarm/Trip Set Points: Changed to "Alert=7.92E+02, High=1.584E+03" Unique System Desc.: Changed to 1 minute average data. System design is such that either the 1RM-VS-109 low range or high range noble gas monitor for each pathway will be in service. At a concentration of 1E-02 tICi/cc on the low range monitor, flow will normally swap to the high range monitor. The minimum and maximum instrument ranges listed are based on system software parameter limitations and pathway ODCM release flow rate. In addition, the maximum range is based on a release concentration of 1E-02 VICi/cc, limited by the automatic swap to the high range monitor.Note: Because actual pathway release flow rate may vary, the"Minimum Instrument Range" and "Maximum Instrument Range" may not reflect the actual instrument ranges. Site dose assessment corrects the pCi/s for source term and flow rate differences depending on selected default source term and decay period. IRM-1VS-109 monitors for low range noble gases at the discharge of the Auxiliary Building shielded area exhaust fans and at the discharge of the Containment Refueling Purge and Exhaust fan (during refueling).

It provides alarms to warn the operator of abnormal releases and provides input to calculate integrated release data.BV1 XR006 Date: Changed to "02/02/2015" Unique System Desc.: "Point deleted per ECP 10-0150" Clear all other fields except Date, Reactor Unit, Data Feeder, Point ID Attachment L-1 5-046 Summary of Changes to Data Point Library Page 2 of 5 BV1 XR007 Date: Changed to "02/02/2015" Plant Spec Point Desc: Changed to "IRM-VS-109 HRNGM" Engr Units/Dig States: "CPM" to "pCi/sec" Engr Units Conversion:

to "Xe 133 CF = amps/ltCi/cc" Minimum Instrument Range: Changed to "1.8E+03" Maximum Insbnsmet Range: Changed to "7.9+12" Alarm/Trip Set Points: Changed to "Alert=5.28E+05, High=1.18E+06" Unique System Desc.: Changed to I minute average data.System design is such that either the 1RM-VS-109 low range or high range noble gas monitor for each pathway will be in service. At a concentration of 1E-02 pCi/cc on the low range monitor, flow will normally swap to the high range monitor.The minimum and maximum instrument ranges listed are based on Xe-133 and pathway ODCM release flow rate.Note: Because actual pathway release flow rate may vary, the"Minimum Instrument Range" and "Maximum Instrument Range" may not reflect the actual instrument ranges. Site dose assessment corrects the pCi/s for source term and flow rate differences depending on selected default source term and decay period. IRM-IVS-109 monitors for high range noble gases at the discharge of the Auxiliary Building shielded area exhaust fans and at the discharge of the Containment Refueling Purge and Exhaust fan (during refueling).

Site dose assessment corrects the pCi/s for source term and flow rate differences depending on selected default source term and decay period. It provides alarms to warn the operator of abnormal releases and provides input to calculate integrated release data.BV1 XRO09 Date: Changed to "02/02/2015" Plant Spec Point Desc: Changed to "lRM-VS-110 LRNGM" Engr Units/Dig States: "CPM" to "pCi/sec" Engr Units Conversion:

to "Xe 133 CF = cps/pCi/cc" Minimum Instrument Range: Changed to "2.3E+01" Maximum Insbument Range: Changed to "2.3E+05" Alarm/Trip Set Points: Changed to "Alert=1.137E+03, High=2.274E+03" Unique System Desc.: Changed to 1 minute average data. System design is such that either the 1RM-VS-110 low range or high range noble gas monitor for each pathway will be in service. At a concentration of 1E-02 pCi/cc on the low range monitor, flow will normally swap to the high range monitor. The minimum and maximum instrument ranges listed are based on system Attachment L-1 5-046 Summary of Changes to Data Point Library Page 3 of 5 BV1 XR009 (cont.)software parameter limitations and pathway ODCM release flow rate. In addition, the maximum range is based on a release concentration of 1E-02 pCi/cc, limited by the automatic swap to the high range monitor.Note: Because actual pathway release flow rate may vary, the"Minimum Instrument Range" and "Maximum Instrument Range" may not reflect the actual instrument ranges. Site dose assessment corrects the pCi/s for source term and flow rate differences depending on selected default source term and decay period. iRM-1VS-110 monitors for low range noble gases at the discharge of the Leak Collection Area Exhaust Fans before the Elevated Release Vent.It provides alarms to warn the operator of abnormal releases and provides input to calculate integrated release data.BV1 XR010 Date: Changed to "02/02/2015" Unique System Desc.: "Point deleted per ECP 10-0150" Clear all other fields except Date, Reactor Unit, Data Feeder, Point ID BV1 XR011 Date: Changed to "02/02/2015" Plant Spec Point Desc: Changed to "lRM-VS-110 HRNGM" Engr Units/Dig States: "CPM" to "pCi/sec" Engr Units Conversion:

to "Xe 133 CF = amps/pCi/cc" Minimum hislwnent Range: Changed to "1.5E+03" Maximum InsbuTnt Range: Changed to "6.3E+12" Alarm/Trip Set Points: Changed to "Alert=7.58E+05, High 1.56E+06" Unique System Desc.: Changed to 1 minute average data.System design is such that either the 1RM-VS-110 low range or high range noble gas monitor for each pathway will be in service. At a concentration of 1E-02 IpCi/cc on the low range monitor, flow will normally swap to the high range monitor. The minimum and maximum instrument ranges listed are based on Xe-133 and pathway ODCM release flow rate.Note: Because actual pathway release flow rate may vary, the"Minimum Instrument Range" and "Maximum Instrument Range" may not reflect the actual instrument ranges. Site dose assessment corrects the tICi/s for source term and flow rate differences depending on selected default source term and decay period. 1RM-VS-110 monitors for high range noble gases at the discharge of the Leak Collection Area Exhaust Fans before the Elevated Release Vent. Site dose assessment corrects the pCi/s for source term and flow rate Attachment L-1 5-046 Summary of Changes to Data Point Library Page 4 of 5 BV1 XRO11 (cont.) differences depending on selected default source term and decay period. It provides alarms to warn the operator of abnormal releases and provides input to calculate integrated release data.BV1 XR013 Date: Changed to "02/02/2015" Plant Spec Point Desc: Changed to "IRM-GW-109 LRNGM" Engr Units/Dig States: "CPM" to "VOCi/sec" Engr Units Conversion:

to "Xe 133 CF = cps/pCi/cc" Minimum Instrument Range: Changed to "6.8E-01" Maximum Instrument Range: Changed to "6.8E+03" Alarm/Trip Set Points: Changed to "Normally N/A" Unique System Desc.: Changed to I minute average data. System design is such that either the 1RM-GW-109 low range or high range noble gas monitor for each pathway will be in service. At a concentration of 1E-02 IiCi/cc on the low range monitor, flow will normally swap to the high range monitor. The minimum and maximum instrument ranges listed are based on system software parameter limitations and pathway ODCM release flow rate. In addition, the maximum range is based on a release concentration of 1 E-02 VCi/cc, limited by the automatic swap to the high range monitor.Note: Because actual pathway release flow rate may vary, the"Minimum Instrument Range" and "Maximum Instrument Range" may not reflect the actual instrument ranges. Site dose assessment corrects the pCi/s for source term and flow rate differences depending on selected default source term and decay period. RM-1GW-109 monitors for low range noble gases at the discharge of the Gaseous Waste Disposal Blowers. It provides alarms to warn the operator of abnormal releases and provides input to calculate integrated release data.BV1 XR014 Date: Changed to "02/02/2015" Unique System Desc.: "Point deleted per ECP 10-0150" Clear all other fields except Date, Reactor Unit, Data Feeder, Point ID BV1 XR015 Date: Changed to "02/02/2015" Plant Spec Point Desc: Changed to "1RM-GW-109 HRNGM" Engr Units/Dig States: "CPM" to "pCi/sec" Engr Units Conversion:

to "Xe 133 CF = amps/pCi/cc" Minimum Instrument Range: Changed to "4.3E+01" Maximum Instrument Range: Changed to "1.8E+11" Alarm/Trip Set Points: Changed to "Alert=3.27E+05, High=6.55E+05" Unique System Desc.: Changed to 1 minute average data. System design is such that either the 1RM-GW-109 low range or high range Attachment L-1 5-046 Summary of Changes to Data Point Library Page 5 of 5 BV1 XRO15 (cont.)noble gas monitor for each pathway will be in service. At a concentration of 1E-02 tiCi/cc on the low range monitor, flow will normally swap to the high range monitor. Minimum and maximum instrument ranges listed are based on Xe-133 and pathway ODCM release flow rate.Note: Because actual pathway release flow rate may vary, the"Minimum Instrument Range" and "Maximum Instrument Range" may not reflect the actual instrument ranges. Site dose assessment corrects the IiCi/s for source term and flow rate differences depending on selected default source term and decay period. IRM-1GW-109 monitors for high range noble gases at the discharge of the Auxiliary Building shielded area exhaust fans and at the discharge of the Gaseous Waste Disposal Blower. Site dose assessment corrects the VCi/s for source term and flow rate differences depending on selected default source term and decay period. It provides alarms to warn the operator of abnormal releases and provides input to calculate integrated release data.

Enclosure L-1 5-046 Beaver Valley Power Station ERDS Data Point Library, Updated Pages (9 pages follow)

BEAVER VALLEY POWER STATION ERDS DATA POINT LIBRARY Date: 202(2015 Reactor Unit: BV1 Data Feeder: ARERAS NRC ERDS Parameter:

EFF-GAS-RAD1 Point ID: XRO05 Plant Spec Point Desc.: 1RM-VS-109 LRNGM Generic/Cond Desc.: RADIOACTIVITY OF RELEASED GASSES Analog/Digital:

A Engr Units/Dig States: uCi/sec Engr Units Conversion:

Xe133 CF = cpsluClIcc Minimum Instr Range: 2.9E+01 Maximum Instr Range: 2.9E+05 Zero Point

Reference:

N/A Reference Point Notes: N/A PROC orSENS: S Number of Sensors: 1 How Processed:

Sensor Location: Alarm/Trip Set Points: NI Detector Power Supply Cut-Off Power Level: NI Detector Power Supply Turn-ON Power Level: Instrument Failure Mode: Temperature Compensation for DP Transmitters:

Level Reference Leg: Unique System Desc.: N/A SEE UNIQUE SYSTEM DESCRIPTION FIELD Alert=7.92E+2, High=1.584E+3 N/A N/A DEPENDS ON FAILURE MODE N N/A 1 minute average data. System design is such that either the RM-1VS-109 low range or high range noble gas monitor for each pathway will be in service. At a concentration of 1 E-2 uCi/cc on the low range monitor, flow will normally swap to the high range monitor. The listed minimum and maximum instrument ranges listed are based on system software parameter limitations and pathway ODCM release flow rate. In addition, the maximum range is based on a release concentration of 1 E-2 uCi/cc, limited by the automatic swap to the high range monitor. Note Because actual pathway release flow rate may vary, the "Minimum Instr Range" and "Maximum Instr Range" may not reflect the actual instrument ranges. Site dose assessment corrects the uCi/s for source term and flow rate differences depending on selected default source term and decay period. RM-1VS-109 monitors for low range noble gases at the discharge of the Auxiliary Building shielded area exhaust fans and at the discharge of the Containment Refueling Purge and Exhaust fan (during refueling).

Provides alarms to warn the operator of abnormal releases and provides input to calculate integrated release data.1-78 BEAVER VALLEY POWER STATION ERDS DATA POINT LIBRARY Date: Reactor Unit: Data Feeder.NRC ERDS Parameter:

Point ID: Plant Spec Point Desc.: Generic/Cond Desc.: Analog/Digital:

Engr Units/Dig States: Engr Units Conversion:

Minimum Instr Range: Maximum Instr Range: Zero Point

Reference:

Reference Point Notes: PROC or SENS: Number of Sensors: How Processed:

Sensor Location: Alarm/Trip Set Points: NI Detector Power Supply Cut-Off Power Level: NI Detector Power Supply Turn-ON Power Level: Instrument Failure Mode: Temperature Compensation for DP Transmitters:

Level Reference Leg: Unique System Desc.: 2/2/2015 BV1 ARERAS XR006 point deleted per ECP 10-0150 1-79 BEAVER VALLEY POWER STATION ERDS DATA POINT LIBRARY Date: 2/2/2015 Reactor Unit: BV1 Data Feeder: ARERAS NRC ERDS Parameter:

EFF-GAS-RAD3 Point ID: XR007 Plant Spec Point Desc.: 1RM-VS-109 HRNGM Generic/Cond Desc.: RADIOACTIVITY OF RELEASED GASSES Analog/Digital:

A Engr Units/Dig States: uCVsec Engr Units Conversion:

Xe133 CF = amps/uCI/cc Minimum Instr Range: 1.8E+03 Maximum Instr Range: 7.9E+12 Zero Point

Reference:

N/A Reference Point Notes: NIA PROC or SENS: S Number of Sensors: 1 How Processed:

N/A Sensor Location:

SEE UNIQUE SYSTEM DESCRIPTION FIELD Alarm/Trip Set Points: Alert=5.28E+5, High=1.18E+6 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-ON Power Level: N/A Instrument Failure Mode: DEPENDS ON FAILURE MODE Temperature Compensation for DP Transmitters:

N Level Reference Leg: N/A Unique System Desc.: 1 minute average data. System design is such that either the RM-IVS-109 low range or high range noble gas monitor for each pathway will be in service. At a concentration of 1E-2 uCi/cc on the low range monitor, flow will normally swap to the high range monitor. Minimum and maximum instrument ranges listed are based on Xe-133 and pathway ODCM release flow rate.Maximum range is based on monitor parameter setting and ODCM release flow rate. Note Because actual pathway release flow rate may vary, the"Minimum Instr Range" and "Maximum Instr Range" may not reflect the actual instrument ranges. Site dose assessment corrects the uCi/s for source term and flow rate differences depending on selected default source term and decay period. RM-1VS-109 monitors for high range noble gases at the discharge of the Auxiliary Building shielded area exhaust fans and at the discharge of the Containment Refueling Purge and Exhaust fan (during refueling).

Site dose assessment corrects the uCi/s for source term and flow rate differences depending on selected default source term and decay period. Provides alarms to wam the operator of abnormal releases and orovides inout to calculate inteurated release data.1-80 BEAVER VALLEY POWER STATION ERDS DATA POINT LIBRARY Date: Reactor Unit: Data Feeder: 2/2/2015 BVi ARERAS NRC ERDS Parameter:

EFF-GAS-RAD4 Point ID: XR009 Plant Spec Point Desc.: 1RM-VS-110 LRNGM Generic/Cond Desc.: RADIOACTIVITY OF RELEASED GASSES Analog/Digital:

A Engr Units/Dig States: uCi/sec Engr Units Conversion:

Xe133 CF = cps/uCi/cc Minimum Instr Range: 2.3E+01 Maximum Instr Range: 2.3E+05 Zero Point

Reference:

N/A Reference Point Notes: N/A PROC orSENS: S Number of Sensors: 1 How Processed:

N/A Sensor Location:

SEE UNIQUE SYSTEM DESCRIPTION FIELD Alarm/Trip Set Points: Alert=1.137E3, High=2.274E+3 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-ON Power Level: N/A Instrument Failure Mode: DEPENDS ON FAILURE MODE Temperature Compensation for DP Transmitters:

N Level Reference Leg: N/A Unique System Desc.: 1 minute average data. System design is such that either the RM-1VS-i 10 low range or high range noble gas monitor for each pathway will be in service, At a concentration of 1 E-2 uCVcc on the low range monitor, flow will normally swap to the high range monitor. The listed minimum and maximum instrument ranges listed are based on system software parameter limitations and pathway ODCM release flow rate. In addition, the maximum range is based on a release concentration of 1E-2 uCi/cc, limited by the automatic swap to the high range monitor. Note Because actual pathway release flow rate may vary, the "Minimum Instr Range" and "Maximum Instr Range" may not reflect the actual instrument ranges. Site dose assessment corrects the uCil/s for source term and flow rate differences depending on selected default source term and decay period. RM-1VS-1 10 monitors for low range noble gases at the discharge of the Leak Collection Area Exhaust Fans before the Elevated Release Vent. Provides alarms to warn the operator of abnormal releases and provides input to calculate Integrated release data.1-81 BEAVER VALLEY POWER STATION ERDS DATA POINT LIBRARY Date: Reactor Unit: Data Feeder: NRC ERDS Parameter.

Point ID: Plant Spec Point Desc.: Generic/Cond Desc.: Analog/Digital:

Engr Units/Dig States: Engr Units Conversion:

Minimum Instr Range: Maximum Instr Range: Zero Point

Reference:

Reference Point Notes: PROC or SENS: Number of Sensors: How Processed:

Sensor Location: Alarm/Trip Set Points: NI Detector Power Supply Cut-Off Power Level: NI Detector Power Supply Turn-ON Power Level: Instrument Failure Mode: Temperature Compensation for DP Transmitters:

Level Reference Leg: Unique System Desc.: 2/2/2015 BV1 ARERAS XR010 point deleted per ECP 10-0150 1-82 BEAVER VALLEY POWER STATION ERDS DATA POINT LIBRARY Date: 212/2015 Reactor Unit: BV1 Data Feeder: ARERAS NRC ERDS Parameter:

EFF-GAS-RAD6 Point ID: XR01 1 Plant Spec Point Desc.: 1RM-VS-110 HRNGM Generic/Cond Desc.: RADIOACTIVITY OF RELEASED GASSES Analog/Digital:

A Engr Units/Dig States: uCVsec Engr Units Conversion:

Xe133 CF = amps/uCI/cc Minimum Instr Range: 1.5E+3 Maximum Instr Range: 6.3E+12 Zero Point

Reference:

N/A Reference Point Notes: N/A PROC orSENS: S Number of Sensors: 1 How Processed:

N/A Sensor Location:

SEE UNIQUE SYSTEM DESCRIPTION FIELD Alarm/Trip Set Points: Alert=7.58E+5, High=1.56E+6 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-ON Power Level: N/A Instrument Failure Mode: DEPENDS ON FAILURE MODE Temperature Compensation for DP Transmitters:

N Level Reference Leg: N/A Unique System Desc.: 1 minute average data. System design is such that either the RM-1VS-110 low range or high range noble gas monitor for each pathway will be in service. At a concentration of 1 E-2 uCi/cc on the low range monitor, flow will normally swap to the high range monitor. Minimum and maximum instrument ranges listed are based on Xe-1 33 and pathway ODCM release flow rate.Maximum range is based on monitor parameter setting and ODCM release flow rate. Note Because actual pathway release flow rate may vary, the"Minimum Instr Range" and "Maximum Instr Range" may not reflect the actual instrument ranges. Site dose assessment corrects the uCils for source term and flow rate differences depending on selected default source term and decay period. RM-1VS-110 monitors for high range noble gases at the discharge of the Leak Collection Area Exhaust Fans before the Elevated Release Vent. Site dose assessment corrects the uCi/s for source term and flow rate differences depending on selected default source term and decay period. Provides alarms to wam the operator of abnormal releases and provides input to calculate integrated release data.1-83 BEAVER VALLEY POWER STATION ERDS DATA POINT LIBRARY Date: 2/2/2015 Reactor Unit: BV1 Data Feeder: ARERAS NRC ERDS Parameter:

EXTRA15 Point ID: XR013 Plant Spec Point Desc.: Generic/Cond Desc.: 1RM-GW-109 LRNGM RADIOACTIVITY OF RELEASED GASSES Analog/Digital:

A Engr Units/Dig States: uCi/sec Engr Units Conversion:

Xe133 CF = cps/uCI/cc Minimum Instr Range: 6.8E-1 Maximum Instr Range: 6.8E+3 Zero Point

Reference:

N/A Reference Point Notes: N/A PROC orSENS: S Number of Sensors: 1 How Processed:

N/A Sensor Location:

SEE UNIQUE SYSTEM DESCRIPTION FIELD Alarm/Trip Set Points: Normally n/a NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-ON Power Level: N/A Instrument Failure Mode: DEPENDS ON FAILURE MODE Temperature Compensation for DP Transmitters:

N Level Reference Leg: N/A Unique System Desc.: 1 minute average data. System design is such that either the RM-1GW-109 low range or high range noble gas monitor for each pathway will be in service. At a concentration of 1 E-2 uCi/cc on the low range monitor, flow will normally swap to the high range monitor. The listed minimum and maximum instrument ranges listed are based on system software parameter limitations and pathway ODCM release flow rate. In addition, the maximum range is based on a release concentration of 1 E-2 uCi/cc, limited by the automatic swap to the high range monitor. Note Because actual pathway release flow rate may vary, the "Minimum Instr Range" and "Maximum Instr Range" may not reflect the actual instrument ranges. Site dose assessment corrects the uCi/s for source term and flow rate differences depending on selected default source term and decay period. RM-1GW-109 monitors for low range noble gases at the discharge of the Gaseous Waste Disposal Blowers. Provides alarms to warn the operator of abnormal releases and provides input to calculate integrated release data.1-84

.BEAVER VALLEY POWER STATION ERDS DATA POINT LIBRARY Date: Reactor Unit: Data Feeder: NRC ERDS Parameter:

Point ID: Plant Spec Point Desc.: GenerictCond Desc.: Analog/Digital:

Engr Units/Dig States: Engr Units Conversion:

Minimum Instr Range: Maximum Instr Range: Zero Point

Reference:

Reference Point Notes: PROC or SENS: Number of Sensors: How Processed:

Sensor Location: Alarm/Trip Set Points: NI Detector Power Supply Cut-Off Power Level: NI Detector Power Supply Turn-ON Power Level: Instrument Failure Mode: Temperature Compensation for DP Transmitters:

Level Reference Leg: Unique System Desc.: 2/2/2015 BV1 ARERAS XR014 point deleted per ECP 10-0150 1-85 BEAVER VALLEY POWER STATION ERDS DATA POINT LIBRARY Date: 2/2/2015 Reactor Unit: BV1 Data Feeder: ARERAS NRC ERDS Parameter:

EXTRA17 Point ID: XR015 Plant Spec Point Desc.: 1RM-GW-109 HRNGM Generic/Cond Desc.: RADIOACTIVITY OF RELEASED GASSES Analog/Digital:

A Engr Units/Dig States: Engr Units Conversion:

Minimum Instr Range: Maximum Instr Range: Zero Point

Reference:

Reference Point Notes: PROC or SENS: Number of Sensors: How Processed:

uCi/sec Xe133 CF = amps/uCI/cc 4.3E+1 1.8E+11 N/A N/A S 1 N/A Sensor Location:

SEE UNIQUE SYSTEM DESCRIPTION FIELD Alarm/Trip Set Points: Alert=3.27E+5, High=6.55E+5 NI Detector Power Supply Cut-Off Power Level: N/A NI Detector Power Supply Turn-ON Power Level: N/A Instrument Failure Mode: DEPENDS ON FAILURE MODE Temperature Compensation for DP Transmitters:

N Level Reference Leg: N/A Unique System Desc.: 1 minute average data. System design is such that either the RM-1GW-109 low range or high range noble gas monitor for each pathway will be in service. At a concentration of IE-2 uCi/cc on the low range monitor, flow will normally swap to the high range monitor. Minimum and maximum instrument ranges listed are based on Xe-133 and pathway ODCM release flow rate.Maximum range is based on monitor parameter setting and ODCM release flow rate. Note Because actual pathway release flow rate may vary, the"Minimum Instr Range" and "Maximum Instr Range" may not reflect the actual instrument ranges. Site dose assessment corrects the uCi/s for source term and flow rate differences depending on selected default source term and decay period. RM-1GW-109 monitors for high range noble gases at the discharge of the Auxiliary Building shielded area exhaust fans and at the discharge of the Gaseous Waste Disposal Blower. Site dose assessment corrects the uCi/s for source term and flow rate differences depending on selected default source term and decay period. Provides alarms to warn the operator of abnormal releases and provides input to calculate integrated release data.1-86