ML16019A187: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 25: | Line 25: | ||
==Dear Mr. Weber:== | ==Dear Mr. Weber:== | ||
In a telephone conversation on January 12, 2016, Mr. R. K. Walton, from Operator Licensing Branch, and | In a telephone conversation on January 12, 2016 , Mr. R. K. Walton , from Operator Licensing Branch , and M r. J. Clark , Donald C. Cook Licensed Operator Requalification Training Supervisor | ||
, made arrangements for the U.S. Nuclear Regulatory Commission ( | , made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Donald C. Cook Nuclear Power Plant | ||
NRC) to inspect the licensed operator requalification program at the Donald C. Cook Nuclear Power Plant | . The inspection is planned for the week of February 29 , 2016, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC | ||
. The inspection is planned for the week of February 29, 2016, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC | -approved requalification program. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled to be administered the weeks of February 22 and February 29, 2016 , to the NRC by February 22, 2016. M r. J. Clark has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection. | ||
-approved requalification program. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled to be administered the weeks of February 22 and February 29, 2016, to the NRC by February 22, 2016. | |||
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). | This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). | ||
These information collections were approved by the Office of Management and Budget (OMB), under approval number 3150 | These information collections were approved by the Office of Management and Budget (OMB), under approval number 3150 | ||
| Line 36: | Line 35: | ||
-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB | -6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB | ||
-10202, (3150 | -10202, (3150 | ||
-0018), Office of Management | -0018), Office of Management an d Budget, Washington, DC 20503. | ||
L. Weber The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. | L. Weber The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. | ||
| Line 45: | Line 44: | ||
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | ||
-rm/adams.html (the Public Electronic Reading Room). | -rm/adams.html (the Public Electronic Reading Room). | ||
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. R. K. Walton at 630-829- | Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. R. K. Walton at 630-829-9 836, or me at 630 | ||
-829- | -829-9 834. Sincerely, | ||
/RA/ | /RA/ | ||
Robert J. Orlikowski, Chief Operations Branch | Robert J. Orlikowski, Chief Operations Branch | ||
| Line 52: | Line 51: | ||
Division of Reactor Safety | Division of Reactor Safety | ||
Docket No | Docket No s. 50-315; 50-316 License No | ||
: s. DPR-58; DPR-74 cc: Distribution via LISTSERV | : s. DPR-58; DPR-74 cc: Distribution via LISTSERV | ||
| Line 65: | Line 63: | ||
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. R. K. Walton at 630 | Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. R. K. Walton at 630 | ||
-829-9836, or me at 630 | -829-9836, or me at 630 | ||
-829-9834. Sincerely, | -829-9834. Sincerely, /RA/ | ||
Robert J. Orlikowski, Chief Operations Branch | Robert J. Orlikowski, Chief Operations Branch | ||
| Line 76: | Line 73: | ||
-1 Resource RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn | -1 Resource RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn | ||
DRPIII DRSIII Jim Clay Carmen Olteanu Scott Sloan ADAMS Accession Number ML16019A187 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME RKWalton:jw Orlikowski DATE 01/14/16 01/15/16 OFFICIAL RECORD COPY | DRPIII DRSIII Jim Clay Carmen Olteanu Scott Sloan ADAMS Accession Number ML16019A187 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME RKWalton:jw Orlikowski DATE 01/14/16 01/15/16 OFFICIAL RECORD COPY | ||
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532 | UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532 | ||
| Line 88: | Line 85: | ||
==Dear Mr. Weber:== | ==Dear Mr. Weber:== | ||
In a telephone conversation on January 12, 2016, Mr. R. K. Walton, from Operator Licensing Branch, and | In a telephone conversation on January 12, 2016 , Mr. R. K. Walton , from Operator Licensing Branch , and M r. J. Clark , Donald C. Cook Licensed Operator Requalification Training Supervisor | ||
, made arrangements for the U.S. Nuclear Regulatory Commission ( | , made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Donald C. Cook Nuclear Power Plant | ||
NRC) to inspect the licensed operator requalification program at the Donald C. Cook Nuclear Power Plant | . The inspection is planned for the week of February 29 , 2016, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC | ||
. The inspection is planned for the week of February 29, 2016, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC | -approved requalification program. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled to be administered the weeks of February 22 and February 29, 2016 , to the NRC by February 22, 2016. M r. J. Clark has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection. | ||
-approved requalification program. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled to be administered the weeks of February 22 and February 29, 2016, to the NRC by February 22, 2016. | |||
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). | This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). | ||
These information collections were approved by the Office of Management and Budget (OMB), under approval number 3150 | These information collections were approved by the Office of Management and Budget (OMB), under approval number 3150 | ||
| Line 99: | Line 95: | ||
-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB | -6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB | ||
-10202, (3150 | -10202, (3150 | ||
-0018), Office of Management | -0018), Office of Management an d Budget, Washington, DC 20503. | ||
L. Weber The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. | L. Weber The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. | ||
| Line 108: | Line 104: | ||
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | ||
-rm/adams.html (the Public Electronic Reading Room). | -rm/adams.html (the Public Electronic Reading Room). | ||
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. R. K. Walton at 630-829- | Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. R. K. Walton at 630-829-9 836, or me at 630 | ||
-829- | -829-9 834. Sincerely, | ||
/RA/ | /RA/ | ||
Robert J. Orlikowski, Chief Operations Branch | Robert J. Orlikowski, Chief Operations Branch | ||
| Line 115: | Line 111: | ||
Division of Reactor Safety | Division of Reactor Safety | ||
Docket No | Docket No s. 50-315; 50-316 License No | ||
: s. DPR-58; DPR-74 cc: Distribution via LISTSERV | : s. DPR-58; DPR-74 cc: Distribution via LISTSERV | ||
| Line 128: | Line 123: | ||
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. R. K. Walton at 630 | Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. R. K. Walton at 630 | ||
-829-9836, or me at 630 | -829-9836, or me at 630 | ||
-829-9834. Sincerely, | -829-9834. Sincerely, /RA/ | ||
Robert J. Orlikowski, Chief Operations Branch | Robert J. Orlikowski, Chief Operations Branch | ||
| Line 139: | Line 133: | ||
-1 Resource RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn | -1 Resource RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn | ||
DRPIII DRSIII Jim Clay Carmen Olteanu Scott Sloan ADAMS Accession Number ML16019A187 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME RKWalton:jw Orlikowski DATE 01/14/16 01/15/16 OFFICIAL RECORD COPY}} | DRPIII DRSIII Jim Clay Carmen Olteanu Scott Sloan ADAMS Accession Number ML16019A187 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME RKWalton:jw Orlikowski DATE 01/14/16 01/15/16 OFFICIAL RECORD COPY}} | ||
Revision as of 16:08, 8 July 2018
| ML16019A187 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 01/15/2016 |
| From: | Orlikowski R J Operations Branch III |
| To: | Weber L Indiana Michigan Power Co |
| References | |
| Download: ML16019A187 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
-4352 January 15, 2016 Mr. Larry Weber Senior VP and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group
One Cook Place Bridgman, MI 49106
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION
- DONALD C. COOK NUCLEAR POWER PLANT
Dear Mr. Weber:
In a telephone conversation on January 12, 2016 , Mr. R. K. Walton , from Operator Licensing Branch , and M r. J. Clark , Donald C. Cook Licensed Operator Requalification Training Supervisor
, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Donald C. Cook Nuclear Power Plant
. The inspection is planned for the week of February 29 , 2016, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC
-approved requalification program. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled to be administered the weeks of February 22 and February 29, 2016 , to the NRC by February 22, 2016. M r. J. Clark has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).
These information collections were approved by the Office of Management and Budget (OMB), under approval number 3150
-0018. The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T
-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB
-10202, (3150
-0018), Office of Management an d Budget, Washington, DC 20503.
L. Weber The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy
of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. R. K. Walton at 630-829-9 836, or me at 630
-829-9 834. Sincerely,
/RA/
Robert J. Orlikowski, Chief Operations Branch
Division of Reactor Safety
Docket No s. 50-315; 50-316 License No
L. Weber The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy
of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. R. K. Walton at 630
-829-9836, or me at 630
-829-9834. Sincerely, /RA/
Robert J. Orlikowski, Chief Operations Branch
Division of Reactor Safety
Docket Nos. 50
-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via LISTSERV Distribution
- Kimyata MorganButler RidsNrrDorlLpl3
-1 Resource RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn
DRPIII DRSIII Jim Clay Carmen Olteanu Scott Sloan ADAMS Accession Number ML16019A187 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME RKWalton:jw Orlikowski DATE 01/14/16 01/15/16 OFFICIAL RECORD COPY
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
-4352 January 15, 2016 Mr. Larry Weber Senior VP and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group
One Cook Place Bridgman, MI 49106
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION
- DONALD C. COOK NUCLEAR POWER PLANT
Dear Mr. Weber:
In a telephone conversation on January 12, 2016 , Mr. R. K. Walton , from Operator Licensing Branch , and M r. J. Clark , Donald C. Cook Licensed Operator Requalification Training Supervisor
, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Donald C. Cook Nuclear Power Plant
. The inspection is planned for the week of February 29 , 2016, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC
-approved requalification program. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled to be administered the weeks of February 22 and February 29, 2016 , to the NRC by February 22, 2016. M r. J. Clark has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).
These information collections were approved by the Office of Management and Budget (OMB), under approval number 3150
-0018. The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T
-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB
-10202, (3150
-0018), Office of Management an d Budget, Washington, DC 20503.
L. Weber The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy
of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. R. K. Walton at 630-829-9 836, or me at 630
-829-9 834. Sincerely,
/RA/
Robert J. Orlikowski, Chief Operations Branch
Division of Reactor Safety
Docket No s. 50-315; 50-316 License No
L. Weber The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy
of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. R. K. Walton at 630
-829-9836, or me at 630
-829-9834. Sincerely, /RA/
Robert J. Orlikowski, Chief Operations Branch
Division of Reactor Safety
Docket Nos. 50
-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via LISTSERV Distribution
- Kimyata MorganButler RidsNrrDorlLpl3
-1 Resource RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn
DRPIII DRSIII Jim Clay Carmen Olteanu Scott Sloan ADAMS Accession Number ML16019A187 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME RKWalton:jw Orlikowski DATE 01/14/16 01/15/16 OFFICIAL RECORD COPY