{{#Wiki_filter:CATEGORY1REGULAT(Q INFORMATION DISTRIBUTIONOSTEM (RIDE)ACCESSION NBR:9602220094 DOC.DATE:
{{#Wiki_filter:CATEGORY 1 REGULAT(Q INFORMATION DISTRIBUTIONOSTEM (RIDE)ACCESSION NBR:9602220094 DOC.DATE: 96/02/13 NOTARIZED:
96/02/13NOTARIZED:
YES FACIL:50-335 St.Lucie Plant, Unit.1, Florida Power&Light Co.50-389 St.Lucie Plant, Unit.2, Florida Power&Light Co.-AUTH.NAME AUTHOR AFFILIATION BOHLKE,W.H.
YESFACIL:50-335 St.LuciePlant,Unit.1,FloridaPower&LightCo.50-389St.LuciePlant,Unit.2,FloridaPower&LightCo.-AUTH.NAMEAUTHORAFFILIATION BOHLKE,W.H.
Florida Power.&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)NP DRY'UBJECT:
FloridaPower.&LightCo.RECIP.NAME RECIPIENT AFFILIATION DocumentControlBranch(Document ControlDesk)NPDRY'UBJECT:
Provides 180-day response to GL 95-07,"Pressure Locking&Thermal Binding of Safety-Related Power-Operated Gate Valves." DOCKET I 05000335 05000389 NOTES: DISTRIBUTION CODE: A056D COPIES RECEIVED:LTR I ENCL+SIZE: T TITLE: Generic Ltr 95-07-Pressure Locking&Thermal Binding of Safety Rela E RECIPIENT ID CODE/NAME NRR/DRPE/EATON NORRIS F J Vl INTERNAL: ILE CENTER O'Il EXTERNAL: NOAC NUDOCS ABSTRACT COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-1 PD NRR/EMEB/B NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 0 D E N NOTE TO ALL"RIDS" RECIPIENTS:
Provides180-dayresponsetoGL95-07,"Pressure Locking&ThermalBindingofSafety-Related Power-Operated GateValves."DOCKETI0500033505000389NOTES:DISTRIBUTION CODE:A056DCOPIESRECEIVED:LTR IENCL+SIZE:TTITLE:GenericLtr95-07-PressureLocking&ThermalBindingofSafetyRelaERECIPIENT IDCODE/NAME NRR/DRPE/EATON NORRISFJVlINTERNAL:
PLEASE HELP US TO REDUCE WASTE)CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR" 8 ,ENCL , 8 Florida Power&Light Company, P.O.Box 128, Fort Pierce, FL 34954-0128 I February 13, 1996 L-96-31 10 CFR 50.4 10 CFR 50.54(f)U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 RE: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Generic Letter 95-07-180-Da Res onse This letter provides the Florida Power and Light Company (FPL)180-day response to NRC Generic Letter (NRC GL)95-07"Pressure Locking and Thermal Binding of Safety Related Power Operated Gate Valves" for St.Lucie Units 1 and'.FPL letter L-95-282 dated October 11, 1995, stated that FPL plans to implement the actions proposed in NRC GL 95-07 and that the requested information would be provided on or before February 13, 1996.In addition, our response stated that if our evaluations determined that modifications were required and they would not be completed by that submission date, FPL would provide a schedule along with the necessary justification in our February 1996 submittal.
ILECENTERO'IlEXTERNAL:
In accordance with the reporting requirements of NRC GL 95-07, Attachment 1 to this letter provides a summary of the evaluations performed to demonstrate that power operated gate valves installed at St.Lucie Units 1 and 2 will not be prevented from performing their active safety functions by the phenomena of pressure locking or thermal binding.Attachment 1 also provides the plans and schedules for the corrective actions implemented or planned to assure the susceptible power operated gate valves will remain capable of performing their intended safety functions.
NOACNUDOCSABSTRACTCOPIESLTTRENCL1111111111RECIPIENT IDCODE/NAME PD2-1PDNRR/EMEB/B NRCPDRCOPIESLTTRENCL1111110DENNOTETOALL"RIDS"RECIPIENTS:
Attachment 2 provides a summary of the operability assessment for the three shutdown cooling system valves that remain to be modified and the justification for our implementation schedule.The corrective actions on the remaining three valves that may be susceptible to pressure locking are scheduled to be completed during the next St.Lucie Unit 2 refueling outage (SL2-10)which is currently scheduled for the Spring of 1997.'ir602220094 960213 PDR ADQCK 05000335'PDR I., an FPL Group company
PLEASEHELPUSTOREDUCEWASTE)CONTACTTHEDOCUMENTCONTROLDESK,ROOMOWFNSD-5(EXT.
~,p>II RE: St.Lucie Units 1 and 2 Docket No.50-335 and 50-389 Generic Letter 95-07-180-Da Res onse L-96-31 This response is provided pursuant to the requirements of Section.182a of the Atomic Energy Act of 1954, as amended, and 10 CFR 50.54(f).Please contact us if there are any questions about this submittal.
415-2083)
Very truly yours, W.H.o lke Vice President St.Lucie Plant WHB/GRM Attachments cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant v
TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEED!TOTALNUMBEROFCOPIESREQUIRED:
St.Lucie Units 1 and 2 Docket No.50-335 and 50-389 Generic Letter 95-07-180-Da Res onse STATE OF FLORIDA))COUNTY OF ST.LUCIE)ss W.H.Bohlke being first duly sworn, deposes and says: That he is Vice President, St.Lucie Plant for the Nuclear Division of Florida Power&Light Company, the Licensee herein;That he has executed the foregoing document;that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.H.o e STATE OF FLORIDA COUNTY OF St.Lucie The foregoing instrument was acknowledged before me this day of 19 g~by W.H.Bo e, who is personall known to me and who did take an oath.k'.I-Ill=4 W%>l Name of Notary Pu ic My Commission expires Commission No.95'7 2 KAREN WEST=".~$+'=,.W COMMISSION
LTTR"8,ENCL,8 FloridaPower&LightCompany,P.O.Box128,FortPierce,FL34954-0128 IFebruary13,1996L-96-3110CFR50.410CFR50.54(f)U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, D.C.20555RE:St.LucieUnits1and2DocketNos.50-335and50-389GenericLetter95-07-180-DaResonseThisletterprovidestheFloridaPowerandLightCompany(FPL)180-dayresponsetoNRCGenericLetter(NRCGL)95-07"Pressure LockingandThermalBindingofSafetyRelatedPowerOperatedGateValves"forSt.LucieUnits1and'.FPLletterL-95-282datedOctober11,1995,statedthatFPLplanstoimplement theactionsproposedinNRCGL95-07andthattherequested information wouldbeprovidedonorbeforeFebruary13,1996.Inaddition, ourresponsestatedthatifourevaluations determined thatmodifications wererequiredandtheywouldnotbecompleted bythatsubmission date,FPLwouldprovideaschedulealongwiththenecessary justification inourFebruary1996submittal.
~CCSS9929 EXPIRES APIII 18, 1998 if'>r'jj,e 80NOEO TIERI TROY FARI INEURANCE, INO.  
Inaccordance withthereporting requirements ofNRCGL95-07,Attachment 1tothisletterprovidesasummaryoftheevaluations performed todemonstrate thatpoweroperatedgatevalvesinstalled atSt.LucieUnits1and2willnotbeprevented fromperforming theiractivesafetyfunctions bythephenomena ofpressurelockingorthermalbinding.Attachment 1alsoprovidestheplansandschedules forthecorrective actionsimplemented orplannedtoassurethesusceptible poweroperatedgatevalveswillremaincapableofperforming theirintendedsafetyfunctions.
Attachment 2providesasummaryoftheoperability assessment forthethreeshutdowncoolingsystemvalvesthatremaintobemodifiedandthejustification forourimplementation schedule.
Thecorrective actionsontheremaining threevalvesthatmaybesusceptible topressurelockingarescheduled tobecompleted duringthenextSt.LucieUnit2refueling outage(SL2-10)whichiscurrently scheduled fortheSpringof1997.'ir602220094 960213PDRADQCK05000335' PDRI.,anFPLGroupcompany
~,p>II RE:St.LucieUnits1and2DocketNo.50-335and50-389GenericLetter95-07-180-DaResonseL-96-31Thisresponseisprovidedpursuanttotherequirements ofSection.182aoftheAtomicEnergyActof1954,asamended,and10CFR50.54(f).
Pleasecontactusifthereareanyquestions aboutthissubmittal.
Verytrulyyours,W.H.olkeVicePresident St.LuciePlantWHB/GRMAttachments cc:StewartD.Ebneter,RegionalAdministrator, RegionII,USNRCSeniorResidentInspector, USNRC,St.LuciePlant v
St.LucieUnits1and2DocketNo.50-335and50-389GenericLetter95-07-180-DaResonseSTATEOFFLORIDA))COUNTYOFST.LUCIE)ssW.H.Bohlkebeingfirstdulysworn,deposesandsays:ThatheisVicePresident, St.LuciePlantfortheNuclearDivisionofFloridaPower&LightCompany,theLicenseeherein;Thathehasexecutedtheforegoing document; thatthestatements madeinthisdocumentaretrueandcorrecttothebestofhisknowledge, information andbelief,andthatheisauthorized toexecutethedocumentonbehalfofsaidLicensee.
H.oeSTATEOFFLORIDACOUNTYOFSt.LucieTheforegoing instrument wasacknowledged beforemethisdayof19g~byW.H.Boe,whoispersonall knowntomeandwhodidtakeanoath.k'.I-Ill=4 W%>lNameofNotaryPuicMyCommission expiresCommission No.95'72KARENWEST=".~$+'=,.WCOMMISSION
~CCSS9929EXPIRESAPIII18,1998if'>r'jj,e80NOEOTIERITROYFARIINEURANCE, INO.  
~0~
~0~
St.LucieUnits1and2~~~DocketNo.50-335and50-389GenericLetter95-07-180-DaResonseATTACHMENT 1ST.LUCIEUNITSj.G.2PRESSURELOCKINGANDTHERMALBINDINGOFPOWEROPERATEDGATEVALVESEVALUATION METHODOLOGY SUMMARY'''96O222009$
St.Lucie Units 1 and 2~~~Docket No.50-335 and 50-389 Generic Letter 95-07-180-Da Res onse ATTACHMENT 1 ST.LUCIE UNITS j.G.2 PRESSURE LOCKING AND THERMAL BINDING OF POWER OPERATED GATE VALVES EVALUATION METHODOLOGY
 
==SUMMARY==
'''96O222009$
1-1 0
1-1 0
EVALUATION METHODOLOGY SUMMARYTheassessment ofthesusceptibility ofSt.LucieUnits1and2poweroperatedvalves(POVs)topressurelockingandthermalbindingutilizedathreephasemethodconsisting of:2)Initialscreening toeliminate POVsthatobviously donotmeettheconditions conducive topressurelockingand/orthermalbinding.hGatevalveevaluation todetermine thepoweroperatedgatevalvesthatmaybesusceptible topressurelockingand/orthermalbinding.3)Adetailed, valvespecificanalysistodetermine whetherapoweroperatedgatevalveissusceptible topressurelockingand/orthermalbinding.PHASE1INITIALSCREENING CRITERIAThevalveinitialscreening wasathreestepreviewtodetermine whetheraPOVwasavalvetypesusceptible topressurelockingand/orthermalbinding.Thefirststepwaspoweroperatedvalvetypescreening, thesecondstepwaspressurelockingsusceptibility screening, andthethirdstepwasthermalbindingsusceptibility screening.
EVALUATION METHODOLOGY
Theresultsofthevalvescreening processofmotoroperatedvalves(MOV)forpressurelockingand/orthermalbindingaredelineated inTable1forSt.LucieUnit1andTable2forSt.LucieUnit2.Theresultsofthevalvescreening processforotherPOVsforpressurelockingand/orthermalbindingaredelineated inTable3forSt.LucieUnit1andTable4forSt.LucieUnit2.Power0cratedValveTeScreeninCriteriaAllnon-safety relategatevalveshavebeenexcluedwiththeexception ofthosenon-safety-related gatevalvesthatperformasafety-related orquality-related functionasdefinedinplantoperating procedures.
 
POVswerereviewedtodetermine safetysignificance undertheNRCGL89-10Program.Motoroperatedvalves(MOVs)excludedfromNRCGL89-10Programwereexcludedfromtheevaluation.
==SUMMARY==
Pressurelockingandthermalbindingonlyconcernsgatevalves.Therefore, alloftheremaining valvedesignshavebeenexcludedfromtheevaluation ofthermalbindingandpressurelockingconditions.
The assessment of the susceptibility of St.Lucie Units 1 and 2 power operated valves (POVs)to pressure locking and thermal binding utilized a three phase method consisting of: 2)Initial screening to eliminate POVs that obviously do not meet the conditions conducive to pressure locking and/or thermal binding.h Gate valve evaluation to determine the power operated gate valves that may be susceptible to pressure locking and/or thermal binding.3)A detailed, valve specific analysis to determine whether a power operated gate valve is susceptible to pressure locking and/or thermal binding.PHASE 1 INITIAL SCREENING CRITERIA The valve initial screening was a three step review to determine whether a POV was a valve type susceptible to pressure locking and/or thermal binding.The first step was power operated valve type screening, the second step was pressure locking susceptibility screening, and the third step was thermal binding susceptibility screening.
Theplantequipment databasewasutilizedtodetermine thevalvetypes.Valvespressurelockorthermally bindwhenopenedfromafullclosedposition.
The results of the valve screening process of motor operated valves (MOV)for pressure locking and/or thermal binding are delineated in Table 1 for St.Lucie Unit 1 and Table 2 for St.Lucie Unit 2.The results of the valve screening process for other POVs for pressure locking and/or thermal binding are delineated in Table 3 for St.Lucie Unit 1 and Table 4 for St.Lucie Unit 2.Power 0 crated Valve T e Screenin Criteria All non-safety relate gate valves have been exclu ed with the exception of those non-safety-related gate valves that perform a safety-related or quality-related function as defined in plant operating procedures.
Therefore, onlygatevalvesthathaveasafety-relatedfunctiontoopenwereevaluated forpressurelockingand/orthermalbinding.1-2 00 PressureLockinScreeninCriteriaAfterallsafety-related power-operate gatevaveswereidentified, thispopulation ofvalveswasthenscreenedbasedonvalvetypeandactivesafetyfunctiontodetermine whethertherewasapotential forpressurelockingorthermalbindingthatcouldpreventthevalvesfromperforming theirintendedsafetyrelatedfunctions.
POVs were reviewed to determine safety significance under the NRC GL 89-10 Program.Motor operated valves (MOVs)excluded from NRC GL 89-10 Program were excluded from the evaluation.
Pressurelockingcanonlyoccurindoublediscorflexiblewedgegatevalves;therefore solidwedgedesignswerenotevaluated forpressurelocking.Valvetypeswerebasedonareviewofthevalvedrawings.
Pressure locking and thermal binding only concerns gate valves.Therefore, all of the remaining valve designs have been excluded from the evaluation of thermal binding and pressure locking conditions.
Pressurelockingiscausedbyfluidgettingintothevalvebonnetandbetweenthediscsofaflexible-wedge ordouble-disc wedge.Thiscouldpreventdiscmovementduetothepressurebeinghigherinthevalvebonnetandbetweenthediscsthaninthevalvebodyandtheincompressibility ofthefluidinthebonnet.Compressible fluidshavetheabilitytooccupyasmallervolumeandallowthedisctomove,whereasincompressible fluidsdonot.Steamsystemscanbesusceptible topressurelockingduetothecondensation ofsteamthatmayoccurinthevalvebonnet.Gatevalveswithdesignfeaturesthatpreventpressurelocking(e.g.,smallholeindisc,reliefvalveonbonnet,etc.)werescreened.
The plant equipment database was utilized to determine the valve types.Valves pressure lock or thermally bind when opened from a full closed position.Therefore, only gate valves that have a safety-related function to open were evaluated for pressure locking and/or thermal binding.1-2 0 0 Pressure Lockin Screenin Criteria After all safety-related power-operate gate va ves were identified, this population of valves was then screened based on valve type and active safety function to determine whether there was a potential for pressure locking or thermal binding that could prevent the valves from performing their intended safety related functions.
ThermalBindinScreeninCriteriaDouble-disc parallel-seat discvavesarenotsusceptietotermalbinding.Fromareviewofthevalvedrawings, alltheNRCGL89-10gatevalvesatSt.Lucieareeitherflexible-wedge orsolid-wedge designwiththeexception oftheUnit2auxiliary feedwatersteamsupplyisolation valves(MV-08-12 andMV-08-13) whicharedoublediscgatevalves.Thecondition conducive tothermalbindingiswhenawedgegatevalveisclosedwhilethesystemishot,thenthermalbindingcanoccurasthesystemcools.Therefore, thermalbindingwillnotoccurifthegatevalveisclosedatnormalambienttemperatures.
Pressure locking can only occur in double disc or flexible wedge gate valves;therefore solid wedge designs were not evaluated for pressure locking.Valve types were based on a review of the valve drawings.Pressure locking is caused by fluid getting into the valve bonnet and between the discs of a flexible-wedge or double-disc wedge.This could prevent disc movement due to the pressure being higher in the valve bonnet and between the discs than in the valve body and the incompressibility of the fluid in the bonnet.Compressible fluids have the ability to occupy a smaller volume and allow the disc to move, whereas incompressible fluids do not.Steam systems can be susceptible to pressure locking due to the condensation of steam that may occur in the valve bonnet.Gate valves with design features that prevent pressure locking (e.g., small hole in disc, relief valve on bonnet, etc.)were screened.Thermal Bindin Screenin Criteria Double-disc parallel-seat disc va ves are not suscepti e to t ermal binding.From a review of the valve drawings, all the NRC GL 89-10 gate valves at St.Lucie are either flexible-wedge or solid-wedge design with the exception of the Unit 2 auxiliary feed water steam supply isolation valves (MV-08-12 and MV-08-13)which are double disc gate valves.The condition conducive to thermal binding is when a wedge gate valve is closed while the system is hot, then thermal binding can occur as the system cools.Therefore, thermal binding will not occur if the gate valve is closed at normal ambient temperatures.
PHASE2GATEVALVEEVALUATION METHODOLOGY Themethodology usedfortheevaluation ofmotoroperatedgatevalvesnotexcludedbyinitialscreening consisted ofapressurelockingevaluation andathermalbindingevaluation.
PHASE 2 GATE VALVE EVALUATION METHODOLOGY The methodology used for the evaluation of motor operated gate valves not excluded by initial screening consisted of a pressure locking evaluation and a thermal binding evaluation.
Thirty-four motoroperatedvalesremainedtobeevaluated duringthisphase.Summaries ofthegateevaluations fortheSt.LucieUnit1MOVsareprovidedinAppendix1A.Summaries ofthegateevaluations fortheSt.LucieUnit2MOVsareprovidedinAppendix1B.PressureLockinEvaluation Methodolo Variousplantoperational sequences couintrouceconitionsconducive topressurelocking.Irrespective ofinitialbonnetcavityfluidpressure(loworhigh)andtemperature, itisclearthatasubsequent temperature increaseofthefluidcouldcauseanincreaseinbonnetcavitypressuredue1-3 tothermalexpansion ofthefluid.Thetemperature increasecanoccurasfluidoneithersideofadischeatsupduringvariousmodesofplantoperation orpossiblechangesinambientairtemperature causedbyplantoperation, leakingpumpsorvalves,orintheeventofahigh-energy linebreak.Inthesesituations, therateoftemperature
Thirty-four motor operated vales remained to be evaluated during this phase.Summaries of the gate evaluations for the St.Lucie Unit 1 MOVs are provided in Appendix 1A.Summaries of the gate evaluations for the St.Lucie Unit 2 MOVs are provided in Appendix 1B.Pressure Lockin Evaluation Methodolo Various plant operational sequences cou intro uce con itions conducive to pressure locking.Irrespective of initial bonnet cavity fluid pressure (low or high)and temperature, it is clear that a subsequent temperature increase of the fluid could cause an increase in bonnet cavity pressure due 1-3 to thermal expansion of the fluid.The temperature increase can occur as fluid on either side of a disc heats up during various modes of plant operation or possible changes in ambient air temperature caused by plant operation, leaking pumps or valves, or in the event of a high-energy line break.In these situations, the rate of temperature increase, which may be relatively slow to very high, controls the bonnet cavity pressure and valve susceptibility to pressure locking.Conversely, a bonnet cavity filled with high pressure fluid, such as leakage from the reactor coolant system, becomes a pressure locking candidate should a loss-of-coolant accident (LOCA)or other transient cause pipe line depressurization.
: increase, whichmayberelatively slowtoveryhigh,controlsthebonnetcavitypressureandvalvesusceptibility topressurelocking.Conversely, abonnetcavityfilledwithhighpressurefluid,suchasleakagefromthereactorcoolantsystem,becomesapressurelockingcandidate shouldaloss-of-coolant accident(LOCA)orothertransient causepipelinedepressurization.
Based upon the above, the evaluation for potential susceptibility of a POV to pressure locking consists of two questions:
Basedupontheabove,theevaluation forpotential susceptibility ofaPOVtopressurelockingconsistsoftwoquestions:
2)Can the bonnet be pressurized due to aP across the valve and subsequently, the valve body is depressurized?
2)Canthebonnetbepressurized duetoaPacrossthevalveandsubsequently, thevalvebodyisdepressurized?
Can the bonnet be filled with fluid with a subsequent temperature increase of the fluid which causes an increase in bonnet cavity pressure due to thermal expansion?
Canthebonnetbefilledwithfluidwithasubsequent temperature increaseofthefluidwhichcausesanincreaseinbonnetcavitypressureduetothermalexpansion?
A positive response to either of these questions indicates that a valve may be susceptible to pressure locking and further analysis is required.Thermal Bindin Evaluation Methodolo The evaluation for potentxa suscepti i ity of a power operated gate valve to thermal binding consists of one question: Can the valve be closed while hot and required to open when at a lower temperature?
Apositiveresponsetoeitherofthesequestions indicates thatavalvemaybesusceptible topressurelockingandfurtheranalysisisrequired.
A positive response to this question indicates that a gate valve may be susceptible to thermal binding and further analysis is required.PHASE 3 VALVE SPECIFIC ANALYSIS A detailed, valve specific analysis was performed on MOVs that were not excluded by either the initial valve screening or gate valve evaluation processes.
ThermalBindinEvaluation Methodolo Theevaluation forpotentxasusceptiiityofapoweroperatedgatevalvetothermalbindingconsistsofonequestion:
Nine motor operated valves were identified as potentially susceptible to pressure locking and/or thermal binding and were evaluated in this phase.Six valves were modified as described below.Three valves on Unit 2 remain to be modified;the basis for their continued operability is described in Attachment 2.On St.Lucie Unit 1, the shutdown cooling (SDC)system isolation valves (V-3480, V-3481, V-3651, and V-3652), which isolate the reactor coolant system (RCS)hot legs from the SDC system, are 1-4 susceptible only to pressure locking.No power operated valves were identified as being susceptible to thermal binding on Unit l.A calculation was performed to'determine the thrust required to open these valves assuming the bonnet becomes pressure locked at 2235 psig.As a result, the actuator gear ratio was changed during the Fall 1994 St.Lucie Unit 1 refueling outage (SLl-13).The modification increased the actuator capability sufficiently to overcome the worst case pressure locking scenario.Therefore, pressure locking is no longer a concern for the Unit 1 valves (V-3480, V-3481, V-3651, and V-3652).On St.Lucie Unit 2, the SDC isolation valves (V-3480, V-3481, V-3651, and V-3652), which isolate the RCS hot legs from the SDC system, and the SDC suction cross-tie valve (V-3545), are susceptible only to pressure locking., No power operated valves were identified as being susceptible to thermal binding.The corrective action for the St.Lucie Unit 2 gate valves, V-3481 and V-3545, was implemented during the Fall 1995 Unit 2 refueling outage (SL2-9).A plant modification was implemented to add an equalization hole in the high pressure side disc of V-3481 and a second modification was implemented to change the normal position of V-3545 to normally open.Attachment 2 of this letter provides a summary of the operability assessment and the schedule justification for St.Lucie Unit 2 Cycle 9 for the remaining three SDC isolation motor-operated gate valves, V-3480, V-3651 and V-3652.The corrective actions for these valves will be implemented during the St.Lucie Unit 2 Cycle 10 refueling outage (SL2-10)currently scheduled for the Spring of 1997.The modification to V-3481 was the pilot implementation of the planned corrective actions for the remaining three valves.The safety-related function of these SDC valves is to open to establish shutdown cooling for decay heat removal following a postulated accident.Since these valves are not required to open for 3 to 4 hours following an accident, it was determined that a pressure locking condition would not exist if adequate seat leakage existed to equalize the pressure between the valve bonnet and the valve body.The known valve seat leakage would depressurize the bonnet over this time period and permit the motor operator to open the valve.1-5 TABLE j.ST.LUCIE UNIT j.PRESSURE LOCKING AND THERMAL BINDING SCREENING FOR MOTOR OPERATED VALVES VALVE NO.NRC GLi GATE'AFETY'RESSURE 89-10 VALVE FUNCTION LOCKINGb TO OPEN 1 2 3 THERMAL BINDING 1 2 v-1403 V-1405 V-2501 V-2504 v-2508 v-2509 V-2514 V-2525 v-3206 V-3207 V-3432 V-3444 V-3452 V-3453 V-3456 V-3457 v-3480 v-3481 V-3614 HCV-3615 HCV-3616 HCV-3617 V-3624 HCV-3625 YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES NO YES YES YES NO YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES NO NO NO NO YES NO YES NO NO YES YES YES YES YES YES YES YES YES YES YES YES NO NO NO NO NO YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES NO YES NO YES NO YES NO YES YES YES YES YES YES YES YES YES YES YES YES YES YES NO NO NO NO YES YES YES YES YES YES If tho answor in any of thoso columns is NO, then additional scrooning for susceptibility to prossuro locking and/or thormal binding is not roquirod.PRESSURE LOCKING SCREENING CRITERIA)If tho answer to any of tho following Questions is HO thon the valve is not susceptible to pressure locking and further evaluation is not roquirod.l.2~3.Does tho Valve have a Floxiblo-Wedge or Double-Disc Wodge Dosign2 Is tho Volvo installed in a prccoss media containing incomprossiblo fluid and/or steam2 Is tho Valvo lackin dosign features that prevent prossuro locking (o.g., small hole in disc, roliof va vo on bcnnot, otc.).2 THERHAL BINDIHG SCREENIHG CRITERIA: If tho answer to any of tho following Questions is NO, then the valve is not susceptible to thormal binding and further evaluation is not required.l.2~Does tho Valve have a Flexible-Wedge, Solid-Wedgo or Split-Wodge Design'2 Can tho Valvo bo closed under temperature conditions greater than normal ambient conditions or duo to HOT ambient conditions (o.g., HELB or HSLB/LOCA) 2 1-6 TABLE j.ST.LUCIE UNIT j.PRESSURE LOCKING AND THERMAL BINDING SCREENING FOR NOTOR OPERATED VALVES VALVE NO.NRC GLi GATE'AFETY'RESSURE 89-10 VALVE FUNCTION LOCKINGb 1 2 3 THERMAL BINDING 1 2 HCV-3626 HCV-3627 v-3634 HCV-3635 HCV-3636 HCV-3637 V-3644 HCV-3645 HCV-3646 HCV-3647 V-3651 v-3652 V-3653 V-3654.V-3655 V-3656 V-3659 V-3660 v-3662 v-3663 MV-02-1 MV-02-2 MV-03-2 Mv-03-1A YES YES NO YES YES YES NO YES YES YES YES YES NO YES NO YES YES YES YES YES NO NO YES YES NO NO NO NO NO NO NO NO YES YES YES YES YES YES YES YES NO NO YES YES NO NO NO NO YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES If ths answer in any of these columns is NO, then additional screening for susceptibility to pressure locking and/or thermal binding is not required.PRESSURE LOCKING SCREENING CRITERIA)If the answer to any of the following Questions is NO then the valve is not susceptible to pressuro locking and further evaluation is not required.1.2~3.Does ths Valve havo a Floxiblo-Wedge or Double-Disc Wodge Dosign2 Is tho Valve installed in a procoss media containing incomprossiblo fluid and/or steam?Is tho Valvo~lackin design features that prevent pressure locking (o.g., small hole in disc, relief~va vo on bonnot, otc.).2 THERMAL BINDING SCREENING CRITERIA: If tho answer to any of tho following Questions is NO, thon tho valve is not susceptible to thermal binding and further evaluation is not required.1.2.Does tho Valve have a Flexible-Wedge, Solid-Wedge or Split-Wsdgo Design2 Can the Valve be closed undor temperature conditions greater than normal ambient conditions or due to HOT ambient conditions (e.g., HELB or MSLB/LOCA) 2 1-7 0 e I TABLE j.ST.LUCIE UNIT j.PRESSURE LOCKING AND THERMAL BINDING SCREENING FOR MOTOR OPERATED VALVES VALVE NO.NRC GL'ATEa SAFETY'RESSURE 89-10 VALVE FUNCTION LOCKINGb TO OPEN 1 2 3 THERMPJ BINDINGc 1 2 MV-03-1B MV-07-lA MV-07-1B MV-07-2A MV-07-2B MV-08-1A MV-08-1B MV-08-3 MV-08-13 MV-08-14 MV-09-1 MV-09-2 MV-09-7 MV-09-8 MV-09-9 MV-09-10 MV-09-11 MV-09-12 MV-09-13 MV-09-14 MV-14-1 MV-14-2 MV-14-3 MV-14-4 YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES NO NO NO NO NO NO NO NO NO NO YES YES YES YES NO NO NO NO NO NO NO NO NO NO NO NO NO NO a If tho answor in any of thoso columns is NO, thon additional screening for susceptibility to pressuro locking and/or thermal binding is not required.PRESSURE LOCKING SCREENING CRITERIAI If the answer to any of tho following Questions is NO thon tho valve is not susceptible to prossuro locking and further evaluation is not required.1.2.3.Doss tho Valvo have a Flexible-Wedge or Double-Disc Wedge Design?Is the Valvo installed in a process media containing incompressible fluid and/or steam?Is tho Valvo lackin dosign featuros that prevent pressure locking (e.g., smell bolo in disc, reliof va vo on bonnet, etc.).T THERHAL BINDING SCREENING CRITERIA: If the answer to any of the following Questions is NO, then the valve is not susceptible to thermal binding and further evaluation is not required.1~2.Doos tho Valve have a Flexible-Wedge, Solid-Wedge or Split-Wedge Design?Can tho Valvo bo closed under temperature conditions greater than normal aabient conditions or duo to HOT aabiont conditions
Canthevalvebeclosedwhilehotandrequiredtoopenwhenatalowertemperature?
{e.g., HELB or HSLB/LOCA) 2 1-8 TABLE j.ST.LUCIE UNIT j.PRESSURE LOCKING AND THERMAL BINDING SCREENING FOR MOTOR OPERATED VALVES NRC GLi GATEAU SAFETY'ALVF NO.89-10 VALVE FUNCTION TO OPEN PRESSURE LOCKINGb 1 2 3 THERMAL BINDINGc 1 2 MV-14-5 mr-14-6 MV-14-7 MV-14-8 MV-15-1 MV-18-1 MV-21-2 MV-21-3 FCV-25-9 YES YES YES YES YES YES YES YES YES NO NO NO NO YES YES NO NO NO NO NO If the answer in any of these columns is HO, then additional screening for susceptibility to pressure locking and/or thermal binding is not required.PRESSURE LOCKING SCREENING CRITERIAI If the answer to any of the following Questions is HO then the valve is not susceptible to pressure locking and further evaluation is not required.l.2.3.Does the Valve have a I'lexible-Wedge or Double-Disc Wedge Design?Is the Valve installed in a process media containing incompressible fluid and/or steam?Is the Valve lacklnc[design features that prevent pressure locking (e.g., small hole in disc, relief~va ve on bonnet, etc.).T THERMAL BINDING SCREENING CRITERIA: If the answer to any of the following Questions is NO, then the valve is not susceptible to thermal binding and further evaluation is not required.l.2.Does the Valve have a plexible-Wedge, Solid-Wedge or Split-Wedge Design?Can the Valve be closed under temperature conditions greater than normal ambient conditions or due to HOT ambient conditions (e.g., HELB or MSLB/LOCA)
Apositiveresponsetothisquestionindicates thatagatevalvemaybesusceptible tothermalbindingandfurtheranalysisisrequired.
I 1-9 v'5'Q~~p TABLE 2 ST.LUCIE UNIT 2 PRESSURE LOCKING AND THERMAL BINDING SCREENING FOR MOTOR OPERATED VALVES VALVE NO.HRC GLa 89-10 GATE a VALVE SAFETY a FUNCTION TO OPEN PRESSURE LOCKING b 1 2 3 THERMAL BINDIHG c 1 2 V-1476 V-1477 V-2185 V-2501 V-2504 v-2508 V-2509 V-2514 V-2525 v-2553 V-2554 V-2555 V-2598 FCV-3301 FCV-3306 V-3432 V-3444 V-3456 V-3457 V-3480 V-3481 HCV-, 3512 V-3517 V-3523 V-3536 v-3539 YES YES NO YES YES YES YES YES YES YES YES YES NO YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES NO NO NO NO NO YES YES YES YES YES YES NO YES NO NO NO YES YES NO YES YES YES YES NO NO NO YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES ,YES YES YES YES YES YES YES YES YES YES YES YES NO NO NO NO YES YES YES YES YES If tho answor in any of these columns is HO, then additional screening for susceptibility to pressure locking and/cr thermal binding is not required.PRESSURE LOCKING SCREENING CRITERIA1 Ii the answer to any of the following Questions is NO thon tho valve is not susceptible to prossure locking and further evaluation is not required.1~2.3.Does the Valve have a Floxiblo-Wedge or Double-Disc Wedge Design?Is the Valve installed in a procoss modia containing incomprossible fluid and/or steam?Is tho Valve~lackin dosign featuros that prevont prossure locking (o.g., small hole in disc, relief~va vo on bonnet, otc.).T c THERMAL BINDING SCREENIHG CRITERIA: If the answer to any of the following Questions is NO, thon tho valve is not susceptible to thermal binding and further evaluation is not required.1.2~Does the Valve have a Flexible-Wedge, Solid-Wedge or Split-Wedge Design?Can the Valve bo closed under temporaturo conditions greater than normal ambiont conditions or due to HOT ambient conditions (o.g., HELB or MSLB/LOCA)T 1-10 TABLE 2 ST.LUCIE UNIT 2 PRESSURE LOCKING AND THERMAL BINDING SCREENING FOR MOTOR OPERATED VALVES VALVE NO.HRC OLa 89-10 GATEa VALVE SAFETY a PRESSVRE LOCHIHO b FUNCTIOH 1 2 3 TO OPEN THERMAL BINDIHG c 1 2 V-3540 V-3545 V-3550 V-3551 v-3614 HCV-3615 HCV-3616 HCV-3617 V-3624 HCV-3625 HCV-3626 HCV-3627 v-3634 HCV-3635 HCV-3636 HCV-3637 V-3644 HCV-3645 HCV-3646 HCV-3647 V-3651 V-3652 V-3654 V-3656 HCV-3657 v-3658 YES YES YES YES NO YES YES YES NO YES YES YES NO YES YES YES NO YES YES YES YES YES YES YES YES YES NO YES NO NO~NO NO NO NO NO NO NO NO NO NO NO NO YES YES YES YES NO YES YES YES NO NO YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES If the answer in any of these columns is NO, then.additional screening for susceptibility to prossure locking and/or thermal binding is not required.PRESSURE LOCKING SCREENING CRITERIA)If the answer to any of tho following Questions is HO then tho valve is not susceptible to prossuro locking and further evaluation is not roquirod.1~2.3.Does the Valve have a Flexible-Wodge or Double-Disc Wedge Design?Is ths Valve installed in a process media containing incompressible fluid and/or steam?Is the Valve lackin design features that prevent pressure locking{o.g., small hole in disc, relief va vo on bonnet, stc.)~2 THERMAL BINDING SCREENING CRITERIA: If the answer to any of the following Questions is NO, then the valve is not suscoptiblo to thermal binding and further evaluation is not required.1.2.Does the Valve have a Flexible-Wedge, Solid-Wedge or Split-Wedge DesignT Can the Valve be closed under tomperaturo conditions greater than normal ambient conditions or due to HOT ambient conditions
PHASE3VALVESPECIFICANALYSISAdetailed, valvespecificanalysiswasperformed onMOVsthatwerenotexcludedbyeithertheinitialvalvescreening orgatevalveevaluation processes.
{o.g., HELB or MSLB/LOCA)2 1-11 I
Ninemotoroperatedvalveswereidentified aspotentially susceptible topressurelockingand/orthermalbindingandwereevaluated inthisphase.Sixvalvesweremodifiedasdescribed below.ThreevalvesonUnit2remaintobemodified; thebasisfortheircontinued operability isdescribed inAttachment 2.OnSt.LucieUnit1,theshutdowncooling(SDC)systemisolation valves(V-3480,V-3481,V-3651,andV-3652),whichisolatethereactorcoolantsystem(RCS)hotlegsfromtheSDCsystem,are1-4 susceptible onlytopressurelocking.Nopoweroperatedvalveswereidentified asbeingsusceptible tothermalbindingonUnitl.Acalculation wasperformed to'determine thethrustrequiredtoopenthesevalvesassumingthebonnetbecomespressurelockedat2235psig.Asaresult,theactuatorgearratiowaschangedduringtheFall1994St.LucieUnit1refueling outage(SLl-13).
TABLE 2 ST.LUCIE UNIT 2 PRESSURE LOCKING AND THERMAL BINDING SCREENING FOR MOTOR OPERATED VALVES VALVE NO.NRC GLa 89-10 GATE VALVE SAFETY a FVNCTION TO OPEN PRESSVRE LOCHIHG b 1 2 3 THERMAL BIHDIHG c 1 2 V-3659 v-3660 v-3664 v-3665 mr-07-1A MV-07-1B MV-07-2A MV-07-2B MV-08-1A MV-08-1B MV-08-3 MV-08-12 MV-08-13 mr-08-14 MV-08-15 MV-08-16 MV-08-17 MV-08-18A MV-08-18B MV-08-19A MV-08-19B MV-09-9 MV-09-10 MV-09-11 MV-09-12 MV-09-13 YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES NO YES YES YES YES NO NO NO NO NO NO NO YES YES YES YES YES YES NO NO NO NO NO NO NO NO NO NO YES YES YES YES NO NO NO NO YES YES YES YES YES YES YES YES YES YES YES YES YES YES NO NO YES YES If tho answer in any of thoso columns is NO, then additional screening for susceptibility to pressure locking and/or thermal binding is not required.PRESSURE LOCKING SCREENING CRITERIA;If tho answer to any of the following Questions is NO then the valve is not susceptible to pressure locking and further evaluation is not required.l.2.3.Does tho Valvo have a Flexible-Wedge or Double-Disc Wedgo Design?Is the Valvo installed in a process media containing incompressible fluid and/or steam?Is tho Valvo~lsckin dosign features that provont pressure locking (o.g., small holo in disc, roliof~va vo on bonnot, otc.).T THERMAL BINDING SCREENIHG CRITERIA: If tho answer to any of tho following Questions is NO, thon tho valve is not suscoptiblo to thermal binding and further evaluation is not roquired.1.2.Does tho Valvo have a Flexible-Wedge, Solid-Wedgo or Split-Wedge Design?Can the Valve bo closed under temperature conditions greater than normal ambient conditions or due to HOT ambient conditions
Themodification increased theactuatorcapability sufficiently toovercometheworstcasepressurelockingscenario.
{e.g., HELB or MSLB/LOCA)T 1-12 TABLE 2 ST.LUCIE UNIT 2 PRESSURE LOCKING AND THERMAL BINDING SCREENING FOR MOTOR OPERATED VALVES VALVE NO.NRC GL'g-IO GATEa VAI VE SAFETY a PRESSVRE LOCNING" FUNCTION 1 2 3 TO OPEN THERMAL BINDIHG c 1 2 MV-09-14 MV-14-1 MV-14-2 MV-14-3 MV-14-4 MV-14-9 MV-14-10 MV-14-11 MV-14-12 MV-14-13 MV-14-14 MV-14-15 MV-14-16 MV-14-17 MV-14-18 MV-14-19 MV-14-20 MV-21-2 MV-21-3 MV-21-4A MV-21-4B FCV-25-29 FCV-25-32 FCV-25-33 FCV-25-34 NO YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO If the answer in any of these columns is NO, then additional screening for susceptibility to pressure locking and/or thermal binding is not required.PRESSURE LOCKING SCREENING CRITERIAr If the answer to any of tho following Questions is NO then tho valvo is not suscoptiblo to pressure locking and further evaluation is not required.l.2.3~Does the Valve have a Floxiblo-Wodge or Double-Disc Wedgo Design?Is the Valve installed in a procoss media containing incompressiblo fluid and/or steam?Is the Valve lackin dosign features that prevent pressure locking{e.g., small hole in disc, relief va vo on bonnet, etc.).?THERMAL BINDING SCREEHING CRITERIA: If tho answor to any of tho following Questions is NO, then the valve is not susceptible to thermal binding and further evaluation is not required.l.2.Does tho Valve have a Floxiblo-Wodge, Solid-Wedgo or Split-Wodgo Dosign?Can the Valve bo closed under temperature conditions qroator than normal ambient conditions or due to HOT ambient conditions (e.g., HELB or MSLB/LOCA)?
Therefore, pressurelockingisnolongeraconcernfortheUnit1valves(V-3480,V-3481,V-3651,andV-3652).OnSt.LucieUnit2,theSDCisolation valves(V-3480,V-3481,V-3651,andV-3652),whichisolatetheRCShotlegsfromtheSDCsystem,andtheSDCsuctioncross-tie valve(V-3545),
aresusceptible onlytopressurelocking.,Nopoweroperatedvalveswereidentified asbeingsusceptible tothermalbinding.Thecorrective actionfortheSt.LucieUnit2gatevalves,V-3481andV-3545,wasimplemented duringtheFall1995Unit2refueling outage(SL2-9).Aplantmodification wasimplemented toaddanequalization holeinthehighpressuresidediscofV-3481andasecondmodification wasimplemented tochangethenormalpositionofV-3545tonormallyopen.Attachment 2ofthisletterprovidesasummaryoftheoperability assessment andtheschedulejustification forSt.LucieUnit2Cycle9fortheremaining threeSDCisolation motor-operated gatevalves,V-3480,V-3651andV-3652.Thecorrective actionsforthesevalveswillbeimplemented duringtheSt.LucieUnit2Cycle10refueling outage(SL2-10)currently scheduled fortheSpringof1997.Themodification toV-3481wasthepilotimplementation oftheplannedcorrective actionsfortheremaining threevalves.Thesafety-related functionoftheseSDCvalvesistoopentoestablish shutdowncoolingfordecayheatremovalfollowing apostulated accident.
Sincethesevalvesarenotrequiredtoopenfor3to4hoursfollowing anaccident, itwasdetermined thatapressurelockingcondition wouldnotexistifadequateseatleakageexistedtoequalizethepressurebetweenthevalvebonnetandthevalvebody.Theknownvalveseatleakagewoulddepressurize thebonnetoverthistimeperiodandpermitthemotoroperatortoopenthevalve.1-5 TABLEj.ST.LUCIEUNITj.PRESSURELOCKINGANDTHERMALBINDINGSCREENING FORMOTOROPERATEDVALVESVALVENO.NRCGLiGATE'AFETY'RESSURE 89-10VALVEFUNCTIONLOCKINGbTOOPEN123THERMALBINDING12v-1403V-1405V-2501V-2504v-2508v-2509V-2514V-2525v-3206V-3207V-3432V-3444V-3452V-3453V-3456V-3457v-3480v-3481V-3614HCV-3615HCV-3616HCV-3617V-3624HCV-3625YESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESNOYESYESYESNOYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESNONONONOYESNOYESNONOYESYESYESYESYESYESYESYESYESYESYESYESNONONONONOYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESNOYESNOYESNOYESNOYESYESYESYESYESYESYESYESYESYESYESYESYESYESNONONONOYESYESYESYESYESYESIfthoansworinanyofthosocolumnsisNO,thenadditional scrooning forsusceptibility toprossurolockingand/orthormalbindingisnotroquirod.
PRESSURELOCKINGSCREENING CRITERIA)
Ifthoanswertoanyofthofollowing Questions isHOthonthevalveisnotsusceptible topressurelockingandfurtherevaluation isnotroquirod.
l.2~3.DoesthoValvehaveaFloxiblo-Wedge orDouble-Disc WodgeDosign2IsthoVolvoinstalled inaprccossmediacontaining incomprossiblo fluidand/orsteam2IsthoValvolackindosignfeaturesthatpreventprossurolocking(o.g.,smallholeindisc,roliofvavoonbcnnot,otc.).2THERHALBINDIHGSCREENIHG CRITERIA:
Ifthoanswertoanyofthofollowing Questions isNO,thenthevalveisnotsusceptible tothormalbindingandfurtherevaluation isnotrequired.
l.2~DoesthoValvehaveaFlexible-Wedge, Solid-Wedgo orSplit-Wodge Design'2CanthoValvoboclosedundertemperature conditions greaterthannormalambientconditions orduotoHOTambientconditions (o.g.,HELBorHSLB/LOCA) 21-6 TABLEj.ST.LUCIEUNITj.PRESSURELOCKINGANDTHERMALBINDINGSCREENING FORNOTOROPERATEDVALVESVALVENO.NRCGLiGATE'AFETY'RESSURE 89-10VALVEFUNCTIONLOCKINGb123THERMALBINDING12HCV-3626HCV-3627v-3634HCV-3635HCV-3636HCV-3637V-3644HCV-3645HCV-3646HCV-3647V-3651v-3652V-3653V-3654.V-3655V-3656V-3659V-3660v-3662v-3663MV-02-1MV-02-2MV-03-2Mv-03-1AYESYESNOYESYESYESNOYESYESYESYESYESNOYESNOYESYESYESYESYESNONOYESYESNONONONONONONONOYESYESYESYESYESYESYESYESNONOYESYESNONONONOYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESIfthsanswerinanyofthesecolumnsisNO,thenadditional screening forsusceptibility topressurelockingand/orthermalbindingisnotrequired.
PRESSURELOCKINGSCREENING CRITERIA)
Iftheanswertoanyofthefollowing Questions isNOthenthevalveisnotsusceptible topressurolockingandfurtherevaluation isnotrequired.
1.2~3.DoesthsValvehavoaFloxiblo-Wedge orDouble-Disc WodgeDosign2IsthoValveinstalled inaprocossmediacontaining incomprossiblo fluidand/orsteam?IsthoValvo~lackindesignfeaturesthatpreventpressurelocking(o.g.,smallholeindisc,relief~vavoonbonnot,otc.).2THERMALBINDINGSCREENING CRITERIA:
Ifthoanswertoanyofthofollowing Questions isNO,thonthovalveisnotsusceptible tothermalbindingandfurtherevaluation isnotrequired.
1.2.DoesthoValvehaveaFlexible-Wedge, Solid-Wedge orSplit-Wsdgo Design2CantheValvebeclosedundortemperature conditions greaterthannormalambientconditions orduetoHOTambientconditions (e.g.,HELBorMSLB/LOCA) 21-7 0eI TABLEj.ST.LUCIEUNITj.PRESSURELOCKINGANDTHERMALBINDINGSCREENING FORMOTOROPERATEDVALVESVALVENO.NRCGL'ATEaSAFETY'RESSURE 89-10VALVEFUNCTIONLOCKINGbTOOPEN123THERMPJBINDINGc12MV-03-1BMV-07-lAMV-07-1BMV-07-2AMV-07-2BMV-08-1AMV-08-1BMV-08-3MV-08-13MV-08-14MV-09-1MV-09-2MV-09-7MV-09-8MV-09-9MV-09-10MV-09-11MV-09-12MV-09-13MV-09-14MV-14-1MV-14-2MV-14-3MV-14-4YESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESNONONONONONONONONONOYESYESYESYESNONONONONONONONONONONONONONOaIfthoansworinanyofthosocolumnsisNO,thonadditional screening forsusceptibility topressurolockingand/orthermalbindingisnotrequired.
PRESSURELOCKINGSCREENING CRITERIAI Iftheanswertoanyofthofollowing Questions isNOthonthovalveisnotsusceptible toprossurolockingandfurtherevaluation isnotrequired.
1.2.3.DossthoValvohaveaFlexible-Wedge orDouble-Disc WedgeDesign?IstheValvoinstalled inaprocessmediacontaining incompressible fluidand/orsteam?IsthoValvolackindosignfeaturosthatpreventpressurelocking(e.g.,smellboloindisc,reliofvavoonbonnet,etc.).TTHERHALBINDINGSCREENING CRITERIA:
Iftheanswertoanyofthefollowing Questions isNO,thenthevalveisnotsusceptible tothermalbindingandfurtherevaluation isnotrequired.
1~2.DoosthoValvehaveaFlexible-Wedge, Solid-Wedge orSplit-Wedge Design?CanthoValvoboclosedundertemperature conditions greaterthannormalaabientconditions orduotoHOTaabiontconditions
{e.g.,HELBorHSLB/LOCA) 21-8 TABLEj.ST.LUCIEUNITj.PRESSURELOCKINGANDTHERMALBINDINGSCREENING FORMOTOROPERATEDVALVESNRCGLiGATEAUSAFETY'ALVF NO.89-10VALVEFUNCTIONTOOPENPRESSURELOCKINGb123THERMALBINDINGc12MV-14-5mr-14-6MV-14-7MV-14-8MV-15-1MV-18-1MV-21-2MV-21-3FCV-25-9YESYESYESYESYESYESYESYESYESNONONONOYESYESNONONONONOIftheanswerinanyofthesecolumnsisHO,thenadditional screening forsusceptibility topressurelockingand/orthermalbindingisnotrequired.
PRESSURELOCKINGSCREENING CRITERIAI Iftheanswertoanyofthefollowing Questions isHOthenthevalveisnotsusceptible topressurelockingandfurtherevaluation isnotrequired.
l.2.3.DoestheValvehaveaI'lexible-Wedge orDouble-Disc WedgeDesign?IstheValveinstalled inaprocessmediacontaining incompressible fluidand/orsteam?IstheValvelacklnc[designfeaturesthatpreventpressurelocking(e.g.,smallholeindisc,relief~vaveonbonnet,etc.).TTHERMALBINDINGSCREENING CRITERIA:
Iftheanswertoanyofthefollowing Questions isNO,thenthevalveisnotsusceptible tothermalbindingandfurtherevaluation isnotrequired.
l.2.DoestheValvehaveaplexible-Wedge, Solid-Wedge orSplit-Wedge Design?CantheValvebeclosedundertemperature conditions greaterthannormalambientconditions orduetoHOTambientconditions (e.g.,HELBorMSLB/LOCA)
I1-9 v'5'Q~~p TABLE2ST.LUCIEUNIT2PRESSURELOCKINGANDTHERMALBINDINGSCREENING FORMOTOROPERATEDVALVESVALVENO.HRCGLa89-10GATEaVALVESAFETYaFUNCTIONTOOPENPRESSURELOCKINGb123THERMALBINDIHGc12V-1476V-1477V-2185V-2501V-2504v-2508V-2509V-2514V-2525v-2553V-2554V-2555V-2598FCV-3301FCV-3306V-3432V-3444V-3456V-3457V-3480V-3481HCV-,3512V-3517V-3523V-3536v-3539YESYESNOYESYESYESYESYESYESYESYESYESNOYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESNONONONONOYESYESYESYESYESYESNOYESNONONOYESYESNOYESYESYESYESNONONOYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYES,YESYESYESYESYESYESYESYESYESYESYESYESNONONONOYESYESYESYESYESIfthoansworinanyofthesecolumnsisHO,thenadditional screening forsusceptibility topressurelockingand/crthermalbindingisnotrequired.
PRESSURELOCKINGSCREENING CRITERIA1 Iitheanswertoanyofthefollowing Questions isNOthonthovalveisnotsusceptible toprossurelockingandfurtherevaluation isnotrequired.
1~2.3.DoestheValvehaveaFloxiblo-Wedge orDouble-Disc WedgeDesign?IstheValveinstalled inaprocossmodiacontaining incomprossible fluidand/orsteam?IsthoValve~lackindosignfeaturosthatprevontprossurelocking(o.g.,smallholeindisc,relief~vavoonbonnet,otc.).TcTHERMALBINDINGSCREENIHG CRITERIA:
Iftheanswertoanyofthefollowing Questions isNO,thonthovalveisnotsusceptible tothermalbindingandfurtherevaluation isnotrequired.
1.2~DoestheValvehaveaFlexible-Wedge, Solid-Wedge orSplit-Wedge Design?CantheValveboclosedundertemporaturo conditions greaterthannormalambiontconditions orduetoHOTambientconditions (o.g.,HELBorMSLB/LOCA)T 1-10 TABLE2ST.LUCIEUNIT2PRESSURELOCKINGANDTHERMALBINDINGSCREENING FORMOTOROPERATEDVALVESVALVENO.HRCOLa89-10GATEaVALVESAFETYaPRESSVRELOCHIHObFUNCTIOH123TOOPENTHERMALBINDIHGc12V-3540V-3545V-3550V-3551v-3614HCV-3615HCV-3616HCV-3617V-3624HCV-3625HCV-3626HCV-3627v-3634HCV-3635HCV-3636HCV-3637V-3644HCV-3645HCV-3646HCV-3647V-3651V-3652V-3654V-3656HCV-3657v-3658YESYESYESYESNOYESYESYESNOYESYESYESNOYESYESYESNOYESYESYESYESYESYESYESYESYESNOYESNONO~NONONONONONONONONONONONOYESYESYESYESNOYESYESYESNONOYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESIftheanswerinanyofthesecolumnsisNO,then.additional screening forsusceptibility toprossurelockingand/orthermalbindingisnotrequired.
PRESSURELOCKINGSCREENING CRITERIA)
Iftheanswertoanyofthofollowing Questions isHOthenthovalveisnotsusceptible toprossurolockingandfurtherevaluation isnotroquirod.
1~2.3.DoestheValvehaveaFlexible-Wodge orDouble-Disc WedgeDesign?IsthsValveinstalled inaprocessmediacontaining incompressible fluidand/orsteam?IstheValvelackindesignfeaturesthatpreventpressurelocking{o.g.,smallholeindisc,reliefvavoonbonnet,stc.)~2THERMALBINDINGSCREENING CRITERIA:
Iftheanswertoanyofthefollowing Questions isNO,thenthevalveisnotsuscoptiblo tothermalbindingandfurtherevaluation isnotrequired.
1.2.DoestheValvehaveaFlexible-Wedge, Solid-Wedge orSplit-Wedge DesignTCantheValvebeclosedundertomperaturo conditions greaterthannormalambientconditions orduetoHOTambientconditions
{o.g.,HELBorMSLB/LOCA)2 1-11 I
TABLE2ST.LUCIEUNIT2PRESSURELOCKINGANDTHERMALBINDINGSCREENING FORMOTOROPERATEDVALVESVALVENO.NRCGLa89-10GATEVALVESAFETYaFVNCTIONTOOPENPRESSVRELOCHIHGb123THERMALBIHDIHGc12V-3659v-3660v-3664v-3665mr-07-1AMV-07-1BMV-07-2AMV-07-2BMV-08-1AMV-08-1BMV-08-3MV-08-12MV-08-13mr-08-14MV-08-15MV-08-16MV-08-17MV-08-18A MV-08-18B MV-08-19A MV-08-19B MV-09-9MV-09-10MV-09-11MV-09-12MV-09-13YESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESNOYESYESYESYESNONONONONONONOYESYESYESYESYESYESNONONONONONONONONONOYESYESYESYESNONONONOYESYESYESYESYESYESYESYESYESYESYESYESYESYESNONOYESYESIfthoanswerinanyofthosocolumnsisNO,thenadditional screening forsusceptibility topressurelockingand/orthermalbindingisnotrequired.
PRESSURELOCKINGSCREENING CRITERIA; Ifthoanswertoanyofthefollowing Questions isNOthenthevalveisnotsusceptible topressurelockingandfurtherevaluation isnotrequired.
l.2.3.DoesthoValvohaveaFlexible-Wedge orDouble-Disc WedgoDesign?IstheValvoinstalled inaprocessmediacontaining incompressible fluidand/orsteam?IsthoValvo~lsckin dosignfeaturesthatprovontpressurelocking(o.g.,smallholoindisc,roliof~vavoonbonnot,otc.).TTHERMALBINDINGSCREENIHG CRITERIA:
Ifthoanswertoanyofthofollowing Questions isNO,thonthovalveisnotsuscoptiblo tothermalbindingandfurtherevaluation isnotroquired.
1.2.DoesthoValvohaveaFlexible-Wedge, Solid-Wedgo orSplit-Wedge Design?CantheValveboclosedundertemperature conditions greaterthannormalambientconditions orduetoHOTambientconditions
{e.g.,HELBorMSLB/LOCA)T 1-12 TABLE2ST.LUCIEUNIT2PRESSURELOCKINGANDTHERMALBINDINGSCREENING FORMOTOROPERATEDVALVESVALVENO.NRCGL'g-IOGATEaVAIVESAFETYaPRESSVRELOCNING"FUNCTION123TOOPENTHERMALBINDIHGc12MV-09-14MV-14-1MV-14-2MV-14-3MV-14-4MV-14-9MV-14-10MV-14-11MV-14-12MV-14-13MV-14-14MV-14-15MV-14-16MV-14-17MV-14-18MV-14-19MV-14-20MV-21-2MV-21-3MV-21-4AMV-21-4BFCV-25-29 FCV-25-32 FCV-25-33 FCV-25-34 NOYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESYESNONONONONONONONONONONONONONONONONONONONONONONONOIftheanswerinanyofthesecolumnsisNO,thenadditional screening forsusceptibility topressurelockingand/orthermalbindingisnotrequired.
PRESSURELOCKINGSCREENING CRITERIAr Iftheanswertoanyofthofollowing Questions isNOthenthovalvoisnotsuscoptiblo topressurelockingandfurtherevaluation isnotrequired.
l.2.3~DoestheValvehaveaFloxiblo-Wodge orDouble-Disc WedgoDesign?IstheValveinstalled inaprocossmediacontaining incompressiblo fluidand/orsteam?IstheValvelackindosignfeaturesthatpreventpressurelocking{e.g.,smallholeindisc,reliefvavoonbonnet,etc.).?THERMALBINDINGSCREEHING CRITERIA:
Ifthoanswortoanyofthofollowing Questions isNO,thenthevalveisnotsusceptible tothermalbindingandfurtherevaluation isnotrequired.
l.2.DoesthoValvehaveaFloxiblo-Wodge, Solid-Wedgo orSplit-Wodgo Dosign?CantheValveboclosedundertemperature conditions qroatorthannormalambientconditions orduetoHOTambientconditions (e.g.,HELBorMSLB/LOCA)?
1-13  
1-13  


TABLE3ST.LUCIEUNITj.PRESSURELOCKINGANDTHERMALBINDINGSCREENING OFPOWEROPERATEDVALVESVALVENO.POV~GATEVALVESAFETY'UNCTIONTOOPENPRESSURELOCKINGa123THERMALBIHDIHG~12V-3459YESNOIftheanswerinanyofthosecolumnsisNO,thenadditional screoning forsusceptibility topressurelockingand/orthormalbindingisnotrequired.
TABLE 3 ST.LUCIE UNIT j.PRESSURE LOCKING AND THERMAL BINDING SCREENING OF POWER OPERATED VALVES VALVE NO.POV~GATE VALVE SAFETY'UNCTION TO OPEN PRESSURE LOCKING a 1 2 3 THERMAL BIHDIHG~1 2 V-3459 YES NO If the answer in any of those columns is NO, then additional screoning for susceptibility to pressure locking and/or thormal binding is not required.h PRESSURE LOCKIHG SCREENING CRITERIA'f the answer to any of tho following Questions is NO thon the valve is not susceptible to pressure locking and further evaluation is not roquired.1.2.3.Does tho Valvo have a Flexible-Wedge or Double-Disc Wedge Design?Is the Valve installed in a procoss media containing incompressible fluid and/or steam?Is the Valve~lackin dosign foatures that provont prossuro locking (o.g., small halo in disc, relief~va vo on bonnet, otc.).T c THERMAL BINDING SCREENING CRITERIA: If the answer to any of tho following Questions 1s HO, thon tho valvo is not susceptible to thermal binding and further evaluation is not required.1.2.Does tho Valve havo a Flexible-Wedge, Solid-Wedge or Split-Wedge Design?Can tho Valve bo closed under temperature conditions greater than normal ambient conditions or due to HOT ambiont conditions (e.g., HELB or MSLB/LOCA)T 1-14 TABLE 4 ST.LUCIE UNIT 2 PRESSURE LOCKING AND THEKItAL BINDING SCREENING FOR POWER OPERATED VALVES VALVE NO.FCV-07-1A FCV-07-1B HCV-09-1A HCV-09-1B HCV-09-2A HCV-09-2B POV'ATE VALVE YES YES YES YES YES YES SAFETY'UNCTION TO OPEN YES YES NO NO NO NO PRESSURE LOCKINGn 1 2 3 NO NO THERMPJ BINDING 1 2 NO NO If tho answer in any of these columns is NO, then additional screening for susceptibility to pressure locking and/or thormal binding is not required.PRESSURE LOCKING SCREENING CRITERIA'f tho answer to any of tho following Questions is NO thon tho valve is not susceptiblo to prossuro locking and further evaluation is not requirod.l.2.3.Does the Valve have a Floxiblo-Wodgo or Double-Disc Wedge Design2 Is tho Valve installed in a procoss media containing incompressible fluid and/or stoam2 Is tho Valve~lackin design foaturos that prevent prossuro locking (e.g., small holo in disc, relief~va vo on bonnet, etc.).2 THERHAL BINDING SCREENING CRITERIA: If tho answor to any of tho following Questions is NO, then the valve is not susceptible to thermal binding and further evaluation is not required.l.2.Does the Valve have a Flexible-Wodge, Solid-Wedge or Split-Wedge Design2 Can the Valve be closed under temperature conditions greater than normal ambient conditions or due to HOT ambient conditions
hPRESSURELOCKIHGSCREENING CRITERIA'f theanswertoanyofthofollowing Questions isNOthonthevalveisnotsusceptible topressurelockingandfurtherevaluation isnotroquired.
{e.g., HELB or HSLB/LOCA)2 1-15  
1.2.3.DoesthoValvohaveaFlexible-Wedge orDouble-Disc WedgeDesign?IstheValveinstalled inaprocossmediacontaining incompressible fluidand/orsteam?IstheValve~lackindosignfoaturesthatprovontprossurolocking(o.g.,smallhaloindisc,relief~vavoonbonnet,otc.).TcTHERMALBINDINGSCREENING CRITERIA:
~~St.Lucie Units 1 and 2 Docket No.50-335 and 50-389 Generic Letter 95-07-180-Da Res onse APPENDIX 1A ST.LUCIE UNIT 1 GATE EVALUATION
Iftheanswertoanyofthofollowing Questions 1sHO,thonthovalvoisnotsusceptible tothermalbindingandfurtherevaluation isnotrequired.
1.2.DoesthoValvehavoaFlexible-Wedge, Solid-Wedge orSplit-Wedge Design?CanthoValveboclosedundertemperature conditions greaterthannormalambientconditions orduetoHOTambiontconditions (e.g.,HELBorMSLB/LOCA)T 1-14 TABLE4ST.LUCIEUNIT2PRESSURELOCKINGANDTHEKItALBINDINGSCREENING FORPOWEROPERATEDVALVESVALVENO.FCV-07-1A FCV-07-1B HCV-09-1A HCV-09-1B HCV-09-2A HCV-09-2B POV'ATEVALVEYESYESYESYESYESYESSAFETY'UNCTION TOOPENYESYESNONONONOPRESSURELOCKINGn123NONOTHERMPJBINDING12NONOIfthoanswerinanyofthesecolumnsisNO,thenadditional screening forsusceptibility topressurelockingand/orthormalbindingisnotrequired.
PRESSURELOCKINGSCREENING CRITERIA'f thoanswertoanyofthofollowing Questions isNOthonthovalveisnotsusceptiblo toprossurolockingandfurtherevaluation isnotrequirod.
l.2.3.DoestheValvehaveaFloxiblo-Wodgo orDouble-Disc WedgeDesign2IsthoValveinstalled inaprocossmediacontaining incompressible fluidand/orstoam2IsthoValve~lackindesignfoaturosthatpreventprossurolocking(e.g.,smallholoindisc,relief~vavoonbonnet,etc.).2THERHALBINDINGSCREENING CRITERIA:
Ifthoanswortoanyofthofollowing Questions isNO,thenthevalveisnotsusceptible tothermalbindingandfurtherevaluation isnotrequired.
l.2.DoestheValvehaveaFlexible-Wodge, Solid-Wedge orSplit-Wedge Design2CantheValvebeclosedundertemperature conditions greaterthannormalambientconditions orduetoHOTambientconditions
{e.g.,HELBorHSLB/LOCA)2 1-15  
~~St.LucieUnits1and2DocketNo.50-335and50-389GenericLetter95-07-180-DaResonseAPPENDIX1AST.LUCIEUNIT1GATEEVALUATION SUMMARYOFPRESSURELOCKINGANDTHERMALBINDINGFORPOWEROPERATEDGATEVALVES


ST.LUCIEUNIT1PHASE2GATEVALVEEVALUATION SUMMARYV-1403andV-1405"PowerOperatedReliefValve(PORV)BlockValves"Descrition:V-1403andV-1405are2'/,"VelansolidwedgegatevaveswitSMB-00actuators.
==SUMMARY==
Thevalvesarelocatedin,thecontainment
OF PRESSURE LOCKING AND THERMAL BINDING FOR POWER OPERATED GATE VALVES
: building, outsidethepressurizer cubicle.Themaximumopeningdifferential pressureis2485psid.Duringpoweroperation bothblockvalvesarerequiredtoremainopen.V-1403andV-1405performthesafety-related functiontopassively maintainRCSpressureboundary.
Thequality-related functionofthesevalvesistoisolatethepressurizer intheeventaPORVisstuckopen.Inaddition, thePORVsareutilizedforcontingencies forfunctional recovery:
RCSpressurecontrolsuccesspath5,PORVsandRCSandcoreheatremoval,successpath4,"once-through-cooling".
Bothofthesecontingencies requireverifying thePORVblockvalvesareopen.PressureLockin:Noevaluation isrequiredbecauseV-1403andV-4aresoiwedgegatevalveswhichhavenotbeendemonstrated tobesusceptible topressurelocking.ThermalBindin:DuringaLOCA,ifactionstoisolatetheLOCAcannoteaccomplished, theOperators aredirectedtoclosethePORVsorcloseV-1403orV-1405.Thesevalvescouldbeclosedathightemperature earlyinaLOCAscenariothenlaterberequiredtoopen,aligningaPORVforlowtemperature overpressure protection (LTOP)oronce-through-cooling, aftertheRCShasbeendepressurized andcooleddown.TheLTOPscenarioisconsidered tobetheboundingthermalbindingscenario.
Areviewwasconducted todetermine ifV-1403andV-1405hadeverbeenclosedhot(e.g.,toisolatealeakingPORV)andsubsequently openedtoalignforLTOP.Itwasdetermined thatbothV-1403&V-1405hadbeenusedtoisolatealeakingPORVwhentheunitwasat100%powerandsubsequently successfully openedtoalignforLTOP.Inaddition, subsequent tothisevent,thesevalveswerechangedtocloseonlimitswitch-inlieuoftorqueswitch.Theuseoflimitswitchcontrolintheclosingdirection reducesthevalveseatingloadsandthepotential forthermalbinding.Conclusion:,
V-1403andV-1405arenotsusceptible tothermalgh1bbjdhp1dworstcasethermalbindingscenario, atatimewhenthepotential ofthermalbindingwasgreaterduetotorqueswitchseatingofthevalves,andthevalvesopened.V-1403andV-1405arenotsusceptible topressurelocking.V-2504"Refueling WaterTank(RWT)Isolation Valve"Descrition:Thisvalveisa3"Velanflex-wedge gatevalvewithanSMB-actuator.
Thevalveislocatedinthe2Achargingpumpcubicleatelevation 0'9".Themaximumopeningdifferential pressureis93psid.Thevalveisnormallyclosed.Thesafety-relatedfunctionofV-2504isopentoalignthechargingpumpstotheRWTforanalternate boratedwatersupplyrequiredbyTechnical Specifications.
Thequality-related functionofV-2504istoautomatically openuponreceiptofavolumecontroltank(VCT)lowlowlevelsignaltoaligntheRWTtothechargingpump(s)suction.PressureLockin:Thereisnoseveredepressurization postulated fortepipingsystemupstreamofV-2504ontheorderofaLOCAorahigh-energy-line-break (HELB).Themostseveredepressurization wouldoccurduetolossofRWTlevel.Therefore, pressurelockingduetoupstreamdepressurization isnotcredible.
Inregardstothermalexpansion offluidtrappedinthebonnet,significant temperature changesatthisvalvearenotpostulated duetothelimitation onsolutiontemperature between55'Fand100'F.Duetothephysicallocationofthevalve,V-2504shouldremainclosetoambienttemperatures atalltimesandpressurelockingisnotaconcern.Thermal-Bindin:V-2504isrestricted bytheTechnical Specification limitation ontemperature fortheRWTof55'Fto100'F.Therefore, itispostulated thatV-2504wouldnotbeclosedhot.Therefore, thermalbindingisnotaconcern.Conclusion:
V-2504isnotsusceptible topressurelockingord'.V-2508&V-2509"BoricAcidGravityFeedValves"Descrition:V-2508&V-2509are3"Velanflex-wedge gatevalveswitSMB-actuators.
Thevalvesareloc'atedinthereactorauxiliary building(RAB)insidetheboricacidmakeuptank(BAMT)cubicleatelevation 2'-7'/,".
V-2508&V-2509arelocatedattheoutletofBAMTs.Themaximumopeningdifferential pressureis28psid.Thesafety-related functionofthesevalvesistoopenuponreceiptofasafetyinjection actuation signal(SIAS)toprovideconcentrated boratedwatertothechargingpumps.PressureLockin:Thereisnoseveredepressurization postulated fortepipingsystemupstreamofthesevalvesontheorderofaLOCAorHELB.Themostseveredepressurization wouldoccurduetochangesinboricacidmakeuptanklevel.Therefore, pressurelockingduetoupstreamdepressurization isnotcredible.
Inregardstothermalexpansion offluidtrappedinthebonnet,significant temperature changesatthesevalvesisnotpostulated becauseofthelowtemperatures inthesystem.ThermalBindin:Duetothelowtemperatures inthesystem,termainingisnotconsidered tobecredible.


==
ST.LUCIE UNIT 1 PHASE 2 GATE VALVE EVALUATION
Conclusion:==


V-2508andV-2509arenotsusceptible topressuregggg''.
==SUMMARY==
V-2514'Make-upBypasstoChargingPumps"Descrition:V-2514isa3"AnchorDarlingflex-wedge gatevalvewitanSMB-000actuator.
V-1403 and V-1405"Power Operated Relief Valve (PORV)Block Valves" Descri tion: V-1403 and V-1405 are 2'/," Velan solid wedge gate va ves wit SMB-00 actuators.
Thevalveislocatedinthereactorauxiliary building(RAB)-0.5elevation.
The valves are located in, the containment building, outside the pressurizer cubicle.The maximum opening differential pressure is 2485 psid.During power operation both block valves are required to remain open.V-1403 and V-1405 perform the safety-related function to passively maintain RCS pressure boundary.The quality-related function of these valves is to isolate the pressurizer in the event a PORV is stuck open.In addition, the PORVs are utilized for contingencies for functional recovery: RCS pressure control success path 5, PORVs and RCS and core heat removal, success path 4,"once-through-cooling".
Themaximumopeningdifferential pressureis146psid.Thevalveisnormallyclosed.Thesafety-related functionofV-2514isopentoalignthechargingpumpstotheboricacidmake-up(BAM)pumpsforanalternate boratedwatersupplyrequiredbyTechnical Specifications.
Both of these contingencies require verifying the PORV block valves are open.Pressure Lockin: No evaluation is required because V-1403 and V-4 are so i wedge gate valves which have not been demonstrated to be susceptible to pressure locking.Thermal Bindin: During a LOCA, if actions to isolate the LOCA can not e accomplished, the Operators are directed to close the PORVs or close V-1403 or V-1405.These valves could be closed at high temperature early in a LOCA scenario then later be required to open, aligning a PORV for low temperature overpressure protection (LTOP)or once-through-cooling, after the RCS has been depressurized and cooled down.The LTOP scenario is considered to be the bounding thermal binding scenario.A review was conducted to determine if V-1403 and V-1405 had ever been closed hot (e.g., to isolate a leaking PORV)and subsequently opened to align for LTOP.It was determined that both V-1403&V-1405 had been used to isolate a leaking PORV when the unit was at 100%power and subsequently successfully opened to align for LTOP.In addition, subsequent to this event, these valves were changed to close on limit switch-in lieu of torque switch.The use of limit switch control in the closing direction reduces the valve seating loads and the potential for thermal binding.Conclusion:, V-1403 and V-1405 are not susceptible to thermal g h 1 b bj d h p 1 d worst case thermal binding scenario, at a time when the potential of thermal binding was greater due to torque switch seating of the valves, and the valves opened.V-1403 and V-1405 are not susceptible to pressure locking.V-2504"Refueling Water Tank (RWT)Isolation Valve" Descri tion: This valve is a 3" Velan flex-wedge gate valve with an SMB-actuator.The valve is located in the 2A charging pump cubicle at elevation 0'9".The maximum opening differential pressure is 93 psid.The valve is normally closed.The safety-related function of V-2504 is open to align the charging pumps to the RWT for an alternate borated water supply required by Technical Specifications.
PressureLockin:Thereisnoseveredepressurization postulated fortepipingsystemupstreamofV-2514ontheorderofaLOCAorHELB.Themostseveredepressurization wouldoccurduetolossBAMTlevelorlossofaBAMpump.Therefore, pressurelockingduetoupstreamdepressurization isnotcredible.
The quality-related function of V-2504 is to automatically open upon receipt of a volume control tank (VCT)low low level signal to align the RWT to the charging pump(s)suction.Pressure Lockin: There is no severe depressurization postulated for t e piping system upstream of V-2504 on the order of a LOCA or a high-energy-line-break (HELB).The most severe depressurization would occur due to loss of RWT level.Therefore, pressure locking due to upstream depressurization is not credible.In regards to thermal expansion of fluid trapped in the bonnet, significant temperature changes at this valve are not postulated due to the limitation on solution temperature between 55'F and 100'F.Due to the physical location of the valve, V-2504 should remain close to ambient temperatures at all times and pressure locking is not a concern.Thermal-Bindin: V-2504 is restricted by the Technical Specification limitation on temperature for the RWT of 55'F to 100'F.Therefore, it is postulated that V-2504 would not be closed hot.Therefore, thermal binding is not a concern.Conclusion:
Inregardstothermalexpansion offluidtrappedinthebonnet,significant temperature changesatthisvalvearenotpostulated duetotheflowofBAMTfluidbecauseofthelimitation onsolutiontemperature
V-2504 is not susceptible to pressure locking or d'.V-2508&V-2509"Boric Acid Gravity Feed Valves" Descri tion: V-2508&V-2509 are 3" Velan flex-wedge gate valves wit SMB-actuators.
>55'Fandenvironmental conditions
The valves are loc'ated in the reactor auxiliary building (RAB)inside the boric acid makeup tank (BAMT)cubicle at elevation 2'-7'/,".V-2508&V-2509 are located at the outlet of BAMTs.The maximum opening differential pressure is 28 psid.The safety-related function of these valves is to open upon receipt of a safety injection actuation signal (SIAS)to provide concentrated borated water to the charging pumps.Pressure Lockin: There is no severe depressurization postulated for t e piping system upstream of these valves on the order of a LOCA or HELB.The most severe depressurization would occur due to changes in boric acid makeup tank level.Therefore, pressure locking due to upstream depressurization is not credible.In regards to thermal expansion of fluid trapped in the bonnet, significant temperature changes at these valves is not postulated because of the low temperatures in the system.Thermal Bindin: Due to the low temperatures in the system, t erma in ing is not considered to be credible.Conclusion:
<120'F.ThermalBindin:Duetothelimitation onsystemandenvironmental temperatures etween55'Fand120'F,thermalbindingisnotaconcern.Conclusion:
V-2508 and V-2509 are not susceptible to pressure g g gg''.
V-2514isnotsusceptible topressurelockingor~'.V-3452,V-3453,V-3456andV-3457"Shutdown CoolingHeatExchanger Isolation Valves"Descrition:Thesevalvesare10"Velanflex-wedge gatevalveswitSMB-actuators.
V-2514'Make-up Bypass to Charging Pumps" Descri tion: V-2514 is a 3" Anchor Darling flex-wedge gate valve wit an SMB-000 actuator.The valve is located in the reactor auxiliary building (RAB)-0.5 elevation.
Thevalvesarelocatedoutsidethecontainment
The maximum opening differential pressure is 146 psid.The valve is normally closed.The safety-related function of V-2514 is open to align the charging pumps to the boric acid make-up (BAM)pumps for an alternate borated water supply required by Technical Specifications.
: building, insidetheRAB,inthe1Aand1Bshutdowncoolingheatexchanger roomsatelevation 4'7".V-3452,V-3453,V-3456andV-3457arenormallylockedclosedisolation valvesthatservetoisolatetheSDCheatexchangers (HXs)fromthelowpressuresafetyinjection (LPSI)systemwhentheSDCHXsarenotinuse.Thesafety-related functionforthesevalvesistoopentoallowwarmupandoperation oftheSDCHXs.Themaximumopeningdifferential pressureis207psid.PressureLockin:FornormalSDCsystemwarm-up,forplacingtheSDCsysteminoperation, andrestoration ofSDCHXs,thesevalvesareopenedwithaLPSIpumprunning.Thereisnorapiddepressurization eventupstreamordownstream ofthesevalves(e.g.,duetoalinebreak)thatwouldrequirethesevalvestoopen.Inregardstothermalexpansion offluidtrappedinthebonnet,thesevalvesarerequiredtoopenforwarminguptheSDCsystemandforrestoring theSDCsystemtoservicefollowing isolation oftheSDCHXs.Therefore, thevalveswouldnotbeheatedpriortoopening.Forrestoration oftheSDCHX,duringthetimeframewheretheSDCHXisbypassed, thereisapotential foranincreaseinSDCsystemtemperature.
Pressure Lockin: There is no severe depressurization postulated for t e piping system upstream of V-2514 on the order of a LOCA or HELB.The most severe depressurization would occur due to loss BAMT level or loss of a BAM pump.Therefore, pressure locking due to upstream depressurization is not credible.In regards to thermal expansion of fluid trapped in the bonnet, significant temperature changes at this valve are not postulated due to the flow of BAMT fluid because of the limitation on solution temperature
However,thesevalvesarenotaffectedbythesystemtemperature increases becauseofthe
>55'F and environmental conditions
~Ie physicallocationofthevalverelativetotheSDCHXinlet/outlet linesandtheSDCbypassline.Therefore, thesevalveswillnotheatupafterclosingduetosystemtemperature increases.
<120'F.Thermal Bindin: Due to the limitation on system and environmental temperatures etween 55'F and 120'F, thermal binding is not a concern.Conclusion:
ThermalBindin:Themostlimitingscenarioforthesevalvesisuetoaossofcomponent coolingwater(CCW)totheSDCHXs.Forthisevent,thesevalvescouldbeclosedhot(300'F)andrequiredtoopenafterthesystemhascooledduetotherestoration ofCCWorduetoambientconditions.
V-2514 is not susceptible to pressure locking or~'.V-3452, V-3453, V-3456 and V-3457"Shutdown Cooling Heat Exchanger Isolation Valves" Descri tion: These valves are 10" Velan flex-wedge gate valves wit SMB-actuators.
However,thermalbindingisnotlikelybecauseitisanticipated thattherestoration ofCCWtotheSDCHXswouldbeashortevolution (i.e.,theSt.LucieUnit1Technical Specifications requirecorrective actiontorestoretheSDCloopstooperablewithin1hourorestablish otherappropriate corrective actions)andthebodyandwedgearecomposedofmaterials whichhavecomparable meancoefficients ofthermalexpansion.
The valves are located outside the containment building, inside the RAB, in the 1A and 1B shutdown cooling heat exchanger rooms at elevation 4'7".V-3452, V-3453, V-3456 and V-3457 are normally locked closed isolation valves that serve to isolate the SDC heat exchangers (HXs)from the low pressure safety injection (LPSI)system when the SDC HXs are not in use.The safety-related function for these valves is to open to allow warmup and operation of the SDC HXs.The maximum opening differential pressure is 207 psid.Pressure Lockin: For normal SDC system warm-up, for placing the SDC system in operation, and restoration of SDC HXs, these valves are opened with a LPSI pump running.There is no rapid depressurization event upstream or downstream of these valves (e.g., due to a line break)that would require these valves to open.In regards to thermal expansion of fluid trapped in the bonnet, these valves are required to open for warming up the SDC system and for restoring the SDC system to service following isolation of the SDC HXs.Therefore, the valves would not be heated prior to opening.For restoration of the SDC HX, during the time frame where the SDC HX is bypassed, there is a potential for an increase in SDC system temperature.
Therefore, thermalexpansion differences wouldbesmallandare.withinthecapability oftheactuators.
However, these valves are not affected by the system temperature increases because of the
~I e physical location of the valve relative to the SDC HX inlet/outlet lines and the SDC bypass line.Therefore, these valves will not heatup after closing due to system temperature increases.
Thermal Bindin: The most limiting scenario for these valves is ue to a oss of component cooling water (CCW)to the SDC HXs.For this event, these valves could be closed hot (300'F)and required to open after the system has cooled due to the restoration of CCW or due to ambient conditions.
However, thermal binding is not likely because it is anticipated that the restoration of CCW to the SDC HXs would be a short evolution (i.e., the St.Lucie Unit 1 Technical Specifications require corrective action to restore the SDC loops to operable within 1 hour or establish other appropriate corrective actions)and the body and wedge are composed of materials which have comparable mean coefficients of thermal expansion.
Therefore, thermal expansion differences would be small and are.within the capability of the actuators.


==
==
Conclusion:==
Conclusion:==


V-3452,V-3453,V-3456andV-3457arenotsusceptible topressurelockingand/orthermalbinding.V-34806V-3652"Shutdown CoolingIsolation Valves"Descrition:Thesevalvesare10"Velanflex-wedge gatevalveswitSMB-actuators.
V-3452, V-3453, V-3456 and V-3457 are not susceptible to pressure locking and/or thermal binding.V-3480 6 V-3652"Shutdown Cooling Isolation Valves" Descri tion: These valves are 10" Velan flex-wedge gate valves wit SMB-actuators.
Thevalvesarelocatedinthecontainment
The valves are located in the containment building, inside the secondary shield wall at elevation 34'1".V-3480 and V-3652 are the inboard (to the RCS)isolation valves that isolate 1A and 1B trains of SDC system from the RCS.The maximum opening differential pressure is 273 psid.The safety-related function for these valves is to open to align the RCS to the SDC system in order to cool the RCS from hot shutdown (Mode 4)to cold shutdown (Mode 5).Thermal Bindin: Typically, V-3480 and V-3652 are closed under hot conditions
: building, insidethesecondary shieldwallatelevation 34'1".V-3480andV-3652aretheinboard(totheRCS)isolation valvesthatisolate1Aand1BtrainsofSDCsystemfromtheRCS.Themaximumopeningdifferential pressureis273psid.Thesafety-related functionforthesevalvesistoopentoaligntheRCStotheSDCsysteminordertocooltheRCSfromhotshutdown(Mode4)tocoldshutdown(Mode5).ThermalBindin:Typically, V-3480andV-3652areclosedunderhotconditions
('F)when isolating the SDC system during heatup and opened cold (<120'F due to the valves cooling to ambient conditions).
('F)whenisolating theSDCsystemduringheatupandopenedcold(<120'Fduetothevalvescoolingtoambientconditions).
In addition, these valves could be isolated under hot conditions due to an inadvertent isolation of SDC and cool if left isolated for a significant period of time.Under these conditions, thermal binding could occur.However, it is important to note that thermal binding has not been observed in these valves when the valves are opened to align the SDC system to the RCS during a plant cooldown.Conclusion:
Inaddition, thesevalvescouldbeisolatedunderhotconditions duetoaninadvertent isolation ofSDCandcoolifleftisolatedforasignificant periodoftime.Undertheseconditions, thermalbindingcouldoccur.However,itisimportant tonotethatthermalbindinghasnotbeenobservedinthesevalveswhenthevalvesareopenedtoaligntheSDCsystemtotheRCSduringaplantcooldown.
V-3480 and V-3652 are potentially susceptible to pressure locking but not thermal binding.In addition, these valves may be susceptible to an increase in bonnet pressures above maximum RCS pressure due to ambient temperature increase associated with a main steam line break (MSLB)inside containment and due to system heatup effects after the valve bonnets have become pressurized.
These valves required a phase 3 review, the detailed valve specific analysis described in Attachment 1 (see page 1-4), in order to determine if sufficient heat input from containment is available to increase the valve bonnet temperature.
V-3481&3651"Shutdown Cooling Isolation Valves" Descri tion: These valves are 10" Velan flex-wedge gate valves wxt SMB-actuators.
The valves are located in the containment building, inside the secondary shield wall at elevation 36'9" (V-3481)and 29'7" (V-3651).V-3481 and V-3651 are the outboard (to the RCS)isolation valves that isolate lA and 1B trains of SDC system from the RCS.The maximum opening differential pressure is 273 psid.The safety-related function for these valves is to open to align the RCS to the SDC system in order to cool the RCS from hot shutdown (Mode 4)to cold shutdown (Mode 5).Thermal Bindin: Typically, V-3481 and V-3651 are closed under hot con xtz.ons'F)when isolating the SDC system during heatup and opened cold (<120'F)due to the valves cooling to ambient conditions.
In addition, these valves could be isolated under hot conditions due to an inadvertent isolation of SDC.As a result, the valves could cool if left isolated for a significant period of time due to the distance of the valves from the RCS.Under these conditions, thermal binding could occur.However, it is important to note that thermal binding has not been observed in these valves when the valves are opened to align the SDC system to the RCS during a plant cooldown.Conclusion:
V-3481 and V-3651 are potentially susceptible to p G 1'h h 11''.dd'.h 1 may be susceptible to an increase in bonnet pressures above maximum RCS pressure due to ambient temperature increase associated with a main steam line break (MSLB)inside containment after the valve bonnets have become pressurized.
These valves required a phase 3 review, the detailed valve specific analysis described in Attachment 1 (see page 1-4), in order to determine if sufficient heat input from containment is available to increase the valve bonnet temperature.
V-3662&V-3663"High Pressure Safety Injection (HPSZ)Pump Suction Valves From SDC HXs" DESCRIPTION:
V-3662&V-3663 are 4" Velan flex wedge gate valves~.h 1 1 d h at elevation 4'6".The maximum opening differential pressure is 223 psid.The safety function of these valves is to open to supply cooled water from the SDC HX to the suction of the high pressure safety injection (HPSI)pumps just prior to initiation of an recirculation actuation signal (RAS).Pressure Lockin: These valves are not affected by the rapid epressurization associated with MSLB or LOCA due their location in the emergency core cooling system (ECCS).The most significant depressurization would be associated with the starting and stopping of a LPSI pump.However, these valves are stroke tested quarterly which adequately demonstrates the capability of these valves to stroke after starting and stopping a LPSI pump.In regards to thermal expansion of fluid trapped in the bonnet, V-3662&V-3663 are required to open post-LOCA after the containment spray pumps have been injecting 55'F-100'F water from the RWT and prior to RAS.Therefore, there is no heat input into the SDC system (prior to RAS)when V-3662 and V-3663 are required to open.Thermal Bindin: It is not credible to postulate a thermal binding con ition for these valves when they are required to open to perform their safety function because the temperature of the SDC system is greater than ambient only when the SDC HXs are in-service to shutdown the unit.These valves are not cycled during the time the SDC system is aligned to the RCS to shutdown the unit.Conclusion:
V-3662 6 V-3663 are not susceptible to pressure g d/h 1 b''.1A-7 0
St.Lucie Units 1 and 2 Docket No.50-335 and 50-389 Generic Letter 95-07-180-Da Res onse APPENDIX 1B ST.LUCIE UNIT 2 GATE EVALUATION


==
==SUMMARY==
Conclusion:==
OF PRESSURE LOCKING AND THERMAL BINDING'FOR POWER OPERATED GATE VALVES P
 
ST.LUCZE UNIT 2 PHASE 2 GATE VALVE EVALUATION
V-3480andV-3652arepotentially susceptible topressurelockingbutnotthermalbinding.Inaddition, thesevalvesmaybesusceptible toanincreaseinbonnetpressures abovemaximumRCSpressureduetoambienttemperature increaseassociated withamainsteamlinebreak(MSLB)insidecontainment andduetosystemheatupeffectsafterthevalvebonnetshavebecomepressurized.
Thesevalvesrequiredaphase3review,thedetailedvalvespecificanalysisdescribed inAttachment 1(seepage1-4),inorderto determine ifsufficient heatinputfromcontainment isavailable toincreasethevalvebonnettemperature.
V-3481&3651"Shutdown CoolingIsolation Valves"Descrition:Thesevalvesare10"Velanflex-wedge gatevalveswxtSMB-actuators.
Thevalvesarelocatedinthecontainment
: building, insidethesecondary shieldwallatelevation 36'9"(V-3481)and29'7"(V-3651).
V-3481andV-3651aretheoutboard(totheRCS)isolation valvesthatisolatelAand1BtrainsofSDCsystemfromtheRCS.Themaximumopeningdifferential pressureis273psid.Thesafety-related functionforthesevalvesistoopentoaligntheRCStotheSDCsysteminordertocooltheRCSfromhotshutdown(Mode4)tocoldshutdown(Mode5).ThermalBindin:Typically, V-3481andV-3651areclosedunderhotconxtz.ons'F)whenisolating theSDCsystemduringheatupandopenedcold(<120'F)duetothevalvescoolingtoambientconditions.
Inaddition, thesevalvescouldbeisolatedunderhotconditions duetoaninadvertent isolation ofSDC.Asaresult,thevalvescouldcoolifleftisolatedforasignificant periodoftimeduetothedistanceofthevalvesfromtheRCS.Undertheseconditions, thermalbindingcouldoccur.However,itisimportant tonotethatthermalbindinghasnotbeenobservedinthesevalveswhenthevalvesareopenedtoaligntheSDCsystemtotheRCSduringaplantcooldown.


==
==SUMMARY==
Conclusion:==
V-1476 and V-1477"Power Operated Relief Valve (PORV)Block Valves" Descri tion: These valves are 3" Westinghouse flex-wedge gate va ves wit SB-00 actuators.
The valves are located in the containment building, outside the pressurizer cubicle.The maximum opening differential pressure is 2485 psid.In accordance with St.Lucie Unit 2 TS, during power operation only one block valve is permitted to remain open, the other is closed.V-1476 and V-1477 perform the safety-related function to passively maintain RCS pressure boundary.The quality-related function of these valves is to be remote-manually actuated to isolate the associated PORV in order to satisfy the"fail-closed" requirements of their respective PORV.In addition, the PORVs are utilized for contingencies for functional recovery: the RCS pressure control success path 5, PORVs, and the RCS and core heat removal success path 4, once-through-cooling.
Both of these contingencies require verifying the PORV block valves are open.Pressure Lockin: In Modes 1,2 and 3, the pressurizer level is max.ntaine so that the PORVs and safety relief valves (and V-1476&V-1477)will relieve only steam.The bonnet could be'come pressurized in a steam system and due to a large or small break LOCA, experience rapid depressurization upstream of the valve.However, the compressibility of the steam in the bonnet precludes this scenario from causing a pressure locked condition.
Steam pressurization of MOV bonnets is a pressure locking concern due to configurations that permit condensate to collect and drain into the valve bonnet (e.g., vertical pipe runs)with a subsequent temperature increase of the valve bonnet."Upright" valves have not experienced pressure locking due to steam in the bonnet.V-1476 and V-1477 are oriented in the"upright" position.Thermal Bindin: Under normal conditions, either V-1476 or V-1477 a.s c ose prior to heating up the RCS to above 325'F.In addition, the valves are demonstrated operable at least once per 92 days by operating the valve through one complete cycle of full travel (unless closed with power removed).The valves are re-opened to align for LTOP when RCS temperature is less than 240'F.There is no evidence that thermal binding occurs with these valves because these valves have performed the function of opening to align for LTOP at less than 240'F after operation in Modes 1, 2 and 3.In addition, these valves have Limitorque type SB operators which have compensating spring packs that absorb inertial closing forces and prevent excessive wedging of the disc into the seat.The installation of compensating spring packs on motor operators reduces the valve seating loads and the potential for thermal binding.Conclusion:
V-1476 and V-1477 are not susceptible to pressure g d/h 1 1''"g.


V-3481andV-3651arepotentially susceptible topG1'hh11''.dd'.h1maybesusceptible toanincreaseinbonnetpressures abovemaximumRCSpressureduetoambienttemperature increaseassociated withamainsteamlinebreak(MSLB)insidecontainment afterthevalvebonnetshavebecomepressurized.
V-2504"RWT Isolation Valve" Descri tion: This valve is a 3" Westinghouse flex-wedge gate va ve wit an SB-00 actuator.The valve is located in the 2A charging pump cubicle at elevation 0'9".The maximum opening differential pressure is 29 psid.The valve is normally closed.The safety-related function of V-2504 is open to align the charging pumps to the refueling water tank (RWT)for an alternate borated water supply required by Technical Specifications.
Thesevalvesrequiredaphase3review,thedetailedvalvespecificanalysisdescribed inAttachment 1(seepage1-4),inordertodetermine ifsufficient heatinputfromcontainment isavailable toincreasethevalvebonnettemperature.
However, credit is not taken for remote operation of V-2504 because the operator is not Class 1E.Instead, the assumption is plant operators will manually open the valve.In addition, the quality-related function if V-2504 is to automatically open upon receipt of a VCT low low level signal to align the RWT to the charging pump(s)suction.Pressure Lockin: There is no severe depressurization postulated or t e piping system upstream of V-2504 on the order of a LOCA or HELB.The most severe depressurization would occur due to loss of RWT level.Therefore, pressure locking due to upstream depressurization is not credible.In regards to thermal expansion of fluid trapped in the bonnet, significant temperature changes at this valve are not postulated due to the flow of RWT fluid because of the limitation on solution temperature between 55'F and 100'F.Thermal Bindin: Fluid temperature in V-2504 is restricted by the Tec nica Specification limitation on temperature for the RWT of 55'F to 100'F.It is postulated that V-2504 would not be closed at temperatures greater than 100'F;therefore thermal binding is not a concern.Conclusion:
V-3662&V-3663"HighPressureSafetyInjection (HPSZ)PumpSuctionValvesFromSDCHXs"DESCRIPTION:
V-2504 is not susceptible to pressure locking or d g.V-2508&V-2509"Boric Acid Gravity Feed Valves" Descri tion: V-2508&V-2509 are 3" Westinghouse flex-wedge gate va ves wit SB-00 actuators.
V-3662&V-3663are4"Velanflexwedgegatevalves~.h11dhatelevation 4'6".Themaximumopeningdifferential pressureis223psid.ThesafetyfunctionofthesevalvesistoopentosupplycooledwaterfromtheSDCHXtothesuctionofthehighpressuresafetyinjection (HPSI)pumpsjustpriortoinitiation ofanrecirculation actuation signal(RAS).PressureLockin:Thesevalvesarenotaffectedbytherapidepressurization associated withMSLBorLOCAduetheirlocationintheemergency corecoolingsystem(ECCS).Themostsignificant depressurization wouldbeassociated withthestartingandstoppingofaLPSIpump.However,thesevalvesarestroketestedquarterly whichadequately demonstrates thecapability ofthesevalvestostrokeafterstartingandstoppingaLPSIpump.Inregardstothermalexpansion offluidtrappedinthebonnet,V-3662&V-3663arerequiredtoopenpost-LOCA afterthecontainment spraypumpshavebeeninjecting 55'F-100'FwaterfromtheRWTandpriortoRAS.Therefore, thereisnoheatinputintotheSDCsystem(priortoRAS)whenV-3662andV-3663arerequiredtoopen.ThermalBindin:Itisnotcredibletopostulate athermalbindingconitionforthesevalveswhentheyarerequiredtoopentoperformtheirsafetyfunctionbecausethetemperature oftheSDCsystemisgreaterthanambientonlywhentheSDCHXsarein-service toshutdowntheunit.ThesevalvesarenotcycledduringthetimetheSDCsystemisalignedtotheRCStoshutdowntheunit.Conclusion:
The valves are located in the reactor auxiliary building (RAB)inside the boric acid makeup tank (BAMT)cubicle at elevation 13'-6.5".V-2508&V-2509 are located at the outlet of BAMTs.The maximum opening differential pressure is 16.2 psid.The safety-related function of these valves is to open upon receipt of a SIAS to provide concentrated borated water supply to the charging pumps.Pressure Lockin: There is no severe depressurization postulated or t e piping system upstream of these valves on the order of a LOCA or HELB.The most severe depressurization would occur due to changes in boric acid makeup tank level.Therefore, pressure locking due to upstream depressurization is not credible.In regards to thermal expansion of fluid trapped in the bonnet, significant temperature changes at these valves is not postulated because of the low temperatures in the system.  
V-36626V-3663arenotsusceptible topressuregd/h1b''.1A-7 0
St.LucieUnits1and2DocketNo.50-335and50-389GenericLetter95-07-180-DaResonseAPPENDIX1BST.LUCIEUNIT2GATEEVALUATION SUMMARYOFPRESSURELOCKINGANDTHERMALBINDING'FORPOWEROPERATEDGATEVALVES P
ST.LUCZEUNIT2PHASE2GATEVALVEEVALUATION SUMMARYV-1476andV-1477"PowerOperatedReliefValve(PORV)BlockValves"Descrition:Thesevalvesare3"Westinghouse flex-wedge gatevaveswitSB-00actuators.
Thevalvesarelocatedinthecontainment
: building, outsidethepressurizer cubicle.Themaximumopeningdifferential pressureis2485psid.Inaccordance withSt.LucieUnit2TS,duringpoweroperation onlyoneblockvalveispermitted toremainopen,theotherisclosed.V-1476andV-1477performthesafety-related functiontopassively maintainRCSpressureboundary.
Thequality-related functionofthesevalvesistoberemote-manually actuatedtoisolatetheassociated PORVinordertosatisfythe"fail-closed" requirements oftheirrespective PORV.Inaddition, thePORVsareutilizedforcontingencies forfunctional recovery:
theRCSpressurecontrolsuccesspath5,PORVs,andtheRCSandcoreheatremovalsuccesspath4,once-through-cooling.
Bothofthesecontingencies requireverifying thePORVblockvalvesareopen.PressureLockin:InModes1,2and3,thepressurizer levelismax.ntaine sothatthePORVsandsafetyreliefvalves(andV-1476&V-1477)willrelieveonlysteam.Thebonnetcouldbe'comepressurized inasteamsystemandduetoalargeorsmallbreakLOCA,experience rapiddepressurization upstreamofthevalve.However,thecompressibility ofthesteaminthebonnetprecludes thisscenariofromcausingapressurelockedcondition.
Steampressurization ofMOVbonnetsisapressurelockingconcernduetoconfigurations thatpermitcondensate tocollectanddrainintothevalvebonnet(e.g.,verticalpiperuns)withasubsequent temperature increaseofthevalvebonnet."Upright" valveshavenotexperienced pressurelockingduetosteaminthebonnet.V-1476andV-1477areorientedinthe"upright" position.
ThermalBindin:Undernormalconditions, eitherV-1476orV-1477a.scosepriortoheatinguptheRCStoabove325'F.Inaddition, thevalvesaredemonstrated operableatleastonceper92daysbyoperating thevalvethroughonecompletecycleoffulltravel(unlessclosedwithpowerremoved).
Thevalvesarere-opened toalignforLTOPwhenRCStemperature islessthan240'F.Thereisnoevidencethatthermalbindingoccurswiththesevalvesbecausethesevalveshaveperformed thefunctionofopeningtoalignforLTOPatlessthan240'Fafteroperation inModes1,2and3.Inaddition, thesevalveshaveLimitorque typeSBoperators whichhavecompensating springpacksthatabsorbinertialclosingforcesandpreventexcessive wedgingofthediscintotheseat.Theinstallation ofcompensating springpacksonmotoroperators reducesthevalveseatingloadsandthepotential forthermalbinding.Conclusion:
V-1476andV-1477arenotsusceptible topressuregd/h11''"g.  


V-2504"RWTIsolation Valve"Descrition:Thisvalveisa3"Westinghouse flex-wedge gatevavewitanSB-00actuator.
Thermal Bindin: Due to the low temperatures in the system, thermal inding is not considered to be credible.Conclusion:
Thevalveislocatedinthe2Achargingpumpcubicleatelevation 0'9".Themaximumopeningdifferential pressureis29psid.Thevalveisnormallyclosed.Thesafety-related functionofV-2504isopentoalignthechargingpumpstotherefueling watertank(RWT)foranalternate boratedwatersupplyrequiredbyTechnical Specifications.
V-2508 and V-2509 are not susceptible to pressure g h h''.V-2514"Boric Acid Makeup Bypass to Charging Pumps" Descri tion: V-2514 is a 3" Westinghouse flex-wedge gate valve wit an SB-00 actuator.The valve is located in the boric acid makeup (BAMT)cubicle at elevation 2'".The maximum opening differential pressure is 132.2 psid.The valve is normally closed.The safety-related function of V-2514 is open to align the charging pumps to the BAM pumps for an alternate borated water supply required by Technical Specifications.
However,creditisnottakenforremoteoperation ofV-2504becausetheoperatorisnotClass1E.Instead,theassumption isplantoperators willmanuallyopenthevalve.Inaddition, thequality-related functionifV-2504istoautomatically openuponreceiptofaVCTlowlowlevelsignaltoaligntheRWTtothechargingpump(s)suction.PressureLockin:Thereisnoseveredepressurization postulated ortepipingsystemupstreamofV-2504ontheorderofaLOCAorHELB.Themostseveredepressurization wouldoccurduetolossofRWTlevel.Therefore, pressurelockingduetoupstreamdepressurization isnotcredible.
Pressure Lockin: There is no severe depressurization postulated for t e piping system upstream of V-2514 on the order of a LOCA or HELB.The most severe depressurization would occur due to loss BAMT level or loss of a BAM pump.Therefore, pressure locking due to upstream depressurization is not credible.In regards to thermal expansion of fluid trapped in the bonnet, significant temperature changes at this valve are not postulated due to the limitation on solution temperature between 55'F and 100'F.Thermal Bindin: Due to the limitation on solution temperature etween F an 100'F, thermal binding is not a concern.Conclusion:
Inregardstothermalexpansion offluidtrappedinthebonnet,significant temperature changesatthisvalvearenotpostulated duetotheflowofRWTfluidbecauseofthelimitation onsolutiontemperature between55'Fand100'F.ThermalBindin:Fluidtemperature inV-2504isrestricted bytheTecnicaSpecification limitation ontemperature fortheRWTof55'Fto100'F.Itispostulated thatV-2504wouldnotbeclosedattemperatures greaterthan100'F;therefore thermalbindingisnotaconcern.Conclusion:
V-2514 is not susceptible to pressure locking or d'.V-3456 6 V-3457"Shutdown Cooling Heat Exchanger Outlet Valves" Descri tion: These valves are 10" Westinghouse flex-wedge gate va ves wit SB-0 actuators.
V-2504isnotsusceptible topressurelockingordg.V-2508&V-2509"BoricAcidGravityFeedValves"Descrition:V-2508&V-2509are3"Westinghouse flex-wedge gatevaveswitSB-00actuators.
The valves are located outside the containment building, inside the RAB, in the 2A and 2B safeguards rooms.V-3456 and V-3457 are normally locked closed isolation valves that serve to isolate the SDC heat exchangers from the LPSI system when the SDC HXs are not in use.The safety-related function for these valves is to open to allow warmup and operation of the SDC HXs.The maximum opening differential pressure is 269 psid.Pressure Lockin: For normal SDC system warm-up (and for placing t e SDC system in operation), these valves are opened prior to starting the LPSI pumps and before the SDC system is aligned to the RCS.There is no rapid depressurization event upstream or downstream of these valves (e.g., due to a line break)that would require these valves to open.For restoration of SDC HXs events, these valves would be closed and reopened on a loss of CCW to a SDC HX.These valves would be reopened with a LPSI pump running.Therefore, there is no depressurization event postulated in which the valves are relied upon to open.In regards to thermal expansion of fluid trapped in the bonnet, V-3456 and V-3457 are required to open for warming up the SDC system and for restoring the SDC system to service following isolation of the SDC HXs.For warmup, these valves are opened prior to starting the associated LPSI pump.Therefore, the valves would not be heated prior to opening.For restoration of the SDC HX event, the physical location of the valves prevents them from being exposed to temperature increases in the system.Thermal Bindin: For a loss of CCW to the SDC HXs, these valves cou e c osed hot and required to open after the system has cooled due to the restoration of CCW or due to ambient conditions.
Thevalvesarelocatedinthereactorauxiliary building(RAB)insidetheboricacidmakeuptank(BAMT)cubicleatelevation 13'-6.5".
However, for the following reasons, thermal binding is not likely: 1)It is expected that the restoration of CCW to the SDC HXs would be a short evolution (i.e.,<30 minutes)and these valves would likely not experience significant cooling in this time frame;2)V-3456 and V-3457 are controlled in the closed direction by position limit switches (this limits the seating force of the disc in the seats);3)V-3456 and V-3457 have SB-0 actuators installed on them.SB Limitorque operators have compensating spring packs that absorb inertial closing forces and prevent excessive wedging of the disc into the seat.The installation of compensating spring packs on motor operators reduces the valve seating loads and the potential for thermal binding;4)The body and disc are identical materials.
V-2508&V-2509arelocatedattheoutletofBAMTs.Themaximumopeningdifferential pressureis16.2psid.Thesafety-related functionofthesevalvesistoopenuponreceiptofaSIAStoprovideconcentrated boratedwatersupplytothechargingpumps.PressureLockin:Thereisnoseveredepressurization postulated ortepipingsystemupstreamofthesevalvesontheorderofaLOCAorHELB.Themostseveredepressurization wouldoccurduetochangesinboricacidmakeuptanklevel.Therefore, pressurelockingduetoupstreamdepressurization isnotcredible.
Therefore, thermal expansion differences would be small and are within the capability of the actuators.
Inregardstothermalexpansion offluidtrappedinthebonnet,significant temperature changesatthesevalvesisnotpostulated becauseofthelowtemperatures inthesystem.
 
ThermalBindin:Duetothelowtemperatures inthesystem,thermalindingisnotconsidered tobecredible.
 
==
Conclusion:==
 
V-2508andV-2509arenotsusceptible topressureghh''.V-2514"BoricAcidMakeupBypasstoChargingPumps"Descrition:V-2514isa3"Westinghouse flex-wedge gatevalvewitanSB-00actuator.
Thevalveislocatedintheboricacidmakeup(BAMT)cubicleatelevation 2'".Themaximumopeningdifferential pressureis132.2psid.Thevalveisnormallyclosed.Thesafety-related functionofV-2514isopentoalignthechargingpumpstotheBAMpumpsforanalternate boratedwatersupplyrequiredbyTechnical Specifications.
PressureLockin:Thereisnoseveredepressurization postulated fortepipingsystemupstreamofV-2514ontheorderofaLOCAorHELB.Themostseveredepressurization wouldoccurduetolossBAMTlevelorlossofaBAMpump.Therefore, pressurelockingduetoupstreamdepressurization isnotcredible.
Inregardstothermalexpansion offluidtrappedinthebonnet,significant temperature changesatthisvalvearenotpostulated duetothelimitation onsolutiontemperature between55'Fand100'F.ThermalBindin:Duetothelimitation onsolutiontemperature etweenFan100'F,thermalbindingisnotaconcern.Conclusion:
V-2514isnotsusceptible topressurelockingord'.V-34566V-3457"Shutdown CoolingHeatExchanger OutletValves"Descrition:Thesevalvesare10"Westinghouse flex-wedge gatevaveswitSB-0actuators.
Thevalvesarelocatedoutsidethecontainment
: building, insidetheRAB,inthe2Aand2Bsafeguards rooms.V-3456andV-3457arenormallylockedclosedisolation valvesthatservetoisolatetheSDCheatexchangers fromtheLPSIsystemwhentheSDCHXsarenotinuse.Thesafety-related functionforthesevalvesistoopentoallowwarmupandoperation oftheSDCHXs.Themaximumopeningdifferential pressureis269psid.PressureLockin:FornormalSDCsystemwarm-up(andforplacingteSDCsysteminoperation),
thesevalvesareopenedpriortostartingtheLPSIpumpsandbeforetheSDCsystemisalignedtotheRCS.Thereisnorapiddepressurization eventupstreamordownstream ofthesevalves(e.g.,duetoalinebreak)thatwouldrequirethesevalvestoopen.Forrestoration ofSDCHXsevents,thesevalveswouldbeclosedandreopenedonalossofCCWtoaSDCHX.ThesevalveswouldbereopenedwithaLPSIpumprunning.Therefore, thereisnodepressurization eventpostulated inwhichthevalvesarereliedupontoopen.Inregardstothermal expansion offluidtrappedinthebonnet,V-3456andV-3457arerequiredtoopenforwarminguptheSDCsystemandforrestoring theSDCsystemtoservicefollowing isolation oftheSDCHXs.Forwarmup,thesevalvesareopenedpriortostartingtheassociated LPSIpump.Therefore, thevalveswouldnotbeheatedpriortoopening.Forrestoration oftheSDCHXevent,thephysicallocationofthevalvespreventsthemfrombeingexposedtotemperature increases inthesystem.ThermalBindin:ForalossofCCWtotheSDCHXs,thesevalvescouecosedhotandrequiredtoopenafterthesystemhascooledduetotherestoration ofCCWorduetoambientconditions.
However,forthefollowing reasons,thermalbindingisnotlikely:1)Itisexpectedthattherestoration ofCCWtotheSDCHXswouldbeashortevolution (i.e.,<30minutes)andthesevalveswouldlikelynotexperience significant coolinginthistimeframe;2)V-3456andV-3457arecontrolled inthecloseddirection bypositionlimitswitches(thislimitstheseatingforceofthediscintheseats);3)V-3456andV-3457haveSB-0actuators installed onthem.SBLimitorque operators havecompensating springpacksthatabsorbinertialclosingforcesandpreventexcessive wedgingofthediscintotheseat.Theinstallation ofcompensating springpacksonmotoroperators reducesthevalveseatingloadsandthepotential forthermalbinding;4)Thebodyanddiscareidentical materials.
Therefore, thermalexpansion differences wouldbesmallandarewithinthecapability oftheactuators.


==
==
Conclusion:==
Conclusion:==


V-3456andV-3457arenotsusceptible topressuregd/h1b''.V-34806V-3652"Shutdown CoolingIsolation Valves"Descrition:Thesevalvesare10"Westinghouse flex-wedge gatevaveswitSMB-1actuators.
V-3456 and V-3457 are not susceptible to pressure g d/h 1 b''.V-3480 6 V-3652"Shutdown Cooling Isolation Valves" Descri tion: These valves are 10" Westinghouse flex-wedge gate va ves wit SMB-1 actuators.
Thevalvesarelocatedinthecontainment
The valves are located in the containment building, inside the secondary shield wall at elevation 39'0" (V-3480)and 30'6" (V-3652), respectively.
: building, insidethesecondary shieldwallatelevation 39'0"(V-3480)and30'6"(V-3652),
V-3480 and V-3652 are the in-board (to the RCS)isolation valves that isolate 2A and 2B trains of SDC from the RCS.The maximum opening differential pressure is 277 psid.The safety-related function for these valves is to open to align the RCS to the SDC system in order to cool the RCS from hot shutdown (Mode 4)to cold shutdown (Mode 5).Thermal Bindin: Typically, V-3480 and V-3652 are closed under hot con z.talons ('F)when isolating the SDC system during heatup and opened cold (<120'F)due to the valves cooling to ambient conditions.
respectively.
In addition, these valves could be isolated under hot conditions due to an inadvertent isolation of SDC.As a result, the valves could cool if left isolated for a significant period of time due to the distance of the valves from the RCS.Under these conditions, thermal binding could occur.However, it is important to note that thermal binding has not been observed in these valves when the valves are opened to align the SDC system to the RCS during a plant cooldown.  
V-3480andV-3652arethein-board(totheRCS)isolation valvesthatisolate2Aand2BtrainsofSDCfromtheRCS.Themaximumopeningdifferential pressureis277psid.Thesafety-related functionforthesevalvesistoopentoaligntheRCStotheSDCsysteminordertocooltheRCSfromhotshutdown(Mode4)tocoldshutdown(Mode5).ThermalBindin:Typically, V-3480andV-3652areclosedunderhotconz.talons('F)whenisolating theSDCsystemduringheatupandopenedcold(<120'F)duetothevalvescoolingtoambientconditions.
Inaddition, thesevalvescouldbeisolatedunderhotconditions duetoaninadvertent isolation ofSDC.Asaresult,thevalvescouldcoolifleftisolatedforasignificant periodoftimeduetothedistanceofthevalvesfromtheRCS.Undertheseconditions, thermalbindingcouldoccur.However,itisimportant tonotethatthermalbindinghasnotbeenobservedinthesevalveswhenthevalvesareopenedtoaligntheSDCsystemtotheRCSduringaplantcooldown.  


==
==
Conclusion:==
Conclusion:==


V-3480andV-3652arepotentially susceptible topCk'bh1b''.dd'.h1maybesusceptible toanincreaseinbonnetpressures abovemaximumRCSpressureduetoambienttemperature increaseassociated withaMSLBinsidecontainment afterthevalveshavebecomepressurized.
V-3480 and V-3652 are potentially susceptible to p C k'b h 1 b''.dd'.h 1 may be susceptible to an increase in bonnet pressures above maximum RCS pressure due to ambient temperature increase associated with a MSLB inside containment after the valves have become pressurized.
Thesevalvesrequiredaphase3review,the'detailed valvespecificanalysisdescribed inAttachment 1(seepage1-4),inordertodetermine ifsufficient heatinputfromcontainment isavailable toincreasethevalvebonnettemperature.
These valves required a phase 3 review, the'detailed valve specific analysis described in Attachment 1 (see page 1-4), in order to determine if sufficient heat input from containment is available to increase the valve bonnet temperature.
V-3481,V-3651&V-3545"Shutdown CoolingIsolation Valves"Descrition:Thesevalvesare10"Westinghouse flex-wedge gatevaveswitSMB-1actuators.
V-3481, V-3651&V-3545"Shutdown Cooling Isolation Valves" Descri tion: These valves are 10" Westinghouse flex-wedge gate va ves wit SMB-1 actuators.
Thevalvesarelocatedinthecontainment
The valves are located in the containment building, inside the secondary shield wall at elevation 39'0" (V-3481), 30'6" (V-3651)and 36'3" (V-3545), respectively.
: building, insidethesecondary shieldwallatelevation 39'0"(V-3481),
V-3481 and V-3651 are the outboard (to the RCS)isolation valves that isolate 2A and 2B trains of SDC system from the RCS.V-3545 is the SDC suction cross-tie isolation valve.The maximum opening differential pressure is 277 psid (V-3481&V-3651)and 275 psid (V-3545).The shutdown cooling suction lines are configured such that one of the two isolation valves in each line is powered from the 2A train, while the second isolation valve, is powered from the 2B train.The cross-tie valve (V-3545)is powered from the 480V motor control center (MCC)2AB, which can be aligned to either the 2A or 2B electrical train.This configuration was required to ensure that the SDC system could be aligned to the RCS in the event of a loss of either 2A or 2B train power.Therefore, the safety-related function for these valves is to align the RCS to the SDC system in order to cool the RCS from hot shutdown (Mode 4)to cold shutdown (Mode 5).For V-3545, the safety function is required as a redundant design feature for a loss of electrical power"to one of the electrical trains.Thermal Bindin: Typically, V-3481, V-3651 and V-3545 are closed un er ot con itions (>300'F)when isolating the SDC system during heatup and opened cold ((120'F)due to the valves cooling to ambient conditions.
30'6"(V-3651)and36'3"(V-3545),
In addition, these valves could be isolated under hot conditions due to an inadvertent isolation of SDC.As a result, the valves could cool if left isolated for a significant period of time due to the distance of the valves from the RCS.Under these conditions, thermal binding could occur.However, it is important to note that thermal binding has not been observed in these valves when the valves are opened to align the SDC system to the RCS during a plant cooldown.Conclusion:
respectively.
V-3481, V-3651, and V-3545 are potentially susceptible to pressure locking but not thermal binding.In addition, these valves may be susceptible to an increase in bonnet pressures above maximum RCS pressure due to ambient temperature increase associated with a MSLB inside containment after the valves have become pressurized.
V-3481andV-3651aretheoutboard(totheRCS)isolation valvesthatisolate2Aand2BtrainsofSDCsystemfromtheRCS.V-3545istheSDCsuctioncross-tie isolation valve.Themaximumopeningdifferential pressureis277psid(V-3481&V-3651)and275psid(V-3545).
These valves required a phase 3 review, the detailed I K' valve specific analysis described in Attachment 1 (see page 1-4), in order to determine if sufficient heat input from containment is available to increase the valve bonnet temperature.
Theshutdowncoolingsuctionlinesareconfigured suchthatoneofthetwoisolation valvesineachlineispoweredfromthe2Atrain,whilethesecondisolation valve,ispoweredfromthe2Btrain.Thecross-tie valve(V-3545)ispoweredfromthe480Vmotorcontrolcenter(MCC)2AB,whichcanbealignedtoeitherthe2Aor2Belectrical train.Thisconfiguration wasrequiredtoensurethattheSDCsystemcouldbealignedtotheRCSintheeventofalossofeither2Aor2Btrainpower.Therefore, thesafety-related functionforthesevalvesistoaligntheRCStotheSDCsysteminordertocooltheRCSfromhotshutdown(Mode4)tocoldshutdown(Mode5).ForV-3545,thesafetyfunctionisrequiredasaredundant designfeatureforalossofelectrical power"tooneoftheelectrical trains.ThermalBindin:Typically, V-3481,V-3651andV-3545areclosedunerotconitions(>300'F)whenisolating theSDCsystemduringheatupandopenedcold((120'F)duetothevalvescoolingtoambientconditions.
V-3517 and V-3658"Shutdown Cooling Heat Exchanger Inlet Isolation Valves"-3517 d-3555 11"*'g gl-dg gate valves with SB-O actuators.
Inaddition, thesevalvescouldbeisolatedunderhotconditions duetoaninadvertent isolation ofSDC.Asaresult,thevalvescouldcoolifleftisolatedforasignificant periodoftimeduetothedistanceofthevalvesfromtheRCS.Undertheseconditions, thermalbindingcouldoccur.However,itisimportant tonotethatthermalbindinghasnotbeenobservedinthesevalveswhenthevalvesareopenedtoaligntheSDCsystemtotheRCSduringaplantcooldown.
The valves are located outside the containment building, inside the reactor auxiliary building, in the 2A and 2B safeguards rooms at elevations
 
-7'10" (V-3517)and-2'8'/," (V-3658).These valves are normally locked closed isolation valves that serve todisolate the SDC heat exchangers from the LPSI system when the SDC HXs are not in use.The safety-related function for these valves is to open to allow warmup and operation of the SDC HXs.The maximum opening differential pressure is 162 psid.Pressure Lockin: For normal SDC system warm-up and for placing t e SDC system in operation, these valves are opened after starting the LPSI pumps and before the SDC system is aligned to the RCS.There is no rapid depressurization event upstream or downstream of these valves (e.g., due to a line break)that would require these valves to open-.In regards to thermal expansion of fluid trapped in the bonnet, V-3517 and V-3658 are required to open for warming up the SDC system.For warmup, these valves are opened after starting the associated LPSI pump and prior to opening the SDC HX flow control valve.Flow is routed through the SDC HX until the system heats up.Therefore, the valves would not be exposed to temperature increases prior to opening.Thermal Bindin: The most limiting scenario is isolation of V-3517 an V-ue to re-alignment of the Safety Injection system after heat up.In this scenario the valves are closed after recirculating the SDC to 150'F.During warmup to place the SDC in service, the valves would be required to open at a temperature
==
<150'F.Thermal binding is not likely because the change in temperature from removal of the SDC system from service to warming the system up is relatively small, and the body and disc are composed of the same material.Therefore, thermal expansion differences would be small.In addition, these valves have operators which have compensating spring packs that absorb inertial closing forces and prevent excessive wedging of the disc into the seat.The installation of compensating spring packs on motor operators reduces the valve seating loads and the potential for thermal binding.Conclusion:
Conclusion:==
V-3517 and V-3658 are not susceptible to pressure g d/5 1 5''.V-3664 6 V-3665"Shutdown Cooling Isolation Valves" Descri tion: These valves are 10" Westinghouse flex-wedge gate va ves wa.t SB-0 actuators.
The valves are located outside the containment building, inside the RAB at elevation 24'7" (V-3664) 0 0 and 25'0" (V-3665), respectively.
V-3664 and V-3665 are the containment isolation valves that isolate 2A and 2B trains of SDC.The maximum opening differential pressure is 269 psid.The safety-related functions for these valves is to provide containment isolation and to open to align the RCS to the SDC system in order to cool the RCS from hot shutdown (Mode 4)to cold shutdown (Mode 5).Pressure Lockin: V-3664&V-3665 are subjected to upstream pressure from the RCS during alignment for shutdown cooling.This scenario assumes that V-3664&V-3665 are opened following the opening of the upstream shutdown cooling isolation valves.There is no rapid depressurization associated with this scenario.However, if it is assumed that there is leakage past upstream isolation valves V-3664&V-3665 the line could be pressurized to 335 psig (the SDC relief valve setpoint).
However, for the depressurization of the RCS from 350 psia to 275 psia (the permissive setpoint for aligning the RCS to SDC), for MSLB or small break LOCA scenarios, the depressurization is not significantly different from the normal Plant Cooldown scenario.Therefore, it is reasonable to conclude that these valves are not susceptible to pressure locking based the capability of these valves to open for a normal plant shutdown.In regards to thermal expansion of fluid trapped in the bonnet, V-3664 and V-3665 remain closed when the SDC system is warmed-up.
However, V-3664 and V-3665 are physically isolated from the flowpath for SDC warm-up.Thermal Bindin: These valves could be closed under hot conditions (i.e., SDC cooling isolated while the RCS is still hot or inadvertent isolation of SDC), and the valve could cool if left isolated for a significant period of time due to the distance of the valve from the RCS.Under these conditions, thermal binding coul'd occur.However, these valve's have operators which have compensating spring packs that absorb inertial closing forces and prevent excessive wedging of the disc into the seat.The installation of compensating spring packs on motor operators has been identified as one method for preventing thermal binding.Therefore, V-3664 and V-3665 are not considered to be susceptible to thermal binding.Conclusion:
V-3664 and V-3665 are not susceptible to pressure g h 11''.MV-08-12&MV-08-13"2C Auxiliary Feed Water (AFW)Pump Steam Admission Valves" DESCRIPTION:
These valves are 4" Pacific double disc gate valves.1 d'y.h''differential pressure is 1015 psid.These valves are normally closed and open at high temperature (i.e., operating temperature
=532'F).These valves open upon receipt of an auxiliary feed water actuation signal (AFAS)and provide a flow path from main steam to the 2C AFW pump turbine.In addition, the valves must be capable of operating on demand to initiate 2C AFW flow to the steam generators to reduce RCS temperature to the entry temperature for initiating the SDC.Pressure Lockin: MV-08-12 and MV-08-13 could experience rapid epressurxzation upstream of the valve (e.g., MSLB, feedwater,line break).However, since these valves are steam valves, the compressibility of the steam in the bonnet precludes this scenario from causing a pressure locked condition.
Pressure locking of steam valves occurs due to configurations that permit condensate to collect and drain into the valve bonnet (e.g., vertical pipe runs)with a subsequent temperature increase of the valve bonnet.MV-08-12 and MV-08-13 are installed in horizontal pipe runs with the actuators mounted above the centerline of the pipe.Based upon the configuration of MV-08-12 and MV-08-13, it is unlikely that condensate would collect in their bonnets.Thermal Bindin: Double disc gate valves are not considered susceptx e to thermal binding.Conclusion:
MV-08-12 and MV-08-13 are not susceptible to pressure g 1 gh''.1B-9


V-3481,V-3651,andV-3545arepotentially susceptible topressurelockingbutnotthermalbinding.Inaddition, thesevalvesmaybesusceptible toanincreaseinbonnetpressures abovemaximumRCSpressureduetoambienttemperature increaseassociated withaMSLBinsidecontainment afterthevalveshavebecomepressurized.
St.Lucie Units 1 and 2 Docket No.50-335 and 50-389 Generic Letter 95-07-180-Da Res onse ATTACHMENT 2 ST.LUCIE UNIT 2
Thesevalvesrequiredaphase3review,thedetailed IK' valvespecificanalysisdescribed inAttachment 1(seepage1-4),inordertodetermine ifsufficient heatinputfromcontainment isavailable toincreasethevalvebonnettemperature.
V-3517andV-3658"Shutdown CoolingHeatExchanger InletIsolation Valves"-3517d-355511"*'ggl-dggatevalveswithSB-Oactuators.
Thevalvesarelocatedoutsidethecontainment
: building, insidethereactorauxiliary
: building, inthe2Aand2Bsafeguards roomsatelevations
-7'10"(V-3517)and-2'8'/,"(V-3658).
Thesevalvesarenormallylockedclosedisolation valvesthatservetodisolate theSDCheatexchangers fromtheLPSIsystemwhentheSDCHXsarenotinuse.Thesafety-related functionforthesevalvesistoopentoallowwarmupandoperation oftheSDCHXs.Themaximumopeningdifferential pressureis162psid.PressureLockin:FornormalSDCsystemwarm-upandforplacingteSDCsysteminoperation, thesevalvesareopenedafterstartingtheLPSIpumpsandbeforetheSDCsystemisalignedtotheRCS.Thereisnorapiddepressurization eventupstreamordownstream ofthesevalves(e.g.,duetoalinebreak)thatwouldrequirethesevalvestoopen-.Inregardstothermalexpansion offluidtrappedinthebonnet,V-3517andV-3658arerequiredtoopenforwarminguptheSDCsystem.Forwarmup,thesevalvesareopenedafterstartingtheassociated LPSIpumpandpriortoopeningtheSDCHXflowcontrolvalve.FlowisroutedthroughtheSDCHXuntilthesystemheatsup.Therefore, thevalveswouldnotbeexposedtotemperature increases priortoopening.ThermalBindin:Themostlimitingscenarioisisolation ofV-3517anV-uetore-alignment oftheSafetyInjection systemafterheatup.Inthisscenariothevalvesareclosedafterrecirculating theSDCto150'F.DuringwarmuptoplacetheSDCinservice,thevalveswouldberequiredtoopenatatemperature
<150'F.Thermalbindingisnotlikelybecausethechangeintemperature fromremovaloftheSDCsystemfromservicetowarmingthesystemupisrelatively small,andthebodyanddiscarecomposedofthesamematerial.
Therefore, thermalexpansion differences wouldbesmall.Inaddition, thesevalveshaveoperators whichhavecompensating springpacksthatabsorbinertialclosingforcesandpreventexcessive wedgingofthediscintotheseat.Theinstallation ofcompensating springpacksonmotoroperators reducesthevalveseatingloadsandthepotential forthermalbinding.Conclusion:
V-3517andV-3658arenotsusceptible topressuregd/515''.V-36646V-3665"Shutdown CoolingIsolation Valves"Descrition:Thesevalvesare10"Westinghouse flex-wedge gatevaveswa.tSB-0actuators.
Thevalvesarelocatedoutsidethecontainment
: building, insidetheRABatelevation 24'7"(V-3664) 00 and25'0"(V-3665),
respectively.
V-3664andV-3665arethecontainment isolation valvesthatisolate2Aand2BtrainsofSDC.Themaximumopeningdifferential pressureis269psid.Thesafety-relatedfunctions forthesevalvesistoprovidecontainment isolation andtoopentoaligntheRCStotheSDCsysteminordertocooltheRCSfromhotshutdown(Mode4)tocoldshutdown(Mode5).PressureLockin:V-3664&V-3665aresubjected toupstreampressurefromtheRCSduringalignment forshutdowncooling.ThisscenarioassumesthatV-3664&V-3665areopenedfollowing theopeningoftheupstreamshutdowncoolingisolation valves.Thereisnorapiddepressurization associated withthisscenario.
However,ifitisassumedthatthereisleakagepastupstreamisolation valvesV-3664&V-3665thelinecouldbepressurized to335psig(theSDCreliefvalvesetpoint).
However,forthedepressurization oftheRCSfrom350psiato275psia(thepermissive setpointforaligningtheRCStoSDC),forMSLBorsmallbreakLOCAscenarios, thedepressurization isnotsignificantly different fromthenormalPlantCooldownscenario.
Therefore, itisreasonable toconcludethatthesevalvesarenotsusceptible topressurelockingbasedthecapability ofthesevalvestoopenforanormalplantshutdown.
Inregardstothermalexpansion offluidtrappedinthebonnet,V-3664andV-3665remainclosedwhentheSDCsystemiswarmed-up.
However,V-3664andV-3665arephysically isolatedfromtheflowpathforSDCwarm-up.ThermalBindin:Thesevalvescouldbeclosedunderhotconditions (i.e.,SDCcoolingisolatedwhiletheRCSisstillhotorinadvertent isolation ofSDC),andthevalvecouldcoolifleftisolatedforasignificant periodoftimeduetothedistanceofthevalvefromtheRCS.Undertheseconditions, thermalbindingcoul'doccur.However,thesevalve'shaveoperators whichhavecompensating springpacksthatabsorbinertialclosingforcesandpreventexcessive wedgingofthediscintotheseat.Theinstallation ofcompensating springpacksonmotoroperators hasbeenidentified asonemethodforpreventing thermalbinding.Therefore, V-3664andV-3665arenotconsidered tobesusceptible tothermalbinding.Conclusion:
V-3664andV-3665arenotsusceptible topressuregh11''.MV-08-12&MV-08-13"2CAuxiliary FeedWater(AFW)PumpSteamAdmission Valves"DESCRIPTION:
Thesevalvesare4"Pacificdoublediscgatevalves.1d'y.h''differential pressureis1015psid.Thesevalvesarenormallyclosedandopenathightemperature (i.e.,operating temperature
=532'F).Thesevalvesopenuponreceiptofanauxiliary feedwateractuation signal(AFAS)andprovideaflowpathfrommainsteamtothe2CAFWpumpturbine.Inaddition, thevalvesmustbecapableofoperating ondemandtoinitiate2CAFWflowtothesteamgenerators toreduceRCStemperature totheentrytemperature forinitiating theSDC.PressureLockin:MV-08-12andMV-08-13couldexperience rapidepressurxzation upstreamofthevalve(e.g.,MSLB,feedwater,line break).However,sincethesevalvesaresteamvalves,thecompressibility ofthesteaminthebonnetprecludes thisscenariofromcausingapressurelockedcondition.
Pressurelockingofsteamvalvesoccursduetoconfigurations thatpermitcondensate tocollectanddrainintothevalvebonnet(e.g.,verticalpiperuns)withasubsequent temperature increaseofthevalvebonnet.MV-08-12andMV-08-13areinstalled inhorizontal piperunswiththeactuators mountedabovethecenterline ofthepipe.Basedupontheconfiguration ofMV-08-12andMV-08-13, itisunlikelythatcondensate wouldcollectintheirbonnets.ThermalBindin:Doublediscgatevalvesarenotconsidered susceptxetothermalbinding.Conclusion:
MV-08-12andMV-08-13arenotsusceptible topressureg1gh''.1B-9


St.LucieUnits1and2DocketNo.50-335and50-389GenericLetter95-07-180-DaResonseATTACHMENT 2ST.LUCIEUNIT2SUMMARYOFTHEOPERABILITY ASSESSMENT FORPRESSURELOCKINGOFSHUTDOWNCOOLINGPOWEROPERATEDGATEVALVESV-.3480,V-3651,ANDV-36522-1 EVALUATION AlthoughtheNRCGL95-07doesnotpermitavalvetobeexcludedfromconsideration ofpressurelockingduetolackofoccurrence atthespecificplant,orvalveleakagerate,FPLconsiders thattheactualvalveseatleakageandvalvehistorical performance areacceptable fordetermining valveoperability untilthefinalcorrective measuresareimplemented.
==SUMMARY==
Duringtheevaluation oftheUnit2SDCisolation valves(V-3480,V-3651andV-3652)forthepurposesofdemonstrating operability, theactualvalveseatleakageperformance wasutilized.
OF THE OPERABILITY ASSESSMENT FOR PRESSURE LOCKING OF SHUTDOWN COOLING POWER OPERATED GATE VALVES V-.3480, V-3651, AND V-3652 2-1 EVALUATION Although the NRC GL 95-07 does not permit a valve to be excluded from consideration of pressure locking due to lack of occurrence at the specific plant, or valve leakage rate, FPL considers that the actual valve seat leakage and valve historical performance are acceptable for determining valve operability until the final corrective measures are implemented.
TheNRCGLdidnotdiscusstheexclusion ofseatleakagefordetermining valveoperability andthisapproachdoesnotexcludethevalvesfromfurtherconsideration ofpressurelocking.Additionally, apressurelockingeventhasnotbeenidentified forthisWestinghouse valvedesign(1500psiclassflexwedgegate)oneitherSt.Lucieunit,andnonewereidentified inthereviewofNUREG-1275',
During the evaluation of the Unit 2 SDC isolation valves (V-3480, V-3651 and V-3652)for the purposes of demonstrating operability, the actual valve seat leakage performance was utilized.The NRC GL did not discuss the exclusion of seat leakage for determining valve operability and this approach does not exclude the valves from further consideration of pressure locking.Additionally, a pressure locking event has not been identified for this Westinghouse valve design (1500 psi class flex wedge gate)on either St.Lucie unit, and none were identified in the review of NUREG-1275', Volume 9, Supplement 6 to NRC GL 89-10', NRC IN 92-26'r INPO SOER 84-074.Valve Leaka e Re uired and Surveillance Data FPL has conservative y ca cu ate t at va ve seat ea age>.004 gpm for V-3480 and V-3652, and that seat leakage>0.011 gpm for V-3651 would reduce pressure in the valve bonnets and the piping between the SDC isolation valves to shutdown cooling entry conditions
Volume9,Supplement 6toNRCGL89-10',NRCIN92-26'rINPOSOER84-074.ValveLeakaeReuiredandSurveillance DataFPLhasconservative ycacuatetatvaveseateaage>.004gpmforV-3480andV-3652,andthatseatleakage>0.011gpmforV-3651wouldreducepressureinthevalvebonnetsandthepipingbetweentheSDCisolation valvestoshutdowncoolingentryconditions
(-250 psig)within 3 hours following the most limiting pressure locking scenario.The most limiting scenario for pressure locking is a MSLB inside containment.
(-250psig)within3hoursfollowing themostlimitingpressurelockingscenario.
A large break LOCA is not considered limiting because the containment sump recirculation would provide for decay heat removal, and the shutdown cooling isolation valves would not be required.A small break LOCA would result in rapid depressurization, but would not significantly heatup containment.
ThemostlimitingscenarioforpressurelockingisaMSLBinsidecontainment.
Valve seat leakage surveillance requirements specified in St.Lucie Unit 2 Technical Specification
AlargebreakLOCAisnotconsidered limitingbecausethecontainment sumprecirculation wouldprovidefordecayheatremoval,andtheshutdowncoolingisolation valveswouldnotberequired.
,(TS)4.4.6.2.3 are satisfied by performing Administrative Procedure 2-0010125A at>least once every 18 months.The surveillance test is also required if the unit enters Mode 5 and the test has not been performed in the preceding 9 months.The test is performed with a differential pressure greater than 200 psid across the valve.A review of the completed data sheets for the period from 1990 to 1995 showed that,NUREG-1275, Volume 9,"Operating Experience Feedback Report-Pressure Locking and Thermal Binding of Gate Valves" Generic Letter 89-10, Supplement 6,"Information on Schedule and Grouping, and Staff Responses to Additional Public Questions"'NRC Information Notice 92-26,"Pressure Locking of Motor Operated Flexible Wedge Gate Valves" INPO SOER Number 84-07,"Pressure Locking and Thermal Binding of Gate Valves" 2-2  
AsmallbreakLOCAwouldresultinrapiddepressurization, butwouldnotsignificantly heatupcontainment.
Valveseatleakagesurveillance requirements specified inSt.LucieUnit2Technical Specification
,(TS)4.4.6.2.3 aresatisfied byperforming Administrative Procedure 2-0010125A at>leastonceevery18months.Thesurveillance testisalsorequirediftheunitentersMode5andthetesthasnotbeenperformed inthepreceding 9months.Thetestisperformed withadifferential pressuregreaterthan200psidacrossthevalve.Areviewofthecompleted datasheetsfortheperiodfrom1990to1995showedthat,NUREG-1275, Volume9,"Operating Experience FeedbackReport-PressureLockingandThermalBindingofGateValves"GenericLetter89-10,Supplement 6,"Information onScheduleandGrouping, andStaffResponses toAdditional PublicQuestions"
'NRCInformation Notice92-26,"Pressure LockingofMotorOperatedFlexibleWedgeGateValves"INPOSOERNumber84-07,"Pressure LockingandThermalBindingofGateValves"2-2  


historically, theobservedseatleakageforthesevalveshasbeen>0.011gpm.Thisexceedstheminimumrequiredleakagetoreducebonnetpressurepriortoopeningtheisolation valvesfollowing apostulated MSLB.BasisforUtilizinTestSeatLeakaeThevalveflex-wedge hasagapetweenitsupstreamanownstream discs;thefluidinthisgapishydraulically connected tothebonnet.FortheobservedseatleakagetooccurduringtheTSsurveillance test,thedownstream discmustleakthroughtheseat.Seatleakagethroughthisdiscallowsthebonnettodepressurize duringanormalplantcooldownevolution, priortoopeningthevalvesforshutdowncoolingoperation.
historically, the observed seat leakage for these valves has been>0.011 gpm.This exceeds the minimum required leakage to reduce bonnet pressure prior to opening the isolation valves following a postulated MSLB.Basis for Utilizin Test Seat Leaka e The valve flex-wedge has a gap etween its upstream an ownstream discs;the fluid in this gap is hydraulically connected to the bonnet.For the observed seat leakage to occur during the TS surveillance test, the downstream disc must leak through the seat.Seat leakage through this disc allows the bonnet to depressurize during a normal plant cooldown evolution, prior to opening the valves for shutdown cooling operation.
Thecondition inthevalvesduringnormalheatup,operation andcooldownarepredicted tobeasfollows:1)Duringthe18-monthTSsurveillance test,thevalvesareseatleakagetestedwiththeRCSatapproximately 250psiatoobtainavalvedifferential pressuregreaterthan200psid.Theobservedseatleakagerequiresthatthedownstream dischavesomeleakage.2)DuringRCSheatup,thevalvesareclosedwiththeRCSandshutdowncoolingfluidat270psigand300'F.Notethatthedownstream isolation valvesV-3664andV-3665onthesamepipinglinebutoutsidecontainment arealsoclosedatthistime.3)DuringRCSheatupandsteadystateoperation, thevalvescooltoambienttemperature, andthedifferential pressurebetweentheRCSfluid(2250psia)andbonnetfluidforcestheupstreamdiscwedgeawayfromitsseat.Thebonnetfluidmaypressurize toRCSpressure, eitherduetothediscwedgebeingforcedawayfromitsseat,orduetoleakagethroughthematingsurfacesoftheseatanddiscwedge.Theupstreamvalvediscwedgewillre-seatwhenthedifferential pressureforceacrosstheupstreamdiscisminimized; thisoccurswhenbonnetpressureapproaches RCSpressure.
The condition in the valves during normal heatup, operation and cooldown are predicted to be as follows: 1)During the 18-month TS surveillance test, the valves are seat leakage tested with the RCS at approximately 250 psia to obtain a valve differential pressure greater than 200 psid.The observed seat leakage requires that the downstream disc have some leakage.2)During RCS heatup, the valves are closed with the RCS and shutdown cooling fluid at 270 psig and 300'F.Note that the downstream isolation valves V-3664 and V-3665 on the same piping line but outside containment are also closed at this time.3)During RCS heatup and steady state operation, the valves cool to ambient temperature, and the differential pressure between the RCS fluid (2250 psia)and bonnet fluid forces the upstream disc wedge away from its seat.The bonnet fluid may pressurize to RCS pressure, either due to the disc wedge being forced away from its seat, or due to leakage through the mating surfaces of the seat and disc wedge.The upstream valve disc wedge will re-seat when the differential pressure force across the upstream disc is minimized; this occurs when bonnet pressure approaches RCS pressure.If the outboard isolation valves (V-3481 and V-3651)have a lower seat leakage rate than the upstream isolation valves (V-3480 and V-3652), the piping between the valves may also pressurize to approximately RCS pressure.If a valve's downstream seat leakage is greater than the upstream valve wedge leakage, the bonnet may not pressurize significantly; this could pressurize downstream piping and cause pressure relief valves V-3666 or V-3667 (335 psig setpoint)to lift and discharge into the containment sump.Relief valve discharge could be observed by changes in the containment sump level, by the RCS leakage detection system, or as RCS leakage.During RCS cooldown the valve bonnet and piping between the valves will depressurize, due to the measured seat leakage through the downstream valve wedge.The time from reactor trip to entering shutdown cooling is typically 8 hours.2-3 0
Iftheoutboardisolation valves(V-3481andV-3651)havealowerseatleakageratethantheupstreamisolation valves(V-3480andV-3652),thepipingbetweenthevalvesmayalsopressurize toapproximately RCSpressure.
4)If a design basis MSLB occurs, the RCS would depressurize to 500 psia in approximately 80 seconds.Plant operators may commence a rapid cooldown to shutdown cooling entry conditions in 3 hours.Since the valves have a history of minor seat leakage through the upstream and downstream wedges and seats at low differential pressure, it is expected that valve seat leakage would occur under post-MSLB conditions to reduce bonnet pressure.However, the difference between a MSLB cooldown and a normal cooldown is that there is only a 3 hour versus 8 hour cooldown period, and the valves and piping will heatup and pressurize because containment ambient temperature will increase rapidly.Under these conditions, the required valve seat leakage rate required to reduce the pressure in the valve bonnet and piping from RCS pressure to the shutdown cooling system design pressure in 3 hours is 0.0011 gpm for valve V-3651 and 0.004 gpm for valves V-3480 and V-3652.The required valve seat leakage to the shutdown cooling system is much less than the observed seat leakage rate determined by the TS surveillance test.To ensure the continued operability of the shutdown cooling isolation valves after Fall 1995 St.Lucie Unit 2 refueling outage (SL2-9), plant personnel verified that the observed seat leakage was at least 0.01 gpm for V-3480 and V-3652, and at least 0.015 gpm for V-3651.This leakage rate provides a 35%margin between measured and required seat leakage.Basis for Extendin Corrective Action Until 1997 Refuelin Outa e T e p armed corrective action was tria imp emente on V-48 during the Fall 1995 SL2-9 refueling outage and will be replicated on the remaining three valves during the next refueling outage.In addition, the planned corrective actions for V-3480 and V-3652 will require a freeze seal and/or a full core off load.To permit better integration of the modifications into the refueling outage activities, the remaining modifications were delayed until the Spring 1997 St.Lucie Unit 2 refueling outage (SL2-10).Deferring corrective action until the next outage is not a safety issue for the following reasons: The shutdown cooling isolation valves are not required until 3 hours after a postulated accident.By that time, the bonnet pressure and piping pressure will decay to an acceptable value, based on the actual observed valve seat leakage;2)No incidence of these valves failing to open has ever been identified on either St.Lucie unit.No incidence of pressure locking has been reported to the valve vendor, or listed in the reviewed industry data;and 2-4 0
Ifavalve'sdownstream seatleakageisgreaterthantheupstreamvalvewedgeleakage,thebonnetmaynotpressurize significantly; thiscouldpressurize downstream pipingandcausepressurereliefvalvesV-3666orV-3667(335psigsetpoint) toliftanddischarge intothecontainment sump.Reliefvalvedischarge couldbeobservedbychangesinthecontainment sumplevel,bytheRCSleakagedetection system,orasRCSleakage.DuringRCScooldownthevalvebonnetandpipingbetweenthevalveswilldepressurize, duetothemeasuredseatleakagethroughthedownstream valvewedge.Thetimefromreactortriptoenteringshutdowncoolingistypically 8hours.2-3 0
The affected valves would be prioritized as medium priority using NRC GL 89-10 guidelines.
4)IfadesignbasisMSLBoccurs,theRCSwoulddepressurize to500psiainapproximately 80seconds.Plantoperators maycommencearapidcooldowntoshutdowncoolingentryconditions in3hours.Sincethevalveshaveahistoryofminorseatleakagethroughtheupstreamanddownstream wedgesandseatsatlowdifferential
For medium priority MOVs, the Nuclear Energy Institute (NEI)guidance recommends that the resources are appropriately applied relative to safety significance and priority of the MOV.2-5 l~0'0}}
: pressure, itisexpectedthatvalveseatleakagewouldoccurunderpost-MSLB conditions toreducebonnetpressure.
However,thedifference betweenaMSLBcooldownandanormalcooldownisthatthereisonlya3hourversus8hourcooldownperiod,andthevalvesandpipingwillheatupandpressurize becausecontainment ambienttemperature willincreaserapidly.Undertheseconditions, therequiredvalveseatleakageraterequiredtoreducethepressureinthevalvebonnetandpipingfromRCSpressuretotheshutdowncoolingsystemdesignpressurein3hoursis0.0011gpmforvalveV-3651and0.004gpmforvalvesV-3480andV-3652.Therequiredvalveseatleakagetotheshutdowncoolingsystemismuchlessthantheobservedseatleakageratedetermined bytheTSsurveillance test.Toensurethecontinued operability oftheshutdowncoolingisolation valvesafterFall1995St.LucieUnit2refueling outage(SL2-9),plantpersonnel verifiedthattheobservedseatleakagewasatleast0.01gpmforV-3480andV-3652,andatleast0.015gpmforV-3651.Thisleakagerateprovidesa35%marginbetweenmeasuredandrequiredseatleakage.BasisforExtendinCorrective ActionUntil1997RefuelinOutaeTeparmedcorrective actionwastriaimpementeonV-48duringtheFall1995SL2-9refueling outageandwillbereplicated ontheremaining threevalvesduringthenextrefueling outage.Inaddition, theplannedcorrective actionsforV-3480andV-3652willrequireafreezesealand/orafullcoreoffload.Topermitbetterintegration ofthemodifications intotherefueling outageactivities, theremaining modifications weredelayeduntiltheSpring1997St.LucieUnit2refueling outage(SL2-10).
Deferring corrective actionuntilthenextoutageisnotasafetyissueforthefollowing reasons:Theshutdowncoolingisolation valvesarenotrequireduntil3hoursafterapostulated accident.
Bythattime,thebonnetpressureandpipingpressurewilldecaytoanacceptable value,basedontheactualobservedvalveseatleakage;2)Noincidence ofthesevalvesfailingtoopenhaseverbeenidentified oneitherSt.Lucieunit.Noincidence ofpressurelockinghasbeenreportedtothevalvevendor,orlistedinthereviewedindustrydata;and2-4 0
Theaffectedvalveswouldbeprioritized asmediumpriorityusingNRCGL89-10guidelines.
FormediumpriorityMOVs,theNuclearEnergyInstitute (NEI)guidancerecommends thattheresources areappropriately appliedrelativetosafetysignificance andpriorityoftheMOV.2-5 l~0'0}}

Revision as of 09:59, 6 July 2018

Provides 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves.
ML17309A821
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/13/1996
From: BOHLKE W H
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-95-07, GL-95-7, L-96-31, NUDOCS 9602220094
Download: ML17309A821 (63)


Text

CATEGORY 1 REGULAT(Q INFORMATION DISTRIBUTIONOSTEM (RIDE)ACCESSION NBR:9602220094 DOC.DATE: 96/02/13 NOTARIZED:

YES FACIL:50-335 St.Lucie Plant, Unit.1, Florida Power&Light Co.50-389 St.Lucie Plant, Unit.2, Florida Power&Light Co.-AUTH.NAME AUTHOR AFFILIATION BOHLKE,W.H.

Florida Power.&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)NP DRY'UBJECT:

Provides 180-day response to GL 95-07,"Pressure Locking&Thermal Binding of Safety-Related Power-Operated Gate Valves." DOCKET I 05000335 05000389 NOTES: DISTRIBUTION CODE: A056D COPIES RECEIVED:LTR I ENCL+SIZE: T TITLE: Generic Ltr 95-07-Pressure Locking&Thermal Binding of Safety Rela E RECIPIENT ID CODE/NAME NRR/DRPE/EATON NORRIS F J Vl INTERNAL: ILE CENTER O'Il EXTERNAL: NOAC NUDOCS ABSTRACT COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-1 PD NRR/EMEB/B NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 0 D E N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE)CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR" 8 ,ENCL , 8 Florida Power&Light Company, P.O.Box 128, Fort Pierce, FL 34954-0128 I February 13, 1996 L-96-31 10 CFR 50.4 10 CFR 50.54(f)U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 RE: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Generic Letter 95-07-180-Da Res onse This letter provides the Florida Power and Light Company (FPL)180-day response to NRC Generic Letter (NRC GL)95-07"Pressure Locking and Thermal Binding of Safety Related Power Operated Gate Valves" for St.Lucie Units 1 and'.FPL letter L-95-282 dated October 11, 1995, stated that FPL plans to implement the actions proposed in NRC GL 95-07 and that the requested information would be provided on or before February 13, 1996.In addition, our response stated that if our evaluations determined that modifications were required and they would not be completed by that submission date, FPL would provide a schedule along with the necessary justification in our February 1996 submittal.

In accordance with the reporting requirements of NRC GL 95-07, Attachment 1 to this letter provides a summary of the evaluations performed to demonstrate that power operated gate valves installed at St.Lucie Units 1 and 2 will not be prevented from performing their active safety functions by the phenomena of pressure locking or thermal binding.Attachment 1 also provides the plans and schedules for the corrective actions implemented or planned to assure the susceptible power operated gate valves will remain capable of performing their intended safety functions.

Attachment 2 provides a summary of the operability assessment for the three shutdown cooling system valves that remain to be modified and the justification for our implementation schedule.The corrective actions on the remaining three valves that may be susceptible to pressure locking are scheduled to be completed during the next St.Lucie Unit 2 refueling outage (SL2-10)which is currently scheduled for the Spring of 1997.'ir602220094 960213 PDR ADQCK 05000335'PDR I., an FPL Group company

~,p>II RE: St.Lucie Units 1 and 2 Docket No.50-335 and 50-389 Generic Letter 95-07-180-Da Res onse L-96-31 This response is provided pursuant to the requirements of Section.182a of the Atomic Energy Act of 1954, as amended, and 10 CFR 50.54(f).Please contact us if there are any questions about this submittal.

Very truly yours, W.H.o lke Vice President St.Lucie Plant WHB/GRM Attachments cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant v

St.Lucie Units 1 and 2 Docket No.50-335 and 50-389 Generic Letter 95-07-180-Da Res onse STATE OF FLORIDA))COUNTY OF ST.LUCIE)ss W.H.Bohlke being first duly sworn, deposes and says: That he is Vice President, St.Lucie Plant for the Nuclear Division of Florida Power&Light Company, the Licensee herein;That he has executed the foregoing document;that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.H.o e STATE OF FLORIDA COUNTY OF St.Lucie The foregoing instrument was acknowledged before me this day of 19 g~by W.H.Bo e, who is personall known to me and who did take an oath.k'.I-Ill=4 W%>l Name of Notary Pu ic My Commission expires Commission No.95'7 2 KAREN WEST=".~$+'=,.W COMMISSION

~CCSS9929 EXPIRES APIII 18, 1998 if'>r'jj,e 80NOEO TIERI TROY FARI INEURANCE, INO.

~0~

St.Lucie Units 1 and 2~~~Docket No.50-335 and 50-389 Generic Letter 95-07-180-Da Res onse ATTACHMENT 1 ST.LUCIE UNITS j.G.2 PRESSURE LOCKING AND THERMAL BINDING OF POWER OPERATED GATE VALVES EVALUATION METHODOLOGY

SUMMARY

96O222009$

1-1 0

EVALUATION METHODOLOGY

SUMMARY

The assessment of the susceptibility of St.Lucie Units 1 and 2 power operated valves (POVs)to pressure locking and thermal binding utilized a three phase method consisting of: 2)Initial screening to eliminate POVs that obviously do not meet the conditions conducive to pressure locking and/or thermal binding.h Gate valve evaluation to determine the power operated gate valves that may be susceptible to pressure locking and/or thermal binding.3)A detailed, valve specific analysis to determine whether a power operated gate valve is susceptible to pressure locking and/or thermal binding.PHASE 1 INITIAL SCREENING CRITERIA The valve initial screening was a three step review to determine whether a POV was a valve type susceptible to pressure locking and/or thermal binding.The first step was power operated valve type screening, the second step was pressure locking susceptibility screening, and the third step was thermal binding susceptibility screening.

The results of the valve screening process of motor operated valves (MOV)for pressure locking and/or thermal binding are delineated in Table 1 for St.Lucie Unit 1 and Table 2 for St.Lucie Unit 2.The results of the valve screening process for other POVs for pressure locking and/or thermal binding are delineated in Table 3 for St.Lucie Unit 1 and Table 4 for St.Lucie Unit 2.Power 0 crated Valve T e Screenin Criteria All non-safety relate gate valves have been exclu ed with the exception of those non-safety-related gate valves that perform a safety-related or quality-related function as defined in plant operating procedures.

POVs were reviewed to determine safety significance under the NRC GL 89-10 Program.Motor operated valves (MOVs)excluded from NRC GL 89-10 Program were excluded from the evaluation.

Pressure locking and thermal binding only concerns gate valves.Therefore, all of the remaining valve designs have been excluded from the evaluation of thermal binding and pressure locking conditions.

The plant equipment database was utilized to determine the valve types.Valves pressure lock or thermally bind when opened from a full closed position.Therefore, only gate valves that have a safety-related function to open were evaluated for pressure locking and/or thermal binding.1-2 0 0 Pressure Lockin Screenin Criteria After all safety-related power-operate gate va ves were identified, this population of valves was then screened based on valve type and active safety function to determine whether there was a potential for pressure locking or thermal binding that could prevent the valves from performing their intended safety related functions.

Pressure locking can only occur in double disc or flexible wedge gate valves;therefore solid wedge designs were not evaluated for pressure locking.Valve types were based on a review of the valve drawings.Pressure locking is caused by fluid getting into the valve bonnet and between the discs of a flexible-wedge or double-disc wedge.This could prevent disc movement due to the pressure being higher in the valve bonnet and between the discs than in the valve body and the incompressibility of the fluid in the bonnet.Compressible fluids have the ability to occupy a smaller volume and allow the disc to move, whereas incompressible fluids do not.Steam systems can be susceptible to pressure locking due to the condensation of steam that may occur in the valve bonnet.Gate valves with design features that prevent pressure locking (e.g., small hole in disc, relief valve on bonnet, etc.)were screened.Thermal Bindin Screenin Criteria Double-disc parallel-seat disc va ves are not suscepti e to t ermal binding.From a review of the valve drawings, all the NRC GL 89-10 gate valves at St.Lucie are either flexible-wedge or solid-wedge design with the exception of the Unit 2 auxiliary feed water steam supply isolation valves (MV-08-12 and MV-08-13)which are double disc gate valves.The condition conducive to thermal binding is when a wedge gate valve is closed while the system is hot, then thermal binding can occur as the system cools.Therefore, thermal binding will not occur if the gate valve is closed at normal ambient temperatures.

PHASE 2 GATE VALVE EVALUATION METHODOLOGY The methodology used for the evaluation of motor operated gate valves not excluded by initial screening consisted of a pressure locking evaluation and a thermal binding evaluation.

Thirty-four motor operated vales remained to be evaluated during this phase.Summaries of the gate evaluations for the St.Lucie Unit 1 MOVs are provided in Appendix 1A.Summaries of the gate evaluations for the St.Lucie Unit 2 MOVs are provided in Appendix 1B.Pressure Lockin Evaluation Methodolo Various plant operational sequences cou intro uce con itions conducive to pressure locking.Irrespective of initial bonnet cavity fluid pressure (low or high)and temperature, it is clear that a subsequent temperature increase of the fluid could cause an increase in bonnet cavity pressure due 1-3 to thermal expansion of the fluid.The temperature increase can occur as fluid on either side of a disc heats up during various modes of plant operation or possible changes in ambient air temperature caused by plant operation, leaking pumps or valves, or in the event of a high-energy line break.In these situations, the rate of temperature increase, which may be relatively slow to very high, controls the bonnet cavity pressure and valve susceptibility to pressure locking.Conversely, a bonnet cavity filled with high pressure fluid, such as leakage from the reactor coolant system, becomes a pressure locking candidate should a loss-of-coolant accident (LOCA)or other transient cause pipe line depressurization.

Based upon the above, the evaluation for potential susceptibility of a POV to pressure locking consists of two questions:

2)Can the bonnet be pressurized due to aP across the valve and subsequently, the valve body is depressurized?

Can the bonnet be filled with fluid with a subsequent temperature increase of the fluid which causes an increase in bonnet cavity pressure due to thermal expansion?

A positive response to either of these questions indicates that a valve may be susceptible to pressure locking and further analysis is required.Thermal Bindin Evaluation Methodolo The evaluation for potentxa suscepti i ity of a power operated gate valve to thermal binding consists of one question: Can the valve be closed while hot and required to open when at a lower temperature?

A positive response to this question indicates that a gate valve may be susceptible to thermal binding and further analysis is required.PHASE 3 VALVE SPECIFIC ANALYSIS A detailed, valve specific analysis was performed on MOVs that were not excluded by either the initial valve screening or gate valve evaluation processes.

Nine motor operated valves were identified as potentially susceptible to pressure locking and/or thermal binding and were evaluated in this phase.Six valves were modified as described below.Three valves on Unit 2 remain to be modified;the basis for their continued operability is described in Attachment 2.On St.Lucie Unit 1, the shutdown cooling (SDC)system isolation valves (V-3480, V-3481, V-3651, and V-3652), which isolate the reactor coolant system (RCS)hot legs from the SDC system, are 1-4 susceptible only to pressure locking.No power operated valves were identified as being susceptible to thermal binding on Unit l.A calculation was performed to'determine the thrust required to open these valves assuming the bonnet becomes pressure locked at 2235 psig.As a result, the actuator gear ratio was changed during the Fall 1994 St.Lucie Unit 1 refueling outage (SLl-13).The modification increased the actuator capability sufficiently to overcome the worst case pressure locking scenario.Therefore, pressure locking is no longer a concern for the Unit 1 valves (V-3480, V-3481, V-3651, and V-3652).On St.Lucie Unit 2, the SDC isolation valves (V-3480, V-3481, V-3651, and V-3652), which isolate the RCS hot legs from the SDC system, and the SDC suction cross-tie valve (V-3545), are susceptible only to pressure locking., No power operated valves were identified as being susceptible to thermal binding.The corrective action for the St.Lucie Unit 2 gate valves, V-3481 and V-3545, was implemented during the Fall 1995 Unit 2 refueling outage (SL2-9).A plant modification was implemented to add an equalization hole in the high pressure side disc of V-3481 and a second modification was implemented to change the normal position of V-3545 to normally open.Attachment 2 of this letter provides a summary of the operability assessment and the schedule justification for St.Lucie Unit 2 Cycle 9 for the remaining three SDC isolation motor-operated gate valves, V-3480, V-3651 and V-3652.The corrective actions for these valves will be implemented during the St.Lucie Unit 2 Cycle 10 refueling outage (SL2-10)currently scheduled for the Spring of 1997.The modification to V-3481 was the pilot implementation of the planned corrective actions for the remaining three valves.The safety-related function of these SDC valves is to open to establish shutdown cooling for decay heat removal following a postulated accident.Since these valves are not required to open for 3 to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> following an accident, it was determined that a pressure locking condition would not exist if adequate seat leakage existed to equalize the pressure between the valve bonnet and the valve body.The known valve seat leakage would depressurize the bonnet over this time period and permit the motor operator to open the valve.1-5 TABLE j.ST.LUCIE UNIT j.PRESSURE LOCKING AND THERMAL BINDING SCREENING FOR MOTOR OPERATED VALVES VALVE NO.NRC GLi GATE'AFETY'RESSURE 89-10 VALVE FUNCTION LOCKINGb TO OPEN 1 2 3 THERMAL BINDING 1 2 v-1403 V-1405 V-2501 V-2504 v-2508 v-2509 V-2514 V-2525 v-3206 V-3207 V-3432 V-3444 V-3452 V-3453 V-3456 V-3457 v-3480 v-3481 V-3614 HCV-3615 HCV-3616 HCV-3617 V-3624 HCV-3625 YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES NO YES YES YES NO YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES NO NO NO NO YES NO YES NO NO YES YES YES YES YES YES YES YES YES YES YES YES NO NO NO NO NO YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES NO YES NO YES NO YES NO YES YES YES YES YES YES YES YES YES YES YES YES YES YES NO NO NO NO YES YES YES YES YES YES If tho answor in any of thoso columns is NO, then additional scrooning for susceptibility to prossuro locking and/or thormal binding is not roquirod.PRESSURE LOCKING SCREENING CRITERIA)If tho answer to any of tho following Questions is HO thon the valve is not susceptible to pressure locking and further evaluation is not roquirod.l.2~3.Does tho Valve have a Floxiblo-Wedge or Double-Disc Wodge Dosign2 Is tho Volvo installed in a prccoss media containing incomprossiblo fluid and/or steam2 Is tho Valvo lackin dosign features that prevent prossuro locking (o.g., small hole in disc, roliof va vo on bcnnot, otc.).2 THERHAL BINDIHG SCREENIHG CRITERIA: If tho answer to any of tho following Questions is NO, then the valve is not susceptible to thormal binding and further evaluation is not required.l.2~Does tho Valve have a Flexible-Wedge, Solid-Wedgo or Split-Wodge Design'2 Can tho Valvo bo closed under temperature conditions greater than normal ambient conditions or duo to HOT ambient conditions (o.g., HELB or HSLB/LOCA) 2 1-6 TABLE j.ST.LUCIE UNIT j.PRESSURE LOCKING AND THERMAL BINDING SCREENING FOR NOTOR OPERATED VALVES VALVE NO.NRC GLi GATE'AFETY'RESSURE 89-10 VALVE FUNCTION LOCKINGb 1 2 3 THERMAL BINDING 1 2 HCV-3626 HCV-3627 v-3634 HCV-3635 HCV-3636 HCV-3637 V-3644 HCV-3645 HCV-3646 HCV-3647 V-3651 v-3652 V-3653 V-3654.V-3655 V-3656 V-3659 V-3660 v-3662 v-3663 MV-02-1 MV-02-2 MV-03-2 Mv-03-1A YES YES NO YES YES YES NO YES YES YES YES YES NO YES NO YES YES YES YES YES NO NO YES YES NO NO NO NO NO NO NO NO YES YES YES YES YES YES YES YES NO NO YES YES NO NO NO NO YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES If ths answer in any of these columns is NO, then additional screening for susceptibility to pressure locking and/or thermal binding is not required.PRESSURE LOCKING SCREENING CRITERIA)If the answer to any of the following Questions is NO then the valve is not susceptible to pressuro locking and further evaluation is not required.1.2~3.Does ths Valve havo a Floxiblo-Wedge or Double-Disc Wodge Dosign2 Is tho Valve installed in a procoss media containing incomprossiblo fluid and/or steam?Is tho Valvo~lackin design features that prevent pressure locking (o.g., small hole in disc, relief~va vo on bonnot, otc.).2 THERMAL BINDING SCREENING CRITERIA: If tho answer to any of tho following Questions is NO, thon tho valve is not susceptible to thermal binding and further evaluation is not required.1.2.Does tho Valve have a Flexible-Wedge, Solid-Wedge or Split-Wsdgo Design2 Can the Valve be closed undor temperature conditions greater than normal ambient conditions or due to HOT ambient conditions (e.g., HELB or MSLB/LOCA) 2 1-7 0 e I TABLE j.ST.LUCIE UNIT j.PRESSURE LOCKING AND THERMAL BINDING SCREENING FOR MOTOR OPERATED VALVES VALVE NO.NRC GL'ATEa SAFETY'RESSURE 89-10 VALVE FUNCTION LOCKINGb TO OPEN 1 2 3 THERMPJ BINDINGc 1 2 MV-03-1B MV-07-lA MV-07-1B MV-07-2A MV-07-2B MV-08-1A MV-08-1B MV-08-3 MV-08-13 MV-08-14 MV-09-1 MV-09-2 MV-09-7 MV-09-8 MV-09-9 MV-09-10 MV-09-11 MV-09-12 MV-09-13 MV-09-14 MV-14-1 MV-14-2 MV-14-3 MV-14-4 YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES NO NO NO NO NO NO NO NO NO NO YES YES YES YES NO NO NO NO NO NO NO NO NO NO NO NO NO NO a If tho answor in any of thoso columns is NO, thon additional screening for susceptibility to pressuro locking and/or thermal binding is not required.PRESSURE LOCKING SCREENING CRITERIAI If the answer to any of tho following Questions is NO thon tho valve is not susceptible to prossuro locking and further evaluation is not required.1.2.3.Doss tho Valvo have a Flexible-Wedge or Double-Disc Wedge Design?Is the Valvo installed in a process media containing incompressible fluid and/or steam?Is tho Valvo lackin dosign featuros that prevent pressure locking (e.g., smell bolo in disc, reliof va vo on bonnet, etc.).T THERHAL BINDING SCREENING CRITERIA: If the answer to any of the following Questions is NO, then the valve is not susceptible to thermal binding and further evaluation is not required.1~2.Doos tho Valve have a Flexible-Wedge, Solid-Wedge or Split-Wedge Design?Can tho Valvo bo closed under temperature conditions greater than normal aabient conditions or duo to HOT aabiont conditions

{e.g., HELB or HSLB/LOCA) 2 1-8 TABLE j.ST.LUCIE UNIT j.PRESSURE LOCKING AND THERMAL BINDING SCREENING FOR MOTOR OPERATED VALVES NRC GLi GATEAU SAFETY'ALVF NO.89-10 VALVE FUNCTION TO OPEN PRESSURE LOCKINGb 1 2 3 THERMAL BINDINGc 1 2 MV-14-5 mr-14-6 MV-14-7 MV-14-8 MV-15-1 MV-18-1 MV-21-2 MV-21-3 FCV-25-9 YES YES YES YES YES YES YES YES YES NO NO NO NO YES YES NO NO NO NO NO If the answer in any of these columns is HO, then additional screening for susceptibility to pressure locking and/or thermal binding is not required.PRESSURE LOCKING SCREENING CRITERIAI If the answer to any of the following Questions is HO then the valve is not susceptible to pressure locking and further evaluation is not required.l.2.3.Does the Valve have a I'lexible-Wedge or Double-Disc Wedge Design?Is the Valve installed in a process media containing incompressible fluid and/or steam?Is the Valve lacklnc[design features that prevent pressure locking (e.g., small hole in disc, relief~va ve on bonnet, etc.).T THERMAL BINDING SCREENING CRITERIA: If the answer to any of the following Questions is NO, then the valve is not susceptible to thermal binding and further evaluation is not required.l.2.Does the Valve have a plexible-Wedge, Solid-Wedge or Split-Wedge Design?Can the Valve be closed under temperature conditions greater than normal ambient conditions or due to HOT ambient conditions (e.g., HELB or MSLB/LOCA)

I 1-9 v'5'Q~~p TABLE 2 ST.LUCIE UNIT 2 PRESSURE LOCKING AND THERMAL BINDING SCREENING FOR MOTOR OPERATED VALVES VALVE NO.HRC GLa 89-10 GATE a VALVE SAFETY a FUNCTION TO OPEN PRESSURE LOCKING b 1 2 3 THERMAL BINDIHG c 1 2 V-1476 V-1477 V-2185 V-2501 V-2504 v-2508 V-2509 V-2514 V-2525 v-2553 V-2554 V-2555 V-2598 FCV-3301 FCV-3306 V-3432 V-3444 V-3456 V-3457 V-3480 V-3481 HCV-, 3512 V-3517 V-3523 V-3536 v-3539 YES YES NO YES YES YES YES YES YES YES YES YES NO YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES NO NO NO NO NO YES YES YES YES YES YES NO YES NO NO NO YES YES NO YES YES YES YES NO NO NO YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES ,YES YES YES YES YES YES YES YES YES YES YES YES NO NO NO NO YES YES YES YES YES If tho answor in any of these columns is HO, then additional screening for susceptibility to pressure locking and/cr thermal binding is not required.PRESSURE LOCKING SCREENING CRITERIA1 Ii the answer to any of the following Questions is NO thon tho valve is not susceptible to prossure locking and further evaluation is not required.1~2.3.Does the Valve have a Floxiblo-Wedge or Double-Disc Wedge Design?Is the Valve installed in a procoss modia containing incomprossible fluid and/or steam?Is tho Valve~lackin dosign featuros that prevont prossure locking (o.g., small hole in disc, relief~va vo on bonnet, otc.).T c THERMAL BINDING SCREENIHG CRITERIA: If the answer to any of the following Questions is NO, thon tho valve is not susceptible to thermal binding and further evaluation is not required.1.2~Does the Valve have a Flexible-Wedge, Solid-Wedge or Split-Wedge Design?Can the Valve bo closed under temporaturo conditions greater than normal ambiont conditions or due to HOT ambient conditions (o.g., HELB or MSLB/LOCA)T 1-10 TABLE 2 ST.LUCIE UNIT 2 PRESSURE LOCKING AND THERMAL BINDING SCREENING FOR MOTOR OPERATED VALVES VALVE NO.HRC OLa 89-10 GATEa VALVE SAFETY a PRESSVRE LOCHIHO b FUNCTIOH 1 2 3 TO OPEN THERMAL BINDIHG c 1 2 V-3540 V-3545 V-3550 V-3551 v-3614 HCV-3615 HCV-3616 HCV-3617 V-3624 HCV-3625 HCV-3626 HCV-3627 v-3634 HCV-3635 HCV-3636 HCV-3637 V-3644 HCV-3645 HCV-3646 HCV-3647 V-3651 V-3652 V-3654 V-3656 HCV-3657 v-3658 YES YES YES YES NO YES YES YES NO YES YES YES NO YES YES YES NO YES YES YES YES YES YES YES YES YES NO YES NO NO~NO NO NO NO NO NO NO NO NO NO NO NO YES YES YES YES NO YES YES YES NO NO YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES If the answer in any of these columns is NO, then.additional screening for susceptibility to prossure locking and/or thermal binding is not required.PRESSURE LOCKING SCREENING CRITERIA)If the answer to any of tho following Questions is HO then tho valve is not susceptible to prossuro locking and further evaluation is not roquirod.1~2.3.Does the Valve have a Flexible-Wodge or Double-Disc Wedge Design?Is ths Valve installed in a process media containing incompressible fluid and/or steam?Is the Valve lackin design features that prevent pressure locking{o.g., small hole in disc, relief va vo on bonnet, stc.)~2 THERMAL BINDING SCREENING CRITERIA: If the answer to any of the following Questions is NO, then the valve is not suscoptiblo to thermal binding and further evaluation is not required.1.2.Does the Valve have a Flexible-Wedge, Solid-Wedge or Split-Wedge DesignT Can the Valve be closed under tomperaturo conditions greater than normal ambient conditions or due to HOT ambient conditions

{o.g., HELB or MSLB/LOCA)2 1-11 I

TABLE 2 ST.LUCIE UNIT 2 PRESSURE LOCKING AND THERMAL BINDING SCREENING FOR MOTOR OPERATED VALVES VALVE NO.NRC GLa 89-10 GATE VALVE SAFETY a FVNCTION TO OPEN PRESSVRE LOCHIHG b 1 2 3 THERMAL BIHDIHG c 1 2 V-3659 v-3660 v-3664 v-3665 mr-07-1A MV-07-1B MV-07-2A MV-07-2B MV-08-1A MV-08-1B MV-08-3 MV-08-12 MV-08-13 mr-08-14 MV-08-15 MV-08-16 MV-08-17 MV-08-18A MV-08-18B MV-08-19A MV-08-19B MV-09-9 MV-09-10 MV-09-11 MV-09-12 MV-09-13 YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES NO YES YES YES YES NO NO NO NO NO NO NO YES YES YES YES YES YES NO NO NO NO NO NO NO NO NO NO YES YES YES YES NO NO NO NO YES YES YES YES YES YES YES YES YES YES YES YES YES YES NO NO YES YES If tho answer in any of thoso columns is NO, then additional screening for susceptibility to pressure locking and/or thermal binding is not required.PRESSURE LOCKING SCREENING CRITERIA;If tho answer to any of the following Questions is NO then the valve is not susceptible to pressure locking and further evaluation is not required.l.2.3.Does tho Valvo have a Flexible-Wedge or Double-Disc Wedgo Design?Is the Valvo installed in a process media containing incompressible fluid and/or steam?Is tho Valvo~lsckin dosign features that provont pressure locking (o.g., small holo in disc, roliof~va vo on bonnot, otc.).T THERMAL BINDING SCREENIHG CRITERIA: If tho answer to any of tho following Questions is NO, thon tho valve is not suscoptiblo to thermal binding and further evaluation is not roquired.1.2.Does tho Valvo have a Flexible-Wedge, Solid-Wedgo or Split-Wedge Design?Can the Valve bo closed under temperature conditions greater than normal ambient conditions or due to HOT ambient conditions

{e.g., HELB or MSLB/LOCA)T 1-12 TABLE 2 ST.LUCIE UNIT 2 PRESSURE LOCKING AND THERMAL BINDING SCREENING FOR MOTOR OPERATED VALVES VALVE NO.NRC GL'g-IO GATEa VAI VE SAFETY a PRESSVRE LOCNING" FUNCTION 1 2 3 TO OPEN THERMAL BINDIHG c 1 2 MV-09-14 MV-14-1 MV-14-2 MV-14-3 MV-14-4 MV-14-9 MV-14-10 MV-14-11 MV-14-12 MV-14-13 MV-14-14 MV-14-15 MV-14-16 MV-14-17 MV-14-18 MV-14-19 MV-14-20 MV-21-2 MV-21-3 MV-21-4A MV-21-4B FCV-25-29 FCV-25-32 FCV-25-33 FCV-25-34 NO YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO If the answer in any of these columns is NO, then additional screening for susceptibility to pressure locking and/or thermal binding is not required.PRESSURE LOCKING SCREENING CRITERIAr If the answer to any of tho following Questions is NO then tho valvo is not suscoptiblo to pressure locking and further evaluation is not required.l.2.3~Does the Valve have a Floxiblo-Wodge or Double-Disc Wedgo Design?Is the Valve installed in a procoss media containing incompressiblo fluid and/or steam?Is the Valve lackin dosign features that prevent pressure locking{e.g., small hole in disc, relief va vo on bonnet, etc.).?THERMAL BINDING SCREEHING CRITERIA: If tho answor to any of tho following Questions is NO, then the valve is not susceptible to thermal binding and further evaluation is not required.l.2.Does tho Valve have a Floxiblo-Wodge, Solid-Wedgo or Split-Wodgo Dosign?Can the Valve bo closed under temperature conditions qroator than normal ambient conditions or due to HOT ambient conditions (e.g., HELB or MSLB/LOCA)?

1-13

TABLE 3 ST.LUCIE UNIT j.PRESSURE LOCKING AND THERMAL BINDING SCREENING OF POWER OPERATED VALVES VALVE NO.POV~GATE VALVE SAFETY'UNCTION TO OPEN PRESSURE LOCKING a 1 2 3 THERMAL BIHDIHG~1 2 V-3459 YES NO If the answer in any of those columns is NO, then additional screoning for susceptibility to pressure locking and/or thormal binding is not required.h PRESSURE LOCKIHG SCREENING CRITERIA'f the answer to any of tho following Questions is NO thon the valve is not susceptible to pressure locking and further evaluation is not roquired.1.2.3.Does tho Valvo have a Flexible-Wedge or Double-Disc Wedge Design?Is the Valve installed in a procoss media containing incompressible fluid and/or steam?Is the Valve~lackin dosign foatures that provont prossuro locking (o.g., small halo in disc, relief~va vo on bonnet, otc.).T c THERMAL BINDING SCREENING CRITERIA: If the answer to any of tho following Questions 1s HO, thon tho valvo is not susceptible to thermal binding and further evaluation is not required.1.2.Does tho Valve havo a Flexible-Wedge, Solid-Wedge or Split-Wedge Design?Can tho Valve bo closed under temperature conditions greater than normal ambient conditions or due to HOT ambiont conditions (e.g., HELB or MSLB/LOCA)T 1-14 TABLE 4 ST.LUCIE UNIT 2 PRESSURE LOCKING AND THEKItAL BINDING SCREENING FOR POWER OPERATED VALVES VALVE NO.FCV-07-1A FCV-07-1B HCV-09-1A HCV-09-1B HCV-09-2A HCV-09-2B POV'ATE VALVE YES YES YES YES YES YES SAFETY'UNCTION TO OPEN YES YES NO NO NO NO PRESSURE LOCKINGn 1 2 3 NO NO THERMPJ BINDING 1 2 NO NO If tho answer in any of these columns is NO, then additional screening for susceptibility to pressure locking and/or thormal binding is not required.PRESSURE LOCKING SCREENING CRITERIA'f tho answer to any of tho following Questions is NO thon tho valve is not susceptiblo to prossuro locking and further evaluation is not requirod.l.2.3.Does the Valve have a Floxiblo-Wodgo or Double-Disc Wedge Design2 Is tho Valve installed in a procoss media containing incompressible fluid and/or stoam2 Is tho Valve~lackin design foaturos that prevent prossuro locking (e.g., small holo in disc, relief~va vo on bonnet, etc.).2 THERHAL BINDING SCREENING CRITERIA: If tho answor to any of tho following Questions is NO, then the valve is not susceptible to thermal binding and further evaluation is not required.l.2.Does the Valve have a Flexible-Wodge, Solid-Wedge or Split-Wedge Design2 Can the Valve be closed under temperature conditions greater than normal ambient conditions or due to HOT ambient conditions

{e.g., HELB or HSLB/LOCA)2 1-15

~~St.Lucie Units 1 and 2 Docket No.50-335 and 50-389 Generic Letter 95-07-180-Da Res onse APPENDIX 1A ST.LUCIE UNIT 1 GATE EVALUATION

SUMMARY

OF PRESSURE LOCKING AND THERMAL BINDING FOR POWER OPERATED GATE VALVES

ST.LUCIE UNIT 1 PHASE 2 GATE VALVE EVALUATION

SUMMARY

V-1403 and V-1405"Power Operated Relief Valve (PORV)Block Valves" Descri tion: V-1403 and V-1405 are 2'/," Velan solid wedge gate va ves wit SMB-00 actuators.

The valves are located in, the containment building, outside the pressurizer cubicle.The maximum opening differential pressure is 2485 psid.During power operation both block valves are required to remain open.V-1403 and V-1405 perform the safety-related function to passively maintain RCS pressure boundary.The quality-related function of these valves is to isolate the pressurizer in the event a PORV is stuck open.In addition, the PORVs are utilized for contingencies for functional recovery: RCS pressure control success path 5, PORVs and RCS and core heat removal, success path 4,"once-through-cooling".

Both of these contingencies require verifying the PORV block valves are open.Pressure Lockin: No evaluation is required because V-1403 and V-4 are so i wedge gate valves which have not been demonstrated to be susceptible to pressure locking.Thermal Bindin: During a LOCA, if actions to isolate the LOCA can not e accomplished, the Operators are directed to close the PORVs or close V-1403 or V-1405.These valves could be closed at high temperature early in a LOCA scenario then later be required to open, aligning a PORV for low temperature overpressure protection (LTOP)or once-through-cooling, after the RCS has been depressurized and cooled down.The LTOP scenario is considered to be the bounding thermal binding scenario.A review was conducted to determine if V-1403 and V-1405 had ever been closed hot (e.g., to isolate a leaking PORV)and subsequently opened to align for LTOP.It was determined that both V-1403&V-1405 had been used to isolate a leaking PORV when the unit was at 100%power and subsequently successfully opened to align for LTOP.In addition, subsequent to this event, these valves were changed to close on limit switch-in lieu of torque switch.The use of limit switch control in the closing direction reduces the valve seating loads and the potential for thermal binding.Conclusion:, V-1403 and V-1405 are not susceptible to thermal g h 1 b bj d h p 1 d worst case thermal binding scenario, at a time when the potential of thermal binding was greater due to torque switch seating of the valves, and the valves opened.V-1403 and V-1405 are not susceptible to pressure locking.V-2504"Refueling Water Tank (RWT)Isolation Valve" Descri tion: This valve is a 3" Velan flex-wedge gate valve with an SMB-actuator.The valve is located in the 2A charging pump cubicle at elevation 0'9".The maximum opening differential pressure is 93 psid.The valve is normally closed.The safety-related function of V-2504 is open to align the charging pumps to the RWT for an alternate borated water supply required by Technical Specifications.

The quality-related function of V-2504 is to automatically open upon receipt of a volume control tank (VCT)low low level signal to align the RWT to the charging pump(s)suction.Pressure Lockin: There is no severe depressurization postulated for t e piping system upstream of V-2504 on the order of a LOCA or a high-energy-line-break (HELB).The most severe depressurization would occur due to loss of RWT level.Therefore, pressure locking due to upstream depressurization is not credible.In regards to thermal expansion of fluid trapped in the bonnet, significant temperature changes at this valve are not postulated due to the limitation on solution temperature between 55'F and 100'F.Due to the physical location of the valve, V-2504 should remain close to ambient temperatures at all times and pressure locking is not a concern.Thermal-Bindin: V-2504 is restricted by the Technical Specification limitation on temperature for the RWT of 55'F to 100'F.Therefore, it is postulated that V-2504 would not be closed hot.Therefore, thermal binding is not a concern.Conclusion:

V-2504 is not susceptible to pressure locking or d'.V-2508&V-2509"Boric Acid Gravity Feed Valves" Descri tion: V-2508&V-2509 are 3" Velan flex-wedge gate valves wit SMB-actuators.

The valves are loc'ated in the reactor auxiliary building (RAB)inside the boric acid makeup tank (BAMT)cubicle at elevation 2'-7'/,".V-2508&V-2509 are located at the outlet of BAMTs.The maximum opening differential pressure is 28 psid.The safety-related function of these valves is to open upon receipt of a safety injection actuation signal (SIAS)to provide concentrated borated water to the charging pumps.Pressure Lockin: There is no severe depressurization postulated for t e piping system upstream of these valves on the order of a LOCA or HELB.The most severe depressurization would occur due to changes in boric acid makeup tank level.Therefore, pressure locking due to upstream depressurization is not credible.In regards to thermal expansion of fluid trapped in the bonnet, significant temperature changes at these valves is not postulated because of the low temperatures in the system.Thermal Bindin: Due to the low temperatures in the system, t erma in ing is not considered to be credible.Conclusion:

V-2508 and V-2509 are not susceptible to pressure g g gg.

V-2514'Make-up Bypass to Charging Pumps" Descri tion: V-2514 is a 3" Anchor Darling flex-wedge gate valve wit an SMB-000 actuator.The valve is located in the reactor auxiliary building (RAB)-0.5 elevation.

The maximum opening differential pressure is 146 psid.The valve is normally closed.The safety-related function of V-2514 is open to align the charging pumps to the boric acid make-up (BAM)pumps for an alternate borated water supply required by Technical Specifications.

Pressure Lockin: There is no severe depressurization postulated for t e piping system upstream of V-2514 on the order of a LOCA or HELB.The most severe depressurization would occur due to loss BAMT level or loss of a BAM pump.Therefore, pressure locking due to upstream depressurization is not credible.In regards to thermal expansion of fluid trapped in the bonnet, significant temperature changes at this valve are not postulated due to the flow of BAMT fluid because of the limitation on solution temperature

>55'F and environmental conditions

<120'F.Thermal Bindin: Due to the limitation on system and environmental temperatures etween 55'F and 120'F, thermal binding is not a concern.Conclusion:

V-2514 is not susceptible to pressure locking or~'.V-3452, V-3453, V-3456 and V-3457"Shutdown Cooling Heat Exchanger Isolation Valves" Descri tion: These valves are 10" Velan flex-wedge gate valves wit SMB-actuators.

The valves are located outside the containment building, inside the RAB, in the 1A and 1B shutdown cooling heat exchanger rooms at elevation 4'7".V-3452, V-3453, V-3456 and V-3457 are normally locked closed isolation valves that serve to isolate the SDC heat exchangers (HXs)from the low pressure safety injection (LPSI)system when the SDC HXs are not in use.The safety-related function for these valves is to open to allow warmup and operation of the SDC HXs.The maximum opening differential pressure is 207 psid.Pressure Lockin: For normal SDC system warm-up, for placing the SDC system in operation, and restoration of SDC HXs, these valves are opened with a LPSI pump running.There is no rapid depressurization event upstream or downstream of these valves (e.g., due to a line break)that would require these valves to open.In regards to thermal expansion of fluid trapped in the bonnet, these valves are required to open for warming up the SDC system and for restoring the SDC system to service following isolation of the SDC HXs.Therefore, the valves would not be heated prior to opening.For restoration of the SDC HX, during the time frame where the SDC HX is bypassed, there is a potential for an increase in SDC system temperature.

However, these valves are not affected by the system temperature increases because of the

~I e physical location of the valve relative to the SDC HX inlet/outlet lines and the SDC bypass line.Therefore, these valves will not heatup after closing due to system temperature increases.

Thermal Bindin: The most limiting scenario for these valves is ue to a oss of component cooling water (CCW)to the SDC HXs.For this event, these valves could be closed hot (300'F)and required to open after the system has cooled due to the restoration of CCW or due to ambient conditions.

However, thermal binding is not likely because it is anticipated that the restoration of CCW to the SDC HXs would be a short evolution (i.e., the St.Lucie Unit 1 Technical Specifications require corrective action to restore the SDC loops to operable within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or establish other appropriate corrective actions)and the body and wedge are composed of materials which have comparable mean coefficients of thermal expansion.

Therefore, thermal expansion differences would be small and are.within the capability of the actuators.

==

Conclusion:==

V-3452, V-3453, V-3456 and V-3457 are not susceptible to pressure locking and/or thermal binding.V-3480 6 V-3652"Shutdown Cooling Isolation Valves" Descri tion: These valves are 10" Velan flex-wedge gate valves wit SMB-actuators.

The valves are located in the containment building, inside the secondary shield wall at elevation 34'1".V-3480 and V-3652 are the inboard (to the RCS)isolation valves that isolate 1A and 1B trains of SDC system from the RCS.The maximum opening differential pressure is 273 psid.The safety-related function for these valves is to open to align the RCS to the SDC system in order to cool the RCS from hot shutdown (Mode 4)to cold shutdown (Mode 5).Thermal Bindin: Typically, V-3480 and V-3652 are closed under hot conditions

('F)when isolating the SDC system during heatup and opened cold (<120'F due to the valves cooling to ambient conditions).

In addition, these valves could be isolated under hot conditions due to an inadvertent isolation of SDC and cool if left isolated for a significant period of time.Under these conditions, thermal binding could occur.However, it is important to note that thermal binding has not been observed in these valves when the valves are opened to align the SDC system to the RCS during a plant cooldown.Conclusion:

V-3480 and V-3652 are potentially susceptible to pressure locking but not thermal binding.In addition, these valves may be susceptible to an increase in bonnet pressures above maximum RCS pressure due to ambient temperature increase associated with a main steam line break (MSLB)inside containment and due to system heatup effects after the valve bonnets have become pressurized.

These valves required a phase 3 review, the detailed valve specific analysis described in Attachment 1 (see page 1-4), in order to determine if sufficient heat input from containment is available to increase the valve bonnet temperature.

V-3481&3651"Shutdown Cooling Isolation Valves" Descri tion: These valves are 10" Velan flex-wedge gate valves wxt SMB-actuators.

The valves are located in the containment building, inside the secondary shield wall at elevation 36'9" (V-3481)and 29'7" (V-3651).V-3481 and V-3651 are the outboard (to the RCS)isolation valves that isolate lA and 1B trains of SDC system from the RCS.The maximum opening differential pressure is 273 psid.The safety-related function for these valves is to open to align the RCS to the SDC system in order to cool the RCS from hot shutdown (Mode 4)to cold shutdown (Mode 5).Thermal Bindin: Typically, V-3481 and V-3651 are closed under hot con xtz.ons'F)when isolating the SDC system during heatup and opened cold (<120'F)due to the valves cooling to ambient conditions.

In addition, these valves could be isolated under hot conditions due to an inadvertent isolation of SDC.As a result, the valves could cool if left isolated for a significant period of time due to the distance of the valves from the RCS.Under these conditions, thermal binding could occur.However, it is important to note that thermal binding has not been observed in these valves when the valves are opened to align the SDC system to the RCS during a plant cooldown.Conclusion:

V-3481 and V-3651 are potentially susceptible to p G 1'h h 11.dd'.h 1 may be susceptible to an increase in bonnet pressures above maximum RCS pressure due to ambient temperature increase associated with a main steam line break (MSLB)inside containment after the valve bonnets have become pressurized.

These valves required a phase 3 review, the detailed valve specific analysis described in Attachment 1 (see page 1-4), in order to determine if sufficient heat input from containment is available to increase the valve bonnet temperature.

V-3662&V-3663"High Pressure Safety Injection (HPSZ)Pump Suction Valves From SDC HXs" DESCRIPTION:

V-3662&V-3663 are 4" Velan flex wedge gate valves~.h 1 1 d h at elevation 4'6".The maximum opening differential pressure is 223 psid.The safety function of these valves is to open to supply cooled water from the SDC HX to the suction of the high pressure safety injection (HPSI)pumps just prior to initiation of an recirculation actuation signal (RAS).Pressure Lockin: These valves are not affected by the rapid epressurization associated with MSLB or LOCA due their location in the emergency core cooling system (ECCS).The most significant depressurization would be associated with the starting and stopping of a LPSI pump.However, these valves are stroke tested quarterly which adequately demonstrates the capability of these valves to stroke after starting and stopping a LPSI pump.In regards to thermal expansion of fluid trapped in the bonnet, V-3662&V-3663 are required to open post-LOCA after the containment spray pumps have been injecting 55'F-100'F water from the RWT and prior to RAS.Therefore, there is no heat input into the SDC system (prior to RAS)when V-3662 and V-3663 are required to open.Thermal Bindin: It is not credible to postulate a thermal binding con ition for these valves when they are required to open to perform their safety function because the temperature of the SDC system is greater than ambient only when the SDC HXs are in-service to shutdown the unit.These valves are not cycled during the time the SDC system is aligned to the RCS to shutdown the unit.Conclusion:

V-3662 6 V-3663 are not susceptible to pressure g d/h 1 b.1A-7 0

St.Lucie Units 1 and 2 Docket No.50-335 and 50-389 Generic Letter 95-07-180-Da Res onse APPENDIX 1B ST.LUCIE UNIT 2 GATE EVALUATION

SUMMARY

OF PRESSURE LOCKING AND THERMAL BINDING'FOR POWER OPERATED GATE VALVES P

ST.LUCZE UNIT 2 PHASE 2 GATE VALVE EVALUATION

SUMMARY

V-1476 and V-1477"Power Operated Relief Valve (PORV)Block Valves" Descri tion: These valves are 3" Westinghouse flex-wedge gate va ves wit SB-00 actuators.

The valves are located in the containment building, outside the pressurizer cubicle.The maximum opening differential pressure is 2485 psid.In accordance with St.Lucie Unit 2 TS, during power operation only one block valve is permitted to remain open, the other is closed.V-1476 and V-1477 perform the safety-related function to passively maintain RCS pressure boundary.The quality-related function of these valves is to be remote-manually actuated to isolate the associated PORV in order to satisfy the"fail-closed" requirements of their respective PORV.In addition, the PORVs are utilized for contingencies for functional recovery: the RCS pressure control success path 5, PORVs, and the RCS and core heat removal success path 4, once-through-cooling.

Both of these contingencies require verifying the PORV block valves are open.Pressure Lockin: In Modes 1,2 and 3, the pressurizer level is max.ntaine so that the PORVs and safety relief valves (and V-1476&V-1477)will relieve only steam.The bonnet could be'come pressurized in a steam system and due to a large or small break LOCA, experience rapid depressurization upstream of the valve.However, the compressibility of the steam in the bonnet precludes this scenario from causing a pressure locked condition.

Steam pressurization of MOV bonnets is a pressure locking concern due to configurations that permit condensate to collect and drain into the valve bonnet (e.g., vertical pipe runs)with a subsequent temperature increase of the valve bonnet."Upright" valves have not experienced pressure locking due to steam in the bonnet.V-1476 and V-1477 are oriented in the"upright" position.Thermal Bindin: Under normal conditions, either V-1476 or V-1477 a.s c ose prior to heating up the RCS to above 325'F.In addition, the valves are demonstrated operable at least once per 92 days by operating the valve through one complete cycle of full travel (unless closed with power removed).The valves are re-opened to align for LTOP when RCS temperature is less than 240'F.There is no evidence that thermal binding occurs with these valves because these valves have performed the function of opening to align for LTOP at less than 240'F after operation in Modes 1, 2 and 3.In addition, these valves have Limitorque type SB operators which have compensating spring packs that absorb inertial closing forces and prevent excessive wedging of the disc into the seat.The installation of compensating spring packs on motor operators reduces the valve seating loads and the potential for thermal binding.Conclusion:

V-1476 and V-1477 are not susceptible to pressure g d/h 1 1"g.

V-2504"RWT Isolation Valve" Descri tion: This valve is a 3" Westinghouse flex-wedge gate va ve wit an SB-00 actuator.The valve is located in the 2A charging pump cubicle at elevation 0'9".The maximum opening differential pressure is 29 psid.The valve is normally closed.The safety-related function of V-2504 is open to align the charging pumps to the refueling water tank (RWT)for an alternate borated water supply required by Technical Specifications.

However, credit is not taken for remote operation of V-2504 because the operator is not Class 1E.Instead, the assumption is plant operators will manually open the valve.In addition, the quality-related function if V-2504 is to automatically open upon receipt of a VCT low low level signal to align the RWT to the charging pump(s)suction.Pressure Lockin: There is no severe depressurization postulated or t e piping system upstream of V-2504 on the order of a LOCA or HELB.The most severe depressurization would occur due to loss of RWT level.Therefore, pressure locking due to upstream depressurization is not credible.In regards to thermal expansion of fluid trapped in the bonnet, significant temperature changes at this valve are not postulated due to the flow of RWT fluid because of the limitation on solution temperature between 55'F and 100'F.Thermal Bindin: Fluid temperature in V-2504 is restricted by the Tec nica Specification limitation on temperature for the RWT of 55'F to 100'F.It is postulated that V-2504 would not be closed at temperatures greater than 100'F;therefore thermal binding is not a concern.Conclusion:

V-2504 is not susceptible to pressure locking or d g.V-2508&V-2509"Boric Acid Gravity Feed Valves" Descri tion: V-2508&V-2509 are 3" Westinghouse flex-wedge gate va ves wit SB-00 actuators.

The valves are located in the reactor auxiliary building (RAB)inside the boric acid makeup tank (BAMT)cubicle at elevation 13'-6.5".V-2508&V-2509 are located at the outlet of BAMTs.The maximum opening differential pressure is 16.2 psid.The safety-related function of these valves is to open upon receipt of a SIAS to provide concentrated borated water supply to the charging pumps.Pressure Lockin: There is no severe depressurization postulated or t e piping system upstream of these valves on the order of a LOCA or HELB.The most severe depressurization would occur due to changes in boric acid makeup tank level.Therefore, pressure locking due to upstream depressurization is not credible.In regards to thermal expansion of fluid trapped in the bonnet, significant temperature changes at these valves is not postulated because of the low temperatures in the system.

Thermal Bindin: Due to the low temperatures in the system, thermal inding is not considered to be credible.Conclusion:

V-2508 and V-2509 are not susceptible to pressure g h h.V-2514"Boric Acid Makeup Bypass to Charging Pumps" Descri tion: V-2514 is a 3" Westinghouse flex-wedge gate valve wit an SB-00 actuator.The valve is located in the boric acid makeup (BAMT)cubicle at elevation 2'".The maximum opening differential pressure is 132.2 psid.The valve is normally closed.The safety-related function of V-2514 is open to align the charging pumps to the BAM pumps for an alternate borated water supply required by Technical Specifications.

Pressure Lockin: There is no severe depressurization postulated for t e piping system upstream of V-2514 on the order of a LOCA or HELB.The most severe depressurization would occur due to loss BAMT level or loss of a BAM pump.Therefore, pressure locking due to upstream depressurization is not credible.In regards to thermal expansion of fluid trapped in the bonnet, significant temperature changes at this valve are not postulated due to the limitation on solution temperature between 55'F and 100'F.Thermal Bindin: Due to the limitation on solution temperature etween F an 100'F, thermal binding is not a concern.Conclusion:

V-2514 is not susceptible to pressure locking or d'.V-3456 6 V-3457"Shutdown Cooling Heat Exchanger Outlet Valves" Descri tion: These valves are 10" Westinghouse flex-wedge gate va ves wit SB-0 actuators.

The valves are located outside the containment building, inside the RAB, in the 2A and 2B safeguards rooms.V-3456 and V-3457 are normally locked closed isolation valves that serve to isolate the SDC heat exchangers from the LPSI system when the SDC HXs are not in use.The safety-related function for these valves is to open to allow warmup and operation of the SDC HXs.The maximum opening differential pressure is 269 psid.Pressure Lockin: For normal SDC system warm-up (and for placing t e SDC system in operation), these valves are opened prior to starting the LPSI pumps and before the SDC system is aligned to the RCS.There is no rapid depressurization event upstream or downstream of these valves (e.g., due to a line break)that would require these valves to open.For restoration of SDC HXs events, these valves would be closed and reopened on a loss of CCW to a SDC HX.These valves would be reopened with a LPSI pump running.Therefore, there is no depressurization event postulated in which the valves are relied upon to open.In regards to thermal expansion of fluid trapped in the bonnet, V-3456 and V-3457 are required to open for warming up the SDC system and for restoring the SDC system to service following isolation of the SDC HXs.For warmup, these valves are opened prior to starting the associated LPSI pump.Therefore, the valves would not be heated prior to opening.For restoration of the SDC HX event, the physical location of the valves prevents them from being exposed to temperature increases in the system.Thermal Bindin: For a loss of CCW to the SDC HXs, these valves cou e c osed hot and required to open after the system has cooled due to the restoration of CCW or due to ambient conditions.

However, for the following reasons, thermal binding is not likely: 1)It is expected that the restoration of CCW to the SDC HXs would be a short evolution (i.e.,<30 minutes)and these valves would likely not experience significant cooling in this time frame;2)V-3456 and V-3457 are controlled in the closed direction by position limit switches (this limits the seating force of the disc in the seats);3)V-3456 and V-3457 have SB-0 actuators installed on them.SB Limitorque operators have compensating spring packs that absorb inertial closing forces and prevent excessive wedging of the disc into the seat.The installation of compensating spring packs on motor operators reduces the valve seating loads and the potential for thermal binding;4)The body and disc are identical materials.

Therefore, thermal expansion differences would be small and are within the capability of the actuators.

==

Conclusion:==

V-3456 and V-3457 are not susceptible to pressure g d/h 1 b.V-3480 6 V-3652"Shutdown Cooling Isolation Valves" Descri tion: These valves are 10" Westinghouse flex-wedge gate va ves wit SMB-1 actuators.

The valves are located in the containment building, inside the secondary shield wall at elevation 39'0" (V-3480)and 30'6" (V-3652), respectively.

V-3480 and V-3652 are the in-board (to the RCS)isolation valves that isolate 2A and 2B trains of SDC from the RCS.The maximum opening differential pressure is 277 psid.The safety-related function for these valves is to open to align the RCS to the SDC system in order to cool the RCS from hot shutdown (Mode 4)to cold shutdown (Mode 5).Thermal Bindin: Typically, V-3480 and V-3652 are closed under hot con z.talons ('F)when isolating the SDC system during heatup and opened cold (<120'F)due to the valves cooling to ambient conditions.

In addition, these valves could be isolated under hot conditions due to an inadvertent isolation of SDC.As a result, the valves could cool if left isolated for a significant period of time due to the distance of the valves from the RCS.Under these conditions, thermal binding could occur.However, it is important to note that thermal binding has not been observed in these valves when the valves are opened to align the SDC system to the RCS during a plant cooldown.

==

Conclusion:==

V-3480 and V-3652 are potentially susceptible to p C k'b h 1 b.dd'.h 1 may be susceptible to an increase in bonnet pressures above maximum RCS pressure due to ambient temperature increase associated with a MSLB inside containment after the valves have become pressurized.

These valves required a phase 3 review, the'detailed valve specific analysis described in Attachment 1 (see page 1-4), in order to determine if sufficient heat input from containment is available to increase the valve bonnet temperature.

V-3481, V-3651&V-3545"Shutdown Cooling Isolation Valves" Descri tion: These valves are 10" Westinghouse flex-wedge gate va ves wit SMB-1 actuators.

The valves are located in the containment building, inside the secondary shield wall at elevation 39'0" (V-3481), 30'6" (V-3651)and 36'3" (V-3545), respectively.

V-3481 and V-3651 are the outboard (to the RCS)isolation valves that isolate 2A and 2B trains of SDC system from the RCS.V-3545 is the SDC suction cross-tie isolation valve.The maximum opening differential pressure is 277 psid (V-3481&V-3651)and 275 psid (V-3545).The shutdown cooling suction lines are configured such that one of the two isolation valves in each line is powered from the 2A train, while the second isolation valve, is powered from the 2B train.The cross-tie valve (V-3545)is powered from the 480V motor control center (MCC)2AB, which can be aligned to either the 2A or 2B electrical train.This configuration was required to ensure that the SDC system could be aligned to the RCS in the event of a loss of either 2A or 2B train power.Therefore, the safety-related function for these valves is to align the RCS to the SDC system in order to cool the RCS from hot shutdown (Mode 4)to cold shutdown (Mode 5).For V-3545, the safety function is required as a redundant design feature for a loss of electrical power"to one of the electrical trains.Thermal Bindin: Typically, V-3481, V-3651 and V-3545 are closed un er ot con itions (>300'F)when isolating the SDC system during heatup and opened cold ((120'F)due to the valves cooling to ambient conditions.

In addition, these valves could be isolated under hot conditions due to an inadvertent isolation of SDC.As a result, the valves could cool if left isolated for a significant period of time due to the distance of the valves from the RCS.Under these conditions, thermal binding could occur.However, it is important to note that thermal binding has not been observed in these valves when the valves are opened to align the SDC system to the RCS during a plant cooldown.Conclusion:

V-3481, V-3651, and V-3545 are potentially susceptible to pressure locking but not thermal binding.In addition, these valves may be susceptible to an increase in bonnet pressures above maximum RCS pressure due to ambient temperature increase associated with a MSLB inside containment after the valves have become pressurized.

These valves required a phase 3 review, the detailed I K' valve specific analysis described in Attachment 1 (see page 1-4), in order to determine if sufficient heat input from containment is available to increase the valve bonnet temperature.

V-3517 and V-3658"Shutdown Cooling Heat Exchanger Inlet Isolation Valves"-3517 d-3555 11"*'g gl-dg gate valves with SB-O actuators.

The valves are located outside the containment building, inside the reactor auxiliary building, in the 2A and 2B safeguards rooms at elevations

-7'10" (V-3517)and-2'8'/," (V-3658).These valves are normally locked closed isolation valves that serve todisolate the SDC heat exchangers from the LPSI system when the SDC HXs are not in use.The safety-related function for these valves is to open to allow warmup and operation of the SDC HXs.The maximum opening differential pressure is 162 psid.Pressure Lockin: For normal SDC system warm-up and for placing t e SDC system in operation, these valves are opened after starting the LPSI pumps and before the SDC system is aligned to the RCS.There is no rapid depressurization event upstream or downstream of these valves (e.g., due to a line break)that would require these valves to open-.In regards to thermal expansion of fluid trapped in the bonnet, V-3517 and V-3658 are required to open for warming up the SDC system.For warmup, these valves are opened after starting the associated LPSI pump and prior to opening the SDC HX flow control valve.Flow is routed through the SDC HX until the system heats up.Therefore, the valves would not be exposed to temperature increases prior to opening.Thermal Bindin: The most limiting scenario is isolation of V-3517 an V-ue to re-alignment of the Safety Injection system after heat up.In this scenario the valves are closed after recirculating the SDC to 150'F.During warmup to place the SDC in service, the valves would be required to open at a temperature

<150'F.Thermal binding is not likely because the change in temperature from removal of the SDC system from service to warming the system up is relatively small, and the body and disc are composed of the same material.Therefore, thermal expansion differences would be small.In addition, these valves have operators which have compensating spring packs that absorb inertial closing forces and prevent excessive wedging of the disc into the seat.The installation of compensating spring packs on motor operators reduces the valve seating loads and the potential for thermal binding.Conclusion:

V-3517 and V-3658 are not susceptible to pressure g d/5 1 5.V-3664 6 V-3665"Shutdown Cooling Isolation Valves" Descri tion: These valves are 10" Westinghouse flex-wedge gate va ves wa.t SB-0 actuators.

The valves are located outside the containment building, inside the RAB at elevation 24'7" (V-3664) 0 0 and 25'0" (V-3665), respectively.

V-3664 and V-3665 are the containment isolation valves that isolate 2A and 2B trains of SDC.The maximum opening differential pressure is 269 psid.The safety-related functions for these valves is to provide containment isolation and to open to align the RCS to the SDC system in order to cool the RCS from hot shutdown (Mode 4)to cold shutdown (Mode 5).Pressure Lockin: V-3664&V-3665 are subjected to upstream pressure from the RCS during alignment for shutdown cooling.This scenario assumes that V-3664&V-3665 are opened following the opening of the upstream shutdown cooling isolation valves.There is no rapid depressurization associated with this scenario.However, if it is assumed that there is leakage past upstream isolation valves V-3664&V-3665 the line could be pressurized to 335 psig (the SDC relief valve setpoint).

However, for the depressurization of the RCS from 350 psia to 275 psia (the permissive setpoint for aligning the RCS to SDC), for MSLB or small break LOCA scenarios, the depressurization is not significantly different from the normal Plant Cooldown scenario.Therefore, it is reasonable to conclude that these valves are not susceptible to pressure locking based the capability of these valves to open for a normal plant shutdown.In regards to thermal expansion of fluid trapped in the bonnet, V-3664 and V-3665 remain closed when the SDC system is warmed-up.

However, V-3664 and V-3665 are physically isolated from the flowpath for SDC warm-up.Thermal Bindin: These valves could be closed under hot conditions (i.e., SDC cooling isolated while the RCS is still hot or inadvertent isolation of SDC), and the valve could cool if left isolated for a significant period of time due to the distance of the valve from the RCS.Under these conditions, thermal binding coul'd occur.However, these valve's have operators which have compensating spring packs that absorb inertial closing forces and prevent excessive wedging of the disc into the seat.The installation of compensating spring packs on motor operators has been identified as one method for preventing thermal binding.Therefore, V-3664 and V-3665 are not considered to be susceptible to thermal binding.Conclusion:

V-3664 and V-3665 are not susceptible to pressure g h 11.MV-08-12&MV-08-13"2C Auxiliary Feed Water (AFW)Pump Steam Admission Valves" DESCRIPTION:

These valves are 4" Pacific double disc gate valves.1 d'y.hdifferential pressure is 1015 psid.These valves are normally closed and open at high temperature (i.e., operating temperature

=532'F).These valves open upon receipt of an auxiliary feed water actuation signal (AFAS)and provide a flow path from main steam to the 2C AFW pump turbine.In addition, the valves must be capable of operating on demand to initiate 2C AFW flow to the steam generators to reduce RCS temperature to the entry temperature for initiating the SDC.Pressure Lockin: MV-08-12 and MV-08-13 could experience rapid epressurxzation upstream of the valve (e.g., MSLB, feedwater,line break).However, since these valves are steam valves, the compressibility of the steam in the bonnet precludes this scenario from causing a pressure locked condition.

Pressure locking of steam valves occurs due to configurations that permit condensate to collect and drain into the valve bonnet (e.g., vertical pipe runs)with a subsequent temperature increase of the valve bonnet.MV-08-12 and MV-08-13 are installed in horizontal pipe runs with the actuators mounted above the centerline of the pipe.Based upon the configuration of MV-08-12 and MV-08-13, it is unlikely that condensate would collect in their bonnets.Thermal Bindin: Double disc gate valves are not considered susceptx e to thermal binding.Conclusion:

MV-08-12 and MV-08-13 are not susceptible to pressure g 1 gh.1B-9

St.Lucie Units 1 and 2 Docket No.50-335 and 50-389 Generic Letter 95-07-180-Da Res onse ATTACHMENT 2 ST.LUCIE UNIT 2

SUMMARY

OF THE OPERABILITY ASSESSMENT FOR PRESSURE LOCKING OF SHUTDOWN COOLING POWER OPERATED GATE VALVES V-.3480, V-3651, AND V-3652 2-1 EVALUATION Although the NRC GL 95-07 does not permit a valve to be excluded from consideration of pressure locking due to lack of occurrence at the specific plant, or valve leakage rate, FPL considers that the actual valve seat leakage and valve historical performance are acceptable for determining valve operability until the final corrective measures are implemented.

During the evaluation of the Unit 2 SDC isolation valves (V-3480, V-3651 and V-3652)for the purposes of demonstrating operability, the actual valve seat leakage performance was utilized.The NRC GL did not discuss the exclusion of seat leakage for determining valve operability and this approach does not exclude the valves from further consideration of pressure locking.Additionally, a pressure locking event has not been identified for this Westinghouse valve design (1500 psi class flex wedge gate)on either St.Lucie unit, and none were identified in the review of NUREG-1275', Volume 9, Supplement 6 to NRC GL 89-10', NRC IN 92-26'r INPO SOER 84-074.Valve Leaka e Re uired and Surveillance Data FPL has conservative y ca cu ate t at va ve seat ea age>.004 gpm for V-3480 and V-3652, and that seat leakage>0.011 gpm for V-3651 would reduce pressure in the valve bonnets and the piping between the SDC isolation valves to shutdown cooling entry conditions

(-250 psig)within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> following the most limiting pressure locking scenario.The most limiting scenario for pressure locking is a MSLB inside containment.

A large break LOCA is not considered limiting because the containment sump recirculation would provide for decay heat removal, and the shutdown cooling isolation valves would not be required.A small break LOCA would result in rapid depressurization, but would not significantly heatup containment.

Valve seat leakage surveillance requirements specified in St.Lucie Unit 2 Technical Specification ,(TS)4.4.6.2.3 are satisfied by performing Administrative Procedure 2-0010125A at>least once every 18 months.The surveillance test is also required if the unit enters Mode 5 and the test has not been performed in the preceding 9 months.The test is performed with a differential pressure greater than 200 psid across the valve.A review of the completed data sheets for the period from 1990 to 1995 showed that,NUREG-1275, Volume 9,"Operating Experience Feedback Report-Pressure Locking and Thermal Binding of Gate Valves" Generic Letter 89-10, Supplement 6,"Information on Schedule and Grouping, and Staff Responses to Additional Public Questions"'NRC Information Notice 92-26,"Pressure Locking of Motor Operated Flexible Wedge Gate Valves" INPO SOER Number 84-07,"Pressure Locking and Thermal Binding of Gate Valves" 2-2

historically, the observed seat leakage for these valves has been>0.011 gpm.This exceeds the minimum required leakage to reduce bonnet pressure prior to opening the isolation valves following a postulated MSLB.Basis for Utilizin Test Seat Leaka e The valve flex-wedge has a gap etween its upstream an ownstream discs;the fluid in this gap is hydraulically connected to the bonnet.For the observed seat leakage to occur during the TS surveillance test, the downstream disc must leak through the seat.Seat leakage through this disc allows the bonnet to depressurize during a normal plant cooldown evolution, prior to opening the valves for shutdown cooling operation.

The condition in the valves during normal heatup, operation and cooldown are predicted to be as follows: 1)During the 18-month TS surveillance test, the valves are seat leakage tested with the RCS at approximately 250 psia to obtain a valve differential pressure greater than 200 psid.The observed seat leakage requires that the downstream disc have some leakage.2)During RCS heatup, the valves are closed with the RCS and shutdown cooling fluid at 270 psig and 300'F.Note that the downstream isolation valves V-3664 and V-3665 on the same piping line but outside containment are also closed at this time.3)During RCS heatup and steady state operation, the valves cool to ambient temperature, and the differential pressure between the RCS fluid (2250 psia)and bonnet fluid forces the upstream disc wedge away from its seat.The bonnet fluid may pressurize to RCS pressure, either due to the disc wedge being forced away from its seat, or due to leakage through the mating surfaces of the seat and disc wedge.The upstream valve disc wedge will re-seat when the differential pressure force across the upstream disc is minimized; this occurs when bonnet pressure approaches RCS pressure.If the outboard isolation valves (V-3481 and V-3651)have a lower seat leakage rate than the upstream isolation valves (V-3480 and V-3652), the piping between the valves may also pressurize to approximately RCS pressure.If a valve's downstream seat leakage is greater than the upstream valve wedge leakage, the bonnet may not pressurize significantly; this could pressurize downstream piping and cause pressure relief valves V-3666 or V-3667 (335 psig setpoint)to lift and discharge into the containment sump.Relief valve discharge could be observed by changes in the containment sump level, by the RCS leakage detection system, or as RCS leakage.During RCS cooldown the valve bonnet and piping between the valves will depressurize, due to the measured seat leakage through the downstream valve wedge.The time from reactor trip to entering shutdown cooling is typically 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.2-3 0

4)If a design basis MSLB occurs, the RCS would depressurize to 500 psia in approximately 80 seconds.Plant operators may commence a rapid cooldown to shutdown cooling entry conditions in 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.Since the valves have a history of minor seat leakage through the upstream and downstream wedges and seats at low differential pressure, it is expected that valve seat leakage would occur under post-MSLB conditions to reduce bonnet pressure.However, the difference between a MSLB cooldown and a normal cooldown is that there is only a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> versus 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> cooldown period, and the valves and piping will heatup and pressurize because containment ambient temperature will increase rapidly.Under these conditions, the required valve seat leakage rate required to reduce the pressure in the valve bonnet and piping from RCS pressure to the shutdown cooling system design pressure in 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> is 0.0011 gpm for valve V-3651 and 0.004 gpm for valves V-3480 and V-3652.The required valve seat leakage to the shutdown cooling system is much less than the observed seat leakage rate determined by the TS surveillance test.To ensure the continued operability of the shutdown cooling isolation valves after Fall 1995 St.Lucie Unit 2 refueling outage (SL2-9), plant personnel verified that the observed seat leakage was at least 0.01 gpm for V-3480 and V-3652, and at least 0.015 gpm for V-3651.This leakage rate provides a 35%margin between measured and required seat leakage.Basis for Extendin Corrective Action Until 1997 Refuelin Outa e T e p armed corrective action was tria imp emente on V-48 during the Fall 1995 SL2-9 refueling outage and will be replicated on the remaining three valves during the next refueling outage.In addition, the planned corrective actions for V-3480 and V-3652 will require a freeze seal and/or a full core off load.To permit better integration of the modifications into the refueling outage activities, the remaining modifications were delayed until the Spring 1997 St.Lucie Unit 2 refueling outage (SL2-10).Deferring corrective action until the next outage is not a safety issue for the following reasons: The shutdown cooling isolation valves are not required until 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> after a postulated accident.By that time, the bonnet pressure and piping pressure will decay to an acceptable value, based on the actual observed valve seat leakage;2)No incidence of these valves failing to open has ever been identified on either St.Lucie unit.No incidence of pressure locking has been reported to the valve vendor, or listed in the reviewed industry data;and 2-4 0

The affected valves would be prioritized as medium priority using NRC GL 89-10 guidelines.

For medium priority MOVs, the Nuclear Energy Institute (NEI)guidance recommends that the resources are appropriately applied relative to safety significance and priority of the MOV.2-5 l~0'0