{{#Wiki_filter:DONALDC.COOKNUCLEARPLANTCOOKNUCLEARPLANTUNITNUMBERS1AND2DOCKETNOS.50-135AND50-316LICENSENOS.DPR-58ANDDPR-74UPDATEDEQUALITYASSURANCE PROGRAMDESCRIPTION FORTHECOOKNUCLEARPIANTJULY,3993Concurred by:~AJAEPSCChiefNuclearEngineDate:AEPSCVicePredent-NuclearOperations
{{#Wiki_filter:DONALD C.COOK NUCLEAR PLANT COOK NUCLEAR PLANT UNIT NUMBERS 1 AND 2 DOCKET NOS.50-135 AND 50-316 LICENSE NOS.DPR-58 AND DPR-74 UPDATED EQUALITY ASSURANCE PROGRAM DESCRIPTION FOR THE COOK NUCLEAR PIANT JULY, 3993 Concurred by:~AJ AEPSC Chi ef Nucl ear Engi ne Date: AEPSC Vice Pre dent-Nuclear Operations
~/iojVZDate:Approvedby:AEPSCDirector-ua1ityAssurance Date:W/4''305190223 930510PDRADQCN05000315PPDR SectionEQUALITYASSURANCE PROGRAMDESCRIPTION FORTHECOOKNUCLEARPLANTTABLEOFCONTENTSTitleTableofContentsPacaeNo.1.71.7.11.7.21.7.31.7.41.7.51.7.61.7.71.7.81.7.91.7.101.7.111.7.121.7.131.7.141.7.151.7.161.7.171.7.181.7.19AppendixAAppendixBStatement ofPolicyfortheDonaldC.CookNuclearPlantgualityAssurance Program.Organization gualityAssurance Program..DesignControlProcurement DocumentControlInstructions, Procedures, andDrawingsDocumentControl1.7-11.7-41.7-2,91.7-371.7-431.7-461.7-49ControlofPurchased ItemsandServices..........1.7-51Identification andControlofItems..ControlofSpecialProcesses Inspection TestControlControlofMeasuring andTestEquipment
~/io jVZ Date: Approved by: AEPSC Director-ua1ity Assurance Date: W/4''305190223 930510 PDR ADQCN 05000315 P PDR Section EQUALITY ASSURANCE PROGRAM DESCRIPTION FOR THE COOK NUCLEAR PLANT TABLE OF CONTENTS Ti tl e Table of Contents Pacae No.1.7 1.7.1 1.7.2 1.7.3 1.7.4 1.7.5 1.7.6 1.7.7 1.7.8 1.7.9 1.7.10 1.7.11 1.7.12 1.7.13 1.7.14 1.7.15 1.7.16 1.7.17 1.7.18 1.7.19 Appendix A Appendix B Statement of Policy for the Donald C.Cook Nuclear Plant guality Assurance Program.Organization guali ty Assurance Program..Design Control Procurement Document Control Instructions, Procedures, and Drawings Document Control 1.7-1 1.7-4 1.7-2,9 1.7-37 1.7-43 1.7-46 1.7-49 Control of Purchased Items and Services..........1.7-51 Identification and Control of Items..Control of Special Processes Inspection Test Control Control of Measuring and Test Equipment....Handling, Storage and Shipping Inspection, Test and Operating Status.Nonconforming Items..Corrective Action.1.7-56 1.7-57 1.7-60 1.7-64 1.7-66 1.7-68 1.7-70~~~~~~1 e7o72 1.7-73 udits A Fire Protection gA Program Figure 1.7-1 Figure 1.7-2 Figure 1.7-3 Figure 1.7-4.1 0~~~~~t~~1~~~~Figure 1.7-5 Regulatory and Safety Guide/ANSI Standards AEPSC/IEM Exceptions to Operating Phase Standard and Regulatory Guides.1.7-77 1.7-81 1.7-88 1.7-89 1.7-90 1.7-91 1.7-92 1.7-93 1.7.98 guali ty Assurance Records.................1.7-75 American Electric Power Service Corporation 1 Riverside Plaza Columbus.OH 43215 614 223 1000~SF ANERlC'AN ELECTRIC POMfER STATEMENT OF POLICY FOR THE DONALD C.COOK NUCLEAR PLANT EQUALITY ASSURANCE PROGRAM POLICY American Electric Power Company Inc., recognizes the fundamental importance of controlling the design, modification, and operation of Indiana Michigan Power Company's Donald C.Cook Nuclear Plant (Cook Nuclear Plant)by implementing a planned and documented guality Assurance Program, including equality Control, that complies with applicable regulations, codes, and standards.
....Handling, StorageandShippingInspection, TestandOperating Status.Nonconforming Items..Corrective Action.1.7-561.7-571.7-601.7-641.7-661.7-681.7-70~~~~~~1e7o721.7-73uditsAFireProtection gAProgramFigure1.7-1Figure1.7-2Figure1.7-3Figure1.7-4.10~~~~~t~~1~~~~Figure1.7-5Regulatory andSafetyGuide/ANSI Standards AEPSC/IEM Exceptions toOperating PhaseStandardandRegulatory Guides.1.7-771.7-811.7-881.7-891.7-901.7-911.7-921.7-931.7.98gualityAssurance Records.................1.7-75 AmericanElectricPowerServiceCorporation 1Riverside PlazaColumbus.
The guality Assurance Program has been established to control activities affecting safety-related functions of structures, systems, and components in the Cook Nuclear Plant.The guality Assurance Program supports the goal of maintaining the safety and reliability of the Cook Nuclear Plant at the highest level through a systematic program designed to assure that a j'ti V'iaaf'i'."e3~lkf'fect3j'i'j safety-related giTincBon's are conducted in compliance w'i th the appl i cabl e regul ati ons, codes, standards, and establ i shed corporate policies and practices.
OH432156142231000~SFANERlC'AN ELECTRICPOMfERSTATEMENT OFPOLICYFORTHEDONALDC.COOKNUCLEARPLANTEQUALITYASSURANCE PROGRAMPOLICYAmericanElectricPowerCompanyInc.,recognizes thefundamental importance ofcontrolling thedesign,modification, andoperation ofIndianaMichiganPowerCompany's DonaldC.CookNuclearPlant(CookNuclearPlant)byimplementing aplannedanddocumented gualityAssurance Program,including equalityControl,thatcomplieswithapplicable regulations, codes,andstandards.
As Chairman of the'Board and Chief Executive Officer of American Electric Power Company, Inc., I maintain the ultimate responsibility for the guality Assurance Program associated with the Cook Nuclear Plant.I have del egated responsi bi 1 i ti es~for~;::implefitentat'i;in.-:;.'.og:;";Laftd);,eoiapl jaic~e4Hi,th.;:::
ThegualityAssurance Programhasbeenestablished tocontrolactivities affecting safety-related functions ofstructures, systems,andcomponents intheCookNuclearPlant.ThegualityAssurance Programsupportsthegoalofmaintaining thesafetyandreliability oftheCookNuclearPlantatthehighestlevelthroughasystematic programdesignedtoassurethataj'tiV'iaaf'i'."e3~lkf'fect3j'i'j safety-related giTincBon's areconducted incompliance w'iththeapplicableregulations,codes,standards, andestablishedcorporate policiesandpractices.
AsChairmanofthe'Board andChiefExecutive OfficerofAmericanElectricPowerCompany,Inc.,Imaintaintheultimateresponsibility forthegualityAssurance Programassociated withtheCookNuclearPlant.Ihavedelegatedresponsibi1ities~for~;::implefitentat'i;in.-:;.'.og:;";Laftd);,eoiapl jaic~e4Hi,th.;:::
%~he,,:,:q9NÃt>YAssuraÃce."::.Prrtg~ram''~
%~he,,:,:q9NÃt>YAssuraÃce."::.Prrtg~ram''~
as'outlined inthisstatemenf.'MPLEMENTATION TheAEPSCDirector-guality Assurance, underilly.direction, hasbeenassignedtheoverallresponsibility forspecifying thegualityAssurance Programrequirements fortheCookNuclearPlantandverifying theirimplementation.
as'outlined in this statemenf.'MPLEMENTATION The AEPSC Director-guality Assurance, under illy.direction, has been assigned the overall responsibility for specifying the guali ty Assurance Program requirements for the Cook Nuclear Plant and verifying their implementation.
TheAEPSCDirector-guality Assurance hasauthority tostopworkonanyactivityaffecting safety-related itemsthatdoesnotmeetapplicable administrative, technical, and/orregulatory requirements.
The AEPSC Director-guality Assurance has authority to stop work on any activity affecting safety-related items that does not meet applicable administrative, technical, and/or regulatory requirements.
TheAEPSCDirector-guality Assurance doesnothavetheauthoritytostopunitoperations, butshallnotifyappropriate plantand/orcorporate management ofconditions notmeetingtheaforementioned criteriaandrecommend thatunitoperations beterminated.
The AEPSC Director-guality Assurance does not have the authori ty to stop unit operations, but shall notify appropriate plant and/or corporate management of conditions not meeting the aforementioned criteria and recommend that unit operations be terminated.
Revised:5/3/931.7-1July,1993 Statement ofPolicyfortheDonaldC.CookNuclearPlantQua1ityAssurance ProgramPage2TheAEPSCVicePresident-Nuclear Operations, undermy,.direction, hasbeendelegated responsibility foreffectively implementing theQualityAssurance Program.TheAEPSCVicePresident-Nuclear Operations istheManagerofNuclearOperations.
Revised: 5/3/93 1.7-1 July, 1993 Statement of Policy for the Donald C.Cook Nuclear Plant Qua1i ty Assurance Program Page 2 The AEPSC Vice President-Nuclear Operations, under my,.direction, has been delegated responsibility for effectively implementing the Quality Assurance Program.The AEPSC Vice President-Nuclear Operations is the Manager of Nuclear Operations.
AllotherAEPSCdivisions anddepartments, exceptQualityAssurance, havingasupporting rolefortheCookNuclearPlantarefunctionally responsible totheManagerofNuclearOperations.
All other AEPSC divisions and departments, except Quality Assurance, having a supporting role for the Cook Nuclear Plant are functionally responsible to the Manager of Nuclear Operations.
ThePlantManager,underthedirection oftheAEPSCVicePresident-NuclearOperations, isdelegated theresponsibility forestablishing theCookNuclearPlantQualityControlProgramandimplementing theQualityAssurance ProgramattheCookNuclearPlant.TheAEPSCDirector-Quality Assurance isresponsible forproviding technical direction tothePlantManagerformattersrelatingtotheQualityAssurance ProgramattheCookNuclearPlant.TheAEPSCDirector-QualityAssurance isalsoresponsible formaintaining aQualityAssurance SectionattheCookNuclearPlanttoperformrequiredreviews,audits,andsurveillances,andtoprovidetechnical liaisonservicestothePlantManager.Theimplementation oftheQualityAssurance Programisdescribed intheAEPSCGeneralProcedures (GPs)andsubtierdepartment/division procedures, PlantManager's Instructions (PMIs),andsubtierDepartment HeadInstructions andProcedures, whichintotaldocumenttherequirements forimplementation oftheProgram.EachAEPSCandCookNuclearPlantorganization involvedinactivities affecting safety-related functions ofstructures, systems,andcomponents intheCookNuclearPlanthastheresponsibility toimplement theapplicable policiesandrequirements oftheQualityAssurance Program.Thisresponsibility includesbeingfamiliarwith,andcomplying with,theapplicable QualityAssurance Programrequirements.
The Plant Manager, under the direction of the AEPSC Vice President-Nuclear Operations, is delegated the responsibility for establishing the Cook Nuclear Plant Quality Control Program and implementing the Quality Assurance Program at the Cook Nuclear Plant.The AEPSC Director-Quality Assurance is responsible for providing technical direction to the Plant Manager for matters relating to the Quality Assurance Program at the Cook Nuclear Plant.The AEPSC Director-Quality Assurance is also responsible for maintaining a Quality Assurance Section at the Cook Nuclear Plant to perform required reviews, audits, and survei llances, and to provide technical liaison services to the Plant Manager.The implementation of the Quality Assurance Program is described in the AEPSC General Procedures (GPs)and subtier department/division procedures, Plant Manager's Instructions (PMIs), and subtier Department Head Instructions and Procedures, which in total document the requirements for implementation of the Program.Each AEPSC and Cook Nuclear Plant organization involved in activities affecting safety-related functions of structures, systems, and components in the Cook Nuclear Plant has the responsibility to implement the applicable policies and requirements of the Quality Assurance Program.This responsibility includes being familiar with, and complying with, the applicable Quality Assurance Program requirements.
COMPLIANCE TheAEPSCDirector-Quality Assurance shallmonitorcompliance withtheestablished QualityAssurance Program.Auditprogramsshallbeestablished toensurethatAEPSCandCookNuclearPlantactivities complywithestablished programrequirements, identifydeficiencies ornoncompliances, andobtaineffective andtimelycorrective actions.Employees engagedinactivities affecting safety-related functions ofstructures, systems,andcomponents intheCookNuclearPlantwhobelievethattheQualityAssurance Programisnotbeingcompliedwith,orthatRevised:5/3/931.7"2July,1993 Statement ofPolicyfortheDonaldC.CookNuclearPlantgualityAssurance ProgramPage3adeficiencyinqualityexists,shouldnotifytheirsupervisor, theAEPSCDirector-equality Assurance, and/orthePlantHanager.Ifthenotification doesnotintheemployee's opinionreceivepromptorappropriate attention, theemployeeshouldcontactsuccessively higherlevelsofmanagement.
COMPLIANCE The AEPSC Director-Quality Assurance shall monitor compliance with the established Quality Assurance Program.Audit programs shall be established to ensure that AEPSC and Cook Nuclear Plant activities comply with established program requirements, identify deficiencies or noncompliances, and obtain effective and timely corrective actions.Employees engaged in activities affecting safety-related functions of structures, systems, and components in the Cook Nuclear Plant who believe that the Quality Assurance Program is not being complied with, or that Revised: 5/3/93 1.7"2 July, 1993 Statement of Policy for the Donald C.Cook Nuclear Plant guali ty Assurance Program Page 3 a defi ci ency in quality exists, should notify their supervisor, the AEPSC Director-equality Assurance, and/or the Plant Hanager.If the notification does not in the employee's opinion receive prompt or appropriate attention, the employee should contact successively higher levels of management.
Employees reporting suchconditions shallnotbediscriminated againstbycompanies oftheAmericanElectricPowerSystem.Discrimination includesdischarge orotheractionsrelativetocompensation, terms,conditions,orprivileges ofemployment.
Employees reporting such conditions shall not be discriminated against by companies of the American Electric Power System.Discrimination includes discharge or other actions relative to compensation, terms, condi tions, or privileges of employment.
PE~P~.'%$.9,vape~r,:,:.",,.'.-.".
P E~P~.'%$.9,vape~r,:,:.",,.'.-.".
Chasrmanof'theBoar'dandChiefExecutiveOfficer.AmericanElectricPowerCompany,Inc.Revised:5/3/931.7-3July,1993 1.7.1ORGANIZATION 1.7.1.1SCOPEAmericanElectricPowerServiceCorporation (AEPSC)isresponsible forestablishing andimplementing theQualityAssurance (QA)Programfortheoperational phaseoftheDonaldC.CookNuclearPlant(CookNuclearPlant).Althoughauthority fordevelopment andexecution ofvariousportionsoftheprogrammaybedelegated toothers,suchascontractors, agentsorconsultants, AEPSCretainsoverallresponsibility.
Chasrman of'the Boar'd and Chi ef Executi ve Of fi cer.American Electric Power Company, Inc.Revised: 5/3/93 1.7-3 July, 1993  
AEPSCshallevaluateworkdelegated tosuchorganizations.
Evaluations shallbebasedonthestatusofsafetyimportance oftheactivitybeingperformed andshallbeinitiated earlyenoughtoassureeffective qualityassurance duringtheperformance ofthedelegated activity.
ThissectionoftheQualityAssurance ProgramDescription (QAPD)identifies theAEPSCorganizational responsibilities foractivities affecting thequalityofsafety-related nuclearpowerplantstructures; systems,andcomponents, anddescri.bes theauthority anddutiesassignedtothem.Itaddresses responsibilities for,bothattaining qualityobjectives andforthefunctions ofestablishing theQAProgram,andverifying thatactivities affecting thequalityofsafety-related itemsareperformed effectively inaccordance withQAProgramrequirements.
1.7.1.2IMPLEMENTATION 1.7.1.2.1 SourceofAuthoritTheChairmanoftheHoardandChiefExecutive OfficerofAmericanElectricPowerCompany,Inc.(AEP)andAEPSCisresponsible forsafeoperation oftheCookNuclearPlant.Authority andresponsibility foreffectively implementing theQAProgramforplantmodifications, operations andmaintenance aredelegated P$totheAEPSCVicePresident
-NuclearOperations (HanagerofNuclearOperations).
Intheoperation ofanuclearpowerplant,thelicenseeisrequiredtoestablish clearanddirectlinesofresponsibility, authority and1.7-4July,1993 accountabi 1ity.Thisrequirement isapplicabletotheorganizationproviding supporttotheplant,aswellastotheplantstaff.ITheAEPSCcorporate supportoftheCookNuclearPlantistheresponsibility oftheentireorganization underthedirectionoftheHanagerofNuclearOperations whomaintains primaryresponsibility fortheCookNuclearPlantwithinthecorporate organization.
TheAEPSCVicePresident
-NuclearOperations istheHanagerofNuclearOperations.
AllotherAEPSCdivisions anddepartments, otherthanthegualityAssurance
: Division, havingasupporting rolefornuclearoperations andfortheCookNuclearPlantarefunctionally responsible totheHanagerofNuclearOperations (reference Figure1.7-1).Inordertofacilitate amorethoroughunderstanding ofthesupportfunctions, someoftheresponsibilities, authorities, andaccountabi litieswithintheorganization areasfollows:1)Theresponsibilities oftheHanagerofNuclearOperations shallbededicated totheareaofCookNuclearPlantoperations andsupport.2)TheHanagerofNuclearOperations shallberesponsible for,andhastheauthority todirect,allCookNuclearPlantoperational andsupportmatterswithinthecorporation andshallmake,orconcur,inallfinaldecisions regarding significant nuclearsafetymatters.3)AEPSCorganization managersresponsible forCookNuclearPlantmattersshallbefamiliarwithactivities withintheirscopeofresponsibility thataffectplantsafetyandreliability..They shallbecognizant of,andsensitive to,internalandexternalfactorsthatmightaffecttheoperations ofCookNuclearPlant.4)AEPSCorganization managersresponsible forCookNuclearPlantmattershaveacommitment toseekandidentifyproblemareasand1.7-5July1993 takecorrective actiontoeliminate unsafeconditions, ortoimprovetrendsthatwillupgradeplantsafetyandreliability.
5)TheManagerofNuclearOperations shallensurethatCookNuclearPlantpersonnel arenotrequested toperforminappropriate workortasksbycorporate personnel, andshallcontrolassignments andrequeststhathavethepotential fordiverting theattention ofthePlantManagerfromtheprimaryresponsibility forsafeandreliableplantoperation.
6)AEPSCorganization managershavingCookNuclearPlantsupportresponsibilities, aswellasthePlantManagerandplantorganization
: managers, shallbefamiliarwiththepolicystatements fromhighermanagement concerning nuclearsafetyandoperational priorities.
Theyshallberesponsible forensuringthatactivitiesundertheirdirection areperformed inaccordance withthesepolicies.
1.7.1.2.2Resonsibilit forAttaininualitOb'ectives inAEPSCNuclear'~~TheAEPChairmanoftheBoardandChiefExecutive OfFicerhasassign'ed
~th'e.,',overal':l~l:-,'.::vespon'sebi%';i',t j~883forspecifying gAProgramrequirements andverifying theirimplementation t~~':::the:,:,'AEPSC::;::,Directbr",
-...::uality:A'ssurance,.:,:
TheAEPSCVicePresident
-NuclearOperations, underthedirection oftheAEPjChairmani ofthe~8'nard!an'd;,,aChsief!.::Eaecntih7e:,;.:,0'ff1~ce'i'.
isresponsible foreffectively implementing theCAProgram.ThePlantManager,underthedirection oftheAEPSCVicePresident-NuclearOperations, isresponsible forestablishing theCookNuclearPlantgualityControlProgramandimplementing thegAProgramattheCookNuclearPlant.1.7-6July,1993  


AEPSChasanindependent off-siteNuclearSafetyandDesignReviewCommittee (NSDRC)whichhasbeenestablished pursuanttotherequirements oftheTechnical Specifications fortheCookNuclearPlant.ThefunctionoftheNSDRCistooverseetheengineering, design,operation, andmaintenance oftheCookNuclearPlantbyperforming auditsandindependent reviewsofactivities whicharespecified inthefacilityTechnical Specifications.TheCookNuclearPlanton-sitereviewgroupistheIndianaMichiganPowerCompany(I&M)PlantNuclearSaFetyReviewCommittee (PNSRC).Thiscommittee hasalsobeenestablished pursuanttotherequirements oftheCookNuclearPlantTechnical Specifications.
====1.7.1 ORGANIZATION====
ThefunctionofthePNSRCistoreviewplantoperations onacontinuing basisandadvisethePlantManageronmattersrelatedtonuclearsafety.1.7.1.2.3CororateOranization AmericanElectricPowerComanAEP,theparentholdingcompany,whollyownsthecommonstockofallAEP.Systemsubsidiary (operating) companies.
1.7.1.1 SCOPE American Electric Power Service Corporation (AEPSC)is responsible for establishing and implementing the Quality Assurance (QA)Program for the operational phase of the Donald C.Cook Nuclear Plant (Cook Nuclear Plant).Although authority for development and execution of various portions of the program may be delegated to others, such as contractors, agents or consultants, AEPSC retains overall responsibility.
Themajoroperating companies andgeneration subsidiaries areshowninFigure1.7-2.TheChairmanoftheBoardandChiefExecutive OfficerofAEPistheChiefExecutive OfficerofAEPSCandalloperating companies.
AEPSC shall evaluate work delegated to such organizations.
Theresponsibility forthefunctional management ofthemajoroperating companies isvestedinthePresident ofeachoperating companyreporting totheAEPSCPresident andChiefOperating OfficerwhoreportstotheAEPSCChairmanoftheBoard.AmericanElectricPowerServiceCororationTheresponsibility foradministrative andtechnical direction oftheAEPSystemanditsfaci1itiesisdelegatedtoAEPSC.AEPSCprovidesmanagement andtechnological servicestothevariousAEPSystemcompanies.
Evaluations shall be based on the status of safety importance of the activity being performed and shall be initiated early enough to assure effective quality assurance during the performance of the delegated activity.This section of the Quality Assurance Program Description (QAPD)identifies the AEPSC organizational responsibilities for activities affecting the quality of safety-related nuclear power plant structures; systems, and components, and descri.bes the authority and duties assigned to them.It addresses responsibilities for, both attaining quality objectives and for the functions of establishing the QA Program, and verifying that activities affecting the quality of safety-related items are performed effectively in accordance with QA Program requirements.
1.7-7July,1993  
1.7.1.2 IMPLEMENTATION 1.7.1.2.1 Source of Authorit The Chairman of the Hoard and Chief Executive Of f i cer of Ameri can Electric Power Company, Inc.(AEP)and AEPSC is responsible for safe operation of the Cook Nuclear Plant.Authority and responsibility for effectively implementing the QA Program for plant modifications, operations and maintenance are delegated P$to the AEPSC Vice President-Nuclear Operations (Hanager of Nuclear Operations).
In the operation of a nuclear power plant, the licensee is required to establish clear and direct lines of responsibility, authority and 1.7-4 July, 1993 accountabi 1 i ty.Thi s requirement i s appl i cabl e to the organi zati on providing support to the plant, as well as to the plant staff.I The AEPSC corporate support of the Cook Nuclear Plant is the responsibility of the entire organization under the directi on of the Hanager of Nuclear Operations who maintains primary responsibility for the Cook Nuclear Plant within the corporate organization.
The AEPSC Vice President-Nuclear Operations is the Hanager of Nuclear Operations.
All other AEPSC divisions and departments, other than the guality Assurance Division, having a supporting role for nuclear operations and for the Cook Nuclear Plant are functionally responsible to the Hanager of Nuclear Operations (reference Figure 1.7-1).In order to facilitate a more thorough understanding of the support functions, some of the responsibilities, authorities, and accountabi lities wi thin the organization are as follows: 1)The responsibilities of the Hanager of Nuclear Operations shall be dedicated to the area of Cook Nuclear Plant operations and support.2)The Hanager of Nuclear Operations shall be responsible for, and has the authority to direct, all Cook Nuclear Plant operational and support matters within the corporation and shall make, or concur, in all final decisions regarding significant nuclear safety matters.3)AEPSC organization managers responsible for Cook Nuclear Plant matters shall be familiar with activities within their scope of responsibility that affect plant safety and reliability..They shall be cognizant of, and sensitive to, internal and external factors that might affect the operations of Cook Nuclear Plant.4)AEPSC organization managers responsible for Cook Nuclear Plant matters have a commitment to seek and identify problem areas and 1.7-5 July 1993 take corrective action to eliminate unsafe conditions, or to improve trends that will upgrade plant safety and reliability.
5)The Manager of Nuclear Operations shall ensure that Cook Nuclear Plant personnel are not requested to perform inappropriate work or tasks by corporate personnel, and shall control assignments and requests that have the potential for diverting the attention of the Plant Manager from the primary responsibility for safe and reliable plant operation.
6)AEPSC organization managers having Cook Nuclear Plant support responsibilities, as well as the Plant Manager and plant organization managers, shall be familiar with the policy statements from higher management concerning nuclear safety and operational priorities.
They shall be responsible for ensuring that activi ties under their direction are performed in accordance with these policies.1.7.1.2.2 Res onsibilit for Attainin ualit Ob'ectives in AEPSC Nuclear'~~The AEP Chairman of the Board and Chief Executive OfFicer has assign'ed~th'e.,',overal':l~l:-,'.::vespon'sebi%';i',t j~883 for specifying gA Program requirements and verifying their implementation t~~':::the:,:,'AEPSC::;::,Directbr",-...:: uality: A'ssu rance,.:,:
The AEPSC Vice President-Nuclear Operations, under the direction of the AEPjChairmani of the~8'nard!an'd;,,aChsief!.::Eaecntih7e:,;.:,0'ff1~ce'i'.
is responsible for effectively implementing the CA Program.The Plant Manager, under the direction of the AEPSC Vice President-Nuclear Operations, is responsible for establishing the Cook Nuclear Plant guality Control Program and implementing the gA Program at the Cook Nuclear Plant.1.7-6 July, 1993  


0eratinComaniesTheoperating facilities oftheAEPSystemareownedandoperatedbytherespective operating companies.
AEPSC has an independent off-site Nuclear Safety and Design Review Committee (NSDRC)which has been established pursuant to the requirements of the Technical Specifications for the Cook Nuclear Plant.The function of the NSDRC is to oversee the engineering, design, operation, and maintenance of the Cook Nuclear Plant by performing audits and independent reviews of activities which are specified in the facility Technical Speci fi cations.The Cook Nuclear Plant on-site review group is the Indiana Michigan Power Company (I&M)Plant Nuclear SaFety Review Committee (PNSRC).This committee has also been established pursuant to the requirements of the Cook Nuclear Plant Technical Specifications.
Theresponsibility forexecuting theengineering, design,construction, specialized technical
The function of the PNSRC is to review plant operations on a continuing basis and advise the Plant Manager on matters related to nuclear safety.1.7.1.2.3 Cor orate Or anization American Electric Power Com an AEP, the parent holding company, wholly owns the common stock of all AEP.System subsidiary (operating) companies.
: training, andcertainoperations'upervision isvestedinAEPSC,whileall,orpart,oftheadministrative functional responsibility's assignedtotheoperating companies.
The major operating companies and generation subsidiaries are shown in Figure 1.7-2.The Chairman of the Board and Chief Executive Officer of AEP is the Chief Executive Officer of AEPSC and all operating companies.
InthecaseofCookNuclearPlant,I&Ngeneralofficestaff(headquarters) providespublicaffairs,accounting, industrial safetydirection andprocurement support.TheCookNuclearPlantisownedandoperatedbyI&MwhichispartoftheAEPSystem.1.7.1.2.4ualitAssurance ResonsibilitofAEPSC1)AEPSCprovidesthetechnical direction fortheCookNuclearPlant,andassuchmakesthefinaldecisions
The responsibility for the functional management of the major operating companies is vested in the President of each operating company reporting to the AEPSC President and Chief Operating Officer who reports to the AEPSC Chairman of the Board.American Electric Power Service Cor oration The responsibility for administrative and technical direction of the AEP System and i ts faci 1 i ti es i s del egated to AEPSC.AEPSC provi des management and technological services to the various AEP System companies.
.pertinent tosafety-related changesinplantdesign.Further,AEPSCreviewsNuclearRegulatory Commission (NRC)letters,bulletins, notices,etc.,forimpactonplantdesign,andtheneedfordesignchangesormodifications.
1.7-7 July, 1993  
2)AEPSCfurnishes qualityassurance, engineering, design,construction, licensing, NRCcorrespondence, fuelmanagement andradiological supportactivities.
3)AEPSCprovidesadditional serviceinmatterssuchassupplierqualification, procurement oforiginalequipment andreplacement parts,andtheprocessofdedicating commercial gradeitemsorservicestosafety-related applications.
4)TheAEPSCgADivisionprovidestechnical direction inqualityassurance matterstoAEPSCandtheCookNuclearPlant,and1.7-8July,1993  


overseestheadequacy, effectiveness andimplementation ofthegAProgramthroughreviewandauditactivities.
0 eratin Com anies The operating facilities of the AEP System are owned and operated by the respective operating companies.
5)Cognizant Engineer-(e.g.,SystemEngineer, Equipment
The responsibility for executing the engineering, design, construction, specialized technical training, and certain operations'upervision is vested in AEPSC, while all, or part, of the administrative functional responsibility's assigned to the operating companies.
: Engineer, LeadEngineer, Responsible
In the case of Cook Nuclear Plant, I&N general office staff (headquarters) provides public affairs, accounting, industrial safety direction and procurement support.The Cook Nuclear Plant is owned and operated by I&M which is part of the AEP System.1.7.1.2.4 uali t Assurance Res onsibi lit of AEPSC 1)AEPSC provides the technical direction for the Cook Nuclear Plant, and as such makes the final decisions.pertinent to safety-related changes in plant design.Further, AEPSC reviews Nuclear Regulatory Commission (NRC)letters, bulletins, notices, etc., for impact on plant design, and the need for design changes or modifications.
: Engineer, etc.)-Thecognizant
2)AEPSC furnishes quality assurance, engineering, design, construction, licensing, NRC correspondence, fuel management and radiological support activities.
: engineer, and/orengineerwiththeothertitlesnoted,isthatAEPSCindividual whoprovidestheengineering/design expertise foraparticular areaofresponsibility.
3)AEPSC provides additional service in matters such as supplier qualification, procurement of original equipment and replacement parts, and the process of dedicating commercial grade items or services to safety-related applications.
Thisresponsibility includestheimplementation ofthequalityassurance andqualitycontrolmeasuresforsystems,equipment, structures, orfunctional areasincludedinthatindividual's responsibility.
4)The AEPSC gA Division provides technical direction in quality assurance matters to AEPSC and the Cook Nuclear Plant, and1.7-8 July, 1993
Thevarioustitlesusedfortheidentification ofanindividual's responsibility andassignment shallbeunderstood tomeanthesameascognizant engineerintherespective areasofresponsibility.
 
ualitAssurance ResonsibilitofI&M-CookNuclearPlantIM'sCookNuclearPlantstaffoperatestheCookNuclearPlantinaccordance withlicensing requirements, including theTechnical Specifications andsuchothercommitments asestablished bytheoperating licenses.
oversees the adequacy, effectiveness and implementation of the gA Program through review and audit activities.
ThePlantManagerInstruction (PHI)systemandsubtierinstructions andprocedures describethemeansbywhichcompliance isachievedandresponsibilities areassigned, including interfaces withAEPSC.Figure1.7-3indicates theorganizational relationships withintheAEPSystempertaining totheoperation andsupportoftheCookNuclearPlant.1.7.1.2.5Oranization AEPSC1.7-9July,1993TheChairmanoftheBoardandChiefExecutive Officerisultimately responsible forthegAProgramassociated withtheCookNuclearPlant.Thisresponsibility
5)Cognizant Engineer-(e.g., System Engineer, Equipment Engineer, Lead Engineer, Responsible Engineer, etc.)-The cognizant engineer, and/or engineer with the other titles noted, is that AEPSC individual who provides the engineering/design expertise for a particular area of responsibility.
'j'.iadministered throughthefollowing AEPSCorganization management personnel:
This responsibility includes the implementation of the quality assurance and quality control measures for systems, equipment, structures, or functional areas included in that individual's responsibility.
AEPSCDirector-gualityAssurance AEPSCVicePresident
The various titles used for the identification of an individual's responsibility and assignment shall be understood to mean the same as cognizant engineer in the respective areas of responsibility.
-NuclearOperations AEPSCVicePresident
ualit Assurance Res onsibi lit of I&M-Cook Nuclear Plant IM's Cook Nuclear Plant staff operates the Cook Nuclear Plant in accordance with licensing requirements, including the Technical Specifications and such other commitments as established by the operating licenses.The Plant Manager Instruction (PHI)system and subtier instructions and procedures describe the means by which compliance is achieved and responsibilities are assigned, including interfaces with AEPSC.Figure 1.7-3 indicates the organizational relationships within the AEP System pertaining to the operation and support of the Cook Nuclear Plant.1.7.1.2.5 Or anization AEPSC1.7-9 July, 1993 The Chairman of the Board and Chief Executive Officer is ultimately responsible for the gA Program associated with the Cook Nuclear Plant.This responsibility
-ProjectManagement andConstruction ualitAssurance DsvisionTheAEPSCDirector-qua1ityAssurance
'j'.i administered through the following AEPSC organization management personnel:
'i''epo'ruing:;::::,:::to",.:::;,:,thi.'':",:::NEP,.::::,":Cha'~",rIIian'.:".;::
AEPSC Director-guality Assurance AEPSC Vice President-Nuclear Operations AEPSC Vice President-Project Management and Construction ualit Assurance Dsvision The AEPSC Director-qua 1 i ty Assurance'i''epo'ruing:;::::,:::to",.:::;,:,thi.'':",:::NEP,.::::,":Cha'~",rIIian'.:".;::
o',::tthe',::::,:Board~andi!
o',::tthe',::::,:Board~andi!
Ch'i'i..f:,:::,:Execut'i lTo",::.":,".,Dsfufi cer,:,'::
Ch'i'i..f:,:::,:Execut'i lTo",::.":,".,Dsfufi cer,:,':: i s responsible for the Dual i ty Assurance'i":.i:: (DA'Pj)f~gi<Viss'onr.
isresponsible fortheDualityAssurance
The DA Diys's'ion consists of the following sections (Figure 1.7-4): gual i ty Assurance Engineering Section Nuclear Software guality Assurance Section Audi ts and Procurement Secti on guality Assurance Section (Site)The the gAD is organizationally independent and is responsible to perform fol 1 owing: Speci fy gA Program requirements.
'i":.i::(DA'Pj)f~gi<Viss'onr.
Identi fy quality problems.Initiate, recommend, or provide solutions through designated channels.Verify implementation of solutions, as appropriate.
TheDADiys's'ion consistsofthefollowing sections(Figure1.7-4):gualityAssurance Engineering SectionNuclearSoftwaregualityAssurance SectionAuditsandProcurement SectiongualityAssurance Section(Site)ThethegADisorganizationally independent andisresponsible toperformfol1owing:SpecifygAProgramrequirements.
Prepare, issue and maintain gA Program documents, as required.Verify the implementation of the gA Program through scheduled audits and survei llances.Verify the implementation of computer software quality assurance through reviews, survei llances and audits.Audit engineering, design, procurement, construction and operational documents for incorporation of, and compliance with, applicable qual.ity assurance requirements to the extent specified by the AEPSC management-approved gA Program.Organize and conduct the gA auditor orientation, training, certification and qualification of AEPSC audit personnel.
Identifyqualityproblems.
Provide direction for the collection, storage, maintenance, and retention of quality assurance records.1.7-10 July, 1993 Maintain, on data base, a list of suppliers of nuclear (N)i tems and services, plus other selected categories of suppliers.
: Initiate, recommend, orprovidesolutions throughdesignated channels.
Identify noncompliances of the established gA Program to the responsible organizations for corrective actions, and report significant occurrences that jeopardize quality to senior AEPSC management.
Verifyimplementation ofsolutions, asappropriate.
Follow up on corrective actions identified by gA during and after disposition implementation.
Prepare,issueandmaintaingAProgramdocuments, asrequired.
Review the disposition of conditions adverse to quality to assure that action taken will preclude recurrence.
Verifytheimplementation ofthegAProgramthroughscheduled auditsandsurveillances.Verifytheimplementation ofcomputersoftwarequalityassurance throughreviews,surveillancesandaudits.Auditengineering, design,procurement, construction andoperational documents forincorporation of,andcompliance with,applicable qual.ityassurance requirements totheextentspecified bytheAEPSCmanagement-approved gAProgram.OrganizeandconductthegAauditororientation,
Conduct in-process gA audits or survei llances at supplier's facilities, as required.Assist and advise other AEP/AEPSC groups in matters related to the gA Program.Conduct audits as directed by the NSDRC.Review AEPSC investigated Condi':tion'eports and associated corrective and preventive action recommendations.
: training, certification andqualification ofAEPSCauditpersonnel.
Maintain cognizance of industry and governmental quality assurance requirements such that the gA Program is compatible with requirements, as necessary.
Providedirection forthecollection, storage,maintenance, andretention ofqualityassurance records.1.7-10July,1993  
Recommend for revision to, or improvements in, the established gA Program to senior AEPSC management.
: Maintain, ondatabase,alistofsuppliers ofnuclear(N)itemsandservices, plusotherselectedcategories ofsuppliers.
Audi t dedication plans for commercial grade items and services.Issue"Stop Work" orders when significant conditions adverse to safety-related items are identified to prevent unsafe conditions from occurring and/or continuing.
Identifynoncompliances oftheestablished gAProgramtotheresponsible organizations forcorrective actions,andreportsignificant occurrences thatjeopardize qualitytoseniorAEPSCmanagement.
Provide AEPSC management with periodic reports concerning the status, adequacy and implementation of the gA Program.Prepare and conduct special verification and/o'r surveillance programs on in-house activities, as requi red or requested.
Followuponcorrective actionsidentified bygAduringandafterdisposition implementation.
Routinely attend, and participate in, daily plant work schedule and status meetings.Provide adequate gA coverage relative to procedural and inspection controls, acceptance criteria, and gA staffing and qualification of personnel to carry out gA assignments.
Reviewthedisposition ofconditions adversetoqualitytoassurethatactiontakenwillprecluderecurrence.
1.7-11 July, 1993  
Conductin-process gAauditsorsurveillancesatsupplier's facilities, asrequired.
AssistandadviseotherAEP/AEPSC groupsinmattersrelatedtothegAProgram.ConductauditsasdirectedbytheNSDRC.ReviewAEPSCinvestigated Condi':tion'eports andassociated corrective andpreventive actionrecommendations.
Maintaincognizance ofindustryandgovernmental qualityassurance requirements suchthatthegAProgramiscompatible withrequirements, asnecessary.
Recommend forrevisionto,orimprovements in,theestablished gAProgramtoseniorAEPSCmanagement.
Auditdedication plansforcommercial gradeitemsandservices.
Issue"StopWork"orderswhensignificant conditions adversetosafety-related itemsareidentified topreventunsafeconditions fromoccurring and/orcontinuing.
ProvideAEPSCmanagement withperiodicreportsconcerning thestatus,adequacyandimplementation ofthegAProgram.Prepareandconductspecialverification and/o'rsurveillance programsonin-houseactivities, asrequiredorrequested.
Routinely attend,andparticipate in,dailyplantworkscheduleandstatusmeetings.
ProvideadequategAcoveragerelativetoprocedural andinspection
: controls, acceptance
: criteria, andgAstaffingandqualification ofpersonnel tocarryoutgAassignments.
1.7-11July,1993  


Determine theacceptability ofvendorstosupplyproductsandservicesforsafety''related applications.
Determine the acceptability of vendors to supply products and services for safety''related applications.
Amlification ofSecificResonsibilities uglification oftheAEPSCDirector-ualitAssurance TheAEPSCDirector-gualityAssurance shallpossessthefollowing positionrequirements:
Am lification of S ecific Res onsibilities uglification of the AEPSC Director-ualit Assurance The AEPSC Director-guality Assurance shall possess the following position requirements:
Bachelor's degreeinengineering, scientific, orrelateddiscipline.
Bachelor's degree in engineering, scientific, or related discipline.
Ten(10)yearsexperience inoneof,oracombination of,thefollowing areas:engineering, design,construction, operations, maintenance offossilornuclearpowergeneration facilities'r utilityfaci'lities'A, ofwhichatleastfour(4)yearsmustbeexperience innuclearqualityassurance relatedactivities.
Ten (10)years experience in one of, or a combination of, the following areas: engineering, design, construction, operations, maintenance of fossil or nuclear power generation facilities'r utility faci'lities'A, of which at least four (4)years must be experience i n nuclear quality assurance related activities.
Knowledge ofgAregulations,
Knowledge of gA regulations, policies, practices and standards.
: policies, practices andstandards.
The same, or higher, organization reporting level as the highest line manager directly responsible for performing activities affecting the quality of safety-related items, such as engineering, procurement, construction and operation, and is sufficiently independent from cost and schedule.Effective communication channels with other senior management positions.
Thesame,orhigher,organization reporting levelasthehighestlinemanagerdirectlyresponsible forperforming activities affecting thequalityofsafety-related items,suchasengineering, procurement, construction andoperation, andissufficiently independent fromcostandschedule.
Effective communication channelswithotherseniormanagement positions.
Responsibility
Responsibility
'forapprovalofgAManual(s).
'for approval of gA Manual(s).
Performance ofnootherdutiesorresponsibilities unrelated togAthatwouldpreventfullattention togAmatters.StoWorkOrdersTheAEPSCgADivi'sation isresponsible forensuringthatactivities affecting thequalityofsafety-related itemsare1.7-12July,1993 performed inamannerthatmeetsapplicable administrative, technical, andregulatory requirements.
Performance of no other duties or responsibilities unrelated to gA that would prevent full attention to gA matters.Sto Work Orders The AEPSC gA Divi'sation is responsible for ensuring that activities affecting the quality of safety-related items are 1.7-12 July, 1993 performed in a manner that meets applicable administrative, technical, and regulatory requirements.
Inordertocarryoutthisresponsibility, theAEPGh'ai'rman
In order to carry out this responsibility, the AEP Gh'ai'rman
",of.:;:.";they~Board:
",of.:;:.";they~Board:
andGhi'H::::,',Execiiti,"ie,':::Offi',ce'r" hasgiventheAEPSCDirector-gualityAssurance theauthority tostopworkonanyactivityaffecting thequalityofsafety-related itemsthatdoesnotmeettheaforementioned requirements.
and Ghi'H::::,',Execiiti,"ie,':::Offi',ce'r" has given the AEPSC Director-guali ty Assurance the authority to stop work on any acti vi ty affecting the quality of safety-related items that does not meet the aforementioned requirements.
Stopworkauthority hasbeenfurtherdelegated bytheAEPSCDirector-gualityAssurance totheAEPSCgualityAssurance Superintendent (site).TheAEPSCDirector-gualityAssurance andtheAEPSCgualityAssurance Superintendent donothavetheauthority tostopunitoperations, butwillnotifyappropriate CookNuclearPlantand/orcorporate management ofconditions whichdonotmeettheaforementioned
Stop work authority has been further delegated by the AEPSC Director-guali ty Assurance to the AEPSC guality Assurance Superintendent (si te).The AEPSC Director-guality Assurance and the AEPSC guality Assurance Superintendent do not have the authority to stop unit operations, but will notify appropriate Cook Nuclear Plant and/or corporate management of conditions which do not meet the aforementioned criteria, and recommend that unit operations be terminated.
: criteria, andrecommend thatunitoperations beterminated.
A Auditor ualification and Certification Pro ram AEPSC has established and maintains a gA auditor training and certi fi cati on program for all AEPSC gA audi tors.Cond'i'tion Identi fi cati on Re ortin and Escal ati on AEPSC has established mechanisms for the identification, reporting and escalation of conChfjons affecting the quality of safety-related items to a level of management whereby satisfactory resolutions can be obtained.Nuclear 0 erations The AEPSC Vice President-Nuclear Operations (Manager of Nuclear Operations), reporting to the AEP ChaLreansof~~the::.':Bo'a@el andgg~h'sef Executi~ve Of'f~jceH, is responsible for nuclear operations.
AAuditorualification andCertification ProramAEPSChasestablished andmaintains agAauditortrainingandcertificationprogramforallAEPSCgAauditors.Cond'i'tion IdentificationReortinandEscalationAEPSChasestablished mechanisms fortheidentification, reporting andescalation ofconChfjons affecting thequalityofsafety-related itemstoalevelofmanagement wherebysatisfactory resolutions canbeobtained.
Nuclear July, 1993 i
Nuclear0erationsTheAEPSCVicePresident
operations is comprised of the AEPSC Nuclear Operations Department, the AEPSC Nuclear Engineering Department, and the Cook Nuclear Plant Organization.
-NuclearOperations (ManagerofNuclearOperations),
The AEPSC Nuclear Operations t::::.:::::: (NO,".:"'.)
reporting totheAEPChaLreansof~~the::.':Bo'a@el andgg~h'sef Executi~ve Of'f~jceH, isresponsible fornuclearoperations.
De'pa'rtm'e'nt is responsible for the following:
NuclearJuly,1993 i
Formulate policies and practices relative to safety, licensing, operation, maintenance, fuel management, and radiological support.Provide the Plant Manager with the technical and managerial guidance, direction and support to ensure the safe operation of the plant.Maintain liaison with the AEPSC Director-guali ty Assurance.
operations iscomprised oftheAEPSCNuclearOperations Department, theAEPSCNuclearEngineering Department, andtheCookNuclearPlantOrganization.
Implement the requirements of the AEPSC gA Program.Maintain knowledge of the latest safety, licensing, and regulatory requirements, codes, standards, and federal regulations applicable to the operation of Cook Nuclear Plant.Accompli sh the procurement, economic, technical, licensing and quality assurance activities dealing with the reactor core and its related fuel assemblies and components.
TheAEPSCNuclearOperations t::::.::::::
Prepare bid specifications, evaluate bids, and negotiate and administer contracts for the procurement of all nuclear fuel and related components and services.Naintain a special nuclear material accountability system.Provide analyses to support nuclear steam supply system operation, including reactor physics, fuel economics, fuel mechanical behavior, core thermal hydraulic and LOCA and non-LOCA transient safety analysis and other analysis activities as requested, furnish plant Technical Specification changes and other licensing work, and participate in NRC and NSDRC meetings as required by these analyses.Perform reactor core operation follow-up activities and other reactor core technical support activities as requested, and arrange for support from the fuel fabricator, when needed.Contract for, and provide technical support for, disposal of both high level and low level radioactive waste.1.7-14 July, 1993 Coordinate the development of neutronics and thermal hydraulic safety codes and conduct safety analyses.Conduct studies of the Cook Nuclear Plant licensing bases to determine the optimal changes to support unit operations at a lower primary pressure and temperature.
(NO,".:"'.)
Coordinate NO)computer code development, and provide the interface control for N0$with the AEPSC Information System Department and Cook Nuclear Plant.Obtain and maintain the NRC Operating License and Technical Specifications for the Cook Nuclear Plant.Act as the communication link between the NRC, AEPSC, and the plant staff.Perform and coordinate efforts involved in gathering information, performing calculations and generic studies;preparing criteria, reports, and responses; reviewing items affecting safety;and interpreting regulations.
De'pa'rtm'e'nt isresponsible forthefollowing:
Review, coordinate, and resolve all matters pertaining to nuclear safety between Cook Nuclear Plant and AEPSC.This includes, but is not limited to: the review of certain plant design changes to ensure that the requirements of 10CFR50.59 are met;the preparation of safety evaluations, or reviews, for any designated subject;the preparation of changes to, and appropriate interpretation of, the plant Technical Specification submittals of license amendments; and the analysis of plant compliance with regulatory requirements.
Formulate policiesandpractices relativetosafety,licensing, operation, maintenance, fuelmanagement, andradiological support.ProvidethePlantManagerwiththetechnical andmanagerial
Primary corporate contact for most oral and written communication with the NRC.Provide support in key areas of expertise, such as nuclear engineering, probabi li stic analysis, thermohydraulic analysis, chemical engineering, mechanical engineering, electrical engineering, and technical writing.Interface with vendors and other outside organizations on matters connected with the nuclear steam supply system and other areas affecting the safe design and operation of nuclear plants.July, 1993 Participate, as appropriate, in the review of nuclear plant operating experiences, and relate those experiences to the design and safe operation of Cook Nuclear Plant.Review, evaluate, and respond to NRC requests for information and NRC notifications of regulatory changes resulting in plant modifications or new facilities.
: guidance, direction andsupporttoensurethesafeoperation oftheplant.MaintainliaisonwiththeAEPSCDirector-gualityAssurance.
Such responses are generated in accordance with appropriate AEPSC Administrative Procedures.
Implement therequirements oftheAEPSCgAProgram.Maintainknowledge ofthelatestsafety,licensing, andregulatory requirements, codes,standards, andfederalregulations applicable totheoperation ofCookNuclearPlant.Accomplishtheprocurement,
Develop, specify, and/or review conceptual nuclear safety cri teria for Cook Nuclear Plant in accordance with established regulations.
: economic, technical, licensing andqualityassurance activities dealingwiththereactorcoreanditsrelatedfuelassemblies andcomponents.
This includes all information contained in the FSAR, as well as specialized information such as environmental qualification and seismic criteria.Review and evaluate performance requirements for systems, equipment and materials for compliance with specified safety cri teria.Review, on a conceptual basis, plant reports and proposed plant safety-related design changes, to the extent that they are related to the ultimate safe operation of the plant, for compliance with safety regulations, plant Technical Specifications, the Updated FSAR design basis, and with any other requirements under the Operating License, to determine if there are any unreviewed safety questions as defined in 10CFR50.59.
Preparebidspecifications, evaluatebids,andnegotiate andadminister contracts fortheprocurement ofallnuclearfuelandrelatedcomponents andservices.
Perform reviews of Candjt~oo'eports and 10CFR21 reviews in accordance with corporate requirements.
Naintainaspecialnuclearmaterialaccountability system.Provideanalysestosupportnuclearsteamsupplysystemoperation, including reactorphysics,fueleconomics, fuelmechanical
Operate the Action Item Tracking (AIT)system for AEPSC internal commitment tracking.Coordinate design changes for the Cook Nuclear Plant, acting as a focal point within AEPSC.This program primarily involves project management responsi'bi li ties for scheduling and implementing Request for Changes (RFCs), and includes extensive interfacing with engineering, design, construction, and Cook Nuclear Plant.Provide working-level coordination with the Institute of Nuclear Power Operations (INPO)in the areas of INPO training, seminars, and workshops.
: behavior, corethermalhydraulic andLOCAandnon-LOCAtransient safetyanalysisandotheranalysisactivities asrequested, furnishplantTechnical Specification changesandotherlicensing work,andparticipate inNRCandNSDRCmeetingsasrequiredbytheseanalyses.
This effort includes providing AEPSC access to INPO resources, such as NUCLEAR NETWORK and Nuclear Plant July, 1993  
Performreactorcoreoperation follow-up activities andotherreactorcoretechnical supportactivities asrequested, andarrangeforsupportfromthefuelfabricator, whenneeded.Contractfor,andprovidetechnical supportfor,disposalofbothhighlevelandlowlevelradioactive waste.1.7-14July,1993 Coordinate thedevelopment ofneutronics andthermalhydraulic safetycodesandconductsafetyanalyses.
ConductstudiesoftheCookNuclearPlantlicensing basestodetermine theoptimalchangestosupportunitoperations atalowerprimarypressureandtemperature.
Coordinate NO)computercodedevelopment, andprovidetheinterface controlforN0$withtheAEPSCInformation SystemDepartment andCookNuclearPlant.ObtainandmaintaintheNRCOperating LicenseandTechnical Specifications fortheCookNuclearPlant.Actasthecommunication linkbetweentheNRC,AEPSC,andtheplantstaff.Performandcoordinate effortsinvolvedingathering information, performing calculations andgenericstudies;preparing
: criteria, reports,andresponses; reviewing itemsaffecting safety;andinterpreting regulations.
Review,coordinate, andresolveallmatterspertaining tonuclearsafetybetweenCookNuclearPlantandAEPSC.Thisincludes, butisnotlimitedto:thereviewofcertainplantdesignchangestoensurethattherequirements of10CFR50.59 aremet;thepreparation ofsafetyevaluations, orreviews,foranydesignated subject;thepreparation ofchangesto,andappropriate interpretation of,theplantTechnical Specification submittals oflicenseamendments; andtheanalysisofplantcompliance withregulatory requirements.
Primarycorporate contactformostoralandwrittencommunication withtheNRC.Providesupportinkeyareasofexpertise, suchasnuclearengineering, probabilisticanalysis, thermohydraulic
: analysis, chemicalengineering, mechanical engineering, electrical engineering, andtechnical writing.Interface withvendorsandotheroutsideorganizations onmattersconnected withthenuclearsteamsupplysystemandotherareasaffecting thesafedesignandoperation ofnuclearplants.July,1993 Participate, asappropriate, inthereviewofnuclearplantoperating experiences, andrelatethoseexperiences tothedesignandsafeoperation ofCookNuclearPlant.Review,evaluate, andrespondtoNRCrequestsforinformation andNRCnotifications ofregulatory changesresulting inplantmodifications ornewfacilities.
Suchresponses aregenerated inaccordance withappropriate AEPSCAdministrative Procedures.
Develop,specify,and/orreviewconceptual nuclearsafetycriteriaforCookNuclearPlantinaccordance withestablished regulations.
Thisincludesallinformation contained intheFSAR,aswellasspecialized information suchasenvironmental qualification andseismiccriteria.
Reviewandevaluateperformance requirements forsystems,equipment andmaterials forcompliance withspecified safetycriteria.Review,onaconceptual basis,plantreportsandproposedplantsafety-related designchanges,totheextentthattheyarerelatedtotheultimatesafeoperation oftheplant,forcompliance withsafetyregulations, plantTechnical Specifications, theUpdatedFSARdesignbasis,andwithanyotherrequirements undertheOperating License,todetermine ifthereareanyunreviewed safetyquestions asdefinedin10CFR50.59.
PerformreviewsofCandjt~oo'eports and10CFR21reviewsinaccordance withcorporate requirements.
OperatetheActionItemTracking(AIT)systemforAEPSCinternalcommitment tracking.
Coordinate designchangesfortheCookNuclearPlant,actingasafocalpointwithinAEPSC.Thisprogramprimarily involvesprojectmanagement responsi'bi litiesforscheduling andimplementing RequestforChanges(RFCs),andincludesextensive interfacing withengineering, design,construction, andCookNuclearPlant.Provideworking-level coordination withtheInstitute ofNuclearPowerOperations (INPO)intheareasofINPOtraining,
: seminars, andworkshops.
Thiseffortincludesproviding AEPSCaccesstoINPOresources, suchasNUCLEARNETWORKandNuclearPlantJuly,1993
 
Reliability DataSystem(NPRDS),andeffectively integrating AEPSCandCookNuclearPlanteffortstowardsuti1izingINPOrecommendations contained inoperating experience reportstoimproveCookNuclearPlantperformance.
Coordinate dailycommunication withtheCookNuclearPlant,provideAEPSCmanagement withadailyplantstatusreport,andmakepresentations toseniormanagement atregularly scheduled construction staffmeetings.
Processincomingvendorinformation.
Contribute totheannualFSARupdatesthroughreviewsofLicenseeEventReports,designchangesandtheAnnualOperating Report.Radiological,emergency
'p'1'a'nni'.ng andSupport~4f~l,."th':.
se'cuAri:0 jAWAVWAWAVA pyograqt.
.AVWA'C..A WNWCorporate supportoftheCookNuclearPlant'radiation protectionandhealthphysics'program, technical reviewsandadviceontheradiological aspectsofdesignchanges,modifications orcapitalimprovements, theALARAprogram,theradiation monitoring system,theenvironmental radiological monitoring andsamplingprogram,doseandshielding
: analysis, radiochemistry review,implications offederalregulations, andmeteorological monitoring.
CookNuclearPlantandcorporate emergency
: planning, including procedure development, exercisescheduling, facilityprocurement andmaintenance, andtheliaisonwithoff-siteemergency planninggroups,suchasFEHAandtheHichiganStatePolice.Reviewfederalcodesandregulations astheyrelatetothedevelopment, implementation, revisionanddistribution oftheHodifiedAmendedSecurityPlan(HASP).Interface with.theplant'ssecuritydepartment providing supportandmaintaining securitydocumentfilesQg.ProvideNuclearGeneralEmployeeTraining(NGET)forAEPSCpersonnel.
Coordinate thedevelopment oftrainingforAEPSCpersonnel whosupporttheoperation andmaintenance ofCookNuclearPlant,l.7-17July,1993 ensuringaunifiedtrainingprogrammeetingannualgoalsandobjectives.
Participate ontheALARAcommittee.
Prepareresponses totheNRConradiological, emergency planningandsecurityissues.Serveastechnical advisorsonplantaudits.Remaincognizant ofcurrentdecommissioning practices anddevelopments.
AEPSCNuclearfnineerin
 
==DeartmentTheAEPSCChiefNuclearEngineer,==


reporting totheAEPSCVicePresident
Reliability Data System (NPRDS), and effectively integrating AEPSC and Cook Nucl ear Pl ant efforts towards uti 1 i zing INPO recommendations contained in operating experience reports to improve Cook Nuclear Plant performance.
-NuclearOperations, isresponsible forcertainengineering anddesignfunctions.
Coordinate daily communication with the Cook Nuclear Plant, provide AEPSC management with a daily plant status report, and make presentations to senior management at regularly scheduled construction staff meetings.Process incoming vendor information.
TheAEPSCNuclearEngineering Department iscomprised ofengineering anddesignentitiesatAEPSC,aswellasanon-siteengineering anddesignsupportorganization attheCookNuclearPlant.TheAEPSCCivilEngineering, Electrical Engineering, andSystemPlanningDepartments provideperiodic, technical assistance fortheCookNuclearPlant.Theadministrative andqualityassurance controlsforthisassistance arecontrolled throughdocumented interface agreements withggAEPSCNuclearEngineering P.AEPSCNuclearEngineering
Contribute to the annual FSAR updates through reviews of Licensee Event Reports, design changes and the Annual Operating Report.Radi ol ogi cal, emergency'p'1'a'nni'.ng and Support~4f~l,."th':.
<,:,,~>(NE~)0eji'i':t~en't:
se'cuAri:0 j A WAVWAWAVA pyograqt..AVWA'C..A WNW Corporate support of the Cook Nucl ear Pl ant'radiation protecti on and health physics'program, technical reviews and advice on the radiological aspects of design changes, modifications or capital improvements, the ALARA program, the radiation monitoring system, the environmental radiological monitoring and sampling program, dose and shielding analysis, radiochemistry review, implications of federal regulations, and meteorological monitoring.
.isresponsible forthefollowing:
Cook Nuclear Plant and corporate emergency planning, including procedure development, exercise scheduling, facility procurement and maintenance, and the liaison with off-site emergency planning groups, such as FEHA and the Hichigan State Police.Review federal codes and regulations as they relate to the development, implementation, revision and distribution of the Hodified Amended Security Plan (HASP).Interface with.the plant's security department providing support and maintaining security document files Qg.Provide Nuclear General Employee Training (NGET)for AEPSC personnel.
Provideplanning, engineering anddesignoftheelectrical facilities insideCookNuclearPlantuptothehighvoltage(HV),bushingsofthemaingenerator transformers andmechanical facilities insideCookNuclearPlantincluding:
Coordinate the development of training for AEPSC personnel who support the operation and maintenance of Cook Nuclear Plant, l.7-17 July, 1993 ensuring a unified training program meeting annual goals and objectives.
determination ofgenerallayoutanddesign;selection ofequipment; preparation ofone-lineandflowdiagrams; and,July,1993  
Participate on the ALARA committee.
Prepare responses to the NRC on radiological, emergency planning and security issues.Serve as technical advisors on plant audits.Remain cognizant of current decommissioning practices and developments.
AEPSC Nuclear fn ineerin De artment The AEPSC Chief Nuclear Engineer, reporting to the AEPSC Vice President-Nuclear Operations, is responsible for certain engineering and design functions.
The AEPSC Nuclear Engineering Department is comprised of engineering and design entities at AEPSC, as well as an on-site engineering and design support organization at the Cook Nuclear Plant.The AEPSC Civil Engineering, Electrical Engineering, and System Planning Departments provide periodic, technical assistance for the Cook Nuclear Plant.The administrative and quality assurance controls for this assistance are controlled through documented interface agreements with gg AEPSC Nuclear Engineering P.AEPSC Nuclear Engineering
<,:,,~>(NE~)0eji'i':t~en't:.is responsible for the following:
Provide planning, engineering and design of the electrical facilities inside Cook Nuclear Plant up to the high voltage (HV), bushings of the main generator transformers and mechanical facilities inside Cook Nuclear Plant including:
determination of general layout and design;selection of equipment; preparation of one-line and flow diagrams;and, July, 1993  


*coordination ofinsideandoutsideplantfacilities.
*coordination of inside and outside plant facilities.
Provide.engineering and;dc'.ign ofallcontrolsforoperation andprotection ofnuclearsteamsupply,steamgenerator, turbinegenerator, auxil'iary equipment andgeneralplantprotection, including checkingandapproving elementary, one-line, andflowdrawings.
Provide.engineering and;dc'.ign of all controls for operation and protection of nuclear steam supply, steam generator, turbine generator, auxil'iary equipment and general plant protection, including checking and approving elementary, one-line, and flow drawings.Ensure that all purchased equipment conforms to accepted standards and fulfills the desired function.Closely follow manufacturer's engineering and design processes to assure provision of adequate and reliable equipment upon which depend the safety, reliability, and performance of the unit and plant.Prepare, review and/or approve design changes, sketches, drawings, calculations, and design verifications, as required.Prepare and/or approve dedication plans, specifications and purchase requisitions.
Ensurethatallpurchased equipment conformstoacceptedstandards andfulfillsthedesiredfunction.
Perform drawing review of equipment, as appropriate.
Closelyfollowmanufacturer's engineering anddesignprocesses toassureprovision ofadequateandreliableequipment uponwhichdependthesafety,reliability, andperformance oftheunitandplant.Prepare,reviewand/orapprovedesignchanges,sketches,
Develop, review and/or approve procedures or correspondence as appropriate.
: drawings, calculations, anddesignverifications, asrequired.
Obtain, review and perform engineering and design evaluations, including environmental equipment qualification (Eg).Establish and maintain a central file for equipment environmental qualification documentation.
Prepareand/orapprovededication plans,specifications andpurchaserequisitions.
Plinij Fac'i~1!i!ty!
Performdrawingreviewofequipment, asappropriate.
Develop,reviewand/orapproveprocedures orcorrespondence asappropriate.
Obtain,reviewandperformengineering anddesignevaluations, including environmental equipment qualification (Eg).Establish andmaintainacentralfileforequipment environmental qualification documentation.
PlinijFac'i~1!i!ty!
Data:-::,,Basi"::::::(FDB)!."".
Data:-::,,Basi"::::::(FDB)!."".
Performcalculations forproperapplication ofequipment.
Perform calculations for proper application of equipment.
Performandevaluateinvestigations, analysesandreportsforfacilities pertaining totheengineering design,operation andmaintenance oftheCookNuclearPlant.Assistfieldpersonnel ininstallation, start-up, andsubsequent locatingofproblemsinequipment, andindetermining properoperation ofequipment, duringnormalorafteremergency operations.
Perform and evaluate investigations, analyses and reports for facilities pertaining to the engineering design, operation and maintenance of the Cook Nuclear Plant.Assist field personnel in installation, start-up, and subsequent locating of problems in equipment, and in determining proper operation of equipment, during normal or after emergency operations.
July,1993 Maintainaconstantawareness forimprovements andmorereliabledesignofequipment andfacilities, maintenance andoperating methodsorprocedures.
July, 1993 Maintain a constant awareness for improvements and more reliable design of equipment and facilities, maintenance and operating methods or procedures.
Maintainaconstantawareness ofactivities toensurecompliance withallapplicable policiesandprocedures, initiating, whenrequired, trainingor'retraining programs.
Maintain a constant awareness of activities to ensure compliance with all applicable policies and procedures, initiating, when required, training or'retraining programs.Participate, as assigned, on the NSDRC and NSDRC subcommittees, and participate in matters covered in the committee's charter.Provide responses to NRC correspondence, as required.Participate in the evaluation and remedy of any situation requiring activation of the emergency response organization.
Participate, asassigned, ontheNSDRCandNSDRCsubcommittees, andparticipate inmatterscoveredinthecommittee's charter.Provideresponses toNRCcorrespondence, asrequired.
Provide support personnel for the Emergency Response Organization.
Participate intheevaluation andremedyofanysituation requiring activation oftheemergency responseorganization.
Provide technical support in areas of operation and maintenance, including:
Providesupportpersonnel fortheEmergency ResponseOrganization.
the Inservice Inspection (ISI)Program;the gA Program;the Fire Protection gA Program;the AEP ALARA Program covering radiation"protection; and, the corporate and plant Industrial Safety program.Provide technical direction and assistance in the layout and arrangement of equipment piping, systems, controls, etc., for the development of drawings.Develop System Descriptions.
Providetechnical supportinareasofoperation andmaintenance, including:
Provide analytical support in engineering and design disciplines (e.g., heat transfer, thermodynamics, fluid dynamics).
theInservice Inspection (ISI)Program;thegAProgram;theFireProtection gAProgram;theAEPALARAProgramcoveringradiation"protection; and,thecorporate andplantIndustrial Safetyprogram.Providetechnical direction andassistance inthelayoutandarrangement ofequipment piping,systems,controls, etc.,forthedevelopment ofdrawings.
Provide engineering and design evaluations for PRs, LERs, INPO SOERs, and NRC Bulletins.
DevelopSystemDescriptions.
Participate, as assigned, on the AEPSC Cook:,:4i..on Assessment Group (~GAG).Nake recommendations and assist in the formulation of policies and practices relating to the design and engineering of office and service buildings, miscellaneous structures and material handling equipment, and provide the general supervision of the engineering of such facilities, structures and equipment.
Provideanalytical supportinengineering anddesigndisciplines (e.g.,heattransfer, thermodynamics, fluiddynamics).
Initiate and/or review, approve and control laboratory and field investigations and feasibility studies.Prepare and administer equipment, labor and service contracts.
Provideengineering anddesignevaluations forPRs,LERs,INPOSOERs,andNRCBulletins.
1.7-20 July, 1993  
Participate, asassigned, ontheAEPSCCook:,:4i..on Assessment Group(~GAG).Nakerecommendations andassistintheformulation ofpoliciesandpractices relatingtothedesignandengineering ofofficeandservicebuildings, miscellaneous structures andmaterialhandlingequipment, andprovidethegeneralsupervision oftheengineering ofsuchfacilities, structures andequipment.
Initiateand/orreview,approveandcontrollaboratory andfieldinvestigations andfeasibility studies.Prepareandadminister equipment, laborandservicecontracts.
1.7-20July,1993
 
Arrangeforoutsideengineering, designandconsulting assistance, asrequired.
Performshopa'ndfieldsurveillance onequipment beingmanufactured, fabricated, orinstalled.
ProvidefieldservicestotheCookNuclearPlant,including theassigning ofpersonnel, asarerequired, duringconstruction, normalorforcedoutages,orasrequested.
Assistintheplanningandexecution ofmaintenance workonequipment, facilities, buildings andotherstructures.
Supervise maintenance andrepairsofallmasonryandconcreteworkatCookNuclearPlant,including supplying qualified inspection personnel.
Directtestingofmaterials usedinconcreteandtestingofsoilstobeusedinworkattheCookNuclearPlant.Reviewandrecommend concretemixformulations forallnewconstruction.
Implement thecorrective actionprogram,withregardtoactivitiesaffecting thequalityofsafety-related itemsandservices, thatcontrolsanddocuments items,servicesoractivities whichdonotconformtorequirements.
Assistinthepreparation ofapplications forfederal,stateandlocalpermitsrelativetoinstallations beingmadewhichrequiresuchpermits.Conductperiodicmanagement reviewsof.theactivities ofthedepartment toensurecompliance withtheobjectives ofthegAProgram,andexternaltechnical surveillance, asnecessary, ofconsultants, outsideorganizations andvendorsoverwhichthedepartment iscognizant.
Establish andmaintainafileforgArecords.Develop,reviewandapprovedesignsanddrawingsformechanical, electrical andstructural systems,equipment andfacilities oftheCookNuclearPlant.Performrequiredcalculations andanalyses, including pipestress,pipesupportdesign,cablesizing,conduitandcabletraysupportandstructural steelandconcrete.
1.7-21July,1993 Assistfieldpersonnel intheresolution ofproblemsstemmingfromtheinstallation ofdesignchanges,orfromas-foundplantconditions, including assigning personnel totheplant.Formulate, administer, andimplement policiesandpractices relatingtotheengineering, anddesignoftheCookNuclearPlant.Conductfunctions soastobeinconformance withtheoperating licensesoftheCookNuclearPlant.Investigate evaluateandcorrectproblems.
Coordinate specialprojectsandstudies,asrequired.
Coordinate thedevelopment andmaintenance ofthecomputerized DesignDrawingControl(DDC)andtheVendorDrawingControl(VDC)programswhichincludecoordinating theprogramswithinterfacing divisions/departments.
Controltheissuanceanddistribution ofdrawingsfortheCookNuclearPlant,including monitoring oftheApertureCardMicrofilm Program.Supervise andcontroltheworkofconsultants, architect/engineers andoutsideengineering anddesignagenciessupplying servicestoAEPSCintheirdiscipline andprocessnotification ofdefectsinaccordance withcompanyrequirements.
Alsoperformdetailedreviewsofengineering anddesignworksubmitted byoutsideagencies.
Reviewandupdateapplicable sectionsofCookNuclearPlantUpdatedFSARasassigned.
Participate, asmembersandasassigned, oncommittees andadhoctaskforcesthatreviewnuclearactivities.
CookNuclearPlantThePlantHanagerreportsfunctionally andadministratively totheAEPSCVicePresident
-NuclearOperations (ManagerofNuclearOperations) andisresponsible fortheCookNuclearPlantactivities(Figure1.7-5).TheCookNuclearPlantorganization isresponsible forthefollowing:
1.7-22July,1993 Ensurethesafetyofallfacilityemployees andthegeneralpublicrelativetogeneralplantsafety,aswellasradiological safety,bymaintaining'trict compliance withplantTechnical Specifications, procedures andinstructions.
Recommend facilityengineering modification andinitiateandapproveplantimprovement requisitions.
Ensurethatworkpractices inallplantdepartments areconsistent withregulatory standards, safety,approvedprocedures, andplantTechnical Specifications.
Providemembership, asrequired, onthePNSRC.Maintaincloseworkingrelationships withtheNRC,aswellaslocal,state,andfederalgovernment regulatory officials regarding conditions whichcouldaffect,orareaffected, byCookNuclearPlantactivities.
Setupplantloadschedules andarrangeforequipment outages.Developandefficiently implement allsitecentralized trainingactivities.Administer thecentralized facilitytrainingcomplex,simulator, andprogramsensuringthatprogramdevelopmentisconsistentwiththesystematic approachtotraining, maintainINPOaccreditations, regulatory andcorporate requirements.
Ensurethathumanresourceactivities includeemployeesupportprograms(i.e.,fitnessforduty)consistent withINPO/NUMARC guidelines, companypolicies, andregulatory requirements andstandards.
Administer theNRCapprovedphysicalSecurityProgramincompliance withregulatory standards, ModifiedAmendedSecurityPlan(AASP),andcompanypolicy.Supervise, plan,anddirecttheactivities relatedtothemaintenance andinstallation ofallCookNuclearPlantequipment, structures, grounds,andyards.Prepareandmaintainrecordsandreportspertinent toequipment maintenance andregulatory agencyrequirements.
Administer contracts andscheduleoutsidecontractors'ork forces.1.7-23July,1993  


Enforceandcoordinate CookNuclearPlantregulations, procedures,
Arrange for outside engineering, design and consulting assistance, as required.Perform shop a'nd field surveillance on equipment being manufactured, fabricated, or installed.
: policies, andobjectives toassuresafety,efficiency, andcontinuityintheoperation oftheCookNuclearPlantwithinthelimitsoftheoperating licenseandtheTechnical Specifications andformulation ofrelatedpoliciesandprocedures.
Provide field services to the Cook Nuclear Plant, including the assigning of personnel, as are required, during construction, normal or forced outages, or as requested.
Plan,schedule, anddirectactivities relatingtotheoperation oftheCookNuclearPlantandassociated switchyards; cooperate inplanningandscheduling ofworkandprocedures forrefueling andmaintenance oftheCookNuclearPlant;anddirectandcoordinate fuelloadingoperations.
Assist in the planning and execution of maintenance work on equipment, facilities, buildings and other structures.
Reviewreportsandrecords,directgeneralinspection ofoperating conditions ofplantequipment, andinvestigate anyabnormalconditions, makingrecommendations forrepairs.Establish andadminister equipment clearance procedures consistent withcompany,plant,andradiation protection standards; authorize andarrangeforequipment outagestomeetnormaloremergency conditions.
Supervise maintenance and repairs of all masonry and concrete work at Cook Nuclear Plant, including supplying qualified inspection personnel.
Providetheshiftoperating crewswithappropriate procedures andinstructions toassisttheminoperating theCookNuclearPlantsafelyandefficiently.
Direct testing of materials used in concrete and testing of soils to be used in work at the Cook Nuclear Plant.Review and recommend concrete mix formulations for all new construction.
Approveoperatortrainingprogramsadministered bytheCookNuclearPlantTrainingDepartment designedtoprovideoperating personnel withtheknowledge andskillrequiredforsafeoperation ofthefacility, andforobtaining andholdingNRCoperatorlicenses.
Implement the corrective action program, with regard to activi ties affecting the quality of safety-related items and services, that controls and documents items, services or activities which do not conform to requirements.
Coordinate trainingprogramsinplantsafetyandemergency procedures forCookNuclearPlantOperating Department personnel toensurethateachshiftgroupwillfunctionproperlyintheeventofinjuryofpersonnel, fire,nuclearincident, orcivildisorder.
Assist in the preparation of applications for federal, state and local permits relative to installations being made which require such permits.Conduct periodic management reviews of.the activities of the department to ensure compliance with the objectives of the gA Program, and external technical surveillance, as necessary, of consultants, outside organizations and vendors over which the department is cognizant.
Advanceplanningandoverallconductofscheduled andforcedoutages,including thescheduling andcoordination ofallplantactivities associated withrefueling, preventive maintenance, corrective maintenance, equipment
Establish and maintain a file for gA records.Develop, review and approve designs and drawings for mechanical, electrical and structural systems, equipment and facilities of the Cook Nuclear Plant.Perform required calculations and analyses, including pipe stress, pipe support design, cable sizing, conduit and cable tray support and structural steel and concrete.1.7-21 July, 1993 Assist field personnel in the resolution of problems stemming from the installation of design changes, or from as-found plant conditions, including assigning personnel to the plant.Formulate, administer, and implement policies and practices relating to the engineering, and design of the Cook Nuclear Plant.Conduct functions so as to be in conformance with the operating licenses of the Cook Nuclear Plant.Investigate evaluate and correct problems.Coordinate special projects and studies, as required.Coordinate the development and maintenance of the computerized Design Drawing Control (DDC)and the Vendor Drawing Control (VDC)programs which include coordinating the programs with interfacing divisions/departments.
: overhaul, Technical Specification surveillance, anddesignchangeinstallations.
Control the issuance and distribution of drawings for the Cook Nuclear Plant, including monitoring of the Aperture Card Microfilm Program.Supervise and control the work of consultants, architect/engineers and outside engineering and design agencies supplying services to AEPSC in their discipline and process notification of defects in accordance with company requirements.
Coordinate allCookNuclearPlantactivitiesassociated withtheinitiation, review,approval, engineering, design,production, 1.7-24July,1993 examination,.inspection, test,turnover, andcloseoutofdesignchanges.Developandimplement aneffective gualityControl(gC)Program.Thisencompasses, butisnotlimitedto,theplanninganddirecting ofqualitycontrolactivities toassurethatindustrycodes,NRCregulations, andcompanyinstructions andpoliciesregarding qualitycontrolforCookNuclearPlantareimplemented, qualified personnel performthework,andthattheseactivities areproperlydocumented.
Also perform detailed reviews of engineering and design work submitted by outside agencies.Review and update applicable sections of Cook Nuclear Plant Updated FSAR as assigned.Participate, as members and as assigned, on committees and ad hoc task forces that review nuclear activities.
Preparereportsofreportable eventswhicharemandatedbytheNRCandtheTechnical Specifications.
Cook Nuclear Plant The Plant Hanager reports functionally and administratively to the AEPSC Vice President-Nuclear Operations (Manager of Nuclear Operations) and is responsible for the Cook Nuclear Plant activi ties (Figure 1.7-5).The Cook Nuclear Plant organization is responsible for the following:
Directtheactivities ofcontractor gC/nondestructive examination (NDE)personnel assignedtotheSafety.andAssessment Department andprovideinspections ofworkperformed.
1.7-22 July, 1993 Ensure the safety of all facility employees and the general public relative to general plant safety, as well as radiological safety, by maintaining'trict compliance with plant Technical Specifications, procedures and instructions.
Preparestatistical reportsutilizedinNRCAppraisal MeetingsandEnforcement Conference.
Recommend facility engineering modification and ini tiate and approve plant improvement requisitions.
Coordinate theeffortsofoutsideagencies, suchasAmericanNuclearInsurers(ANI),INPO,andthird-party inspector programs.
Ensure that work practices in all plant departments are consistent with regulatory standards, safety, approved procedures, and plant Technical Specifications.
Maintainknowledge ofdevelopments andchangesinNRCrequirements, industrystandards andcodes,regulatory compliance activities, andqualitycontroldisciplines andtechniques.
Provide membership, as required, on the PNSRC.Maintain close working relationships with the NRC, as well as local, state, and federal government regulatory officials regarding conditions which could affect, or are affected, by Cook Nuclear Plant activities.
Stopplantoperation intheeventthatconditions arefoundwhichareinviolation oftheTechnical Specifications oradversetoquality.Maintainandrenewaccreditation oftrainingprograms.
Set up plant load schedules and arrange for equipment outages.Develop and efficiently implement all site centralized training acti vi ti es.Administer the centralized facility training complex, simulator, and programs ensuring that program devel opment i s consi stent wi th the systematic approach to training, maintain INPO accreditations, regulatory and corporate requirements.
gualification andcertification ofIKNpersonnel performing inspections ortestsofmajormodifications andnon-routine maintenance totherequirements ofRegulatory Guide1.58andANSIN45.2.6,exceptasnotedinAppendixBhereto,item9.gualification andcertification ofILNNDEpersonnel totherequirements oftheAEPNDEHanual.gualification ofI&Npersonnel performing inspection ofnormaloperating activities toANSIN18.1.1.7-25July,1993 Propercertification ofcontractor inspection, testandexamination personnel inaccordance withRegulatory Guide1.58,ANSIN45.2.6,'ASMEB8PVCodeand/orSNT-TC-1A, asapplicable.
Ensure that human resource activities include employee support programs (i.e., fitness for duty)consistent with INPO/NUMARC guidelines, company policies, and regulatory requirements and standards.
Performpeerinspections ofworkcompleted byI8Mpersonnel byindependent personsqualified toANSIN18.7.ConductoftheInservice Inspection (ISI)Program.Procurement, receiving, qualitycontrolreceiptinspection, storage,handling, issue,stocklevelmaintenance, andoverallcontrolofstoresitems.Providematerialserviceandsupportinaccordance withpoliciesandprocedures requiredbyAEPPurchasing andStores,AEPSCgA,andtheNRC,whichareadministered andenforcedinatotalefforttoensuresafetyandplantreliability.
Administer the NRC approved physical Security Program in compliance with regulatory standards, Modified Amended Security Plan (AASP), and company policy.Supervise, plan, and direct the activities related to the maintenance and installation of all Cook Nuclear Plant equipment, structures, grounds, and yards.Prepare and maintain records and reports pertinent to equipment maintenance and regulatory agency requirements.
Plananddirectengineering andtechnical studies,nuclearfuelmanagement, equipment performance, instrument andcontrolmaintenance, on-sitecomputersystems,ShiftTechnical
Administer contracts and schedule outside contractors'ork forces.1.7-23 July, 1993  
: Advisors, andemergency planningfortheCookNuclearPlant.Theseactivities supportdailyon-siteoperations inasafe,reliable, andefficient mannerinaccordance withallcorporate
: policies, applicable laws,regulations,
: licenses, andTechnical Specification requirements.
Implement stationperformance testingandmonitorprogramstoensureoptimumplantefficiency.
Directprogramsrelatedtoon-sitefuelmanagement andreactorcorephysicstesting,andensuresatisfactory completion.
Establish testingandpreventive maintenance programsrelatedtostationinstrumentation, electrical systems,andcomputers.
Recommend alternatives toCookNuclearPlantoperation, technical oremergency procedures, anddesignofequipment toimprovesafetyofoperations andoverallplantefficiency.
Implement thecorporate Emergency PlanasitpertainstotheCookNuclearPlantsite.Providetechnical andengineering servicesinthefieldsofchemistry, radiation protection, ALARA,andenvironmental in1.7-26July,1993 supportofthesafeoperation oftheplantandthehealthandsafetyoftheemployees andthepublic.Planandscheduletheactivities oftheRadiation Protection Department oftheCookNuclearPlantinsupportofoperations andmaintenance.
Establish chemistry, radiochemistry, andhealthphysicscriteriawhichensuremaximumequipment liFe,andtheprotection ofthehealthandsafetyoftheworkersandthepublic.Establish samplingandanalysisprogramswhichensurethechemistry, radiochemistry, andhealthphysicscriteriaarewithintheestablished criteria.
Establish anddirectinvestigations, responses, andcorrective actionswhenoutsidetheestablished criteria.
Administer anddirecttheCookNuclearPlant'sradioactive wasteprograms, including volumereduction, packaging andshipping.
Administration ofthegARecordsProgram.MaintaintheCookNuclearPlantFacilityDataBase.ProectManaementandConstruction DeartmentTheAEPSCVicePresident
-ProjectManagement andConstruction, reporting totheAEPCha~emaP~Pof
~the.-:;Board~andFGh~ef..-"..::Execot~yi~0jjjci~r:,
isresponsible fortheProjectManagement andConstruction Department.'eporting totheAEPSCVicePresident
-ProjectHanagement andConstruction arethefollowing:
SiteConstruction Manager,reporting administratively totheAEPSCVicePresident
-ProjectManagement andConstruction, andfunctionally tothePlantManager-CookNuclearPlant.TheProjectManagement andConstruction Department isresponsible forthefollowing:
1.7-27July,1993 Administer andimplement construction jobordersissuedbytheCookNuclearPlantorganization formajormodifications, replacement andmaintenance workwithoutsidecontractors.
Administer andmonitorcontractor's industrial safetyprogramsandperformance.
Administer humanresources'unctions forsiteconstruction organization.
Hanageconstruction laborrelations withtheInternational BuildingandConstruction TradesUnions.Scope,bid,recommend awardsandadminister construction laborandservicescontracts.
Plan,organizeandcontrolmajorconstruction
: projects, asassignedbytheAEPChadirman;:;"::of jihad':",Boar'0,"::-.""an~1.:,,Chief, Haintaincognizance onmatterspertaining totheCookNuclearPlantandcorporate emergency responseorganization.
Prepareconstruction laborestimates.
Provideconstructabi lityguidancewhenrequested insupportofengineering anddesignchanges.Participate ontheNuclearSafetyDesignReviewCommittee.
Purchasin andStores


==Deartment(notcharted)The,==
Enforce and coordinate Cook Nuclear Plant regulations, procedures, policies, and objectives to assure safety, efficiency, and conti nui ty in the operation of the Cook Nuclear Plant within the limits of the operating license and the Technical Specifications and formulation of related policies and procedures.
:",4EPSC!EEgecdt'i'yeti c'e;.:Pres iden't~Op~riti onsPieporit'ing+fii theAEPChapman,:-';ofrtha."-;Boartd~'andi!ChTe~f-'Execntxva Officer,isresponsible forthePurchasing andStoresDepartment throughtheAEPSCVicePresident-Purchasing andHaterials Hanagement.
Plan, schedule, and direct activities relating to the operation of the Cook Nuclear Plant and associated switchyards; cooperate in planning and scheduling of work and procedures for refueling and maintenance of the Cook Nuclear Plant;and direct and coordinate fuel loading operations.
ThePurchasing andStoresDepartment isresponsible forthefollowing:
Review reports and records, direct general inspection of operating conditions of plant equipment, and investigate any abnormal conditions, making recommendations for repairs.Establish and administer equipment clearance procedures consistent with company, plant, and radiation protection standards; authorize and arrange for equipment outages to meet normal or emergency conditions.
Procurement ofsafety-related itemsfromonlyqualified andapprovedsuppliers.
Provide the shift operating crews with appropriate procedures and instructions to assist them in operating the Cook Nuclear Plant safely and efficiently.
Providesupervision toCookNuclearPlantPurchasing Section.Provideorderingandstockingdescriptions ofsafety-related itemsandincludethesedescriptions intheCookNuclearPlantinventory 1.7-28July,1993 catalog,including necessary communications withsuppliers, cognizant engineers, theCookNuclearPlantStoresSupervisor andotherappropriate personnel.
Approve operator training programs administered by the Cook Nuclear Plant Training Department designed to provide operating personnel with the knowledge and skill required for safe operation of the facility, and for obtaining and holding NRC operator licenses.Coordinate training programs in plant safety and emergency procedures for Cook Nuclear Plant Operating Department personnel to ensure that each shift group will function properly i n the event of injury of personnel, fire, nuclear incident, or civil disorder.Advance planning and overall conduct of scheduled and forced outages, including the scheduling and coordination of all plant activities associated with refueling, preventive maintenance, corrective maintenance, equipment overhaul, Technical Specification surveillance, and design change installations.
MaintainandcontroltheMaterial&Equipment databasefileforsafety-related items.Establish computerized inventory statusreports,onlineinventory andpurchaseorderinquirycapabilities andotherprocedures toorder,trackandcontrolmaterials.
Coordinate all Cook Nuclear Plant activi ties associated with the initiation, review, approval, engineering, design, production, 1.7-24 July, 1993 examination,.inspection, test, turnover, and close out of design changes.Develop and implement an effective guali ty Control (gC)Program.This encompasses, but is not limited to, the planning and directing of quality control activities to assure that industry codes, NRC regulations, and company instructions and policies regarding quality control for Cook Nuclear Plant are implemented, qualified personnel perform the work, and that these activities are properly documented.
Coordinate procurement activities withAEPSCNuclearOperations, AEPSCNuclearEngineering, CookNuclearPlantSitePurchasing, AEPSCgualityAssurance andCookNuclearPlantpersonnel.
Prepare reports of reportable events which are mandated by the NRC and the Technical Specifications.
Prepareandissuerequestsforquotations, contracts, serviceorders".'':::;,:,'blank'et";;:,;orders::,:
Direct the activities of contractor gC/nondestructive examination (NDE)personnel assigned to the Safety.and Assessment Department and provide inspections of work performed.
andpurchaseordersforsafety-related items.Establish asystemtoimplement corrective actionasdescribed intheAEPSCGeneralProcedures fortheCookNuclearPlant.Establish asystemofdocumentkeepingandtransmittal.
Prepare statistical reports utilized in NRC Appraisal Meetings and Enforcement Conference.
Establish asystemofdocumentcontrolforcontrolled procedures, instructions, andpurchasing documents forsafety-related items.Themaintenance andcontrolofselectedprocurement document'itandard phrasesasidentified bytheDirector-gualityAssurance, ordesignee.
Coordinate the efforts of outside agencies, such as American Nuclear Insurers (ANI), INPO, and third-party inspector programs.Maintain knowledge of developments and changes in NRC requirements, industry standards and codes, regulatory compliance activities, and quality control disciplines and techniques.
Conducttrainingsessionsinvolving purchasing personnel andothersonanannualbasis,ormorefrequently, asrequired, andascertain thattrainingsessionsincludecompleteresponsibilities associated withthepurchaseofsafety-related itemsandgpepvi~ces:,.
Stop plant operation in the event that conditions are found which are in violation of the Technical Specifications or adverse to qual i ty.Maintain and renew accreditation of training programs.gualification and certification of IKN personnel performing inspections or tests of major modifications and non-routine maintenance to the requirements of Regulatory Guide 1.58 and ANSI N45.2.6, except as noted in Appendix B hereto, item 9.gualification and certification of ILN NDE personnel to the requirements of the AEP NDE Hanual.gualification of I&N personnel performing inspection of normal operating activities to ANSI N18.1.1.7-25 July, 1993 Proper certification of contractor inspection, test and examination personnel in accordance with Regulatory Guide 1.58, ANSI N45.2.6,'ASME B8PV Code and/or SNT-TC-1A, as applicable.
1.7.21.7.2.1EQUALITYASSURANCE PROGRAMSCOPEPoliciesthatdefineandestablish theCookNuclearPlantgAProgramaresummarized intheindividual sectionsofthisdocument.
Perform peer inspections of work completed by I8M personnel by independent persons qualified to ANSI N18.7.Conduct of the Inservice Inspection (ISI)Program.Procurement, receiving, quality control receipt inspection, storage, handling, issue, stock level maintenance, and overall control of stores items.Provide material service and support in accordance with policies and procedures required by AEP Purchasing and Stores, AEPSC gA, and the NRC, which are administered and enforced in a total effort to ensure safety and plant reliability.
Theprogramisimplemented throughprocedures andinstructions responsive toprovisions ofthegAPD,andwillbecarriedoutforthelifeoftheCookNuclearPlant.1.7-29July,1993 Qualityassurance controlsapplytoactivities affecting thequalityofsafety-related structures, systemsandcomponents toanextentbasedontheimportance ofthosestructures, systems,components, etc.,(items)tosafety.Suchactivities areperformed undercontrolled conditions, including theuseofappropriate equipment, environmental conditions, assignment ofqualified personnel, andassurance thatallapplicable prerequisites havebeenmet.Safety-related itemsaredefinedasitems:Whichareassociated withthesafeshutdown(hot)ofthereactor;orisolation ofthereactor;ormaintenance oftheintegrity ofthereactorcoolantsystempressureboundary.
Plan and direct engineering and technical studies, nuclear fuel management, equipment performance, instrument and control maintenance, on-site computer systems, Shift Technical Advisors, and emergency planning for the Cook Nuclear Plant.These activities support daily on-site operations in a safe, reliable, and efficient manner in accordance with all corporate policies, applicable laws, regulations, licenses, and Technical Specification requirements.
ORWhosefailuremightcauseorincreasetheseverityofadesignbasisaccidentasdescribed intheUpdatedFSAR;orleadtoareleaseofradioactivity inexcessof10CFR100guidelines.
Implement station performance testing and monitor programs to ensure optimum plant efficiency.
Ingeneral,itemsareclassified assafety-related iftheyare:SeismicClassI,orElectrical ClasslE;orassociated withtheEngineered SafetyFeaturesActuation System(ESFAS);orassociated withtheReactorProtection System(RPS).AspecialQAProgramhasbeenimplemented forFireProtection items(Section1.7.19herein).TheQAProgramalsoincludesprovision forRadwasteQAinaccordance withtherequirements of10CFR71,$95partH.QAProgramstatus,scope,adequacy, andcompliance withIOCFR50,AppendixB,areregularly reviewedbyAEPSCmanagement throughreports,meetings, andreviewofauditresults.Theimplementation oftheQAProgrammaybeaccomplished byAEPSCand/orIndianaNichiganPowerCompanyordelegated inwholeorinparttoother1.7-30July,1993 AEPSystemcompanies oroutsideparties.However,AEPSCand/orIndianaMichiganPowerCompanyretainfullresponsibility forallactivities affecting safety-reIated items.Theperformance ofthedelegated organization isevaluated byauditorsurveillancesonafrequency commensurate withtheirscopeandimportance ofassignedwork.1.7.2.2IMPLEMENTATION 1.7.2.2.1 TheChairmanoftheBoardandChiefExecutive OfficerofAEPSChasstatedinasigned,formal"Statement ofPolicy",thatitisthecorporate policytocomplywiththeprovisions ofapplicable codes,standards andregulations pertaining toqualityassurance fornuclearpowerplantsasrequiredbytheCookNuclearPlantoperating licenses.
Direct programs related to on-site fuel management and reactor core physics testing, and ensure satisfactory completion.
Thestatement makesthisgAPDandtheassociated implementing procedures andinstructi onsmandatory, andrequirescompliance byallresponsible organizations andindividuals.
Establish testing and preventive maintenance programs related to station instrumentation, electrical systems, and computers.
Thestatement alsoidentifies themanagement positions withinthecompanies vestedwithresponsibility an'dauthority forimplementing theprogramandassuringitseffectiveness.
Recommend alternatives to Cook Nuclear Plant operation, technical or emergency procedures, and design of equipment to improve safety of operations and overall plant efficiency.
1.7.2.2.2 ThegAProgramatAEPSCandtheCookNuclearPlantconsistofcontrolsexercised byorganizations responsible forattaining qualityobjectives, andbyorganizations responsible forassurance functions.
Implement the corporate Emergency Plan as it pertains to the Cook Nuclear Plant site.Provide technical and engineering services in the fields of chemistry, radiation protection, ALARA, and environmental in 1.7-26 July, 1993 support of the safe operation of the plant and the health and safety of the employees and the public.Plan and schedule the activities of the Radiation Protection Department of the Cook Nuclear Plant in support of operations and maintenance.
ThegAProgrameffectiveness iscontinually assessedthroughmanagement reviewofvariousreports,NSDRCreviewofthegAauditprogram,andshallalsobeperiodically reviewedbyindependent outsidepartiesasdeemednecessary bymanagement.
Establish chemistry, radiochemistry, and health physics criteria which ensure maximum equipment liFe, and the protection of the health and safety of the workers and the public.Establish sampling and analysis programs which ensure the chemistry, radiochemistry, and health physics criteria are within the established criteria.Establish and direct investigations, responses, and corrective actions when outside the established criteria.Administer and direct the Cook Nuclear Plant's radioactive waste programs, including volume reduction, packaging and shipping.Administration of the gA Records Program.Maintain the Cook Nuclear Plant Facility Data Base.Pro ect Mana ement and Construction De artment The AEPSC Vice President-Project Management and Construction, reporting to the AEP Cha~emaP~Pof
ThegAProgramdescribed inthisgAPDisintendedtoapplyforthelifeoftheCookNuclearPlant.July,1993  
~the.-:;Board~andFGh~ef..-"..::Execot~yi~0jjjci~r:, is responsible for the Project Management and Construction Department.'eporting to the AEPSC Vice President-Project Hanagement and Construction are the following:
Site Construction Manager, reporting administratively to the AEPSC Vice President-Project Management and Construction, and functionally to the Plant Manager-Cook Nuclear Plant.The Project Management and Construction Department is responsible for the following:
1.7-27 July, 1993 Administer and implement construction job orders issued by the Cook Nuclear Plant organization for major modifications, replacement and maintenance work with outside contractors.
Administer and monitor contractor's industrial safety programs and performance.
Administer human resources'unctions for site construction organization.
Hanage construction labor relations with the International Building and Construction Trades Unions.Scope, bid, recommend awards and administer construction labor and services contracts.
Plan, organize and control major construction projects, as assigned by the AEP Chadirman;:;"::of jihad':",Boar'0,"::-.""an~1.:,,Chief, Haintain cognizance on matters pertaining to the Cook Nuclear Plant and corporate emergency response organization.
Prepare construction labor estimates.
Provide constructabi lity guidance when requested in support of engineering and design changes.Participate on the Nuclear Safety Design Review Committee.
Purchasin and Stores De artment (not charted)The,:",4EPSC!EEgecdt'i'yeti c'e;.:Pres i den't~Op~riti onsPieporit'ing+fii the AEP Chapman,:-';ofrtha."-;Boartd~'andi!ChTe~f-'Execntxva Officer, is responsible for the Purchasing and Stores Department through the AEPSC Vice President-Purchasing and Haterials Hanagement.
The Purchasing and Stores Department is responsible for the following:
Procurement of safety-related items from only qualified and approved suppliers.
Provide supervision to Cook Nuclear Plant Purchasing Section.Provide ordering and stocking descriptions of safety-related items and include these descriptions in the Cook Nuclear Plant inventory 1.7-28 July, 1993 catalog, including necessary communications with suppliers, cognizant engineers, the Cook Nuclear Plant Stores Supervisor and other appropriate personnel.
Maintain and control the Material&Equipment database file for safety-related items.Establish computerized inventory status reports, on line inventory and purchase order inqui ry capabilities and other procedures to order, track and control materials.
Coordinate procurement activities with AEPSC Nuclear Operations, AEPSC Nuclear Engineering, Cook Nuclear Plant Site Purchasing, AEPSC guality Assurance and Cook Nuclear Plant personnel.
Prepare and issue requests for quotations, contracts, service orders".'':::;,:,'blank'et";;:,;orders::,:
and purchase orders for safety-related items.Establish a system to implement corrective action as described in the AEPSC General Procedures for the Cook Nuclear Plant.Establish a system of document keeping and transmittal.
Establish a system of document control for controlled procedures, instructions, and purchasing documents for safety-related items.The maintenance and control of selected procurement document'itandard phrases as identified by the Director-guali ty Assurance, or designee.Conduct training sessions involving purchasing personnel and others on an annual basis, or more frequently, as required, and ascertain that training sessions include complete responsibilities associated with the purchase of safety-related items andgpepvi~ces:,.
1.7.2 1.7.2.1 EQUALITY ASSURANCE PROGRAM SCOPE Policies that define and establish the Cook Nuclear Plant gA Program are summarized in the individual sections of this document.The program is implemented through procedures and instructions responsive to provisions of the gAPD, and will be carried out for the life of the Cook Nuclear Plant.1.7-29 July, 1993 Quality assurance controls apply to activities affecting the quality of safety-related structures, systems and components to an extent based on the importance of those structures, systems, components, etc., (items)to safety.Such activities are performed under controlled conditions, including the use of appropriate equipment, environmental conditions, assignment of qualified personnel, and assurance that all applicable prerequisites have been met.Safety-related items are defined as items: Which are associated with the safe shutdown (hot)of the reactor;or isolation of the reactor;or maintenance of the integrity of the reactor coolant system pressure boundary.OR Whose failure might cause or increase the severity of a design basis accident as described in the Updated FSAR;or lead to a release of radioactivity in excess of 10CFR100 guidelines.
In general, items are classified as safety-related if they are: Seismic Class I, or Electrical Class lE;or associated with the Engineered Safety Features Actuation System (ESFAS);or associated with the Reactor Protection System (RPS).A special QA Program has been implemented for Fire Protection items (Section 1.7.19 herein).The QA Program also includes provision for Radwaste QA in accordance wi th the requirements of 10CFR71,$95part H.QA Program status, scope, adequacy, and compliance with IOCFR50, Appendix B, are regularly reviewed by AEPSC management through reports, meetings, and review of audit results.The implementation of the QA Program may be accomplished by AEPSC and/or Indiana Nichigan Power Company or delegated in whole or in part to other 1.7-30 July, 1993 AEP System companies or outside parties.However, AEPSC and/or Indiana Michigan Power Company retain full responsibility for all activities affecting safety-reIated items.The performance of the delegated organization i s evaluated by audit or survei llances on a frequency commensurate with their scope and importance of assigned work.1.7.2.2 IMPLEMENTATION 1.7.2.2.1 The Chairman of the Board and Chief Executive Officer of AEPSC has stated in a signed, formal"Statement of Policy", that it is the corporate policy to comply with the provisions of applicable codes, standards and regulations pertaining to quality assurance for nuclear power plants as required by the Cook Nuclear Plant operating licenses.The statement makes this gAPD and the associated implementing procedures and instructi ons mandatory, and requires compliance by all responsible organizations and individuals.
The statement also identifies the management positions wi thin the companies vested with responsibility an'd authority for implementing the program and assuring its effectiveness.
1.7.2.2.2 The gA Program at AEPSC and the Cook Nuclear Plant consist of controls exercised by organizations responsible for attaining quality objectives, and by organizations responsible for assurance functions.
The gA Program effectiveness is continually assessed through management review of various reports, NSDRC review of the gA audit program, and shall also be periodically reviewed by independent outside parties as deemed necessary by management.
The gA Program described in this gAPD is intended to apply for the life of the Cook Nuclear Plant.July, 1993  


TheQAProgramappliestoactivities affecting thequalityofsafety-relatedstructures, components, andrelatedconsumables duringplantoperation, maintenance, testing,andalldesignchanges.Safety-related structures, systemsandcomponents areidentified intheFacilityDataBaseandotherdocuments whicharedeveloped andmaintained fortheplant.Asdeemednecessary bytheAEPSCDirector-QualityAssurance, orthePlantManager,applicable portionsoftheQAProgramcontrolswillbeappliedtononsafety-related activities associated withtheimplementation oftheQAProgramtoensure"thatcommitments aremet(e.g.,off-siterecordsstorage,trainingservices, etc.).1.7.2.2.3 ThisQAPD,organized topresenttheQAProgramfortheCookNuclearPlantintheorderofthe18criteriaof10CFR50,AppendixB,statesAEPSCpolicyforeachofthecriteriaanddescribes howthecontrolspertinent toeacharecarriedout.AnychangesmadetothisQAPDthatdonotreducethecommitments previously acceptedbytheNRCmustbesubmitted totheNRCatleastannually.
The QA Program applies to activities affecting the quality of safety-related structures, components, and related consumables during plant operation, maintenance, testing, and all design changes.Safety-related structures, systems and components are identified in the Facility Data Base and other documents which are developed and maintained for the plant.As deemed necessary by the AEPSC Director-Quality Assurance, or the Plant Manager, applicable porti ons of the QA Program controls will be applied to nonsafety-related activities associated with the implementation of the QA Program to ensure" that commitments are met (e.g., off-site records storage, training services, etc.).1.7.2.2.3 This QAPD, organized to present the QA Program for the Cook Nuclear Plant in the order of the 18 criteria of 10CFR50, Appendix B, states AEPSC policy for each of the criteria and describes how the controls pertinent to each are carried out.Any changes made to this QAPD that do not reduce the commitments previously accepted by the NRC must be submitted to the NRC at least annually.Any changes made to this QAPD that do reduce the commitments previously accepted by the NRC must be submitted to the NRC and receive NRC approval prior to implementation.
AnychangesmadetothisQAPDthatdoreducethecommitments previously acceptedbytheNRCmustbesubmitted totheNRCandreceiveNRCapprovalpriortoimplementation.
The submittal of the changes described above shall be made in accordance with the requirements of 10CFR50.54.
Thesubmittal ofthechangesdescribed aboveshallbemadeinaccordance withtherequirements of10CFR50.54.
The program described in this QAPD will not be intentionally changed in any way that would prevent it from meeting the criteria of 10CFR50, Appendix 8 and other applicable operating license"requirements.
Theprogramdescribed inthisQAPDwillnotbeintentionally changedinanywaythatwouldpreventitfrommeetingthecriteriaof10CFR50,Appendix8andotherapplicable operating license"requirements.
1.7.2.2.4 Documents used for implementing the provisions of this QAPD include the following:
1.7.2.2.4 Documents usedforimplementing theprovisions ofthisQAPDincludethefollowing:
1.7-32 July, 1993 Plant Manager Instructions (PHIs)establish the policy at the plant for compliance with specified criteria, and assign responsibility to the various departments,'s required, for implementation.
1.7-32July,1993 PlantManagerInstructions (PHIs)establish thepolicyattheplantforcompliance withspecified
Plant Manager Procedures (PHPs), Department Head Procedures (DHPs), and in some cases Department Head Instructions (DHIs), have been prepared to describe the detailed activities required to support safe and effective plant operation as per the PMIs.The PHIs are reviewed by AEPSC (}A for concurrence that they will'satisfactorily implement regulatory requirements and commitments.
: criteria, andassignresponsibility tothevariousdepartments,'s
PHIs and PHPs are reviewed by the PNSRC prior to approval by the Plant Manager.DHPs and DHIs are reviewed within the departments prior to approval by the Department Head of origination.
: required, forimplementation.
DHPs and DHIs that might involve an unreviewed safety question as defined in 10CFR50.59 are reviewed by PNSRC prior to approval by the Department Head of origination.
PlantManagerProcedures (PHPs),Department HeadProcedures (DHPs),andinsomecasesDepartment HeadInstructions (DHIs),havebeenpreparedtodescribethedetailedactivities requiredtosupportsafeandeffective plantoperation asperthePMIs.ThePHIsarereviewedbyAEPSC(}Aforconcurrence thattheywill'satisfactorily implement regulatory requirements andcommitments.
AEPSC General Procedures (GPs)are utilized to define corporate policies and requirements for quality assurance, and to implement certain corporate gA Program requirements.
PHIsandPHPsarereviewedbythePNSRCpriortoapprovalbythePlantManager.DHPsandDHIsarereviewedwithinthedepartments priortoapprovalbytheDepartment Headoforigination.
AEPSC division/department and/or section procedures are also used to implement gA Program requirements.
DHPsandDHIsthatmightinvolveanunreviewed safetyquestionasdefinedin10CFR50.59 arereviewedbyPNSRCpriortoapprovalbytheDepartment Headoforigination.
GPs may also be used to define policies which are nonprocedural in nature.When contractors perform work on-site under their own quality assurance programs, the programs are audited for compliance and consistency with the applicable requirements of the Cook Nuclear Plant's gA Program and the contract, and are approved by AEPSC gA prior to the start of work.Implementation of on-site contractor's gA programs, will be audited to assure that the contractor's programs are effective.
AEPSCGeneralProcedures (GPs)areutilizedtodefinecorporate policiesandrequirements forqualityassurance, andtoimplement certaincorporate gAProgramrequirements.
1.7-33 July, 1993  
AEPSCdivision/department and/orsectionprocedures arealsousedtoimplement gAProgramrequirements.
GPsmayalsobeusedtodefinepolicieswhicharenonprocedural innature.Whencontractors performworkon-siteundertheirownqualityassurance
: programs, theprogramsareauditedforcompliance andconsistency withtheapplicable requirements oftheCookNuclearPlant'sgAProgramandthecontract, andareapprovedbyAEPSCgApriortothestartofwork.Implementation ofon-sitecontractor's gAprograms, willbeauditedtoassurethatthecontractor's programsareeffective.
1.7-33July,1993  


1.7.2.2.5
1.7.2.2.5~~~~Provisions of the gA Program for the Cook Nuclear Plant apply to activities affecti ng the quality of safety-related items.Appendix A to this gAPD lists the Regulatory/Safety Guides and ANSI Standards that identify AEPSC's commitment.
~~~~Provisions ofthegAProgramfortheCookNuclearPlantapplytoactivities affectingthequalityofsafety-related items.AppendixAtothisgAPDliststheRegulatory/Safety GuidesandANSIStandards thatidentifyAEPSC'scommitment.
Appendix B descri bes necessary exceptions and clarifications to the requirements of those documents.
AppendixBdescribesnecessary exceptions andclarifications totherequirements ofthosedocuments.
The scope of the program, and the extent to which its controls are applied, are established as follows: a)AEPSC uses the criteria specified in the Cook Nuclear Plant Updated FSAR for identifying structures, systems and components to which the gA Program applies.b)This identification process'results in the Facility Data Base for the Cook Nuclear Plant.This Facility Data Base is controlled by authorized personnel.
Thescopeoftheprogram,andtheextenttowhichitscontrolsareapplied,areestablished asfollows:a)AEPSCusesthecriteriaspecified intheCookNuclearPlantUpdatedFSARforidentifying structures, systemsandcomponents towhichthegAProgramapplies.b)Thisidentification process'resultsintheFacilityDataBasefortheCookNuclearPlant.ThisFacilityDataBaseiscontrolled byauthorized personnel.
Facility Data Base items are determined by engineering analysis of the function(s) of plant i tems in relation to safe operation and shutdown.c)The extent to which controls specified in the gA Program are applied to Facility Data Base items is determined for each item considering its relative importance to safety.Such determinations are based on data in such documents as the Cook Nuclear Plant Technical Specifications and the Updated FSAR.1.7.2.2.6 Activities affecting safety-related items are accomplished under controlled conditions.
FacilityDataBaseitemsaredetermined byengineering analysisofthefunction(s) ofplantitemsinrelationtosafeoperation andshutdown.
Preparations for such activities include consideration of the following:
c)Theextenttowhichcontrolsspecified inthegAProgramareappliedtoFacilityDataBaseitemsisdetermined foreachitemconsidering itsrelativeimportance tosafety.Suchdeterminations arebasedondatainsuchdocuments astheCookNuclearPlantTechnical Specifications andtheUpdatedFSAR.1.7.2.2.6 Activities affecting safety-related itemsareaccomplished undercontrolled conditions.
a)b)c)Assigned personnel are qualified.
Preparations forsuchactivities includeconsideration ofthefollowing:
Work has been planned to applicable engineering and/or Technical Specifications.
a)b)c)Assignedpersonnel arequalified.
Specified equipment and/or tools are available.
Workhasbeenplannedtoapplicable engineering and/orTechnical Specifications.
1.7-34 July, 1993  
Specified equipment and/ortoolsareavailable.
1.7-34July,1993  


d)e)g)h)Itemsareinanacceptable status.Itemsonwhichworkistobeperformed areinthepropercondition forthetask.'roperapprovedinstructions/procedures fortheworkareavailable foruse.Itemsandfacilities thatcouldbedamagedbytheworkhavebeenprotected, asrequired.
d)e)g)h)Items are in an acceptable status.Items on which work is to be performed are in the proper condition for the task.'roper approved instructions/procedures for the work are available for use.Items and facilities that could be damaged by the work have been protected, as required.Provisions have been made for special controls, processes, tests and verification methods.1.7.2.2.7 Responsibility and authority for planning and implementing indoctrination and training of AEPSC and Cook Nuclear Plant staff personnel are specifically designated, as follows: a)The training and indoctrination program provides for on-going training and periodic familiarization with the gA Program for the Cook Nuclear Plant.b)Personnel who perform inspection and examination functions are qualified in accordance with requirements of Regulatory Guide 1.8, ANSI N18.1, Regulatory Guide 1.58, ANSI N45.2.6, the ASHE BLPV Code, or SNT-TC-lA, as applicable, and with exceptions as noted in Appendix B hereto.c)AEPSC gA~y~auditors are qualified in accordance with Regulatory Guide 1.146 and ANSI N45.2.23.d)Personnel assigned duties such as special cleaning processes, welding, etc., are qualified in accordance with applicable codes, standards, regulatory guides and/or plant procedures.
Provisions havebeenmadeforspecialcontrols, processes, testsandverification methods.1.7.2.2.7 Responsibility andauthority forplanningandimplementing indoctrination andtrainingofAEPSCandCookNuclearPlantstaffpersonnel arespecifically designated, asfollows:a)Thetrainingandindoctrination programprovidesforon-goingtrainingandperiodicfamiliarization withthegAProgramfortheCookNuclearPlant.b)Personnel whoperforminspection andexamination functions arequalified inaccordance withrequirements ofRegulatory Guide1.8,ANSIN18.1,Regulatory Guide1.58,ANSIN45.2.6,theASHEBLPVCode,orSNT-TC-lA, asapplicable, andwithexceptions asnotedinAppendixBhereto.c)AEPSCgA~y~auditors arequalified inaccordance withRegulatory Guide1.146andANSIN45.2.23.
1.7-35 July, 1993 e)The training, qual i fi cati on and certi fi cation program includes, as applicable, provisions for retraining, reexamination and recertification to ensure that proficiency is maintained.
d)Personnel assigneddutiessuchasspecialcleaningprocesses, welding,etc.,arequalified inaccordance withapplicable codes,standards, regulatory guidesand/orplantprocedures.
f)Training, qualification, and cet tification records inc'luding documentation of objectives, wai vers/excepti ons, attendees and dates of attendance, are maintained at least as long as the personnel involved are performing activities to which the training, qualification and certification is relevant.g)Personnel responsible for performing activities that affect safety-related items are instructed as to the purpose, scope and implementation of the applicable manuals, instructions and procedures.
1.7-35July,1993 e)Thetraining, qualificationandcertificationprogramincludes, asapplicable, provisions forretraining, reexamination andrecertification toensurethatproficiency ismaintained.
Management/supervisory personnel receive functional training to the level necessary to plan, coordinate and administer the day-to-day verification activities of the gA Program for which they are responsible.
f)Training, qualification, andcettification recordsinc'luding documentation ofobjectives, waivers/excepti ons,attendees anddatesofattendance, aremaintained atleastaslongasthepersonnel involvedareperforming activities towhichthetraining, qualification andcertification isrelevant.
Training of AEPSC and Cook Nuclear Plant personnel is performed employing the following techniques, as applicable:
g)Personnel responsible forperforming activities thataffectsafety-related itemsareinstructed astothepurpose,scopeandimplementation oftheapplicable manuals,instructions andprocedures.
I)on the job and formal training administered by the department or section the individual works for;2)formal training conducted by qualified instructors from the Cook Nuclear Plant Training Department or other entities (internal and external to the AEP System);and 3)formal, INPO accredited training conducted by the Cook Nuclear Plant Training Department.
Management/supervisory personnel receivefunctional trainingtothelevelnecessary toplan,coordinate andadminister theday-to-day verification activities ofthegAProgramforwhichtheyareresponsible.
Records of traini ng sessions for such training are maintained.
TrainingofAEPSCandCookNuclearPlantpersonnel isperformed employing thefollowing techniques, asapplicable:
Where personnel qualifications or certi fi cations are required, these certi ficati ons are performed on a scheduled basis (consi stent with the appropriate code or standard).
I)onthejobandformaltrainingadministered bythedepartment orsectiontheindividual worksfor;2)formaltrainingconducted byqualified instructors fromtheCookNuclearPlantTrainingDepartment orotherentities(internal andexternaltotheAEPSystem);and3)formal,INPOaccredited trainingconducted bytheCookNuclearPlantTrainingDepartment.
'ook Nuclear Plant employees receive introductory training in quality assurance usually within the first two weeks of employment.
Recordsoftrainingsessionsforsuchtrainingaremaintained.
In addi tion, AEPSC personnel receive training prior to being allowed 1.7-36 July, 1993  
Wherepersonnel qualifications orcertificationsarerequired, thesecertificationsareperformed onascheduled basis(consistentwiththeappropriate codeorstandard).
~A unescorted access to the plant.This training includes management's policy for implementation of the gA Program through Plant Nanager and Department Head Instructions and Procedures.
'ookNuclearPlantemployees receiveintroductory traininginqualityassurance usuallywithinthefirsttwoweeksofemployment.
These instructions also include a description of the gA Program, the use of instructions and procedures, personnel requirements for procedure compliance and the systems and components controlled by the gA Program.1.7.3 DESIGN CONTROL 1.7.3.1 SCOPE Design changes are accomplished in accordance with approved design.Activities to develop such designs are controlled.
Inaddition,AEPSCpersonnel receivetrainingpriortobeingallowed1.7-36July,1993  
Depending on the type of design change, these activities include design and field engineering; the performance of physics, seismic, stress, thermal, hydraulic and radiation evaluations; update of the FSAR;review of accident analyses;the development and control of associated computer programs;studies of material compatibility; accessibility for inservice inspection and maintenance; determination of quality standards; and requirement for equipment qualification.
~A unescorted accesstotheplant.Thistrainingincludesmanagement's policyforimplementation ofthegAProgramthroughPlantNanagerandDepartment HeadInstructions andProcedures.
The controls apply to preparation and review of design documents, including the correct translation of applicable regulatory requirements and design bases into design, procurement and procedural documents.
Theseinstructions alsoincludeadescription ofthegAProgram,theuseofinstructions andprocedures, personnel requirements forprocedure compliance andthesystemsandcomponents controlled bythegAProgram.1.7.3DESIGNCONTROL1.7.3.1SCOPEDesignchangesareaccomplished inaccordance withapproveddesign.Activities todevelopsuchdesignsarecontrolled.
1.7.3.2 1.7.3.2.1 IMPLEMENTATION Design changes are controlled by procedures and instructions and are reviewed as required by lOCFR50.59 and the Technical Specifications.
Depending onthetypeofdesignchange,theseactivities includedesignandfieldengineering; theperformance ofphysics,seismic,stress,thermal,hydraulic andradiation evaluations; updateoftheFSAR;reviewofaccidentanalyses; thedevelopment andcontrolofassociated computerprograms; studiesofmaterialcompatibility; accessibility forinservice inspection andmaintenance; determination ofqualitystandards; andrequirement forequipment qualification.
Safety-related design changes are accomplished by one of two separate processes:
Thecontrolsapplytopreparation andreviewofdesigndocuments, including thecorrecttranslation ofapplicable regulatory requirements anddesignbasesintodesign,procurement andprocedural documents.
Minor Nodification (NN), or Request for Change (RFC).Those that do not alter the intended function of the item and can be determined by judgement to have a minimal overall impact on the item being modified may be implemented via the NH process.All other safety-1.7-37 July, 1993  
1.7.3.21.7.3.2.1 IMPLEMENTATION Designchangesarecontrolled byprocedures andinstructions andarereviewedasrequiredbylOCFR50.59 andtheTechnical Specifications.
Safety-related designchangesareaccomplished byoneoftwoseparateprocesses:
MinorNodification (NN),orRequestforChange(RFC).Thosethatdonotaltertheintendedfunctionoftheitemandcanbedetermined byjudgement tohaveaminimaloverallimpactontheitembeingmodifiedmaybeimplemented viatheNHprocess.Allothersafety-1.7-37July,1993  


relateddesignchanges,thatarenotappropriate forMNprocessing, areimplemented viatheRFCprocess.IncaseswheredesignchangescouldbedeemedtobewithinthescopeofRFCsorMNssolelyduetopossibleinsignificant adverseseismiceffects,thechangemaybeimplemented viathePlantModification (PN)process.Inthecasewheresafety-related itemsareinvolvedandthechangeintroduces onlyinsignificant adverseseismiceffects,thechangemaybeimplemented viathePlantModification (PH)process.1.7.3.2.2 Designchangesarereviewedtodetermine theirimpactonnuclearsafetyandtodetermine iftheproposedchangesinvolveanunreviewed safetyquestionasdefinedby10CFR50.59.
related design changes, that are not appropriate for MN processing, are implemented via the RFC process.In cases where design changes could be deemed to be within the scope of RFCs or MNs solely due to possible insignificant adverse seismic effects, the change may be implemented via the Plant Modification (PN)process.In the case where safety-related items are involved and the change introduces only insignificant adverse seismic effects, the change may be implemented via the Plant Modification (PH)process.1.7.3.2.2 Design changes are reviewed to determine their impact on nuclear safety and to determine if the proposed changes involve an unreviewed safety question as defined by 10CFR50.59.
Ifadesignchangeweretoinvolveanunreviewed safetyquestion, itwouldnotbeapprovedforimplementation unti1therequiredNRCapprovalwasreceived.
If a design change were to involve an unreviewed safety question, it would not be approved for implementation unti 1 the required NRC approval was received.RFCs (except those requiring emergency processing), HHs and PHs (having only insignificant seismic effect on safety rie]abed items)are reviewed and approved prior to implementation, as a minimum, by the cognizant AEPSC section and Plant Manager.The PNSRC also reviews those RFCs, NNs, and PNs for which safety evaluations are deemed necessary, pursuant to 10CFR50.59 and Technical Specification 6.5.1.6.1.7.3.2.3 For RFCs, the Change Control Board established within AEPSC provides an additional review and approval level.The Change Control Board is comprised of members of the Engineering, Design, Nuclear Operations and gA organizations within AEPSC, and is supplemented by other AEPSC organizations or individuals, as required.1.7-38 July, 1993 The cognizant member of the Change Control Board assigns a lead engineer for each RFC.The lead engineer is responsible for coordinating the RFC activities within AfPSC and maintaining close interface with AEPSC Site Engineering Support Project Engineering.
RFCs(exceptthoserequiring emergency processing),
1.7.3.2.4 Proposed RFCs which require emergency processing are originated at the.plant, reviewed by the PNSRC, and approved by the Plant Hanager.Cook Nuclear Plant management then contacts the AEPSC NO/>, and other AEPSC management, as required, describes the change requested, and implements the change only after receiving verbal AEPSC management authorization to proceed.These reviews and approvals are documented and become a part of the RFC Packet.1.7.3.2.5 When RFCs or HHs involve design interfaces between internal or external design organizations, or across technical disciplines, these interfaces are controlled.
HHsandPHs(havingonlyinsignificant seismiceffectonsafetyrie]abeditems)arereviewedandapprovedpriortoimplementation, asaminimum,bythecognizant AEPSCsectionandPlantManager.ThePNSRCalsoreviewsthoseRFCs,NNs,andPNsforwhichsafetyevaluations aredeemednecessary, pursuantto10CFR50.59 andTechnical Specification 6.5.1.6.1.7.3.2.3 ForRFCs,theChangeControlBoardestablished withinAEPSCprovidesanadditional reviewandapprovallevel.TheChangeControlBoardiscomprised ofmembersoftheEngineering, Design,NuclearOperations andgAorganizations withinAEPSC,andissupplemented byotherAEPSCorganizations orindividuals, asrequired.
Procedures are used for the review, approval, release, distribution and revision of documents involving design interfaces to ensure that structures, systems and components are compatible geometrically and functionally with processes and the environment.
1.7-38July,1993 Thecognizant memberoftheChangeControlBoardassignsaleadengineerforeachRFC.Theleadengineerisresponsible forcoordinating theRFCactivities withinAfPSCandmaintaining closeinterface withAEPSCSiteEngineering SupportProjectEngineering.
Lines of communication are established for controlling the flow of needed design information across design interfaces, including changes to the information as work progresses.
1.7.3.2.4 ProposedRFCswhichrequireemergency processing areoriginated atthe.plant,reviewedbythePNSRC,andapprovedbythePlantHanager.CookNuclearPlantmanagement thencontactstheAEPSCNO/>,andotherAEPSCmanagement, asrequired, describes thechangerequested, andimplements thechangeonlyafterreceiving verbalAEPSCmanagement authorization toproceed.Thesereviewsandapprovals aredocumented andbecomeapartoftheRFCPacket.1.7.3.2.5 WhenRFCsorHHsinvolvedesigninterfaces betweeninternalorexternaldesignorganizations, oracrosstechnical disciplines, theseinterfaces arecontrolled.
Decisions and problem resolutions involving design interfaces are made by the AEPSC organization having responsibility for engineering direction of the design effort.1.7.3.2.6 Checks are performed and documented to verify the dimensional accuracy and completeness of design drawings and specifications.
Procedures areusedforthereview,approval, release,distribution andrevisionofdocuments involving designinterfaces toensurethatstructures, systemsandcomponents arecompatible geometrically andfunctionally withprocesses andtheenvironment.
1.7-39 July, 1993 RFC design document packages are audited by AEPSC gA to assure that the documents have been prepared, verified, reviewed and approved in accordance with company procedures.
Linesofcommunication areestablished forcontrolling theflowofneededdesigninformation acrossdesigninterfaces, including changestotheinformation asworkprogresses.
1.7.3.2.8 The extent of, and methods for, design verification are documented.
Decisions andproblemresolutions involving designinterfaces aremadebytheAEPSCorganization havingresponsibility forengineering direction ofthedesigneffort.1.7.3.2.6 Checksareperformed anddocumented toverifythedimensional accuracyandcompleteness ofdesigndrawingsandspecifications.
The""extent of design verification performed is a function of the importance of the item to safety, design complexity, degree of standardization, the state-of-the-art, and similarity with previously proven designs.Hethods for design verification include evaluation of the applicability of standardized or previously proven designs, alternate'alculations, qualification testing and design reviews.These methods may be used singly or in combination," depending on the needs for the design under consideration.
1.7-39July,1993 RFCdesigndocumentpackagesareauditedbyAEPSCgAtoassurethatthedocuments havebeenprepared,
When design verification is done by evaluating standardized or previously proven designs, the applicability of such designs is confirmed.
: verified, reviewedandapprovedinaccordance withcompanyprocedures.
Any differences from the proven design are documented and evaluated for the intended application.
1.7.3.2.8 Theextentof,andmethodsfor,designverification aredocumented.
gualification testing of prototypes, components, or features is used when the ability of an item to perform an essential safety function cannot otherwise be adequately substantiated.
The""extentofdesignverification performed isafunctionoftheimportance oftheitemtosafety,designcomplexity, degreeofstandardization, thestate-of-the-art, andsimilarity withpreviously provendesigns.Hethodsfordesignverification includeevaluation oftheapplicability ofstandardized orpreviously provendesigns,alternate'alculations, qualification testinganddesignreviews.Thesemethodsmaybeusedsinglyorincombination,"
This testing is performed before plant equipment installation, where possible, but always before reliance upon the item to perform a safety-related function.gualification testing is performed under conditions that simulate the most adverse design conditions, considering all relevant operating modes.Test requirements, procedures and results are documented.
depending ontheneedsforthedesignunderconsideration.
Results are evaluated to assure that test requirements have been satisfied.
Whendesignverification isdonebyevaluating standardized orpreviously provendesigns,theapplicability ofsuchdesignsisconfirmed.
Design changes shown to be necessary through testing are made, and any necessary retesting or other verification is performed.
Anydifferences fromtheprovendesignaredocumented andevaluated fortheintendedapplication.
Test configurations are clearly documented.
gualification testingofprototypes, components, orfeaturesisusedwhentheabilityofanitemtoperformanessential safetyfunctioncannototherwise beadequately substantiated.
1.7-40 July, 1993 Design reviews are performed by multi-organizational or interdisciplinary groups, or by single individuals.
Thistestingisperformed beforeplantequipment installation, wherepossible, butalwaysbeforerelianceupontheitemtoperformasafety-related function.
Criteria are established to determine when a formal group review is required, and when review by an individual is sufficient.
gualification testingisperformed underconditions thatsimulatethemostadversedesignconditions, considering allrelevantoperating modes.Testrequirements, procedures andresultsaredocumented.
Procedures require that minor design changes accomplished by the HN process also receive formal design verification.
Resultsareevaluated toassurethattestrequirements havebeensatisfied.
Applicable design verification activities shall be completed prior to declaring the design change, or portion thereof, operational.
Designchangesshowntobenecessary throughtestingaremade,andanynecessary retesting orotherverification isperformed.
1.7.3.2.9 Persons representing applicable technical disciplines are assigned to perform design verifications.
Testconfigurations areclearlydocumented.
These persons are qualified by appropriate education or experience, but are not directly responsible for the design.The designer's immediate supervisor may perform the verification, provided that: 2)3)The supervisor is the only technically qualified individual.
1.7-40July,1993 Designreviewsareperformed bymulti-organizational orinterdisciplinary groups,orbysingleindividuals.
o The supervisor has not specified a singular design approach, ruled out design considerations, nor established the design inputs.and The need is g documented and approved g~by the supervisor's management.
Criteriaareestablished todetermine whenaformalgroupreviewisrequired, andwhenreviewbyanindividual issufficient.
and%:".",:l9 Regularly scheduled (}A audits verify conformance to previous items 1 through 3.Design verification on safety-related design changes shall be completed prior to declaring a design change, or portions thereof, operational.
Procedures requirethatminordesignchangesaccomplished bytheHNprocessalsoreceiveformaldesignverification.
1.7-41 July, 1993 1.7.3.2.10
Applicable designverification activities shallbecompleted priortodeclaring thedesignchange,orportionthereof,operational.
~~~~Implementation of design changes is coordinated on site by AEPSC Site Engineering Support Project Engineering.
1.7.3.2.9 Personsrepresenting applicable technical disciplines areassignedtoperformdesignverifications.
Material to perform the design change must meet the specifications established for the original system, or as specified by the lead engineer.For those design changes where testing after completion is required, the testing documentation is reviewed by the organization performing the test and, when specified, by the AEPSC lead engineer or other cognizant engineer(s).
Thesepersonsarequalified byappropriate education orexperience, butarenotdirectlyresponsible forthedesign.Thedesigner's immediate supervisor mayperformtheverification, providedthat:2)3)Thesupervisor istheonlytechnically qualified individual.
Further, completed design changes are audited/survei lied by AEPSC gA following installation and testing.1.7.3.2.11 Changes to design documents, including field changes, are reviewed, approved and controlled in a manner commensurate with that used for the original design.Such changes are evaluated for impact.Information on approved changes is transmitted to all affected organizations.
oThesupervisor hasnotspecified asingulardesignapproach, ruledoutdesignconsiderations, norestablished thedesigninputs.andTheneedisgdocumented andapprovedg~bythesupervisor's management.
1.7.3.2.12 Error and deficiencies in, and deviations from, approved design documents are identified and dispositioned in accordance with established design control and/or corrective action procedures.
and%:".",:l9 Regularly scheduled
1.7.3.2.13 Established 1)2)3)4)5)e)design control procedures provide for: controlled submission of design changes, engineering evaluation, review for impact on nuclear safety, audit by AEPSC gA, design modification, AEPSC managerial review, and 1.7-42 July, 1993 7)approval and record keeping for the implemented design change.1.7.4 PROCUREHENT DOCUHENT CONTROL 1.7.4.1 SCOPE Procurement documents define the characteristics of i tem(s)to be procured, identify applicable regulatory and industry codes/standards requirements, and specify supplier gA Program requirements to the extent necessary to assure adequate quality.1.7.4.2 1.7.4.2.1 IHPLEHENTATION Procurement control is established by instructions and procedures.
(}Aauditsverifyconformance topreviousitems1through3.Designverification onsafety-related designchangesshallbecompleted priortodeclaring adesignchange,orportionsthereof,operational.
These documents require that purchase documents be sufficiently detailed to ensure that purchased safetP~r:ilat'ed@:gems and services Q%, are:)purchased to specification and code requirements equivalent to those of the original equipment or service (except when the Code of Federal Regulations requires upgrading), 2)properly documented to show compliance with the applicable specifications, codes and standards, and 3)purchased from vendors or contractors who have been evaluated and deemed qualified, or by the commercial grade dedication process.Procedures establish the review of procurement documents to determine that: Appt',opr,'.,i%tegtec4'ni.'.:cd'::;::;.and quality requirements are correctly stated, inspectable and controllable; there are adequate acceptance criteria;and procurement documents have been prepared, reviewed and approved in accordance with established requirements.
1.7-41July,1993 1.7.3.2.10
The manager of the originating group, with support of the cognizant AEPSC engineering group, is responsible for assuring that applicable requirements are set forth in procurement documents.
~~~~Implementation ofdesignchangesiscoordinated onsitebyAEPSCSiteEngineering SupportProjectEngineering.
1.7-43 July, 1993 The Cook Nuclear Plant may request assistance of AEPSC cognizant engineers in any procurement activity.I 1.7.4.2.2 The Facility Data Base, in conjunction with other sources, is used for equipment safety classification and procurement grade.AEPSC specifications are used to determine requirements, codes or standards that i tems must fulfill, and define the documentation that must accompany the item to the plant.Procurement documents for safety-related items and services are reviewed to ensure that: correct classification is made;the requirements are properly stated;and that measures have been, or will be, implemented to assure the requirements are met and adequately provided for.'I Purchase requisitions for new safety-related items are initiated by the cognizant engineering group which establishes initial requirements.
Materialtoperformthedesignchangemustmeetthespecifications established fortheoriginalsystem,orasspecified bytheleadengineer.
Replacement/spares are purchased to requirements equivalent to the original unless upgrading is required by Federal Regulations, or deemed necessary by the cognizant engineering group.1.7.4.2.3 The contents of procurement documents vary according to the item(s)being purchased and its function(s) in the Cook Nuclear Plant.Provisions of this gAPD are considered for application to service contractors, also.As applicable, procurement documents include: a)Scope of work to be performed.
Forthosedesignchangeswheretestingaftercompletion isrequired, thetestingdocumentation isreviewedbytheorganization performing thetestand,whenspecified, bytheAEPSCleadengineerorothercognizant engineer(s).
b)Technical requirements, with applicable drawings, specifications, codes and standards identified by title, document number, revision and date, with any required procedures, such as special process instructions identified in such a way as to indicate source and need.Imposition of guides/standards on AEPSC/IM suppliers and 1.7-44 July, 1993 c)d)e)g)subtier suppliers will be on a case-by-case basis depending upon the item or service to be supplied and upon the degree that AEPSC/I&M relies on suppliers to invoke guides/standards.
Further,completed designchangesareaudited/survei liedbyAEPSCgAfollowing installation andtesting.1.7.3.2.11 Changestodesigndocuments, including fieldchanges,arereviewed, approvedandcontrolled inamannercommensurate withthatusedfortheoriginaldesign.Suchchangesareevaluated forimpact.Information onapprovedchangesistransmitted toallaffectedorganizations.
AEPSC/I&M recognizes that certain suppliers have acceptable 10CFR50, Appendix B gA programs, even through, the suppliers are not committed to Regulatory Guides or industry standards-(e.g.
1.7.3.2.12 Erroranddeficiencies in,anddeviations from,approveddesigndocuments areidentified anddispositioned inaccordance withestablished designcontroland/orcorrective actionprocedures.
ANSI N45.2.6.).
1.7.3.2.13 Established 1)2)3)4)5)e)designcontrolprocedures providefor:controlled submission ofdesignchanges,engineering evaluation, reviewforimpactonnuclearsafety,auditbyAEPSCgA,designmodification, AEPSCmanagerial review,and1.7-42July,1993 7)approvalandrecordkeepingfortheimplemented designchange.1.7.4PROCUREHENT DOCUHENTCONTROL1.7.4.1SCOPEProcurement documents definethecharacteristics ofitem(s)tobeprocured, identifyapplicable regulatory andindustrycodes/standards requirements, andspecifysuppliergAProgramrequirements totheextentnecessary toassureadequatequality.1.7.4.21.7.4.2.1 IHPLEHENTATION Procurement controlisestablished byinstructions andprocedures.
In those cases, in which suppliers are not committed to the same guides/standards as AEPSC/I&M, AEPSC/I&M will assure that (1)the supplier's gA program provides adequate gA controls, regardless of the lack of specific commitment, or (2)controls will be invoked directly by AEPSC/I&M to assure adequate'uality of items/services received by suppliers.
Thesedocuments requirethatpurchasedocuments besufficiently detailedtoensurethatpurchased safetP~r:ilat'ed@:gems andservicesQ%,are:)purchased tospecification andcoderequirements equivalent tothoseoftheoriginalequipment orservice(exceptwhentheCodeofFederalRegulations requiresupgrading),
Regulatory, administrative and reporting requirements.
2)properlydocumented toshowcompliance withtheapplicable specifications, codesandstandards, and3)purchased fromvendorsorcontractors whohavebeenevaluated anddeemedqualified, orbythecommercial gradededication process.Procedures establish thereviewofprocurement documents todetermine that:Appt',opr,'.,i%tegtec4'ni.'.:cd'::;::;.and qualityrequirements arecorrectly stated,inspectable andcontrollable; thereareadequateacceptance criteria; andprocurement documents havebeenprepared, reviewedandapprovedinaccordance withestablished requirements.
guality requirements appropriate to the complexity and scope of the work, including necessary tests and/or inspections.
Themanageroftheoriginating group,withsupportofthecognizant AEPSCengineering group,isresponsible forassuringthatapplicable requirements aresetforthinprocurement documents.
A requirement for a documented gA Program, subject to gA review and written concurrence prior to the start of work.A requirement for the supplier to invoke applicable quality requirements on subtier suppliers.
1.7-43July,1993 TheCookNuclearPlantmayrequestassistance ofAEPSCcognizant engineers inanyprocurement activity.
Provisions for access to supplier, and subtier suppliers', facilities and records for inspections, survei llances and audits.Identification of documentation to be provided by the supplier, the schedule of submittals and documents requiring AEPSC approval.1.7.4.2.4 The AEPSC gA Division performs audits of procurement documents to assure that gA Program requirements have been met.These audits are conducted in accordance with AEP5C gA Division procedures.
I1.7.4.2.2 TheFacilityDataBase,inconjunction withothersources,isusedforequipment safetyclassification andprocurement grade.AEPSCspecifications areusedtodetermine requirements, codesorstandards thatitemsmustfulfill,anddefinethedocumentation thatmustaccompany theitemtotheplant.Procurement documents forsafety-related itemsandservicesarereviewedtoensurethat:correctclassification ismade;therequirements areproperlystated;andthatmeasureshavebeen,orwillbe,implemented toassuretherequirements aremetandadequately providedfor.'IPurchaserequisitions fornewsafety-related itemsareinitiated bythecognizant engineering groupwhichestablishes initialrequirements.
1.7.4.2.5 Changes to procurement documents are controlled in a manner commensurate with that used for the original documents.
Replacement/spares arepurchased torequirements equivalent totheoriginalunlessupgrading isrequiredbyFederalRegulations, ordeemednecessary bythecognizant engineering group.1.7.4.2.3 Thecontentsofprocurement documents varyaccording totheitem(s)beingpurchased anditsfunction(s) intheCookNuclearPlant.Provisions ofthisgAPDareconsidered forapplication toservicecontractors, also.Asapplicable, procurement documents include:a)Scopeofworktobeperformed.
1.7-45 July, 1993 1.7.5 1.7.5.1 INSTRUCTIONS, PROCEDURES, AND DRAWINGS SCOPE Activities affecting the quality of safety-related structures, systems and components are accomplished using instructions, procedures and drawings appropriate to the circumstances, including acceptance criteria for determining if an activity has been satisfactorily completed.
b)Technical requirements, withapplicable
1.7.5.2 1.7.5.2.1 IMPLEMENTATION Instructions and procedures incorporate:
: drawings, specifications, codesandstandards identified bytitle,documentnumber,revisionanddate,withanyrequiredprocedures, suchasspecialprocessinstructions identified insuchawayastoindicatesourceandneed.Imposition ofguides/standards onAEPSC/IMsuppliers and1.7-44July,1993 c)d)e)g)subtiersuppliers willbeonacase-by-case basisdepending upontheitemorservicetobesuppliedanduponthedegreethatAEPSC/I&M reliesonsuppliers toinvokeguides/standards.
1)a description of the activity to be accomplished, and 2)appropriate quantitative (such as tolerances and operating limits)and qualitative (such as workmanship and standards) acceptance criteria sufficient to determine that the activity has been satisfactorily accomplished.
AEPSC/I&M recognizes thatcertainsuppliers haveacceptable 10CFR50,AppendixBgAprograms, eventhrough,thesuppliers arenotcommitted toRegulatory Guidesorindustrystandards-(e.g.
Hold points for inspecti on are establ i shed when required.Instructions and procedures pertaining to the specification of, and/or implementation of, the gA Program receive multiple reviews for technical adequacy and inclusion of appropriate quality requirements.
ANSIN45.2.6.).
Top tier instructions and procedures are reviewed and/or approved by AEPSC gA.Lower tier documents are reviewed and approved, as a minimum, by management/supervisory personnel trained to the level necessary to plan, coordinate and administer those day-to-day verification activities of the gA Program for which they are responsible.
Inthosecases,inwhichsuppliers arenotcommitted tothesameguides/standards asAEPSC/I&M, AEPSC/I&M willassurethat(1)thesupplier's gAprogramprovidesadequategAcontrols, regardless ofthelackofspecificcommitment, or(2)controlswillbeinvokeddirectlybyAEPSC/I&M toassureadequate'uality ofitems/services receivedbysuppliers.
Special procedures may be issued for activities which have short-term app1 i cabi 1 i ty.1.7.5.2.2 AEPSC activities relative to the Cook Nuclear Plant are outlined by procedures which provide the controls for the implementation of these 1.7-46 July, 1993 activities.
Regulatory, administrative andreporting requirements.
AEPSC has two categories of QA Program implementation procedures:
gualityrequirements appropriate tothecomplexity andscopeofthework,including necessary testsand/orinspections.
1)General Procedures (GPs)which are applicable to all AEPSC divisions and departments involved with Cook Nuclear Plant.2)Organization procedures which apply to the specific division, department or section involved.1.7;5;2.3 Activities at the Cook Nuclear Plant are controlled using plant procedures.
Arequirement foradocumented gAProgram,subjecttogAreviewandwrittenconcurrence priortothestartofwork.Arequirement forthesuppliertoinvokeapplicable qualityrequirements onsubtiersuppliers.
The PHIs have been classified into the following series: 1000 Personnel Selection, PNSRC Procedures 2000 Administration
Provisions foraccesstosupplier, andsubtiersuppliers',
-Document Control, Security, Training, Records, Emergency Plan, Fire Protection, Clearance Permits, Chemical Control, Internal Cleanliness, Spill Response, Standing orders, Corrective Maintenance.
facilities andrecordsforinspections, surveillancesandaudits.Identification ofdocumentation tobeprovidedbythesupplier, thescheduleofsubmittals anddocuments requiring AEPSCapproval.
3000 Procurement, Receiving, Shipping and Storage 4000 Operations, Fuel Handling, Surveillance Testing, Test Controls 5000 Maintenance, Repair, Modification, Special Processes, EQ and ISI Control of Contractors 6000 Technical-Chemistry/Radiological Controls, Radiation Protection, Performance/Engineering Testing, and Instrument and Control Maintenance and Calibration, Measuring and Test Equipment 7000 Quality Assurance, Quality Control Program and Condition/Problem Reporting Instructions and procedures identify the regulatory requirements and commitments which pertain to the subject that it will control and establish responsibilities for implementation.
1.7.4.2.4 TheAEPSCgADivisionperformsauditsofprocurement documents toassurethatgAProgramrequirements havebeenmet.Theseauditsareconducted inaccordance withAEP5CgADivisionprocedures.
Instructions and 1.7-47 July, 1993  
1.7.4.2.5 Changestoprocurement documents arecontrolled inamannercommensurate withthatusedfortheoriginaldocuments.
1.7-45July,1993 1.7.51.7.5.1INSTRUCTIONS, PROCEDURES, ANDDRAWINGSSCOPEActivities affecting thequalityofsafety-related structures, systemsandcomponents areaccomplished usinginstructions, procedures anddrawingsappropriate tothecircumstances, including acceptance criteriafordetermining ifanactivityhasbeensatisfactorily completed.
1.7.5.21.7.5.2.1 IMPLEMENTATION Instructions andprocedures incorporate:
1)adescription oftheactivitytobeaccomplished, and2)appropriate quantitative (suchastolerances andoperating limits)andqualitative (suchasworkmanship andstandards) acceptance criteriasufficient todetermine thattheactivityhasbeensatisfactorily accomplished.
Holdpointsforinspectionareestablishedwhenrequired.
Instructions andprocedures pertaining tothespecification of,and/orimplementation of,thegAProgramreceivemultiplereviewsfortechnical adequacyandinclusion ofappropriate qualityrequirements.
Toptierinstructions andprocedures arereviewedand/orapprovedbyAEPSCgA.Lowertierdocuments arereviewedandapproved, asaminimum,bymanagement/supervisory personnel trainedtothelevelnecessary toplan,coordinate andadminister thoseday-to-day verification activities ofthegAProgramforwhichtheyareresponsible.
Specialprocedures maybeissuedforactivities whichhaveshort-term app1icabi1ity.1.7.5.2.2 AEPSCactivities relativetotheCookNuclearPlantareoutlinedbyprocedures whichprovidethecontrolsfortheimplementation ofthese1.7-46July,1993 activities.
AEPSChastwocategories ofQAProgramimplementation procedures:
1)GeneralProcedures (GPs)whichareapplicable toallAEPSCdivisions anddepartments involvedwithCookNuclearPlant.2)Organization procedures whichapplytothespecificdivision, department orsectioninvolved.
1.7;5;2.3 Activities attheCookNuclearPlantarecontrolled usingplantprocedures.
ThePHIshavebeenclassified intothefollowing series:1000Personnel Selection, PNSRCProcedures 2000Administration
-DocumentControl,Security,
: Training, Records,Emergency Plan,FireProtection, Clearance Permits,ChemicalControl,InternalCleanliness, SpillResponse, Standingorders,Corrective Maintenance.
3000Procurement, Receiving, ShippingandStorage4000Operations, FuelHandling, Surveillance Testing,TestControls5000Maintenance, Repair,Modification, SpecialProcesses, EQandISIControlofContractors 6000Technical
-Chemistry/Radiological
: Controls, Radiation Protection, Performance/Engineering Testing,andInstrument andControlMaintenance andCalibration, Measuring andTestEquipment 7000QualityAssurance, QualityControlProgramandCondition/Problem Reporting Instructions andprocedures identifytheregulatory requirements andcommitments whichpertaintothesubjectthatitwillcontrolandestablish responsibilities forimplementation.
Instructions and1.7-47July,1993  


procedures mayeitherprovidetheguidancenecessary forthedevelopment ofsupplemental instructions and/orprocedures toimplement theirrequirements, orprovidecomprehensive guidancebasedonthesubjectmatter.1.7.5.2.4 CookNuclearPlantdrawingsareproduced, controlled anddistributed underthecontrolofAEPSCandtheCookNuclearPlant.AEPSCdesigndrawingsareproducedby,orunderthecontrolof,theAEPSCNuclear.Engineering Department underasetofprocedures whichdirecttheirdevelopment andreview.Theseprocedures specifyrequirements forinclusion ofquantitative andqualitative acceptance criteria.
procedures may either provide the guidance necessary for the development of supplemental instructions and/or procedures to implement thei r requirements, or provide comprehensive guidance based on the subject matter.1.7.5.2.4 Cook Nuclear Plant drawings are produced, controlled and distributed under the control of AEPSC and the Cook Nuclear Plant.AEPSC design drawings are produced by, or under the control of, the AEPSC Nuclear.Engineering Department under a set of procedures which direct their development and review.These procedures specify requirements for inclusion of quantitative and qualitative acceptance criteria.Specific drawings are reviewed and approved by the cognizant engineering organization.
Specificdrawingsarereviewedandapprovedbythecognizant engineering organization.
AEPSC has stationed an on-site design staff to provide for the revision of certain types of design drawings to reflect as-built conditions.
AEPSChasstationed anon-sitedesignstafftoprovidefortherevisionofcertaintypesofdesigndrawingstoreflectas-builtconditions.
1.7.5.2.5 Complex Cook Nuclear Plant procedures are designated as"In Hand" procedures.
1.7.5.2.5 ComplexCookNuclearPlantprocedures aredesignated as"InHand"procedures.
Examples of".In Hand" procedures are those developed for extensive or complex jobs where reliance on memory cannot be trusted.Further, those procedures which describe a sequence which cannot be altered, or require the documentation of data during the course of the procedure, are considered."In Hand" procedures are designated as such by double asterisks (**)which precede the procedure number on the cover sheet, all pages and attachments of a procedure and the corresponding index.1.7-48 July, 1993 it 1.7.6 1.7.6.1 DOCUMENT CONTROL SCOPE Documents controlling activities within the scope defined in 1.7.2 herein are issued and changed according to established procedures.
Examplesof".InHand"procedures arethosedeveloped forextensive orcomplexjobswhererelianceonmemorycannotbetrusted.Further,thoseprocedures whichdescribeasequencewhichcannotbealtered,orrequirethedocumentation ofdataduringthecourseoftheprocedure, areconsidered.
Documents such as instructions, procedures and drawings, including changes thereto, are reviewed for adequacy, approved for release by authorized personnel, and are distributed and used at the location where a prescribed activity is performed.
"InHand"procedures aredesignated assuchbydoubleasterisks
Changes to controlled documents are reviewed and approved by the same organizations that performed the original review and approval, or by other qualified, responsible organizations specifically designated in accordance with the procedures governing these documents.
(**)whichprecedetheprocedure numberonthecoversheet,allpagesandattachments ofaprocedure andthecorresponding index.1.7-48July,1993it 1.7.61.7.6.1DOCUMENTCONTROLSCOPEDocuments controlling activities withinthescopedefinedin1.7.2hereinareissuedandchangedaccording toestablished procedures.
Obsolete or superseded documents are controlled to prevent inadvertent use.1.7.6.2 IMPLEMENTATION Controls are established for approval, issue and change of documents in the following categories:
Documents suchasinstructions, procedures anddrawings, including changesthereto,arereviewedforadequacy, approvedforreleasebyauthorized personnel, andaredistributed andusedatthelocationwhereaprescribed activityisperformed.
a)b)c)d)e)f)g)Design documents (e.g., calculations, specifications, analyses)Drawings and related documents Procurement documents Instructions and procedures Updated Final Safety Analysis Report (UFSAR)Plant Technical Specifications Safeguards documents 1.7.6.2.2 The review, approval, issuance and change of documents are controlled by: 1.7-49 July, 1993 a)Establishment of criteria to ensure that adequate technical and quality requirements are incorporated.
Changestocontrolled documents arereviewedandapprovedbythesameorganizations thatperformed theoriginalreviewandapproval, orbyotherqualified, responsible organizations specifically designated inaccordance withtheprocedures governing thesedocuments.
b)Identification of the organization responsible for review, approval, issue and maintenance.
Obsoleteorsuperseded documents arecontrolled topreventinadvertent use.1.7.6.2IMPLEMENTATION Controlsareestablished forapproval, issueandchangeofdocuments inthefollowing categories:
c)Review of changes to documents by the organization that performed the initial review and approval, or by the organization desi gnated in accordance with the procedure governing the review and approval of specific types of documents.
a)b)c)d)e)f)g)Designdocuments (e.g.,calculations, specifications, analyses)
1.7.6.2.3 Documents are issued and controlled so that: a)The documents are available prior to commencing work.b)Obsolete documents are replaced by current documents in a timely manner.1.7.6.2.4 Haster lists, or equivalent controls, are used to identify the current revision of instructions, procedures, specifications and drawings.These control documents are updated and distributed to designated personnel who are responsible for maintaining current copies of the applicable documents.
Drawingsandrelateddocuments Procurement documents Instructions andprocedures UpdatedFinalSafetyAnalysisReport(UFSAR)PlantTechnical Specifications Safeguards documents 1.7.6.2.2 Thereview,approval, issuanceandchangeofdocuments arecontrolled by:1.7-49July,1993 a)Establishment ofcriteriatoensurethatadequatetechnical andqualityrequirements areincorporated.
The distribution of controlled documents is performed under procedures requiring receipt acknowledgement and in accordance wi th establ i shed di stri buti on 1 i sts.1.7.6.2.5 In the event a drawing is developed on-site to reflect an as-built configuration, the marked-up drawing is maintained in the Naster Plant File and all holders of the drawing are issued appropriate notification to inform them the revision they hold is not current, cannot be used 1.7-50 July, 1993 and, if required, reference must be made to the Master Plant File drawing.v 1.7.6.2.6 Documents prepared for use in training are appropriately marked to indicate that:hey cannot be used to operate or maintain the facility or to conduct activities affecting the quality of safety-related items.At the Cook Nuclear'Plant, unless a document is identified as'controlled'r
b)Identification oftheorganization responsible forreview,approval, issueandmaintenance.
'working copy'nly, it is automatically assumed that the document is for information use only.1.7.7 1.7.7.1 CONTROL OF PURCHASED ITEMS AND SERVICES SCOPE Activities that implemenf approved procurement requests for items and services are controlled to assure conformance with procurement document requirements.
c)Reviewofchangestodocuments bytheorganization thatperformed theinitialreviewandapproval, orbytheorganization designatedinaccordance withtheprocedure governing thereviewandapprovalofspecifictypesofdocuments.
Controls include a system of supplier evaluation and selection audits, acceptance of items and documentation upon delivery, and periodic assessment of supplier performance.
1.7.6.2.3 Documents areissuedandcontrolled sothat:a)Thedocuments areavailable priortocommencing work.b)Obsoletedocuments arereplacedbycurrentdocuments inatimelymanner.1.7.6.2.4 Hasterlists,orequivalent
Objective evidence of quality that demonstrates conformance with specified procurement document requirements is available to the Cook Nuclear Plant site prior to use of equipment, material, or services.1.7.7.2 IMPLEMENTATION 1.7.7.2.1 AEPSC qualifies suppliers,(dncludi ng,.dVstrmlbutors'Atoi the!mutenst>>
: controls, areusedtoidentifythecurrentrevisionofinstructions, procedures, specifications anddrawings.
the!y, Le'reform",;;;:q'ual'iity',."::,re'lated@igbvi'ti'esp by performing a documented evaluation of their capability to provide items or services specified by procurement documents.
Thesecontroldocuments areupdatedanddistributed todesignated personnel whoareresponsible formaintaining currentcopiesoftheapplicable documents.
Items and services designated as safety-related are purchased from suppliers whose gA programs have been accepted in accordance with AEPSC requirements, or from commercial grade suppliers'hrough the AEPSC dedication program.Suppliers of other items/services 1.7-51 July, 1993 are subject to evaluation and approval based on acceptance criteria appl i cabl e to those i tems/servi ces.gualification oF such suppliers is determined by the AEPSC gA Division.In the discharge of this responsibility, the AEPSC gA Division may use information generated by other utilities.
Thedistribution ofcontrolled documents isperformed underprocedures requiring receiptacknowledgement andinaccordance withestablisheddistribution1ists.1.7.6.2.5 Intheeventadrawingisdeveloped on-sitetoreflectanas-builtconfiguration, themarked-up drawingismaintained intheNasterPlantFileandallholdersofthedrawingareissuedappropriate notification toinformthemtherevisiontheyholdisnotcurrent,cannotbeused1.7-50July,1993 and,ifrequired, reference mustbemadetotheMasterPlantFiledrawing.v1.7.6.2.6 Documents preparedforuseintrainingareappropriately markedtoindicatethat:heycannotbeusedtooperateormaintainthefacilityortoconductactivities affecting thequalityofsafety-related items.AttheCookNuclear'Plant, unlessadocumentisidentified as'controlled'r
The supplier l,:::;,: must be approved before procurement can be completed.
'workingcopy'nly, itisautomatically assumedthatthedocumentisforinformation useonly.1.7.71.7.7.1CONTROLOFPURCHASED ITEMSANDSERVICESSCOPEActivities thatimplemenf approvedprocurement requestsforitemsandservicesarecontrolled toassureconformance withprocurement documentrequirements.
AEPSC is a member of the Nuclear Procurement Issues Committee (NUPIC), participates in joint supplier audits, and shares audit information consi stent with NUPIC requirements.
Controlsincludeasystemofsupplierevaluation andselection audits,acceptance ofitemsanddocumentation upondelivery, andperiodicassessment ofsupplierperformance.
The supplier~l-:::;:;.'" must be acceptable, or acceptable subject to follow-up, before a procurement can be approve'd and processed.
Objective evidenceofqualitythatdemonstrates conformance withspecified procurement documentrequirements isavailable totheCookNuclearPlantsitepriortouseofequipment,
Additional audits will be conducted, as necessary, to meet requirements.
: material, orservices.
Acceptance is not complete until it has been determined that the suppliers'A program can meet the requirements for the i tem(s)/service(s) offered.1.7.7.2.2 For items that are not unique to a nuclear power plant (" Commercial Grade")where requirements cannot be imposed in a practical manner at the time of procurement, programs for dedication to safety-related standards are established and accomplished by the AEPSC cognizant engineer prior to the item being accepted for safety-related use.1.7.7.2.3 In-process audits of suppliers'ctivities during fabrication, inspection, testing and shipment of items are performed when deemed necessary, depending upon supplier qualification status, complexity of the item(s)being furnished, the items'mportance to safety, and/or previous supplier history.These audits are performed by AEPSC gA.The cognizant engineer and/or responsible Cook Nuclear Plant personnel may also participate, if deemed necessary.
1.7.7.2IMPLEMENTATION 1.7.7.2.1 AEPSCqualifies suppliers,(dncludi ng,.dVstrmlbutors'Atoi the!mutenst>>
1.7-52 July, 1993  
the!y,Le'reform",;;;:q'ual'iity',."::,re'lated@igbvi'ti'esp byperforming adocumented evaluation oftheircapability toprovideitemsorservicesspecified byprocurement documents.
'I~~,l 1.7.7.2.4~~~~Spare and replacement parts are procured in such a manner that their performance and quality are at least equivalent to those of the parts that will be replaced.a)Specifications and codes referenced in procurement documents for spare or replacement items are at least equivalent to those for the original items or to properly reviewed and approved revisions.
Itemsandservicesdesignated assafety-related arepurchased fromsuppliers whosegAprogramshavebeenacceptedinaccordance withAEPSCrequirements, orfromcommercial gradesuppliers
b)Parts intended as spares or replacement for"off-the-shelf" items, or other items for which quality requirements were not originally specified, are evaluated for performance at least equivalent to the original.c)Where quality requirements for the original items cannot be determined, requirements and controls are established by engineering evaluation performed by qualified individuals.
'hroughtheAEPSCdedication program.Suppliers ofotheritems/services 1.7-51July,1993 aresubjecttoevaluation andapprovalbasedonacceptance criteriaapplicabletothoseitems/servi ces.gualification oFsuchsuppliers isdetermined bytheAEPSCgADivision.
The evaluation assures there is no adverse effect on interfaces, safety, interchangeability, fit, form, function, or compliance with applicable regulatory or code requirements.
Inthedischarge ofthisresponsibility, theAEPSCgADivisionmayuseinformation generated byotherutilities.
Evaluation results are documented.
Thesupplierl,:::;,:mustbeapprovedbeforeprocurement canbecompleted.
d)Any additional or modified design criteria, imposed after previous procurement of the item(s), are identified and incorporated.
AEPSCisamemberoftheNuclearProcurement IssuesCommittee (NUPIC),participates injointsupplieraudits,andsharesauditinformation consistentwithNUPICrequirements.
1.7.7.2.5 Instructions and procedures address i~he requirements for supplier selection and control, as well as procurement document control.The prograingfor,'eceipt inspection of safety-related items addresses g~inspection of incoming items, including a review of the documentation required under the procurement.
Thesupplier~l-:::;:;.'"
Receipt inspection personnel are qualified and certified in accordance with the requirements of ANSI N45.2.6.Provisions for receipt inspection apply regardless of where 1.7-53 July, 1993  
mustbeacceptable, oracceptable subjecttofollow-up, beforeaprocurement canbeapprove'd andprocessed.
Additional auditswillbeconducted, asnecessary, tomeetrequirements.
Acceptance isnotcompleteuntilithasbeendetermined thatthesuppliers'A programcanmeettherequirements fortheitem(s)/service(s) offered.1.7.7.2.2 Foritemsthatarenotuniquetoanuclearpowerplant("Commercial Grade")whererequirements cannotbeimposedinapractical manneratthetimeofprocurement, programsfordedication tosafety-related standards areestablished andaccomplished bytheAEPSCcognizant engineerpriortotheitembeingacceptedforsafety-related use.1.7.7.2.3 In-process auditsofsuppliers'ctivities duringfabrication, inspection, testingandshipmentofitemsareperformed whendeemednecessary, depending uponsupplierqualification status,complexity oftheitem(s)beingfurnished, theitems'mportance tosafety,and/orprevioussupplierhistory.Theseauditsareperformed byAEPSCgA.Thecognizant engineerand/orresponsible CookNuclearPlantpersonnel mayalsoparticipate, ifdeemednecessary.
1.7-52July,1993  
'I~~,l 1.7.7.2.4
~~~~Spareandreplacement partsareprocuredinsuchamannerthattheirperformance andqualityareatleastequivalent tothoseofthepartsthatwillbereplaced.
a)Specifications andcodesreferenced inprocurement documents forspareorreplacement itemsareatleastequivalent tothosefortheoriginalitemsortoproperlyreviewedandapprovedrevisions.
b)Partsintendedassparesorreplacement for"off-the-shelf" items,orotheritemsforwhichqualityrequirements werenotoriginally specified, areevaluated forperformance atleastequivalent totheoriginal.
c)Wherequalityrequirements fortheoriginalitemscannotbedetermined, requirements andcontrolsareestablished byengineering evaluation performed byqualified individuals.
Theevaluation assuresthereisnoadverseeffectoninterfaces, safety,interchangeability, fit,form,function, orcompliance withapplicable regulatory orcoderequirements.
Evaluation resultsaredocumented.
d)Anyadditional ormodifieddesigncriteria, imposedafterpreviousprocurement oftheitem(s),areidentified andincorporated.
1.7.7.2.5 Instructions andprocedures addressi~herequirements forsupplierselection andcontrol,aswellasprocurement documentcontrol.Theprograingfor,'eceipt inspection ofsafety-related itemsaddresses g~inspection ofincomingitems,including areviewofthedocumentation requiredundertheprocurement.
Receiptinspection personnel arequalified andcertified inaccordance withtherequirements ofANSIN45.2.6.Provisions forreceiptinspection applyregardless ofwhere1.7-53July,1993  


Nonconforming items,ormissingorquestionable documentation resultsinitemsbeingplacedon"HOLD"andmaintained inadesignated, controlled areai:,":..-'":-'.
Nonconforming items, or missing or questionable documentation results in items being placed on"HOLD" and maintained in a designated, controlled area i:,":..-'":-'.
Ifthenonconformance cannotbecleared,theitemiseitherscrapped, returnedtomanufacturer, ordispositioned throughengineering analysis.
If the nonconformance cannot be cleared, the item is either scrapped, returned to manufacturer, or dispositioned through engineering analysis.1.7.7.2.7 Contractors providing services (on-si te)for safety-related components are required to have either a formal quality assurance program and procedures, or they must abide by the Cook Nuclear Plant gA Program and procedures.
1.7.7.2.7 Contractors providing services(on-site)forsafety-related components arerequiredtohaveeitheraformalqualityassurance programandprocedures, ortheymustabidebytheCookNuclearPlantgAProgramandprocedures.
Prior to their working at the Cook Nuclear Plant, contractors.::.::vio'rk'in3a'underT!t}j'e]::,r.',,:,nun quality assurance programs must be audited and approved by AEPSC gA.Contractor procedures must be reviewed and approved by the originating/sponsoring department head.Further, periodic audi ts'of site contractor acti vi ti es are conducted under the direction of the AEPSC guality Assurance Superintendent.
PriortotheirworkingattheCookNuclearPlant,contractors.::.::vio'rk'in3a'underT!t}j'e]::,r.',,:,nun qualityassurance programsmustbeauditedandapprovedbyAEPSCgA.Contractor procedures mustbereviewedandapprovedbytheoriginating/sponsoring department head.Further,periodicaudits'ofsitecontractor activitiesareconducted underthedirection oftheAEPSCgualityAssurance Superintendent.
1.7.7.2.8~~~~To the extent prescribed in specific procurement documents, suppliers furnish quality records;documentary evidence that material and equipment either conforms to requirements or identifies any requirements that have not been met;and descriptions of those nonconformances from the procurement requirements, which have been disposi tioned"use-as-is" or"repair." This evidence is retained at the Plant, or at the Service Corporation.
1.7.7.2.8
To the extent prescribed in specific procurement agreements, suppliers are required to maintain additional (backup)documents in their record system.In some cases, such as with NSSS, suppliers are designated primary record retention responsibility.
~~~~Totheextentprescribed inspecificprocurement documents, suppliers furnishqualityrecords;documentary evidencethatmaterialandequipment eitherconformstorequirements oridentifies anyrequirements thathavenotbeenmet;anddescriptions ofthosenonconformances fromtheprocurement requirements, whichhavebeendispositioned"use-as-is" or"repair."
1.7-55 July, 1993 1.7.7.2.9~~~~The capability of suppliers to furnish valid documentation is evaluated during procurement document reviews, annual supplier evaluations, and during audits.1.7.8 1.7.8.1 IDENTIFICATION AND CONTROL OF ITEMS SCOPE Items are identified and controlled to prevent their inadvertent use.Identification of items is maintained either on the items, their storage areas or containers, or on records traceable to the items.1.7.8.2 IMPLEMENTATION 1.7.8.2.1 Controls are established that provide for the identification and control of items (including partially fabricated assemblies).
ThisevidenceisretainedatthePlant,orattheServiceCorporation.
1.7.8.2.2 Items are identified by physically marking the item or its container, and by maintaining records traceable to the item.The method of.identification is such that the quality of the item is not degraded.1.7.8.2.3 Items are traceable to applicable drawings, specifications, or other pertinent documents to ensure that only correct and acceptable items are used.Verification of traceabi lity is performed and documented prior to release for fabrication, assembly, or installation.
Totheextentprescribed inspecificprocurement agreements, suppliers arerequiredtomaintainadditional (backup)documents intheirrecordsystem.Insomecases,suchaswithNSSS,suppliers aredesignated primaryrecordretention responsibility.
1.7-56 July, 1993  
1.7-55July,1993 1.7.7.2.9
~~~~Thecapability ofsuppliers tofurnishvaliddocumentation isevaluated duringprocurement documentreviews,annualsupplierevaluations, andduringaudits.1.7.81.7.8.1IDENTIFICATION ANDCONTROLOFITEMSSCOPEItemsareidentified andcontrolled topreventtheirinadvertent use.Identification ofitemsismaintained eitherontheitems,theirstorageareasorcontainers, oronrecordstraceable totheitems.1.7.8.2IMPLEMENTATION 1.7.8.2.1 Controlsareestablished thatprovidefortheidentification andcontrolofitems(including partially fabricated assemblies).
1.7.8.2.2Itemsareidentified byphysically markingtheitemoritscontainer, andbymaintaining recordstraceable totheitem.Themethodof.identification issuchthatthequalityoftheitemisnotdegraded.
1.7.8.2.3 Itemsaretraceable toapplicable
: drawings, specifications, orotherpertinent documents toensurethatonlycorrectandacceptable itemsareused.Verification oftraceabilityisperformed anddocumented priortoreleaseforfabrication,
: assembly, orinstallation.
1.7-56July,1993  


1.7.8.2.4
1.7.8.2.4~~~~Requirements for the identification by use of heat number, part number, serial number, etc., are included in AEPSC Specifications (DCCs)and/or the procurement document.1.7.8.2.5 Separate storage is provided for incorrect or defective items that are on hold and material which has been accepted for use.All safety-related items are appropriately tagged or identified (stamping, etc.)to provide easy identification as to the items'sage status.Records are maintained for the issue of items to provide traceabi li ty from storage to end use in the Cook Nuclear Plant.1.7.8.2.6 When materials are subdivided, appropriate identification numbers are transferred to each section of the material, or traceability is maintained through documentation.
~~~~Requirements fortheidentification byuseofheatnumber,partnumber,serialnumber,etc.,areincludedinAEPSCSpecifications (DCCs)and/ortheprocurement document.
1.7.9 1.7.9.1 CONTROL OF SPECIAL PROCESSES SCOPE Special processes are controlled and accomplished by qualified personnel using approved procedures and equipment in accordance with applicable codes, standards, specifications, criteria and other special requirements.
1.7.8.2.5 Separatestorageisprovidedforincorrect ordefective itemsthatareonholdandmaterialwhichhasbeenacceptedforuse.Allsafety-relateditemsareappropriately taggedoridentified (stamping, etc.)toprovideeasyidentification astotheitems'sage status.Recordsaremaintained fortheissueofitemstoprovidetraceabilityfromstoragetoenduseintheCookNuclearPlant.1.7.8.2.6 Whenmaterials aresubdivided, appropriate identification numbersaretransferred toeachsectionofthematerial, ortraceability ismaintained throughdocumentation.
1.7.9.2 IMPLEMENTATION 1.7.9.2.1 Processes subject to special process controls are those for which full verification or characterization by direct inspection is impossible or 1.7-57 July, 1993 impractical.
1.7.91.7.9.1CONTROLOFSPECIALPROCESSES SCOPESpecialprocesses arecontrolled andaccomplished byqualified personnel usingapprovedprocedures andequipment inaccordance withapplicable codes,standards, specifications, criteriaandotherspecialrequirements.
Such processes include welding, heat treating, chemical cleaning, application of protective coatings, concrete placement and NDE.1.7.9.2.2 Special process requirements for chemical cleaning, application of protective coatings and concrete placement are set forth in AEPSC Specifications (DCCs)and/or directives prepared by the responsible AEPSC cognizant engineer.These documents are reviewed and approved by other personnel with the necessary technical competence.
1.7.9.2IMPLEMENTATION 1.7.9.2.1 Processes subjecttospecialprocesscontrolsarethoseforwhichfullverification orcharacterization bydirectinspection isimpossible or1.7-57July,1993 impractical.
AEPSC Specifications are audited by the AEPSC gA Division.Special process requirements for welding, heat treating and NDE are set forth in AEPSC Specifications, the AEP Melding and NDE Hanuals and plant procedures.
Suchprocesses includewelding,heattreating, chemicalcleaning, application ofprotective
These specifications and manuals are prepared by, or are reviewed and approved by, the AEPSC Cognizant Engineer-Welding and NDE Administrator.
: coatings, concreteplacement andNDE.1.7.9.2.2 Specialprocessrequirements forchemicalcleaning, application ofprotective coatingsandconcreteplacement aresetforthinAEPSCSpecifications (DCCs)and/ordirectives preparedbytheresponsible AEPSCcognizant engineer.
The administrative controls portion of the NDE Hanual is audited by AEPSC gA.Special process procedures, with the exception of welding and heat treating, are prepared by Cook Nuclear Plant personnel with technical knowledge in the discipline involved.These procedures, which are also reviewed by other personnel with the necessary technical competence, are qualified by testing.Welding is performed in accordance with procedures contained in the AEP Welding Hanual, or by approved contractor's procedures.
Thesedocuments arereviewedandapprovedbyotherpersonnel withthenecessary technical competence.
These procedures are qualified"in accordance with applicable codes, and Procedure gualification Records are prepared.Weld Procedure gualification Records are reviewed and approved by the AEPSC Cognizant Engineer-Welding.Weld qualification documentation is retained in the AEP Welding Hanual, or the approved contractor's manual.1.7-58 July, 1993  
AEPSCSpecifications areauditedbytheAEPSCgADivision.
Specialprocessrequirements forwelding,heattreatingandNDEaresetforthinAEPSCSpecifications, theAEPMeldingandNDEHanualsandplantprocedures.
Thesespecifications andmanualsarepreparedby,orarereviewedandapprovedby,theAEPSCCognizant Engineer-WeldingandNDEAdministrator.
Theadministrative controlsportionoftheNDEHanualisauditedbyAEPSCgA.Specialprocessprocedures, withtheexception ofweldingandheattreating, arepreparedbyCookNuclearPlantpersonnel withtechnical knowledge inthediscipline involved.
Theseprocedures, whicharealsoreviewedbyotherpersonnel withthenecessary technical competence, arequalified bytesting.Weldingisperformed inaccordance withprocedures contained intheAEPWeldingHanual,orbyapprovedcontractor's procedures.
Theseprocedures arequalified"in accordance withapplicable codes,andProcedure gualification Recordsareprepared.
WeldProcedure gualification RecordsarereviewedandapprovedbytheAEPSCCognizant Engineer-Welding.Weldqualification documentation isretainedintheAEPWeldingHanual,ortheapprovedcontractor's manual.1.7-58July,1993  


Contractor weldingprocedures arequalified bythecontractor.
Contractor welding procedures are qualified by the contractor.
Theseprocedures andthequa1ification documentation arereviewedandapprovedbytheAEPSCCognizant Engineer-Melding.Thisdocumentation isretainedbythecontractor.
These procedures and the qua1ification documentation are reviewed and approved by the AEPSC Cognizant Engineer-Melding.This documentation is retained by the contractor.
1.7.9.2.3 NDEpersonnel arequalified andcertified byaCookNuclearPlantNDELeve1IIIwhohasbeenqualified andcertified bythedesignated AEPSCNDEAdministrator.
1.7.9.2.3 NDE personnel are qualified and certified by a Cook Nuclear Plant NDE Leve1 III who has been qualified and certified by the designated AEPSC NDE Administrator.
Certification isbyexamination.
Certification is by examination.
Personnel qualification iskeptcurrentbyre-examination attimeintervals
Personnel qualification is kept current by re-examination at time intervals\specified in qualification/certification procedures which are in accordance with the ASHE Code, Cook Nuclear Plant welders are qualified by the Haintenance Department using AEPSC approved procedures.
\specified inqualification/certification procedures whichareinaccordance withtheASHECode,CookNuclearPlantweldersarequalified bytheHaintenance Department usingAEPSCapprovedprocedures.
Supervision of Cook Nuclear Plant welder qualifications is performed by the Haintenance Department.
Supervision ofCookNuclearPlantwelderqualifications isperformed bytheHaintenance Department.
Examination of specimens is performed under the supervision of the Safety and Assessment Department in accordance with the AEP Welding Hanual covering welder qualification.
Examination ofspecimens isperformed underthesupervision oftheSafetyandAssessment Department inaccordance withtheAEPWeldingHanualcoveringwelderqualification.
Cook Nuclear Plant welder qualification records are maintained for each welder by the Hain'tenance Department.
CookNuclearPlantwelderqualification recordsaremaintained foreachwelderbytheHain'tenance Department.
Contractor and craft welders are qualified by the contractor using procedures approved by the AEPSC Cognizant Engineer-'elding in accordance with AEPSC procedures.
Contractor andcraftweldersarequalified bythecontractor usingprocedures approvedbytheAEPSCCognizant Engineer-'eldinginaccordance withAEPSCprocedures.
Contractor and craft welder qualification records are maintained by the contractor.
Contractor andcraftwelderqualification recordsaremaintained bythecontractor.
1.7.9.2.4 gC/NOE Technicians assigned to the Safety and Assessment Department perform nondestructive testing for work performed by Cook Nuclear Plant and contractor personnel.
1.7.9.2.4 gC/NOETechnicians assignedtotheSafetyandAssessment Department performnondestructive testingforworkperformed byCookNuclearPlantandcontractor personnel.
These individuals are qualified to either SNT-TC-IA, or ANSI N45.2.6, and records of the qualifications/
Theseindividuals arequalified toeitherSNT-TC-IA, orANSIN45.2.6,andrecordsofthequalifications/
certifications are maintained at Cook Nuclear Plant.1.7-59 July, 1993  
certifications aremaintained atCookNuclearPlant.1.7-59July,1993  
,
,
1.7.9.2.5 Forspecialprocesses thatrequirequalified equipment, suchequipment isqualified inaccdrdance withapplicable codes,standards andspecifications.
1.7.9.2.5 For special processes that require qualified equipment, such equipment is qualified in accdrdance with applicable codes, standards and specifications.
1.7.9.2.6 Specialprocessqualifications arereviewedduringregularly scheduled gAaudits.gualification recordsaremaintained inaccordance with1.7.17herein.1.7.9.2.7 Thedocumentation resulting fromweldingandnondestructive testingisreviewedbyappropriate personnel.
1.7.9.2.6 Special process qualifications are reviewed during regularly scheduled gA audits.gualification records are maintained in accordance with 1.7.17 herein.1.7.9.2.7 The documentation resulting from welding and nondestructive testing is reviewed by appropriate personnel.
1.7.10INSPECTION 1.7.10.1SCOPE~~~Activities affecting thequalityofsafety-related structures, systemsandcomponents areinspected toverifytheirconformance withrequirements.
1.7.10 INSPECTION 1.7.10.1 SCOPE~~~Activities affecting the quality of safety-related structures, systems and components are inspected to verify their conformance with requirements.
Theseinspections areperformed'by personnel otherthanthosewhoperformtheactivity.
These inspections are performed'by personnel other than those who perform the activity.Inspections are performed by qualified personnel utilizing written procedures which establish prerequisites and provide documentation for evaluating test and inspection results.Direct inspection, process monitoring, or both, are used as necessary.
Inspections areperformed byqualified personnel utilizing writtenprocedures whichestablish prerequisites andprovidedocumentation forevaluating testandinspection results.Directinspection, processmonitoring, orboth,areusedasnecessary.
When applicable, hold points are used to ensure that inspections are accomplished at the correct points in the sequence of activities.
Whenapplicable, holdpointsareusedtoensurethatinspections areaccomplished atthecorrectpointsinthesequenceofactivities.
1.7.10.2 IMPLEMENTATION 1.7.10.2.1 Inspections are applied to appropriate activities to assure conformance to specified requirements.
1.7.10.2IMPLEMENTATION 1.7.10.2.1 Inspections areappliedtoappropriate activities toassureconformance tospecified requirements.
Hold points are provided in the sequence of procedures to allow for the inspection, witnessing, examination, measurement, or review necessary to 1.7-60 July, 1993 assure that the critical, or irreversible, elements of an activity are being performed as required.Note that hold points may not apply to all procedures, but each must be reviewed for this attribute.
Holdpointsareprovidedinthesequenceofprocedures toallowfortheinspection, witnessing, examination, measurement, orreviewnecessary to1.7-60July,1993 assurethatthecritical, orirreversible, elementsofanactivityarebeingperformed asrequired.
Hold points specify exactly what is to be done (e.g., type of inspection or examination, etc.), acceptance criteria, or reference to another procedure, etc., for the satisfactory completion of the hold point.When included in the sequence of a procedure, the activities required by hold points are completed prior to continuing work beyond that point.Process monitoring is used in whole, or in part, where direct inspection alone is impractical or inadequate.
Notethatholdpointsmaynotapplytoallprocedures, buteachmustbereviewedforthisattribute.
1.7.10.2.2 Training, qualification and certification programs for personnel who perform inspections are established, implemented and documented in accordance with 1.7.2 herein and as described in Appendix B hereto, item 9b, with exceptions as noted therein.1.7.10.2.3 Inspection requirements are specified in procedures, instructions, drawings, or checklists as applicable.
Holdpointsspecifyexactlywhatistobedone(e.g.,typeofinspection orexamination, etc.),acceptance
They provide for the following, as appropriate:
: criteria, orreference toanotherprocedure, etc.,forthesatisfactory completion oftheholdpoint.Whenincludedinthesequenceofaprocedure, theactivities requiredbyholdpointsarecompleted priortocontinuing workbeyondthatpoint.Processmonitoring isusedinwhole,orinpart,wheredirectinspection aloneisimpractical orinadequate.
a)Identification of applicable revisions of required instructions,drawings and specifications.
1.7.10.2.2
b)Identification of characteristics and activities to be inspected.
: Training, qualification andcertification programsforpersonnel whoperforminspections areestablished, implemented anddocumented inaccordance with1.7.2hereinandasdescribed inAppendixBhereto,item9b,withexceptions asnotedtherein.1.7.10.2.3 Inspection requirements arespecified inprocedures, instructions,
c)Inspection methods.d)Specification of measuring and test equipment having the necessary accuracy.1.7-61 July, 1993 e)Identification oF personnel responsible for performing the inspection.
: drawings, orchecklists asapplicable.
f)Acceptance and rejection criteria.g)Recording of the inspection results and the identification of the inspector.
Theyprovideforthefollowing, asappropriate:
1.7.10.2.4 Inspections are conducted using the following programs: a~Peer Ins ection Pro ram.The Peer Inspection Program is based on the premise that ILH personnel are qualified to ANSI N18.1 (1971), Selection and Trainin of Nuclear Power Plant Personnel,'and are periodically trained in their skill area using INPO accredited training.As a result of their experience, qualifications, and training, 18M personnel may perform inspections of work functions associ ated with normal operation of the Plant, routine maintenance, and certain routine technical activities which are routinely performed by IEM personnel (peers).Peer inspection personnel are independent in that they do not perform or directly supervise the work being inspected, but they may be from the same work group.D.C.Cook Plant Safety and Assessment gC/NDE personnel, qualified in accordance with Regulatory Guide 1.58 and ANSI N45.2.6, will ensure (via surveillance) that peer inspections are being correctly implemented and make periodic reports to management.
a)Identification ofapplicable revisions ofrequiredinstructions,drawings andspecifications.
b.ANSI N45.2.6 Ins ection Pro ram.Major modification and non-routine maintenance work on safetygrelated equipment is inspected per ANSI N45.2.6, uglification'f Ins ection Examination and Testin Personnel for Nuclear Power Plants, whether it is performed by I&H or contractor personnel.
b)Identification ofcharacteristics andactivities tobeinspected.
All safetyP>related work performed by contract personnel is inspected per ANSI N45.2.6.1.7-62 July, 1993 Inspections of these work activities are performed by inspectors quali fi ed and certified in accordance with Regulatory Guide 1.58 and.ANSI N45.2.6.Contractors performing work on safety..-,'related equipment are required to comply with the applicable requirements of Regulatory Guide 1.33 and ANSI N45.2.1.7.10.2.5 Inspecti ons associ ated wi th the packaging and shi pment of radi oacti ve waste and materials are conducted using the following program: a)NRC Licensed Packa in s-Inspections of NRC licensed radioactive material packagings shall be performed by individuals independent from the work being performed.
c)Inspection methods.d)Specification ofmeasuring andtestequipment havingthenecessary accuracy.
The independent inspectors shall be Indiana Michigan Power personnel, qualified in accordance with Regulatory Guide 1.8 and ANSI N18.1, as a minimum.Additionally, the inspector shall be familiar with the activities being performed.
1.7-61July,1993 e)Identification oFpersonnel responsible forperforming theinspection.
b)Non-NRC Licensed Packa in s and Containers
f)Acceptance andrejection criteria.
-Inspections of non-NRC licensed radioactive material packagings and containers (shipping and/or burial)shall be performed by Indiana Michigan Power personnel, qualified in accordance with Regulatory Guide 18.and ANSI N18.1, as a minimum.c)Trans ortati on Vehi cl es-Inspecti on of transportati on vehi cl es being shipped as"exclusive use", shall be performed by Indiana Nichigan Power personnel, qualified in accordance with Regulatory Guide 1.8 and ANSI N18.1, as a minimum.d)Other ins ections and Verification
g)Recording oftheinspection resultsandtheidentification oftheinspector.
-Inspections and verifications of other activities associated with the packaging and shipment of radioactive materials and waste shall be performed by Indiana and Michigan Power personnel, qualified in accordance with Regulatory Guide 1.8 and ANSI N18.1, as a minimum.1.7-63 July, 1993 1.7.10.2.6
1.7.10.2.4 Inspections areconducted usingthefollowing programs:
~~~~Inspections are performed, documented, and the results evaluated by designated personnel in order to ensure that the results substantiate the acceptability of the item or work.Evaluation and review results are documented.
a~PeerInsectionProram.ThePeerInspection ProgramisbasedonthepremisethatILHpersonnel arequalified toANSIN18.1(1971),Selection andTraininofNuclearPowerPlantPersonnel,
1.7.11 TEST CONTROL 1.7.11.1 SCOPE Testing is performed in accordance with established programs to demonstrate that structures, systems and components will perform satisfactorily in service.The testing is performed by qualified personnel in accordance with written procedures that incorporate specified requirements and acceptance criteria.Types of tests are: Scheduled Surveillance, preventive maintenance, post-design,'qualification.
'andareperiodically trainedintheirskillareausingINPOaccredited training.
Unscheduled Pre-and post-maintenance.
Asaresultoftheirexperience, qualifications, andtraining, 18Mpersonnel mayperforminspections ofworkfunctions associatedwithnormaloperation ofthePlant,routinemaintenance, andcertainroutinetechnical activities whichareroutinely performed byIEMpersonnel (peers).Peerinspection personnel areindependent inthattheydonotperformordirectlysupervise theworkbeinginspected, buttheymaybefromthesameworkgroup.D.C.CookPlantSafetyandAssessment gC/NDEpersonnel, qualified inaccordance withRegulatory Guide1.58andANSIN45.2.6,willensure(viasurveillance) thatpeerinspections arebeingcorrectly implemented andmakeperiodicreportstomanagement.
Test parameters (including any prerequisites), instrumentation requirements, and environmental conditions are specified in test procedures.
b.ANSIN45.2.6InsectionProram.Majormodification andnon-routinemaintenance workonsafetygrelated equipment isinspected perANSIN45.2.6,uglification'f InsectionExamination andTestinPersonnel forNuclearPowerPlants,whetheritisperformed byI&Horcontractor personnel.
Test results are documented and evaluated.
AllsafetyP>related workperformed bycontractpersonnel isinspected perANSIN45.2.6.1.7-62July,1993 Inspections oftheseworkactivities areperformed byinspectors qualifiedandcertified inaccordance withRegulatory Guide1.58and.ANSIN45.2.6.Contractors performing workonsafety..-,'related equipment arerequiredtocomplywiththeapplicable requirements ofRegulatory Guide1.33andANSIN45.2.1.7.10.2.5 Inspectionsassociatedwiththepackaging andshipmentofradioactivewasteandmaterials areconducted usingthefollowing program:a)NRCLicensedPackains-Inspections ofNRClicensedradioactive materialpackagings shallbeperformed byindividuals independent fromtheworkbeingperformed.
1.7.11.2 IMPLEMENTATION 1.7.11.2.1 Tests are performed in accordance with programs, procedures and criteria that designate when tests are required and how they are to be performed.
Theindependent inspectors shallbeIndianaMichiganPowerpersonnel, qualified inaccordance withRegulatory Guide1.8andANSIN18.1,asaminimum.Additionally, theinspector shallbefamiliarwiththeactivities beingperformed.
Such testing includes the following:
b)Non-NRCLicensedPackainsandContainers
1.7-64 July, 1993 a)qua 1 i fi cati on.tests, as appl i cabl e, to veri Fy desi gn adequacy.b)Acceptance tests of equipment and components to assure their operation prior to delivery or installation.
-Inspections ofnon-NRClicensedradioactive materialpackagings andcontainers (shipping and/orburial)shallbeperformed byIndianaMichiganPowerpersonnel, qualified inaccordance withRegulatory Guide18.andANSIN18.1,asaminimum.c)TransortationVehicles-Inspectionoftransportati onvehiclesbeingshippedas"exclusive use",shallbeperformed byIndianaNichiganPowerpersonnel, qualified inaccordance withRegulatory Guide1.8andANSIN18.1,asaminimum.d)OtherinsectionsandVerification
c)Post-design tests to assure proper and safe operation of systems and equipment prior to unrestricted operatioh.
-Inspections andverifications ofotheractivities associated withthepackaging andshipmentofradioactive materials andwasteshallbeperformed byIndianaandMichiganPowerpersonnel, qualified inaccordance withRegulatory Guide1.8andANSIN18.1,asaminimum.1.7-63July,1993 1.7.10.2.6
d)Surveillance tests to assure continuing proper and safe operation of systems and equipment.
~~~~Inspections areperformed, documented, andtheresultsevaluated bydesignated personnel inordertoensurethattheresultssubstantiate theacceptability oftheitemorwork.Evaluation andreviewresultsaredocumented.
The PHI on surveillance testing controls the periodic testing of equipment and systems to fulfill the surveillance requirements established by the Technical Specifications.
1.7.11TESTCONTROL1.7.11.1SCOPETestingisperformed inaccordance withestablished programstodemonstrate thatstructures, systemsandcomponents willperformsatisfactorily inservice.Thetestingisperformed byqualified personnel inaccordance withwrittenprocedures thatincorporate specified requirements andacceptance criteria.
Controls have been established to identify uncompleted surveillance testing to assure it is rescheduled for completion to meet Technical Specification frequency requirements.
Typesoftestsare:Scheduled Surveillance, preventive maintenance, post-design,
Data taken during s'urvei]lance testing is reviewed by appropriate management personnel to assure that acceptance criteria is fulfilled, or corrective action is taken to correct deficiencies.
'qualification.
e)Maintenance tests after preventive or corrective maintenance.
Unscheduled Pre-andpost-maintenance.
1.7.11.2.2 Test procedures, as required, provide mandatory hold points for witness or review.1.7.11.2.3 Testing is accomplished'after installation, maintenance, or repair, by surveillance test procedures, or performance tests, which must be satisfactorily completed prior to determining the equipment i s in an operable status.All data resulting from these tests is retained at the Cook Nuclear Plant after review by appropriate management personnel.
Testparameters (including anyprerequisites),
1.7-65 July, 1993 e
instrumentation requirements, andenvironmental conditions arespecified intestprocedures.
1.7.12 CONTROL OF MEASURING AND TEST EgUIPHENT 1.7.12.1 SCOPE Measuring and testing equipment used in activities affecting the quality op safety-related s't'iuctur'ess:;~!systems;:;i'en'd:;":,coiiipon'eats are properly identified, controlled, calibrated and adjusted at specified intervals to maintain accuracy within necessary limits.r 1.7.12.2 IHPLEHENTATION 1.7.12.2.1 Established procedures and instructions are used for calibration and control of measuring and test equipment utilized in the measurement, inspection and monitoring of structures, systems and components.
Testresultsaredocumented andevaluated.
These procedures and instructions describe calibration techniques and frequencies, and maintenance and control of the equipment.
1.7.11.2IMPLEMENTATION 1.7.11.2.1 Testsareperformed inaccordance withprograms, procedures andcriteriathatdesignate whentestsarerequiredandhowtheyaretobeperformed.
AEPSC gA periodically assesses the effectiveness of the calibration program via the gA audit program.1.7.12.2.2 Heasuring and test equipment is uniquely identified and is traceable to i ts cal ibrati on source.1.7.12.2.3 A system has been established for attaching, or affixing labels, to measuring and test equipment to display the date calibrated and the next calibration due date, or a control system is used that identifies to potential users any equipment beyond the calibration due date.1.7-66 July, 1993 0
Suchtestingincludesthefollowing:
1.7-64July,1993 a)qua1ification.tests,asapplicable,toveriFydesignadequacy.
b)Acceptance testsofequipment andcomponents toassuretheiroperation priortodeliveryorinstallation.
c)Post-design teststoassureproperandsafeoperation ofsystemsandequipment priortounrestricted operatioh.
d)Surveillance teststoassurecontinuing properandsafeoperation ofsystemsandequipment.
ThePHIonsurveillance testingcontrolstheperiodictestingofequipment andsystemstofulfillthesurveillance requirements established bytheTechnical Specifications.
Controlshavebeenestablished toidentifyuncompleted surveillance testingtoassureitisrescheduled forcompletion tomeetTechnical Specification frequency requirements.
Datatakendurings'urvei]lancetestingisreviewedbyappropriate management personnel toassurethatacceptance criteriaisfulfilled, orcorrective actionistakentocorrectdeficiencies.
e)Maintenance testsafterpreventive orcorrective maintenance.
1.7.11.2.2 Testprocedures, asrequired, providemandatory holdpointsforwitnessorreview.1.7.11.2.3 Testingisaccomplished'after installation, maintenance, orrepair,bysurveillance testprocedures, orperformance tests,whichmustbesatisfactorily completed priortodetermining theequipment isinanoperablestatus.Alldataresulting fromthesetestsisretainedattheCookNuclearPlantafterreviewbyappropriate management personnel.
1.7-65July,1993 e
1.7.12CONTROLOFMEASURING ANDTESTEgUIPHENT 1.7.12.1SCOPEMeasuring andtestingequipment usedinactivities affecting thequalityopsafety-related s't'iuctur'ess:;~!systems;:;i'en'd:;":,coiiipon'eats areproperlyidentified, controlled, calibrated andadjustedatspecified intervals tomaintainaccuracywithinnecessary limits.r1.7.12.2IHPLEHENTATION 1.7.12.2.1 Established procedures andinstructions areusedforcalibration andcontrolofmeasuring andtestequipment utilizedinthemeasurement, inspection andmonitoring ofstructures, systemsandcomponents.
Theseprocedures andinstructions describecalibration techniques andfrequencies, andmaintenance andcontroloftheequipment.
AEPSCgAperiodically assessestheeffectiveness ofthecalibration programviathegAauditprogram.1.7.12.2.2 Heasuring andtestequipment isuniquelyidentified andistraceable toitscalibrationsource.1.7.12.2.3 Asystemhasbeenestablished forattaching, oraffixinglabels,tomeasuring andtestequipment todisplaythedatecalibrated andthenextcalibration duedate,oracontrolsystemisusedthatidentifies topotential usersanyequipment beyondthecalibration duedate.1.7-66July,1993 0
1.7.12.2.4
1.7.12.2.4
~~~~Measuring andtestequipment iscalibrated atspecified intervals.
~~~~Measuring and test equipment is calibrated at specified intervals.
Theseintervals arebasedonthefrequency ofuse,stability characteristics andotherconditions thatcouldadversely affecttherequiredmeasurement accuracy.
These intervals are based on the frequency of use, stability characteristics and other conditions that could adversely affect the required measurement accuracy.Calibration standards are traceable to nationally recognized standards; or where such standards do not exist, provisions are established to document the basis for calibration.
Calibration standards aretraceable tonationally recognized standards; orwheresuchstandards donotexist,provisions areestablished todocumentthebasisforcalibration.
The primary standards used to calibrate secondary standards have, except in certain instances, an accuracy of at least four (4)times the required accuracy of the secondary standard.In those cases where the four (4)times accuracy cannot be achieved, the basis for acceptance is documented and is authorized by the responsible manager.The secondary standards have an accuracy that assures equipment being calibrated will be within required tolerances.
Theprimarystandards usedtocalibrate secondary standards have,exceptincertaininstances, anaccuracyofatleastfour(4)timestherequiredaccuracyofthesecondary standard.
The basis for acceptance is documented and authorized by the responsible manager.1.7.12.2.5
Inthosecaseswherethefour(4)timesaccuracycannotbeachieved, thebasisforacceptance isdocumented andisauthorized bytheresponsible manager.Thesecondary standards haveanaccuracythatassuresequipment beingcalibrated willbewithinrequiredtolerances.
~~~~Cook Nuclear Plant procedures define the requirements for the control of standards, test equipment and process equipment.
Thebasisforacceptance isdocumented andauthorized bytheresponsible manager.1.7.12.2.5
1.7.12.2.6 When measuring and testing equipment used for inspection and testing is found to be outside of required accuracy limits at the time of calibration, evaluations are conducted to determine the validity of the results obtained since the most recent calibration.
~~~~CookNuclearPlantprocedures definetherequirements forthecontrolofstandards, testequipment andprocessequipment.
Retests, or reinspections, are performed on suspect items.The results of evaluations are documented.
1.7.12.2.6Whenmeasuring andtestingequipment usedforinspection andtestingisfoundtobeoutsideofrequiredaccuracylimitsatthetimeofcalibration, evaluations areconducted todetermine thevalidityoftheresultsobtainedsincethemostrecentcalibration.
1.7-67 July, 1993 1.7.13 HANDLING, STORAGE, AND SHIPPING 1.7.13.1 SCOPE Acti vi ti es with the potential for causing contami nati on or deterioration, by environmental conditions such as temperature or humidity that could adversely affect the ability of an item to perform its safety-related functions and activities necessary to prevent damage or loss, are identified and controlled.
Retests,orreinspections, areperformed onsuspectitems.Theresultsofevaluations aredocumented.
These activities are cleaning, packaging, preserving, handling, shipping and storing.Controls are'" effected through the use of appropriate procedures and instructions.
1.7-67July,1993 1.7.13HANDLING, STORAGE,ANDSHIPPING1.7.13.1SCOPEActivitieswiththepotential forcausingcontaminationordeterioration, byenvironmental conditions suchastemperature orhumiditythatcouldadversely affecttheabilityofanitemtoperformitssafety-related functions andactivities necessary topreventdamageorloss,areidentified andcontrolled.
1.7.13.2 IMPLEMENTATION 1.7.13.2.1 Procedures are used to control the cleaning, handling, storing, packaging, preserving and shipping of materials, components and systems in accordance with designated procurement requirements.
Theseactivities arecleaning, packaging, preserving,
These procedures include,'but are not limited to, the following functions:
: handling, shippingandstoring.Controlsare'"effectedthroughtheuseofappropriate procedures andinstructions.
a)Cleaning-to assure that required cleanliness levels are achieved and maintained.
1.7.13.2IMPLEMENTATION 1.7.13.2.1 Procedures areusedtocontrolthecleaning,
b)Packaging and preservation
: handling, storing,packaging, preserving andshippingofmaterials, components andsystemsinaccordance withdesignated procurement requirements.
-to provide adequate protection against damage or deterioration.
Theseprocedures include,'butarenotlimitedto,thefollowing functions:
When necessary, these procedures provide for special environments, such as inert gas atmosphere, specific moisture content levels and temperature levels.c)Handling-to preclude damage or safety hazards.d)Storing-to minimize the possibility of loss, damage or deterioration of items in storage, including consumables such as chemicals, reagents and lubricants.
a)Cleaning-toassurethatrequiredcleanliness levelsareachievedandmaintained.
1.7-68 July, 1993 Controls have been established for limited shelf life items such as"0" rings, epoxy, lubricants, solvents and chemicals to assure they are correctly identified, stored and controlled to prevent shelf life expired materials from being used in the Cook Nuclear Plant.Controls are established in plant procedures.
b)Packaging andpreservation
1.7.13.2.3 Packaging and shipping requirements are provided to vendors in AEPSC Specifications (OCCs)which are a part of the procurement document, or are otherwise specified in the procurement document.Controls for receipt inspection, damaged items and special handling requirements at the Cook Nuclear Plant are established by plant procedures.
-toprovideadequateprotection againstdamageordeterioration.
Special controls are provided to'assure that stainless steel components and materials are handled with approved lifting slings.Storage and surveillance requirements have been established to assure segregation of storage.Special controls have been implemented for critical, high value, or perishable items.Routine surveillance is conducted on stored material to provide inspection for damage, rotation of stored pumps and motors, inspection for protection of exposed surfaces and cleanliness of the storage area.1.7.13.2.5 Special handling procedures have been implemented for the processing of nuclear fuel during refueling outages.These procedures minimize the risk of damage to the new and spent fuel and the possible release of radioactive material when placing the spent fuel into the spent fuel pool.1.7-69 July, 1993 1.7.14 INSPECTION, TEST, AND OPERATING STATUS 1.7.14.1 SCOPE Operating status of structures, systems and components is indicated by tagging of valves and switches, or by other specified means, in such a manner as to prevent inadvertent operation.
Whennecessary, theseprocedures provideforspecialenvironments, suchasinertgasatmosphere, specificmoisturecontentlevelsandtemperature levels.c)Handling-toprecludedamageorsafetyhazards.d)Storing-tominimizethepossibility ofloss,damageordeterioration ofitemsinstorage,including consumables suchaschemicals, reagentsandlubricants.
The status of inspections and tests performed on individual items is clearly indicated by markings and/or logging under strict procedural controls to prevent inadvertent bypassing of such inspections and tests.1.7.14.2 IMPLEMENTATION 1.7.14.2.1 For design change activities, including item fabrication, installation and test, a program exists which specifies the degree of control required for the identiftcation of inspection and test status of structures, systems and components.
1.7-68July,1993 Controlshavebeenestablished forlimitedshelflifeitemssuchas"0"rings,epoxy,lubricants, solventsandchemicals toassuretheyarecorrectly identified, storedandcontrolled topreventshelflifeexpiredmaterials frombeingusedintheCookNuclearPlant.Controlsareestablished inplantprocedures.
Physical identification is used to the extent practical to indicate the status of items requiring inspections, tests, or examinations.
1.7.13.2.3 Packaging andshippingrequirements areprovidedtovendorsinAEPSCSpecifications (OCCs)whichareapartoftheprocurement
Procedures'xist which provide for the use of calibration and rejection stickers, tags, stamps and other forms of identification to indicate test and inspection status.The Clearance Permit System uses various tags to identify equipment and system operability status.Another program establishes a tagging system for lifted leads, etc.For those items requiring calibration, the program provides for physical indication of calibration status by calibration stickers, or a control system is used.1.7.14.2.2 Application and removal of inspection and welding stamps, and of such status indicators as tags, markings, labels, etc., is controlled by plant procedures.
: document, orareotherwise specified intheprocurement document.
1.7-70 July, 1993 hh, The inspection status of materials received at the Cook Nuclear Plant is identified in accordance with established instructions.
Controlsforreceiptinspection, damageditemsandspecialhandlingrequirements attheCookNuclearPlantareestablished byplantprocedures.
The status is identified as Hold, ahold for guality Control Clearance, Reject, or Accept.The inspection status of work in progress is controlled by the use of hold points in procedures.
Specialcontrolsareprovidedto'assure thatstainless steelcomponents andmaterials arehandledwithapprovedliftingslings.Storageandsurveillance requirements havebeenestablished toassuresegregation ofstorage.Specialcontrolshavebeenimplemented forcritical, highvalue,orperishable items.Routinesurveillance isconducted onstoredmaterialtoprovideinspection fordamage,rotationofstoredpumpsandmotors,inspection forprotection ofexposedsurfacesandcleanliness ofthestoragearea.1.7.13.2.5 Specialhandlingprocedures havebeenimplemented fortheprocessing ofnuclearfuelduringrefueling outages.Theseprocedures minimizetheriskofdamagetothenewandspentfuelandthepossiblereleaseofradioactive materialwhenplacingthespentfuelintothespentfuelpool.1.7-69July,1993 1.7.14INSPECTION, TEST,ANDOPERATING STATUS1.7.14.1SCOPEOperating statusofstructures, systemsandcomponents isindicated bytaggingofvalvesandswitches, orbyotherspecified means,insuchamannerastopreventinadvertent operation.
Plant guality Control, or departmental ANSI.N18.1 qualified personnel{reference 1.7.10.2.4 herein), inspect an activity at various stages and sign off the procedural inspection steps.The status of welding is controlled through the use of a weld data block which.identifies the inspection and NDE status of each weld.1.7.14.2.3 Required surveillance test procedures are defined in PHIs.These instructions provide for documenting bypassed, tests and rescheduling of the test.The status of testing after minor maintenance is recorded as part of the Job Order.The status oF testing after major maintenance is included as part of the procedure, and includes the performance of functional testing and approval of data by supervisory personnel.
Thestatusofinspections andtestsperformed onindividual itemsisclearlyindicated bymarkingsand/orloggingunderstrictprocedural controlstopreventinadvertent bypassing ofsuchinspections andtests.1.7.14.2IMPLEMENTATION 1.7.14.2.1 Fordesignchangeactivities, including itemfabrication, installation andtest,aprogramexistswhichspecifies thedegreeofcontrolrequiredfortheidentiftcation ofinspection andteststatusofstructures, systemsandcomponents.
Testing, inspection and other operations important to safety are conducted in accordance with properly reviewed and approved procedures.
Physicalidentification isusedtotheextentpractical toindicatethestatusofitemsrequiring inspections, tests,orexaminations.
The PHI for plant procedures requires that procedures be followed as written.Alteration to the sequence of a procedure can only be accomplished by a procedure change which is subject to the same controls as the original review and approval.When an immediate procedure change is required to continue in-process work or testing and the required complete review and approval process cannot be accomplished, an"On The Spot" change is processed in accordance with the PMI on plant procedures.
Procedures'xist whichprovidefortheuseofcalibration andrejection
July, 1993  
: stickers, tags,stampsandotherformsofidentification toindicatetestandinspection status.TheClearance PermitSystemusesvarioustagstoidentifyequipment andsystemoperability status.Anotherprogramestablishes ataggingsystemforliftedleads,etc.Forthoseitemsrequiring calibration, theprogramprovidesforphysicalindication ofcalibration statusbycalibration
: stickers, oracontrolsystemisused.1.7.14.2.2 Application andremovalofinspection andweldingstamps,andofsuchstatusindicators astags,markings, labels,etc.,iscontrolled byplantprocedures.
1.7-70July,1993 hh, Theinspection statusofmaterials receivedattheCookNuclearPlantisidentified inaccordance withestablished instructions.
Thestatusisidentified asHold,aholdforgualityControlClearance, Reject,orAccept.Theinspection statusofworkinprogressiscontrolled bytheuseofholdpointsinprocedures.
PlantgualityControl,ordepartmental ANSI.N18.1qualified personnel
{reference 1.7.10.2.4 herein),inspectanactivityatvariousstagesandsignofftheprocedural inspection steps.Thestatusofweldingiscontrolled throughtheuseofawelddatablockwhich.identifies theinspection andNDEstatusofeachweld.1.7.14.2.3 Requiredsurveillance testprocedures aredefinedinPHIs.Theseinstructions providefordocumenting
: bypassed, testsandrescheduling ofthetest.Thestatusoftestingafterminormaintenance isrecordedaspartoftheJobOrder.ThestatusoFtestingaftermajormaintenance isincludedaspartoftheprocedure, andincludestheperformance offunctional testingandapprovalofdatabysupervisory personnel.
Testing,inspection andotheroperations important tosafetyareconducted inaccordance withproperlyreviewedandapprovedprocedures.
ThePHIforplantprocedures requiresthatprocedures befollowedaswritten.Alteration tothesequenceofaprocedure canonlybeaccomplished byaprocedure changewhichissubjecttothesamecontrolsastheoriginalreviewandapproval.
Whenanimmediate procedure changeisrequiredtocontinuein-process workortestingandtherequiredcompletereviewandapprovalprocesscannotbeaccomplished, an"OnTheSpot"changeisprocessed inaccordance withthePMIonplantprocedures.
July,1993  


1.7.14.2.4
1.7.14.2.4
~~~~Nonconforming, inoperable, ormalfunctioning structures, systemsandcomponents areclearlyidentified bytags,stickers,
~~~~Nonconforming, inoperable, or malfunctioning structures, systems and components are clearly identified by tags, stickers,'stamps, etc., and documented to prevent inadvertent use.1.7.15 NONCONFORMING ITEMS 1.7.15.1 SCOPE Materials, parts, or components that do not conform to requirhments are controlled in order to prevent their inadvertent use.Nonconforming items are identified, documented, segregated when practical and dispositioned.
'stamps,etc.,anddocumented topreventinadvertent use.1.7.15NONCONFORMING ITEMS1.7.15.1SCOPEMaterials, parts,orcomponents thatdonotconformtorequirhments arecontrolled inordertopreventtheirinadvertent use.Nonconforming itemsareidentified, documented, segregated whenpractical anddispositioned.
Affected organizations are notified of nonconformances.
Affectedorganizations arenotifiedofnonconformances.
1.7.15.2 IMPLEMENTATION 1.7.15.2.1 Items, services, or activities that are deficient in characteristic, documentation, or procedure, which render the quality unacceptable or indeterminate, are identified as nonconforming and any further use is controlled.
1.7.15.2IMPLEMENTATION 1.7.15.2.1 Items,services, oractivities thataredeficient incharacteristic, documentation, orprocedure, whichrenderthequalityunacceptable orindeterminate, areidentified asnonconforming andanyfurtheruseiscontrolled.
Nonconformances are documented and dispositioned, and notifi cation is made to affected organizations.
Nonconformances aredocumented anddispositioned, andnotificationismadetoaffectedorganizations.
Personnel authorized to disposition, conditionally release and close out nonconformances are designated.
Personnel authorized todisposition, conditionally releaseandcloseoutnonconformances aredesignated.
The Job Order System and/or the Condjgion Reports (refer to 1.7.16 herein)are used at Cook Nuclear Plant to identify nonconforming items and initiate corrective action for items which are installed or have been released to the Cook Nuclear Plant.Systems, components, or materials which require repair or inspection are controlled under the Job Order System.In addition, the various procedures identified in 1.7.14 herein provide for identification, segregation and documentation of nonconforming items.1.7-72 July, 1993 1.7.15.2'Nonconforming items are identified by marking, tagging, segregating, or by documented administrative controls.Documentation describes the nonconformance, the disposition of the nonconformance and the inspection requirements.
TheJobOrderSystemand/ortheCondjgion Reports(referto1.7.16herein)areusedatCookNuclearPlanttoidentifynonconforming itemsandinitiatecorrective actionforitemswhichareinstalled orhavebeenreleasedtotheCookNuclearPlant.Systems,components, ormaterials whichrequirerepairorinspection arecontrolled undertheJobOrderSystem.Inaddition, thevariousprocedures identified in1.7.14hereinprovideforidentification, segregation anddocumentation ofnonconforming items.1.7-72July,1993 1.7.15.2'Nonconforming itemsareidentified bymarking,tagging,segregating, orbydocumented administrative controls.
It also includes signature approval of the disposition.
Documentation describes thenonconformance, thedisposition ofthenonconformance andtheinspection requirements.
Completed Job Orders are reviewed by the supervisor responsible for accomplishing the work, and the supervisor of the department/section that originated the Job Order.The gA Division periodically audits the Job Order System, and on a sample basis, Job Orders.1.7.15.2.3 Items that have been repaired or reworked are inspected and tested in accordance with the original inspection and test requirements, or alternatives, that have been documented.
Italsoincludessignature approvalofthedisposition.
Items that have the disposition of"repair" or"use-as-is" require documentation justifying acceptability.
Completed JobOrdersarereviewedbythesupervisor responsible foraccomplishing thework,andthesupervisor ofthedepartment/section thatoriginated theJobOrder.ThegADivisionperiodically auditstheJobOrderSystem,andonasamplebasis,JobOrders.1.7.15.2.3 Itemsthathavebeenrepairedorreworkedareinspected andtestedinaccordance withtheoriginalinspection andtestrequirements, oralternatives, thathavebeendocumented.
The changes are recorded to denote the as-built condition.
Itemsthathavethedisposition of"repair"or"use-as-is" requiredocumentation justifying acceptability.
When required by established procedures, surveillance or operability tests are conducted on an item after rework, repair or replacement.
Thechangesarerecordedtodenotetheas-builtcondition.
1.7.15.2.4 Disposition of conditionally released items are closed out before the items are relied upon-to perform safety-related functions.
Whenrequiredbyestablished procedures, surveillance oroperability testsareconducted onanitemafterrework,repairorreplacement.
1.7.16, CORRECTIVE ACTION 1.7.16.1 SCOPE 4 Conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and 1.7-73 July, 1993 0 I nonconformances are identified promptly and corrected as soon as practical.
1.7.15.2.4 Disposition ofconditionally releaseditemsareclosedoutbeforetheitemsarereliedupon-toperformsafety-related functions.
For significant conditions adverse to quality, the cause of the condition is determined, corrective action is taken to correct the immediate problem, and preventive action is implemented to prevent recurrence.
1.7.16,CORRECTIVE ACTION1.7.16.1SCOPE4Conditions adversetoquality,suchasfailures, malfunctions, deficiencies, deviations, defective materialandequipment, and1.7-73July,1993 0I nonconformances areidentified promptlyandcorrected assoonaspractical.
In these cases, the condition, cause and corrective action taken is documented and reported to appropriate levels of management.
Forsignificant conditions adversetoquality,thecauseofthecondition isdetermined, corrective actionistakentocorrecttheimmediate problem,andpreventive actionisimplemented topreventrecurrence.
1.7.16.2 IMPLEMENTATION 1.7.16.2.1 Procedures are established that describe the plant and AEPSC corrective action programs.These procedures are reviewed and concurred with by the AEPSC gA Division.1.7.16.2.2 Condition N~Reports provide the mechanism for plant and AEPSC personnel to notify management of conditions adverse to quality.Condition e~Reports are also used to report violations to codes, regulations and the Technical Specifications.
Inthesecases,thecondition, causeandcorrective actiontakenisdocumented andreportedtoappropriate levelsofmanagement.
Investigations of reported conditions adverse to quality are assigned by management.
1.7.16.2IMPLEMENTATION 1.7.16.2.1 Procedures areestablished thatdescribetheplantandAEPSCcorrective actionprograms.
The Condition Q Report is used to document the investigation of an;:-:;,adverse condi't'ion; and to identify the need for a design change to correct system or equipment deficiencies, or to identify the need for the initiation of Job Orders to correct minor deficiencies.
Theseprocedures arereviewedandconcurred withbytheAEPSCgADivision.
Further, Condition jP, Reports are used to identify those actions necessary to prevent recurrence of the reported condition.
1.7.16.2.2 Condition N~Reportsprovidethemechanism forplantandAEPSCpersonnel tonotifymanagement ofconditions adversetoquality.Condition e~Reportsarealsousedtoreportviolations tocodes,regulations andtheTechnical Specifications.
Investigations ofreportedconditions adversetoqualityareassignedbymanagement.
TheCondition QReportisusedtodocumenttheinvestigation ofan;:-:;,adverse condi't'ion; andtoidentifytheneedforadesignchangetocorrectsystemorequipment deficiencies, ortoidentifytheneedfortheinitiation ofJobOrderstocorrectminordeficiencies.
Further,Condition jP,Reportsareusedtoidentifythoseactionsnecessary topreventrecurrence ofthereportedcondition.
7~he,PNSRC:=::::,evalua'tes~~acfian~s:
7~he,PNSRC:=::::,evalua'tes~~acfian~s:
takenpo!r..be sng."takensatodcroreci,,;
takenpo!r..be sng." takensatodcroreci,,;
aLdpurevent r'ae'co'rr anni!,:o':.:::the:
aLdpurevent r'ae'co'rr anni!,: o':.:::the:
de'fiagency,';,,for.,..con ditipnvra'p~orts&#xc3;i'nv'o,
de'fi agency,';,,for.,..con di tip n vra'p~orts&#xc3;i'nv'o,'vyng i":.".'>l;:.",'a:::;:-,:--,,a;:;";:vi'iationso'f:,""::Tech"hnscal,:;>Poacifd'cat'ion b.;..:ih.;.:":;,',">>:.a:irepor'~ab~.e.-'e jen t i~::;:";;,=,*!any':,,'cocci de'otal:=",.'..!un'>1 adn, f ner or unt cofnl,:.1r,eodt riadi oac'tl:.v a';:r<<e lease 1.7-74 July, 1993 LV d!';--::&#xc3;9:,.".a7,'s'a fety:"-,.rvel a'te'd':;'a'dverse'.,':tr'end
'vyngi":.".'>l;:.",'a:::;:-,:--,,a;:;";:vi'iationso'f:,""::Tech"hnscal,:;>Poacifd'cat'ion b.;..:ih.;.:":;,',">>:.a:irepor'~ab~.e.-'e jenti~::;:";;,=,*!any':,,'cocci de'otal:=",.'..!un'>1 adn,fneroruntcofnl,:.1r,eodt riadioac'tl:.v a';:r<<elease1.7-74July,1993 LVd!';--::&#xc3;9:,.".a7,'s'a fety:"-,.rvel a'te'd':;'a'dverse'.,':tr'end
'VhVE PAYS VLVEhLVLVLV QL')'Vh S,V>>W'Eh WNWYhWhhYh hWEhChV lh4AWk)hYEEV e>'~-':: ':.'a''-,'," jotenis:al.:;-::nuc:jear~sa'fete.';"'::hazard I EEECWAh XBWEVh (OV(Y~hk@hL Vh WhYL$WN%NV YhWh49~'f~Pe,";,::an:,,ventr'v':6'.nto,'"Tecvhni'ca'1:,"";.Sji'ecYfi cati'on',,".ELCOj;.'3".'0';"3<':
'VhVEPAYSVLVEhLVLVLV QL')'VhS,V>>W'EhWNWYhWhhYh hWEhChVlh4AWk)hYEEV e>'~-'::':.'a''-,',"
('fa'i'1:".u're:.',;.to co'm*p.ly, w'i::th'i'L'CO,':;sgnoht'..':.con'taj'ni'nqVSpeei'f i cFsh'utdo'Anijsche'du]
jotenis:al.:;-::nuc:jear~sa'fete.';"'::hazard IEEECWAhXBWEVh(OV(Y~hk@hLVhWhYL$WN%NVYhWh49~'f~Pe,";,::an:,,ventr'v':6'.nto,'"Tecvhni'ca'1:,"";.Sji'ecYfi cati'on',,".ELCOj;.'3".'0';"3<':
e);: umkV~VE'L'V~WWhh4%XWVL.h
('fa'i'1:".u're:.',;.to co'm*p.ly, w'i::th'i'L'CO,':;sgnoht'..':.con'taj'ni'nqVSpeei'f icFsh'utdo'Anijsche'du]
e);:umkV~VE'L'V~WWhh4%XWVL.h
'~V'W:IhauuatWaP~ELWEhWhWLINRSYhVLEVL~VuN~
'~V'W:IhauuatWaP~ELWEhWhWLINRSYhVLEVL~VuN~
'a'!',"."-,.'gga"..,T'ecViiii cal':;::,:;.Spec'i'a't'i'ori:"'..O'CO';-.'entry',,':.'th'at~'ww'as!
'a'!',"."-,.'gga"..,T'ecViiii cal':;::,:;.Spec'i'a't'i'ori:"'..O'CO';-.'entry',,':.'th'at~'ww'as!
the",=:":ri'sul t;:,-,of:hEh'VWIVhW LVWWWIMperhsonne:.l:;-!
the",=:":ri'sul t;:,-,o f: hEh'VWIVhW L V W WWI M perhsonne:.l:;-!
error,:;.,
error,:;., VK L+'V'hhhVwhVV'XC4C~
VKL+'V'hhhVwhVV'XC4C~
NA(E w v I The AEPSC NSDRC is responsible for assuring that independent reviews of violations (as specified in the Technical Specifications) are performed.
NA(EwvITheAEPSCNSDRCisresponsible forassuringthatindependent reviewsofviolations (asspecified intheTechnical Specifications) areperformed.
'These violations are considered significant problems which are documented on Condition>~Reports.The reviews will provide an independent evaluation of the reported problems and corrective actions.The AEPSC gA Division periodically audits the corrective action systems for compliance and effectiveness.
'Theseviolations areconsidered significant problemswhicharedocumented onCondition
1.7.17 EQUALITY ASSURANCE RECORDS 1.7.17.1 SCOPE~~~Records that furnish evidence of activities affecting the quality of safety-related structures, systems and components are maintained.
>~Reports.Thereviewswillprovideanindependent evaluation ofthereportedproblemsandcorrective actions.TheAEPSCgADivisionperiodically auditsthecorrective actionsystemsforcompliance andeffectiveness.
They are accurate, complete, legible and are protected against damage, deterioration, or loss.They are identifiable and retrievable.
1.7.17EQUALITYASSURANCE RECORDS1.7.17.1SCOPE~~~Recordsthatfurnishevidenceofactivities affecting thequalityofsafety-related structures, systemsandcomponents aremaintained.
1.7.17.2 IMPLEMENTATION 1.7.17.2.1 Documents that furnish evidence of activities affecting the quality of safety-related items are generated and controlled in accordance with the procedure that governs those activities.
Theyareaccurate,
Upon completion, these documents are considered records.These records include: a)b)Results of reviews, inspections, survei llances, tests, audits and material analyses.gualification of personnel, procedures and equipment.
: complete, legibleandareprotected againstdamage,deterioration, orloss.Theyareidentifiable andretrievable.
1.7-75 July, 1993  
1.7.17.2IMPLEMENTATION 1.7.17.2.1 Documents thatfurnishevidenceofactivities affecting thequalityofsafety-related itemsaregenerated andcontrolled inaccordance withtheprocedure thatgovernsthoseactivities.
'C c)d)e)f)g)h)Operation logs.Haintenance and modification procedures and related inspection I results.Reportable occurrences.
Uponcompletion, thesedocuments areconsidered records.Theserecordsinclude:a)b)Resultsofreviews,inspections, surveillances,tests,auditsandmaterialanalyses.
Records required by the plant Technical Specifications.
gualification ofpersonnel, procedures andequipment.
Con'dj ti;on Reports.~rNcc4+N~5~i Other documentati on such as drawings, speci fi cati ons, dedi cati on plans, procurement documents, calibration procedures and reports.Radiographs.
1.7-75July,1993  
1.7.17.2.2 Instructions and procedures establish the requirements for the identification and preparation of records for systems and equipment under the gA Program, and provide the controls for retention of these records.Criteria for the storage location of quality related records, and a retention schedule for these records, has been established.
'Cc)d)e)f)g)h)Operation logs.Haintenance andmodification procedures andrelatedinspection Iresults.Reportable occurrences.
File Indexes have been established to provide direction for filing, and to provide for the retrievability of the records.Controls have been established for limiting access to the Plant Haster File to prevent unauthorized entry, unauthorized removal, and for use of the records under emergency conditions.
RecordsrequiredbytheplantTechnical Specifications.
The Nuclear..Records Hanagement Supervisor is responsible for the control and operation of the Plant Haster File Room.1.7.17.2.3 Within AEPSC, each department/division manager is responsible for the identification, collection, maintenance and storage of records generated by their department/division.
Con'djti;onReports.~rNcc4+N~5~iOtherdocumentati onsuchasdrawings, specifications,dedicationplans,procurement documents, calibration procedures andreports.Radiographs.
Procedures ensure the maintenance of 1.7-76 July, 1993 records sufficient to furnish objective evidence that activities affecting quality are in compliance with the established gA Program.I 1.7.17.2.4 When a document becomes a record, it is designated as permanent, or nonpermanent, and then transmitted to file.Nonpermanent records have specified retention times.Permanent records are maintained for the life of the plant or equipment, as applicable.
1.7.17.2.2 Instructions andprocedures establish therequirements fortheidentification andpreparation ofrecordsforsystemsandequipment underthegAProgram,andprovidethecontrolsforretention oftheserecords.Criteriaforthestoragelocationofqualityrelatedrecords,andaretention schedulefortheserecords,hasbeenestablished.
1.7.17.2.5 Only authorized personnel may issue corrections or supplements to records.1.7.17.2.6 Traceability between the record and the item or activity to which it applies is provided.1.7.17.2.7 Except for records that can only be stored as originals, such as radiographs and some strip charts, or micrographs thereof, records are stored in remote, dual facilities to prevent damage, deterioration, or loss due to natural or unnatural causes.When only the single original can be retained, special fire-rated facilities are used.1.7.18 AUDITS 1.7.18.1 SCOPE A comprehensive system of audits is carried out to provide independent evaluation of compliance with, and the effectiveness of, the gA Program, including those elements of the program implemented by suppliers and contractors.
FileIndexeshavebeenestablished toprovidedirection forfiling,andtoprovidefortheretrievability oftherecords.Controlshavebeenestablished forlimitingaccesstothePlantHasterFiletopreventunauthorized entry,unauthorized removal,andforuseoftherecordsunderemergency conditions.
Audits are performed in accordance with written procedures 1.7-77 iuly, 1993  
TheNuclear..
RecordsHanagement Supervisor isresponsible forthecontrolandoperation ofthePlantHasterFileRoom.1.7.17.2.3 WithinAEPSC,eachdepartment/division managerisresponsible fortheidentification, collection, maintenance andstorageofrecordsgenerated bytheirdepartment/division.
Procedures ensurethemaintenance of1.7-76July,1993 recordssufficient tofurnishobjective evidencethatactivities affecting qualityareincompliance withtheestablished gAProgram.I1.7.17.2.4 Whenadocumentbecomesarecord,itisdesignated aspermanent, ornonpermanent, andthentransmitted tofile.Nonpermanent recordshavespecified retention times.Permanent recordsaremaintained forthelifeoftheplantorequipment, asapplicable.
1.7.17.2.5 Onlyauthorized personnel mayissuecorrections orsupplements torecords.1.7.17.2.6 Traceability betweentherecordandtheitemoractivitytowhichitappliesisprovided.
1.7.17.2.7 Exceptforrecordsthatcanonlybestoredasoriginals, suchasradiographs andsomestripcharts,ormicrographs thereof,recordsarestoredinremote,dualfacilities topreventdamage,deterioration, orlossduetonaturalorunnatural causes.Whenonlythesingleoriginalcanberetained, specialfire-rated facilities areused.1.7.18AUDITS1.7.18.1SCOPEAcomprehensive systemofauditsiscarriedouttoprovideindependent evaluation ofcompliance with,andtheeffectiveness of,thegAProgram,including thoseelementsoftheprogramimplemented bysuppliers andcontractors.
Auditsareperformed inaccordance withwrittenprocedures 1.7-77iuly,1993  


orchecklists byqualified personnel nothavingdirectresponsibility intheareasaudited.Auditresultsaredocumented andreviewedbymanagement.
or checklists by qualified personnel not having direct responsibility in the areas audited.Audit results are documented and reviewed by management.
Follow-up actionistakenwhereindicated.
Follow-up action is taken where indicated.
1.7.18.2IMPLEMENTATION 1.7.18.2.1 AEPSCADivisionResonsibilities Thebasicresponsibility fortheassessment ofthegAProgramisvestedintheAEPSCgAD.TheAEPSCgADisprimarily responsible forensuringthatpropergAprogramsareestablished andforverification oftheirimplementation.
1.7.18.2 IMPLEMENTATION 1.7.18.2.1 AEPSC A Division Res onsibilities The basic responsibility for the assessment of the gA Program is vested in the AEPSC gAD.The AEPSC gAD is primarily responsible for ensuring that proper gA programs are established and for verification of their implementation.
Theseresponsibilities aredischarged incooperation withtheAEPSCandCookNuclearPlantmanagement andtheirstaffs.1.7.18.2.2 Internalauditsareperformed inaccordance withestablished schedules thatreflectthestatusandimportance ofsafetytotheactivities beingperformed.
These responsibilities are discharged in cooperation with the AEPSC and Cook Nuclear Plant management and their staffs.1.7.18.2.2 Internal audits are performed in accordance with established schedules that reflect the status and importance of safety to the activities being performed.
Allareaswheretherequirements of10CFR50,AppendixBapplyareauditedwithinaperiodofonetotwoyears.1.7.18.2.3 TheAEPSCgADconductsauditstoverifytheadequacyandimplementation ofthegAProgramattheCookNuclearPlantandwithintheAEPSystem.gAauditreportsaredistributed totheappropriate management andtheNSDRC(allaudits).1.7.18.2.4 Theindependent off-sitereviewandauditorganization istheAEPSCNSDRC.Thiscommittee iscomposedofAEPSC,I&MandCookNuclearPlantmanagement members.AnNSDRCManualhasbeendeveloped forthiscommittee whichcontainstheNSDRCCharterandprocedures.
All areas where the requirements of 10CFR50, Appendix B apply are audited within a period of one to two years.1.7.18.2.3 The AEPSC gAD conducts audits to verify the adequacy and implementation of the gA Program at the Cook Nuclear Plant and within the AEP System.gA audit reports are distributed to the appropriate management and the NSDRC (all audits).1.7.18.2.4 The independent off-site review and audit organization is the AEPSC NSDRC.This committee is composed of AEPSC, I&M and Cook Nuclear Plant management members.An NSDRC Manual has been developed for this committee which contains the NSDRC Charter and procedures.
TheNSDRCconductsperiodicauditsofCookNuclearPlantoperations pursuanttoestablished criteria(Technical Specifications, etc.).1.7-78July,1993 NSDRCauditreportsaresubmitted forreviewtotheNSORCmembership andtheChairmanoftheNSORCP>.Condition Reportsprovidefortherecording ofactionstakentocorrectdeficiencies foundduringtheseaudits.1.7.18.2.5 TheCookNuclearPlanton-sitereviewgroupisthePNSRC.Thiscommittee reviewsplantoperations asaroutineevaluation andservestoadvisethePlantHanageronmattersrelatedtonuclearsafety.Thecomposition ofthecommittee isdefinedintheTechnical Specifications.
The NSDRC conducts periodic audits of Cook Nuclear Plant operations pursuant to established criteria (Technical Specifications, etc.).1.7-78 July, 1993 NSDRC audit reports are submitted for review to the NSORC membership and the Chairman of the NSORC P>.Condition Reports provide for the recording of actions taken to correct deficiencies found during these audits.1.7.18.2.5 The Cook Nuclear Plant on-site review group is the PNSRC.This committee reviews plant operations as a routine evaluation and serves to advise the Plant Hanager on matters related to nuclear safety.The composition of the committee is defined in the Technical Specifications.
ThePNSRCalsoreviewsinstructions, procedures, anddesignchangesforsafety-related systemspriortoapprovalbythePlantHanager.Inaddition, thiscommittee servestoconductinvestigations ofviolations toTechnical Specifications, andreviewssignificant Coi7dft'i~6n.":';Reports todetermine ifappropriate actionhasbeentaken.1.7.18.2.6 Auditsofsuppliers andcontractors arescheduled basedonthestatusofsafetyimportance oftheactivities beingperformed, andareinitiated earlyenoughtoassureeffective qualityassurance duringdesign,procurement, manufacturing, construction, installation, inspection andtesting.Principal contractors arerequiredtoaudittheirsuppliers systematically inaccordance withthecriteriaestablished withintheirqualityassurance programs.'-
The PNSRC also reviews instructions, procedures, and design changes for safety-related systems prior to approval by the Plant Hanager.In addition, this committee serves to conduct investigations of violations to Technical Specifications, and reviews significant Coi7dft'i~6n.":';Reports to determine if appropriate action has been taken.1.7.18.2.6 Audits of suppliers and contractors are scheduled based on the status of safety importance of the activities being performed, and are initiated early enough to assure effective quality assurance during design, procurement, manufacturing, construction, installation, inspection and testing.Principal contractors are required to audit their suppliers systematically in accordance with the criteria established within their quality assurance programs.'-
1.7.18.2.7 Regularly scheduled auditsaresupplemented by"specialaudits"whensignificant changesaremadeinthegAProgram,whenitissuspected 1.7-79July,1993  
1.7.18.2.7 Regularly scheduled audits are supplemented by"special audits" when significant changes are made in the gA Program, when it is suspected 1.7-79 July, 1993  


thatqualityisinjeopardy, orwhenanindependent assessment ofprogrameffeetivenessisconsiderednecessary.
that quality is in jeopardy, or when an independent assessment of program e f fee ti veness i s cons i dered necessary.
C1.7.18.2.8 Auditsincludeanobjective evaluation ofpractices, procedures, instructions, activities anditemsrelatedtoquality;andareviewofdocuments andrecordstoconfirmthatthegAProgramiseffective andproperlyimplemented.
C 1.7.18.2.8 Audits include an objective evaluation of practices, procedures, instructions, activities and items related to quality;and a review of documents and records to confirm that the gA Program is effective and properly implemented.
1.7.18.2.9 Auditprocedures andthescope,plans,checklists andresultsofindividual auditsaredocumented.
1.7.18.2.9 Audit procedures and the scope, plans, checklists and results of individual audits are documented.
1.7.1.2.10 Personnel selectedforauditingassignments haveexperience, oraregiventrainingcommensurate withtheneedsoftheaudit,andhavenodirectresponsibilities intheareasaudited.1.7.18.2.11 Hanagement oftheauditedorganization identifies andtakesappropriate actiontocorrectobserveddeficiencies andtopreventrecurrence.
1.7.1.2.10 Personnel selected for auditing assignments have experience, or are given training commensurate with the needs of the audit, and have no direct responsibilities in the areas audited.1.7.18.2.11 Hanagement of the audited organization identifies and takes appropriate action to correct observed deficiencies and to prevent recurrence.
Follow-up isperformed bytheauditingorganization toensurethattheappropriate actionsweretaken.Suchfollow-up includesreaudits, whennecessary.
Follow-up is performed by the auditing organization to ensure that the appropriate actions were taken.Such follow-up includes reaudits, when necessary.
1.7.18.2.12 TheadequacyofthegAProgramisregularly assessedbyAEPSCmanagement.
1.7.18.2.12 The adequacy of the gA Program is regularly assessed by AEPSC management.
Thefollowing activities constituteformalelementsofthatassessment:
The following activities consti tute formal elements of that assessment:
1.7-80July,1993 a)Auditreports,including follow-up oncorrective actionaccomplishment andeffectiveness, aredistributed toappropriate levelsofmanagement.
1.7-80 July, 1993 a)Audit reports, including follow-up on corrective action accomplishment and effectiveness, are distributed to appropriate levels of management.
b)Individuals independent fromthegAorganization, butknowledgeable inauditi,ng andqualityassurance, periodically reviewtheeffectiveness ofthegAPrograms.
b)Individuals independent from the gA organization, but knowledgeable in auditi,ng and quality assurance, periodically review the effectiveness of the gA Programs.Conclusions and recommendations are reported to the AEPSC Vice President-Nuclear Operations.
Conclusions andrecommendations arereportedtotheAEPSCVicePresident
1.7.19 FIRE PROTECTION gA PROGRAM 1.7.19.1 Introducti on The Cook Nuclear Plant Fire Protection gA Program has been developed using the guidance of NRC Branch Technical Position (APCSB)9.5-1, Appendix A, Section C,"guali ty Assurance Program," and NRC clarification"Nuclear Plant Fire Protection Functional Responsibi li ties, Administrative Controls, and guality Assurance," dated June 14, 1977.As such, the Fire Protection gA Program is part of the overall gA Program for the plant.The Fire Protection gA Program encompasses design, procurement, fabrication, construction, surveillance, inspection, operation, maintenance', modification, and audits.Implementation and assessment of the Fire Protection gA Program is the responsibility of each involved AEPSC and Indiana Michigan Power Company organization.
-NuclearOperations.
l.i.19.!The Fire Protection gA Program is under the management control of AEPSC.This control consists of: 1)Verifying the effectiveness of the Fire Protection gA Program through review, surveillance, and audits.1.7-81 July, 1993 2)Directing formulation, implementation, and assessment of the Fire Protection gA Program by procedural controls.3)Assuring the gA program is acceptable to the management responsible for fire protection.
1.7.19FIREPROTECTION gAPROGRAM1.7.19.1Introducti onTheCookNuclearPlantFireProtection gAProgramhasbeendeveloped usingtheguidanceofNRCBranchTechnical Position(APCSB)9.5-1,AppendixA,SectionC,"gualityAssurance Program,"
The Plant Manager has delegated responsibility to various Cook Nuclear Plant departments for the following fire protection activities: "a)b)c)d)e)f)g)Maintenance of fire protection systems.Testing of fire protection equipment.
andNRCclarification "NuclearPlantFireProtection Functional Responsibi lities,Administrative
Fire safety inspections.
: Controls, andgualityAssurance,"
Fire fighting procedures.
datedJune14,1977.Assuch,theFireProtection gAProgramispartoftheoverallgAProgramfortheplant.TheFireProtection gAProgramencompasses design,procurement, fabrication, construction, surveillance, inspection, operation, maintenance',
Fire dri 1 l s.Emergency remote shutdown procedures.
modification, andaudits.Implementation andassessment oftheFireProtection gAProgramistheresponsibility ofeachinvolvedAEPSCandIndianaMichiganPowerCompanyorganization.
Emergency repair procedures (10CFR50, Appendix R).The Fire Protection gA Program at the Cook Nuclear Plant also provides for inspection of fire hazards, explosion hazards, and training of fire brigade and responding fire departments.
l.i.19.!TheFireProtection gAProgramisunderthemanagement controlofAEPSC.Thiscontrolconsistsof:1)Verifying theeffectiveness oftheFireProtection gAProgramthroughreview,surveillance, andaudits.1.7-81July,1993 2)Directing formulation, implementation, andassessment oftheFireProtection gAProgrambyprocedural controls.
The Safety and Assessment Department's Fire Protection Shift Supervisor on duty, or designee, is designated as the Fire Brigade Leader and coordinates the fire fighting efforts of shift personnel and the Fire Brigade.The Operations Department provides an individual with plant systems knowledge to serve as an advisor to the Fire Brigade Leader.1.7.19.3 Desi n Control and Procurement Document Control guality standards are specified in the design documents such as appropriate fire protection codes and standards, and, as necessary, deviations and changes from these quality standards are controlled.
3)AssuringthegAprogramisacceptable tothemanagement responsible forfireprotection.
The Cook Nuclear Plant design was reviewed by qualified personnel to ensure inclusion of appropriate fire protection requirements.
ThePlantManagerhasdelegated responsibility tovariousCookNuclearPlantdepartments forthefollowing fireprotection activities:
These reviews include items such as: 1.7-82 July, 1993 1)Verification as to the adequacy of electrical isolation and cable separation criteria.I 2)Verification of appropriate requirements for room isolation (sealing penetrations, floors and other fire barriers).
"a)b)c)d)e)f)g)Maintenance offireprotection systems.Testingoffireprotection equipment.
3)Determination for increase in fire loadings.4)Determination for the need of additional fire detection and suppression equipment.
Firesafetyinspections.
Procurement of fire protection equipment and related items are subject to the requirements of the fire protection procurement documents.
Firefightingprocedures.
A review of these documents is performed to assure fire protection requirements and quality requireme'nts are correctly stated, verifiable, and controllable, and that there is adequate acceptance and rejection criteria.Procurement documents must be prepared, reviewed, and approved according to gA Program requirements.
Firedri1ls.Emergency remoteshutdownprocedures.
Design and procurement document changes, including field changes and design'deviations, are controlled by procedure.
Emergency repairprocedures (10CFR50, AppendixR).TheFireProtection gAProgramattheCookNuclearPlantalsoprovidesforinspection offirehazards,explosion hazards,andtrainingoffirebrigadeandresponding firedepartments.
1.7.19.4 Instructions Procedures and Drawin s II Inspections, tests, administrative controls, fire drills and training that assist in implementing the fire protection program are prescribed by approved instructions or procedures.
TheSafetyandAssessment Department's FireProtection ShiftSupervisor onduty,ordesignee, isdesignated astheFireBrigadeLeaderandcoordinates thefirefightingeffortsofshiftpersonnel andtheFireBrigade.TheOperations Department providesanindividual withplantsystemsknowledge toserveasanadvisortotheFireBrigadeLeader.1.7.19.3DesinControlandProcurement DocumentControlgualitystandards arespecified inthedesigndocuments suchasappropriate fireprotection codesandstandards, and,asnecessary, deviations andchangesfromthesequalitystandards arecontrolled.
Indoctrination and training programs for fire prevention and fire fighting are implemented in accordance with approved procedures.
TheCookNuclearPlantdesignwasreviewedbyqualified personnel toensureinclusion ofappropriate fireprotection requirements.
Activities associated with the fire protecti on systems and fire protection related systems are prescribed and accomplished in accordance with documented instructions, procedures, and drawings.Instructions and procedures for design, installation, inspection, tests, maintenance, 1.7-83 July, 1993 l
Thesereviewsincludeitemssuchas:1.7-82July,1993 1)Verification astotheadequacyofelectrical isolation andcableseparation criteria.
modification and administrative controls are reviewed through audits to assure that the fire protection program is maintained.
I2)Verification ofappropriate requirements forroomisolation (sealingpenetrations, floorsandotherfirebarriers).
Operation and maintenance information has been provided to the plant in the form of System Descriptions and equipment supplier information.
3)Determination forincreaseinfireloadings.
1.7.19.5 Control of Purchased Items and Services Measures are established to assure that purchased items and services conform to procurement documents.
4)Determination fortheneedofadditional firedetection andsuppression equipment.
These measures include provisions, as appropriate, for source evaluation and selection, objective evidence of quality furnished by the contractor, inspections at suppliers, or receipt inspection.
Procurement offireprotection equipment andrelateditemsaresubjecttotherequirements ofthefireprotection procurement documents.
Source or receipt inspection is provided, as a minimum, for those items where quality cannot be verified after installation.
Areviewofthesedocuments isperformed toassurefireprotection requirements andqualityrequireme'nts arecorrectly stated,verifiable, andcontrollable, andthatthereisadequateacceptance andrejection criteria.
1.1.19.6~~~A program for independent inspection of the fire protection activities has been established and implemented.
Procurement documents mustbeprepared,
These inspections are performed by personnel other than those responsible for implementation of the activity.The inspections include: a)Inspection of installation, maintenance and modification of fire protection systems and equipment.
: reviewed, andapprovedaccording togAProgramrequirements.
b)Inspections of penetration seals and fire retardant coating installations to verify the activity is satisfactorily completed in accordance with installation specifications.
Designandprocurement documentchanges,including fieldchangesanddesign'deviations, arecontrolled byprocedure.
1.7-84 July, 1993  
1.7.19.4Instructions Procedures andDrawinsIIInspections, tests,administrative
: controls, firedrillsandtrainingthatassistinimplementing thefireprotection programareprescribed byapprovedinstructions orprocedures.
Indoctrination andtrainingprogramsforfireprevention andfirefightingareimplemented inaccordance withapprovedprocedures.
Activities associated withthefireprotectionsystemsandfireprotection relatedsystemsareprescribed andaccomplished inaccordance withdocumented instructions, procedures, anddrawings.
Instructions andprocedures fordesign,installation, inspection, tests,maintenance, 1.7-83July,1993 l
modification andadministrative controlsarereviewedthroughauditstoassurethatthefireprotection programismaintained.
Operation andmaintenance information hasbeenprovidedtotheplantintheformofSystemDescriptions andequipment supplierinformation.
1.7.19.5ControlofPurchased ItemsandServicesMeasuresareestablished toassurethatpurchased itemsandservicesconformtoprocurement documents.
Thesemeasuresincludeprovisions, asappropriate, forsourceevaluation andselection, objective evidenceofqualityfurnished bythecontractor, inspections atsuppliers, orreceiptinspection.
Sourceorreceiptinspection isprovided, asaminimum,forthoseitemswherequalitycannotbeverifiedafterinstallation.
1.1.19.6~~~Aprogramforindependent inspection ofthefireprotection activities hasbeenestablished andimplemented.
Theseinspections areperformed bypersonnel otherthanthoseresponsible forimplementation oftheactivity.
Theinspections include:a)Inspection ofinstallation, maintenance andmodification offireprotection systemsandequipment.
b)Inspections ofpenetration sealsandfireretardant coatinginstallations toverifytheactivityissatisfactorily completed inaccordance withinstallation specifications.
1.7-84July,1993  


c)Inspections ofcableroutingtoverifyconformance withdesignrequirements asspecified inAEPSCSpecifications and/orplantprocedures.
c)Inspections of cable routing to verify conformance with design requirements as specified in AEPSC Specifications and/or plant procedures.
d)Inspections toverifythatappropriate requirements forfirebarriersaresatisfied following installation, modification, repairorreplacement activities.e)Heasurestoassurethatinspection personnel areindependent fromtheindividuals performing theactivitybeinginspected andareknowledgeable inthedesignandinstallation requirements forfireprotection.
d)Inspections to verify that appropriate requirements for fire barriers are satisfied following installation, modification, repair or replacement activi ti es.e)Heasures to assure that inspection personnel are independent from the individuals performing the activity being inspected and are knowledgeable in the design and installation requirements for fire protection.
f)Inspection procedures, instructions orchecklists forrequiredinspections.
f)Inspection procedures, instructions or checklists for required inspections.
g)Periodicinspections ofA'eprotection systems,emergency breathing andauxiliary equipment.
g)Periodic inspections of A'e protection systems, emergency breathing and auxiliary equipment.
h)Periodicinspections ofmaterials subjecttodegradation, suchasfirestops,sealsandfireretardant coatingasrequiredbyTechnical Specifications ormanufacturer's recommendations.
h)Periodic inspections of materials subject to degradation, such as fire stops, seals and fire retardant coating as required by Technical Specifications or manufacturer's recommendations.
1.7.19.7TestandTestControla)Instal1ationtesting-Followinginstal1ation,modification,repair,orreplacement, sufficient testingisperformed todemonstrate thatthefireprotection systemsandequipment willperformsatisfactorily.
1.7.19.7 Test and Test Control a)Instal 1 ati on testing-Foll owing instal 1 ati on, modi fi cati on, repair, or replacement, sufficient testing is performed to demonstrate that the fire protection systems and equipment will perform satisfactorily.
Writtentestprocedures forinstallation testsincorporate therequirements andacceptance limitscontained inapplicable designdocuments.
Written test procedures for installation tests incorporate the requirements and acceptance limits contained in applicable design documents.
b)Periodictesting-Periodictestingoccurstodocumentthatfireprotectionequipmentfunctionsinaccordance withitsdesign.1.7-85July,1993  
b)Peri odi c testing-Peri odi c testing occurs to document that fire protecti on equi pment functi ons in accordance wi th i ts desi gn.1.7-85 July, 1993  


4c)Programshavebeenestablished toverifythetestingoffireprotection systems,andtoverifythattestpersonnel areeffectively trained.d)Testresultsaredocumented, evaluated, andtheiracceptability determined byaqualified responsible individual orgroup.1.7.19.8InsectionTestand0eratinStatusTheinspection, testandoperating statusforplantTechnical Specification fireprotection systemsareperformed asdescribed in1.7.14herein.1.7.19.9Nonconformin ItemsTechnical Specification fireprotection equipment nonconformances areidentified anddispositioned asdescribed in1.7.15herein.1.7.19.10 Corrective Action~~~Thecorrective actionmechanism described in1.7.16hereinappliestotheTechnical Specification fireprotection equipment.
4 c)Programs have been established to verify the testing of fire protection systems, and to verify that test personnel are effectively trained.d)Test results are documented, evaluated, and their acceptability determined by a qualified responsible individual or group.1.7.19.8 Ins ection Test and 0 eratin Status The inspection, test and operating status for plant Technical Specification fire protection systems are performed as described in 1.7.14 herein.1.7.19.9 Nonconformin Items Technical Specification fire protection equipment nonconformances are identified and dispositioned as described in 1.7.15 herein.1.7.19.10 Corrective Action~~~The corrective action mechanism described in 1.7.16 herein applies to the Technical Specification fire protection equipment.
1.7.19.11RecordsRecordsgenerated tosupportthefireprotection programarecontrolled asdescribed in1.7.17herein.1.7.19.12AuditsAuditsareconducted anddocumented toverifycompliance withtheFireProtection gAProgramasdescribed in1.7.1.18herein.Auditsareperiodically performed toverifycompliance withtheadministrative controlsandimplementation offireprotection quality1.7-86July,1993 0
1.7.19.11 Records Records generated to support the fire protection program are controlled as described in 1.7.17 herein.1.7.19.12 Audi ts Audits are conducted and documented to verify compliance with the Fire Protection gA Program as described in 1.7.1.18 herein.Audits are periodically performed to verify compliance with the administrative controls and implementation of fire protection quality 1.7-86 July, 1993 0
assurance criteria.
assurance criteria.The audits are performed in accordance with pre-established written procedures or checklists.
Theauditsareperformed inaccordance withpre-established writtenprocedures orchecklists.
Audit results are documented and reviewed by management having responsibility in the area audited.Follow-up action is taken by responsible management to correct the deficiencies revealed by the audit.1.7-87 July, 1993 AMERlCAN ELECTRIC POWER SERVlCE CORPORATlON Support Organization for the Cook Plant CHAIRMAN OF THE BOARD AND CHIEF EXECUTIVE OFFICER DIRECTOR QUALITY ASSURANCE VICE PRESIDENT NUCLEAR OPERATIONS I I I I I I I I VICE PRESIDENT PROJECT MANAGEMENT AND CONSTRUCTION OTHER AEPSC ENGINEERING/DESIGN SUPPORT OTHER AEPSC SUPPORT NUCLEAR OPERATIONS DEPARTMENT PROJECTMANAGEMENT AND CONSTRUCTION DEPARTMENT QVAUTYASSURANCE DIVISION NUCLEAR ENGINEERING DEPARTMENT PLANT MANAGER COOK NUCLEAR PLANT'I I I I I I I I I J SITE CONSTRUCTION MANAGER C C r ED+Qadi'OT PART OF AEPSC ORGANIZATION
Auditresultsaredocumented andreviewedbymanagement havingresponsibility intheareaaudited.Follow-up actionistakenbyresponsible management tocorrectthedeficiencies revealedbytheaudit.1.7-87July,1993 AMERlCANELECTRICPOWERSERVlCECORPORATlON SupportOrganization fortheCookPlantCHAIRMANOFTHEBOARDANDCHIEFEXECUTIVE OFFICERDIRECTORQUALITYASSURANCE VICEPRESIDENT NUCLEAROPERATIONS IIIIIIIIVICEPRESIDENT PROJECTMANAGEMENT ANDCONSTRUCTION OTHERAEPSCENGINEERING/DESIGN SUPPORTOTHERAEPSCSUPPORTNUCLEAROPERATIONS DEPARTMENT PROJECTMANAGEMENT ANDCONSTRUCTION DEPARTMENT QVAUTYASSURANCE DIVISIONNUCLEARENGINEERING DEPARTMENT PLANTMANAGERCOOKNUCLEARPLANT'IIIIIIIIIJSITECONSTRUCTION MANAGERCCrED+Qadi'OTPARTOFAEPSCORGANIZATION
-SHOWN FOR INFORMATION ONLY ADMINISTRATIVE AND FUNCTIONAL DIRECTION FUNCTIONAL DIRECTION FOR THE COOK NUCLEAR PLANT AMERICAN ELECT C POWER COMPANYAMERICAN ELECTRIC POWER COMPANY AMERICAN ELECTRIC POWER SERVICE CORPORATION APPALACHIAN POWER COMPANY OHIO POWER COMPANY INDIANA MICHIGAN POWER COMPANY COLUMBUS SOUTHERN POWER COMPANY KINGSPORT POWER COMPANY KENTUCKY POWER COMPANY WHEELING POWER COMPANY I I I I I I I COOK NUCLEAR PLANT ADMINISTRATIVE, TECHNICAL, AND FUNCTIONAL DIRECTION Tl C 2: O ORGANIZATIONAL RELATIONSHIPS WITHIN THE AMERICAN ELECTRIC POWER SYSTEM PERTAINING TO QUALITY ASSURANCE AND QUALITY CONTROL SUPPORT OF THE COOK NUCLEAR PLANT CHAIRMAN OF THE BOARD AND CHIEF EXECUllVE OFFICER AEPSC, INDIANA MICHIGAN POWER COMPANY AND OTHER AEP SUBSIDIARIES VICE PRESIDENT NUCLEAR OPERATlONS AEPSC AND VICE PRESIDENT, INDIANA MICHIGAN (MANAGER OF NUCLEAR OPERATlONS NUCLEAR OPERATIONS 8 NUCLEAR ENGINEERING DEPARTMENTS I I I I I OTHER AEPSC DEPARlMENTS DIRECTOR QUALITY ASSURANCE AEPSC PLANT MANAGER COOK NUCLEAR PLANT QUAUTY ASSURANCE SUPERINTENDENT (ON SITE)AEPSC SAFETY 8 ASSESSMENT SUPERINTENDENT Administrative and functional direction Technical direction Technical liaison Functional directIon for Cook Nuclear Plant Activities 1.7-90 July, 1993 AEPSC QUALITY ASSURANCE DIVISION ORGANIZATION AEPSC DIRECTOR QUALITYASSURANCE SECTION MANAGER AUDITS AND PROCUREMENT SECTION MANAGER QUALITYASSURANCE ENGINEERING
-SHOWNFORINFORMATION ONLYADMINISTRATIVE ANDFUNCTIONAL DIRECTION FUNCTIONAL DIRECTION FORTHECOOKNUCLEARPLANT AMERICANELECTCPOWERCOMPANYAMERICANELECTRICPOWERCOMPANYAMERICANELECTRICPOWERSERVICECORPORATION APPALACHIAN POWERCOMPANYOHIOPOWERCOMPANYINDIANAMICHIGANPOWERCOMPANYCOLUMBUSSOUTHERNPOWERCOMPANYKINGSPORT POWERCOMPANYKENTUCKYPOWERCOMPANYWHEELINGPOWERCOMPANYIIIIIIICOOKNUCLEARPLANTADMINISTRATIVE, TECHNICAL, ANDFUNCTIONAL DIRECTION TlC2:O ORGANIZATIONAL RELATIONSHIPS WITHINTHEAMERICANELECTRICPOWERSYSTEMPERTAINING TOQUALITYASSURANCE ANDQUALITYCONTROLSUPPORTOFTHECOOKNUCLEARPLANTCHAIRMANOFTHEBOARDANDCHIEFEXECUllVE OFFICERAEPSC,INDIANAMICHIGANPOWERCOMPANYANDOTHERAEPSUBSIDIARIES VICEPRESIDENT NUCLEAROPERATlONS AEPSCANDVICEPRESIDENT, INDIANAMICHIGAN(MANAGEROFNUCLEAROPERATlONS NUCLEAROPERATIONS 8NUCLEARENGINEERING DEPARTMENTS IIIIIOTHERAEPSCDEPARlMENTS DIRECTORQUALITYASSURANCE AEPSCPLANTMANAGERCOOKNUCLEARPLANTQUAUTYASSURANCE SUPERINTENDENT (ONSITE)AEPSCSAFETY8ASSESSMENT SUPERINTENDENT Administrative andfunctional direction Technical direction Technical liaisonFunctional directIon forCookNuclearPlantActivities 1.7-90July,1993 AEPSCQUALITYASSURANCE DIVISIONORGANIZATION AEPSCDIRECTORQUALITYASSURANCE SECTIONMANAGERAUDITSANDPROCUREMENT SECTIONMANAGERQUALITYASSURANCE ENGINEERING
~SECTION MANAGER NUCLEAR SOFTWARE QUALITY ASSURANCE QUALITY ASSURANCE SUPERINTENDENT (SITE)  
~SECTIONMANAGERNUCLEARSOFTWAREQUALITYASSURANCE QUALITYASSURANCE SUPERINTENDENT (SITE)  


.Organization ortheCookNuclearPlantIndianaMichiganPowerCompanyPlantManagerExecutive StaffAssistant PlantSafetyChairmanPoAssistant PlantManagerProduction Assistant PlantManagerTechnical SupportAssistant PlantManagerProjectsAccounting andBudgetManaerOperations Superintendent Radlallon Protection Suerlntendent integrated Scheduling Superintendent SafetyandAssessment Superintendent QualityControl/NDE Maintenance Superintendent PlantEnglneqrlng Superintendent ComputerSciencesSuperintendent Admlnlstratlve Superintendent "IStoresSupervisor Chemistry Superintendent Emergency PlanningCoordinator SiteConstruction ManagerNuclearSecurityManagerTralnlngSuperintendent HumanResources Supervisor APPENDIXAREGULATORY ANDSAFETYGUIDESANSISTANDARDS 1.Reg.Guide1.8(9/75)ANSIN18.1(1971)Personnel Selection andTrainingSelection.
.Organization or the Cook Nuclear Plant Indiana Michigan Power Company Plant Manager Executive Staff Assistant Plant Safety Chairman Po Assistant Plant Manager Production Assistant Plant Manager Technical Support Assistant Plant Manager Projects Accounting and Budget Mana er Operations Superintendent Radlallon Protection Su erlntendent integrated Scheduling Superintendent Safety and Assessment Superintendent Quality Control/NDE Maintenance Superintendent Plant Englneqrlng Superintendent Computer Sciences Superintendent Admlnlstratlve Superintendent"I Stores Supervisor Chemistry Superintendent Emergency Planning Coordinator Site Construction Manager Nuclear Security Manager Tralnlng Superintendent Human Resources Supervisor APPENDIX A REGULATORY AND SAFETY GUIDES ANSI STANDARDS 1.Reg.Guide 1.8 (9/75)ANSI N18.1 (1971)Personnel Selection and Training Selection.
andTrainingofNuclearPowerPlantPersonnel 2.Reg.Guide1.14(8/75)ReactorCoolantPumpFlywheelIntegrity3.Reg.Guide1.16(8/75)Reporting ofOperating Information, AppendixA-Technical Specifications 4.SafetyGuide30(8/72)ANSIN45.2.4(1972)equalityAssurance Requirements fortheInstallation, Inspection, andTestingofInstrumentation andElectricEquipment Installation, Inspection, andTestingRequirements forInstrumentation andElectricEquipment DuringtheConstruction ofNuclearPowerGenerating Stations5.Reg.Guide1.33(02/78)ANSIN18.7(1976)(ANS3.21976)ANSIN45.2(1977)equalityAssurance ProgramRequirements (Operation)
and Training of Nuclear Power Plant Personnel 2.Reg.Guide 1.14 (8/75)Reactor Coolant Pump Flywheel Integri ty 3.Reg.Guide 1.16 (8/75)Reporting of Operating Information, Appendix A-Technical Specifications 4.Safety Guide 30 (8/72)ANSI N45.2.4 (1972)equality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment Installation, Inspection, and Testing Requirements for Instrumentation and Electric Equipment During the Construction of Nuclear Power Generating Stations 5.Reg.Guide 1.33 (02/78)ANSI N18.7 (1976)(ANS 3.2 1976)ANSI N45.2 (1977)equality Assurance Program Requirements (Operation)
Administrative ControlsandequalityAssurance fortheOperational PhaseofNuclearPowerPlantsequalityAssurance ProgramRequirements forNuclearFacilities 1.7-93July,1993 6.Reg.Guide1.37(3/73)~~~ANSIN45.2.1(1973)gualityAssurance Requirements forCleaningofFluidSystemsandAssociated Components ofWater-CooledNuclearPowerPlantsCleaningofFluidSystemsandAssociated Components DuringConstruction PhaseofNuclearPowerPlants7.Reg.Guide1.3(10/76)ANSIN45.2.2(1972)gualityAssurance Requirements forPackaging,
Administrative Controls and equality Assurance for the Operational Phase of Nuclear Power Plants equality Assurance Program Requirements for Nuclear Facilities 1.7-93 July, 1993 6.Reg.Guide 1.37 (3/73)~~~ANSI N45.2.1 (1973)guality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants Cleaning of Fluid Systems and Associated Components During Construction Phase of Nuclear Power Plants 7.Reg.Guide 1.3 (10/76)ANSI N45.2.2 (1972)guality Assurance Requirements for Packaging, Shipping, Receiving, Storage and Handling of Items for Water-Cooled Nuclear Power Plants Packaging, Shipping, Receiving, Storage and Handling of Items for Nuclear Power Plants (During the Construction Phase)~~~8.Reg.Guide 1.39 (10/76)ANSI N45.2.3 (1973)Housekeeping Requirements for Water-Cooled Nuclear Power Plants Housekeeping During the Construction Phase of Nuclear Power Plants 9.Reg.Guide 1.54 (6/73)ANSI N101.4 (1972)guality Assurance Requirements for Protective Coatings Applied to Water-Cooled Nuclear Power Plants guality Assurance for Protective Coatings Applied to Nuclear Facilities 10.Reg.Guide 1.58 (9/80)gualification of Nuclear Power Plant Inspection, Examination and Testing Personnel 1.7-94 July, 1993 ANS I N45.2.6 (1978)equal i fi cati ons of Inspecti on, Exami-nation, and Testing Personnel for Nuclear Power Plants 11.Reg.Guide 1.63 (7/78)Electric Penetration Assemblies in Containment Structures for Light-Mater-Cooled Nuclear Power Plants 12.Reg.Guide 1.64 (10/73)ANSI N45.2.11 (1974)equality Assurance Requirements for the Design of Nuclear Power Plants equality Assurance Requirements for the Design of Nuclear Power Plants 13.Reg.Guide 1.74 (2/74)ANSI N45.2.10{1973)equality Assurance Terms and Defini ti ons equality Assurance Terms and Definitions 14.Reg.Guide 1.88 (10/76)~~~ANSI N45.2.9 (1974)Collection, Storage, and Naintenance of Nuclear Power Plant equality, Assurance Records Requirements for Collection, Storage, and Haintenance of equality Assurance Records for Nuclear Power Plants 15.Reg.Guide 1.94 (4/76)equality Assurance Requirements for Installation, Inspection, and Testing of Structural Concrete and Structural Steel During the Construction Phase of Nuclear Power Plants 1.7-95 July, 1993 ANSI N45.2.5 (1974)Supplementary guality Assurance Requirements for Installation, Inspection, and Testing of Structural Concrete and Structural Steel During the Construction Phase of Nuclear Power Plants 16.Reg.Guide 1.108 (8/77)Periodic Testing of Diesel Generator Units used as Onsite Electric Power Systems at Nuclear Power Plants 17.Reg.Guide 1.123 (7/77)ANSI N45.2.13 (1976)guality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants guality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants 18.Reg.Guide 1.144 (1/79)ANSI N45.2.12{1977)Auditing of guality Assurance Programs for Nuclear Power Plants Requirements for Auditing of guali ty Assurance Programs for Nuclear Power Plants 19.Reg.Guide 1.146{8/80)ANSI N45.2.23 (1978)gualification of guality Assurance Program Audit Personnel for Nuclear Power Plants gualification of guality Assurance Program Audit Personnel for Nuclear Power Plants 1.7-96 July, 1993 20.ANSI N45.2.8 (1975)Supplementary equality Assurance Requirements for Installation, Inspection and Testing of Hechanical Equipment and Systems for the Construction Phase of Nuclear Power Plants 21.ANSI N45.4 (1972)Leakage-Rate Testing of Containment Structures for Nuclear Reactors 1.7-97 July, 1993 APPENDIX B AEPSC/IBM EXCEPTIONS TO OPERATING PHASE STANDARDS AND REGULATORY GUIDES 1.GENERAL Certain Regulatory Guides invoke, or imply, Regulatory Guides and standards in addition to the standard each primarily endorses.Certain ANSI Standards invoke, or imply, additional standards.
: Shipping, Receiving, StorageandHandlingofItemsforWater-Cooled NuclearPowerPlantsPackaging,
Exce ti on Inter retati on The AEPSC/I&M commitment refers to the Regulatory Guides and ANSI Standards specifically identified in Appendix A.Additional Regulatory Guides, ANSI Standards and similar documents implied, or referenced, in those specifically identified are not part of this commitment.
: Shipping, Receiving, StorageandHandlingofItemsforNuclearPowerPlants(DuringtheConstruction Phase)~~~8.Reg.Guide1.39(10/76)ANSIN45.2.3(1973)Housekeeping Requirements forWater-CooledNuclearPowerPlantsHousekeeping DuringtheConstruction PhaseofNuclearPowerPlants9.Reg.Guide1.54(6/73)ANSIN101.4(1972)gualityAssurance Requirements forProtective CoatingsAppliedtoWater-Cooled NuclearPowerPlantsgualityAssurance forProtective CoatingsAppliedtoNuclearFacilities 10.Reg.Guide1.58(9/80)gualification ofNuclearPowerPlantInspection, Examination andTestingPersonnel 1.7-94July,1993 ANSIN45.2.6(1978)equalificationsofInspection,Exami-nation,andTestingPersonnel forNuclearPowerPlants11.Reg.Guide1.63(7/78)ElectricPenetration Assemblies inContainment Structures forLight-Mater-Cooled NuclearPowerPlants12.Reg.Guide1.64(10/73)ANSIN45.2.11(1974)equalityAssurance Requirements fortheDesignofNuclearPowerPlantsequalityAssurance Requirements fortheDesignofNuclearPowerPlants13.Reg.Guide1.74(2/74)ANSIN45.2.10{1973)equalityAssurance TermsandDefinitionsequalityAssurance TermsandDefinitions 14.Reg.Guide1.88(10/76)~~~ANSIN45.2.9(1974)Collection, Storage,andNaintenance ofNuclearPowerPlantequality, Assurance RecordsRequirements forCollection, Storage,andHaintenance ofequalityAssurance RecordsforNuclearPowerPlants15.Reg.Guide1.94(4/76)equalityAssurance Requirements forInstallation, Inspection, andTestingofStructural ConcreteandStructural SteelDuringtheConstruction PhaseofNuclearPowerPlants1.7-95July,1993 ANSIN45.2.5(1974)Supplementary gualityAssurance Requirements forInstallation, Inspection, andTestingofStructural ConcreteandStructural SteelDuringtheConstruction PhaseofNuclearPowerPlants16.Reg.Guide1.108(8/77)PeriodicTestingofDieselGenerator UnitsusedasOnsiteElectricPowerSystemsatNuclearPowerPlants17.Reg.Guide1.123(7/77)ANSIN45.2.13(1976)gualityAssurance Requirements forControlofProcurement ofItemsandServicesforNuclearPowerPlantsgualityAssurance Requirements forControlofProcurement ofItemsandServicesforNuclearPowerPlants18.Reg.Guide1.144(1/79)ANSIN45.2.12{1977)AuditingofgualityAssurance ProgramsforNuclearPowerPlantsRequirements forAuditingofgualityAssurance ProgramsforNuclearPowerPlants19.Reg.Guide1.146{8/80)ANSIN45.2.23(1978)gualification ofgualityAssurance ProgramAuditPersonnel forNuclearPowerPlantsgualification ofgualityAssurance ProgramAuditPersonnel forNuclearPowerPlants1.7-96July,1993 20.ANSIN45.2.8(1975)Supplementary equalityAssurance Requirements forInstallation, Inspection andTestingofHechanical Equipment andSystemsfortheConstruction PhaseofNuclearPowerPlants21.ANSIN45.4(1972)Leakage-Rate TestingofContainment Structures forNuclearReactors1.7-97July,1993 APPENDIXBAEPSC/IBM EXCEPTIONS TOOPERATING PHASESTANDARDS ANDREGULATORY GUIDES1.GENERALCertainRegulatory Guidesinvoke,orimply,Regulatory Guidesandstandards inadditiontothestandardeachprimarily endorses.
2.N18.7, General~~Exce tion Inter retation AEPSC and ILM have established both an on-site and off-site standing committee for independent review activities; together they form the independent review body.The standard numeric and qualification requirement may not be met by each group individually.
CertainANSIStandards invoke,orimply,additional standards.
Procedures will be established to specify how each group will be involved in review activities.
ExcetionInterretationTheAEPSC/I&M commitment referstotheRegulatory GuidesandANSIStandards specifically identified inAppendixA.Additional Regulatory Guides,ANSIStandards andsimilardocuments implied,orreferenced, inthosespecifically identified arenotpartofthiscommitment.
This exception/interpretation is consistent with the plant's Technical Specifications.
2.N18.7,General~~ExcetionInterretationAEPSCandILMhaveestablished bothanon-siteandoff-sitestandingcommittee forindependent reviewactivities; togethertheyformtheindependent reviewbody.Thestandardnumericandqualification requirement maynotbemetbyeachgroupindividually.
1.7-98 July, 1993  
Procedures willbeestablished tospecifyhoweachgroupwillbeinvolvedinreviewactivities.
~~~~2a.Sec.4.3.1"Personnel assi gned responsibility for independent reviews shall be specified in both number and technical disciplines, and shall collectively have the experience and competence required to review problems in the following areas: Exce tion Inter retation AEPSC Nuclear Safety and Design Review Committee (NSDRC)and Plant Nuclear Safety Review Committee (PNSRC)will not have members specified by number, nor by technical disciplines, and its members may not have the experience and competence required to review problems in all areas listed in this section.This exception/interpretation is consistent with the plant's Technical Specifications.
Thisexception/interpretation isconsistent withtheplant'sTechnical Specifications.
The NSDRC and PNSRC will not specifically include a member qualified in nondestructive testing, but will use qualified technical consultants to perform this and other functions as determined necessary by the respective committee chairman.2b.Sec.4.3.2.1~R"When a standing committee is responsible for the independent review program, it shall be composed of no less than five persons of whom no more than a minority are members of the on-site operating organization.
1.7-98July,1993  
Competent alternates are permitted if designated in advance.The use of alternates shall be restricted to legitimate absences of principals." Exce tion Inter retation See Item 2a.1.7-99 July, 1993  
~~~~2a.Sec.4.3.1"Personnel assignedresponsibility forindependent reviewsshallbespecified inbothnumberandtechnical disciplines, andshallcollectively havetheexperience andcompetence requiredtoreviewproblemsinthefollowing areas:ExcetionInterretationAEPSCNuclearSafetyandDesignReviewCommittee (NSDRC)andPlantNuclearSafetyReviewCommittee (PNSRC)willnothavemembersspecified bynumber,norbytechnical disciplines, anditsmembersmaynothavetheexperience andcompetence requiredtoreviewproblemsinallareaslistedinthissection.Thisexception/interpretation isconsistent withtheplant'sTechnical Specifications.
TheNSDRCandPNSRCwillnotspecifically includeamemberqualified innondestructive testing,butwillusequalified technical consultants toperformthisandotherfunctions asdetermined necessary bytherespective committee chairman.
2b.Sec.4.3.2.1~R"Whenastandingcommittee isresponsible fortheindependent reviewprogram,itshallbecomposedofnolessthanfivepersonsofwhomnomorethanaminorityaremembersoftheon-siteoperating organization.
Competent alternates arepermitted ifdesignated inadvance.Theuseofalternates shallberestricted tolegitimate absencesofprincipals."
ExcetionInterretationSeeItem2a.1.7-99July,1993  
~~~~~2c.Sec.4.3.3.1"...recommendations
~~~~~2c.Sec.4.3.3.1"...recommendations
...shallbedisseminated promptlytoappropriate membersofmanagement havingresponsibility intheareareviewed."
...shall be disseminated promptly to appropriate members of management having responsibility in the area reviewed." Exce tion Inter retation Recommendations made as a result of review will generally be conveyed to the on-site, or off-site, standing committee.
ExcetionInterretationRecommendations madeasaresultofreviewwillgenerally beconveyedtotheon-site,oroff-site, standingcommittee.
Procedures will be maintained specifying how recommendations are to be considered.
Procedures willbemaintained specifying howrecommendations aretobeconsidered.
2d.Sec.4.3.4 Re uirement"The following subjects shall be reviewed by the independent review body: Exce tion Inter retation Subjects requiring review will be as specified in the plant Technical Specifications.
2d.Sec.4.3.4Reuirement"Thefollowing subjectsshallbereviewedbytheindependent reviewbody:ExcetionInterretationSubjectsrequiring reviewwillbeasspecified intheplantTechnical Specifications.
2e.Sec.4.3.4(3)~ll"Changes in the Technical Specifications or License Amendments relating to nuclear safety are to be reviewed by the independent review body prior to implementation, except in those cases where the change is identical to a previously reviewed proposed change." Exce ti on Inter retati on'lthough the usual practice i's to meet this requirement, exceptions are made to NSDRC review and approval prior to implementation in rare cases with the permission of the NSDRC Chairman and Secretary.
2e.Sec.4.3.4(3)~ll"ChangesintheTechnical Specifications orLicenseAmendments relatingtonuclearsafetyaretobereviewedbytheindependent reviewbodypriortoimplementation, exceptinthosecaseswherethechangeisidentical toapreviously reviewedproposedchange."ExcetionInterretation'lthoughtheusualpracticei'stomeetthisrequirement, exceptions aremadetoNSDRCreviewandapprovalpriortoimplementation inrarecaseswiththepermission oftheNSDRCChairmanandSecretary.
PNSRC review and approval is always done prior to implementation of Technical Specification changes.1.7-100 July, 1993  
PNSRCreviewandapprovalisalwaysdonepriortoimplementation ofTechnical Specification changes.1.7-100July,1993  


~~~2f.Sec.4.4"Theon-siteoperating organization shallprovide,aspartofthenormaldutiesofplantsupervisory personnel ExcetionInterretationSomeoftheresponsibilities oftheon-siteoperating organization described inSection4.4maybe'carriedoutbythePNSRCand/orNSDRCasdescribed inplantTechnical Specifications.
~~~2f.Sec.4.4"The on-site operating organization shall provide, as part of the normal duties of plant supervisory personnel Exce tion Inter retation Some of the responsibilities of the on-site operating organization described in Section 4.4 may be'carried out by the PNSRC and/or NSDRC as described in plant Technical Specifications.
2g.Sec.5.2.2~lt"Temporary changes,whichclearlydonotchangetheintentoftheapprovedprocedure, shallasaminimumbeapprovedbytwomembersoftheplantstaffknowledgeable intheareasaffectedbytheprocedures.
2g.Sec.5.2.2~lt"Temporary changes, which clearly do not change the intent of the approved procedure, shall as a minimum be approved by two members of the plant staff knowledgeable in the areas affected by the procedures.
Atleastoneoftheseindividuals shallbethesupervisor inchargeoftheshiftandholdasenioroperator's licenseontheunitaffected."
At least one of these individuals shall be the supervisor in charge of the shift and hold a senior operator's license on the unit affected." Exce tion Inter retation IM considers that this requirement applies only to procedures identified in plant Technical Specifications.
ExcetionInterretationIMconsiders thatthisrequirement appliesonlytoprocedures identified inplantTechnical Specifications.
Temporary changes to these procedures shall be approved as described in plant Technical Specifications.
Temporary changestotheseprocedures shallbeapprovedasdescribed inplantTechnical Specifications.
2h.Sec.5.2.6~lt"In cases where required documentary evidence is not available, the associated equipment or materials must be considered nonconforming in accordance with Section 5.2.14.Until suitable documentary evidence is available to show the equipment or material is in conformance, affected systems shall be considered to be inoperable and reliance shall not be placed on such systems to fulfill their intended safety functions." Exce tion Inter retation I&H initiates appropriate corrective action when it is discovered that documentary evidence does not exist for a test or inspection which is a 1.7-101 July, 1993  
2h.Sec.5.2.6~lt"Incaseswhererequireddocumentary evidenceisnotavailable, theassociated equipment ormaterials mustbeconsidered nonconforming inaccordance withSection5.2.14.Untilsuitabledocumentary evidenceisavailable toshowtheequipment ormaterialisinconformance, affectedsystemsshallbeconsidered tobeinoperable andrelianceshallnotbeplacedonsuchsystemstofulfilltheirintendedsafetyfunctions."
ExcetionInterretationI&Hinitiates appropriate corrective actionwhenitisdiscovered thatdocumentary evidencedoesnotexistforatestorinspection whichisa1.7-101July,1993  


requirement toverifyequipment acceptability.
requirement to verify equipment acceptability.
Thisactionincludesatechnical evaluation oftheequipment's operability status.I2i.Sec.5.2."Asurveillance testingandinspection program...shallincludetheestablishment ofamastersurveillance schedulereflecting thestatusofallplannedin-plantsurveillance testsandinspections."
This action includes a technical evaluation of the equipment's operability status.I 2i.Sec.5.2."A surveillance testing and inspection program...shall include the establishment of a master surveillance schedule reflecting the status of all planned in-plant surveillance tests and inspections." Exce tion Inter retation Separate master schedules may exist for different programs, such as ISI, pump and valve testing, and Technical Specification surveillance testing.2j.Sec.5.2.13.1"To the extent necessary, procurement documents shall require suppliers to provide a guality Assurance Program consistent with the pertinent requirements of ANSI N45.2-1977." Exce tion Inter retation To the extent necessary, procurement documents require that the supplier has a documented guali ty Assurance Program consistent with the pertinent.
ExcetionInterretationSeparatemasterschedules mayexistfordifferent
requirements of lOCFR50, Appendix B;ANSI N45.2;or other nationally recognized codes and standards.
: programs, suchasISI,pumpandvalvetesting,andTechnical Specification surveillance testing.2j.Sec.5.2.13.1"Totheextentnecessary, procurement documents shallrequiresuppliers toprovideagualityAssurance Programconsistent withthepertinent requirements ofANSIN45.2-1977."ExcetionInterretationTotheextentnecessary, procurement documents requirethatthesupplierhasadocumented gualityAssurance Programconsistent withthepertinent.
2k.Sec.5.2.13.2~ll ANSI N18.7 and N45.2.13 specify that where required by code, regulation, or contract, documentary evidence that items conform to procurement requirements shall be available at the nuclear power plant site prior to installation or use of such items.Exce tion Inter retation The required documentary evidence is available at the site prior to use, but not necessarily prior to installation.
requirements oflOCFR50,AppendixB;ANSIN45.2;orothernationally recognized codesandstandards.
This allows installation to 1.7-102 July, 1993  
2k.Sec.5.2.13.2~llANSIN18.7andN45.2.13specifythatwhererequiredbycode,regulation, orcontract, documentary evidencethatitemsconformtoprocurement requirements shallbeavailable atthenuclearpowerplantsitepriortoinstallation oruseofsuchitems.ExcetionInterretationTherequireddocumentary evidenceisavailable atthesitepriortouse,butnotnecessarily priortoinstallation.
Thisallowsinstallation to1.7-102July,1993  


proceedwhileanymissingdocuments arebeingobtained, butprecludes dependence ontheitemforsafetypurposes.
proceed while any missing documents are being obtained, but precludes dependence on the item for safety purposes.21.Sec.5.2.15"Plant procedures shall be reviewed by an individual knowledgeable in the area affected by the procedure no less frequently than every two years to determine if changes are necessary or desirable." Exce tion Inter retation Biennial reviews are not performed in that IEM has programmatic control requirements in place that make the biennial review process redundant from a regulatory perspective.
21.Sec.5.2.15"Plantprocedures shallbereviewedbyanindividual knowledgeable intheareaaffectedbytheprocedure nolessfrequently thaneverytwoyearstodetermine ifchangesarenecessary ordesirable."
These programmatic controls were effected in an effort to ensure that plant instructions and procedures are reviewed for possible revision when pertinent source material is revised, therefore maintaining the procedures current.We believe that this approach, in addition to an annual random sampling of procedures, better addresses the intent of the biennial review process and is more acceptable from both a technical and practical perspective than a static two-year review process.2m.Sec.5.2.16 Records shall be made, and equipment suitably marked, to indicate calibration status.Exce tion Inter retation See Item 6b.1.7-103 July, 1993  
ExcetionInterretationBiennialreviewsarenotperformed inthatIEMhasprogrammatic controlrequirements inplacethatmakethebiennialreviewprocessredundant fromaregulatory perspective.
~~~~2n.Sec.5.3.5(4)This section requires that where sections of documents such as vendor manuals, operating and maintenance instructions, or drawings are incorporated directly, or by reference into a maintenance procedure, they shall receive the same level of review and approval as operating procedures.
Theseprogrammatic controlswereeffectedinanefforttoensurethatplantinstructions andprocedures arereviewedforpossiblerevisionwhenpertinent sourcematerialisrevised,therefore maintaining theprocedures current.Webelievethatthisapproach, inadditiontoanannualrandomsamplingofprocedures, betteraddresses theintentofthebiennialreviewprocessandismoreacceptable frombothatechnical andpractical perspective thanastatictwo-yearreviewprocess.2m.Sec.5.2.16Recordsshallbemade,andequipment suitablymarked,toindicatecalibration status.ExcetionInterretationSeeItem6b.1.7-103July,1993  
Exce tion Inter retation Such documents are reviewed by appropriately qualified personnel prior to use to ensure that, when used as instructions, they provide proper and adequate information to ensure the required quality of work.Haintenance procedures which reference these documents receive the same level of review and approval as operating procedures.
~~~~2n.Sec.5.3.5(4)Thissectionrequiresthatwheresectionsofdocuments suchasvendormanuals,operating andmaintenance instructions, ordrawingsareincorporated
3.N45.2.1, 3a.Sec.3 N45.2.I establishes criteria for classifying items into"cleanliness levels," and requires that items be so classified.
: directly, orbyreference intoamaintenance procedure, theyshallreceivethesamelevelofreviewandapprovalasoperating procedures.
Exce tion Inter retation Instead of using the cleanliness level classification system of N45.2.1, the required cleanliness for specific items and activities is addressed on a case-by-case basis.Cleanliness is maintained, consistent with the work being performed, so as to prevent the introduction of foreign material.As a minimum, cleanliness inspections are performed prior to closure of"nuclear" systems and equipment.
ExcetionInterretationSuchdocuments arereviewedbyappropriately qualified personnel priortousetoensurethat,whenusedasinstructions, theyprovideproperandadequateinformation toensuretherequiredqualityofwork.Haintenance procedures whichreference thesedocuments receivethesamelevelofreviewandapprovalasoperating procedures.
Such inspections are documented.
3.N45.2.1,3a.Sec.3N45.2.Iestablishes criteriaforclassifying itemsinto"cleanliness levels,"andrequiresthatitemsbesoclassified.
1.7-104 July, 1993  
ExcetionInterretationInsteadofusingthecleanliness levelclassification systemofN45.2.1,therequiredcleanliness forspecificitemsandactivities isaddressed onacase-by-case basis.Cleanliness ismaintained, consistent withtheworkbeingperformed, soastopreventtheintroduction offoreignmaterial.
Asaminimum,cleanliness inspections areperformed priortoclosureof"nuclear" systemsandequipment.
Suchinspections aredocumented.
1.7-104July,1993  


~~3b.Sec.5"Fittingandtack-wel'ded joints(whichwillnotbeimmediately sealedbywelding)shallbewrappedwithpolyethylene orothernonhalogenated plasticfilmuntiltheweldscanbecompleted."
~~3b.Sec.5"Fitting and tack-wel'ded joints (which will not be immediately sealed by welding)shall be wrapped with polyethylene or other nonhalogenated plastic film unti l the welds can be completed." Exce tion Inter retation I&N sometimes uses other nonhalogenated material, compatible with the parent material, since plastic film is subject to damage and does not always provide adequate protection.
ExcetionInterretationI&Nsometimes usesothernonhalogenated
4.N45.2.2, General II N45.2.2 establishes requirements and criteria for classifying safety'j related items into protection levels.Exce ti on Inter retati on Instead of classifying safety.-;:,'related items into protection levels, controls over the packaging, shipping, handling and storage of such items are established on a case-by-case basis with due regard for the item's complexity, use and sensitivity to damage.Prior to installation or use, the items are inspected and serviced, as necessary, to assure that no damage or deterioration exists which could affect their function.4a.Sec.3.9 and Appendix A3.9~ll"The item and the outside of containers shall be marked." (Further criteria for marking and tagging are given in the Appendix.)
: material, compatible withtheparentmaterial, sinceplasticfilmissubjecttodamageanddoesnotalwaysprovideadequateprotection.
Exce tion Inter retation These requirements were originally written for items packaged and shipped to construction projects.Full compliance is not always necessary in the case of items shipped to operating plants and may, in some cases, 0 1.7-105 July, 1993 increase the probability of damage to the item.The requirements are implemented to the extent necessary to assure traceabi li ty and integrity of the item.4b.Sec.5.2.2"Receiving inspections shall be performed in an area equivalent to the level of storage." Exce tion Inter retation Receiving inspection area environmental controls may be less stringent than storage environmental requirements for an item.However, such inspections are performed in a manner and in an environment which do not endanger the required quality of the item.4c.Sec.6.2.4"The use or storage of food, drinks and salt tablet dispensers in any storage area shall not be permitted." Exce ti on Inter retati on Packaged food for emergency or extended overtime use may be stored in material stock rooms.The packaging assures that materials are not contaminated.
4.N45.2.2,GeneralIIN45.2.2establishes requirements andcriteriaforclassifying safety'jrelateditemsintoprotection levels.ExcetionInterretationInsteadofclassifying safety.-;:,'related itemsintoprotection levels,controlsoverthepackaging,
Food will not be"used" in these areas.4d.Sec.6.3.4~ll"All items and their containers shall be plainly marked so that they are easily identified without excessive handling or unnecessary opening of crates and boxes." Exce tion Inter retation See N45.2.2, Section 3.9 (Exception 4b.).1.7-106 July, 1993  
: shipping, handlingandstorageofsuchitemsareestablished onacase-by-case basiswithdueregardfortheitem'scomplexity, useandsensitivity todamage.Priortoinstallation oruse,theitemsareinspected andserviced, asnecessary, toassurethatnodamageordeterioration existswhichcouldaffecttheirfunction.
4a.Sec.3.9andAppendixA3.9~ll"Theitemandtheoutsideofcontainers shallbemarked."(FurthercriteriaformarkingandtaggingaregivenintheAppendix.)
ExcetionInterretationTheserequirements wereoriginally writtenforitemspackagedandshippedtoconstruction projects.
Fullcompliance isnotalwaysnecessary inthecaseofitemsshippedtooperating plantsandmay,insomecases,01.7-105July,1993 increasetheprobability ofdamagetotheitem.Therequirements areimplemented totheextentnecessary toassuretraceabilityandintegrity oftheitem.4b.Sec.5.2.2"Receiving inspections shallbeperformed inanareaequivalent tothelevelofstorage."
ExcetionInterretationReceiving inspection areaenvironmental controlsmaybelessstringent thanstorageenvironmental requirements foranitem.However,suchinspections areperformed inamannerandinanenvironment whichdonotendangertherequiredqualityoftheitem.4c.Sec.6.2.4"Theuseorstorageoffood,drinksandsalttabletdispensers inanystorageareashallnotbepermitted."
ExcetionInterretationPackagedfoodforemergency orextendedovertimeusemaybestoredinmaterialstockrooms.Thepackaging assuresthatmaterials arenotcontaminated.
Foodwillnotbe"used"intheseareas.4d.Sec.6.3.4~ll"Allitemsandtheircontainers shallbeplainlymarkedsothattheyareeasilyidentified withoutexcessive handlingorunnecessary openingofcratesandboxes."ExcetionInterretationSeeN45.2.2,Section3.9(Exception 4b.).1.7-106July,1993  
/t'  
/t'  
~~~~4e.Sec.6.4.1"Inspections andexaminations shallbeperformed anddocumented onaperiodicbasistoassurethattheintegrity oftheitemanditscontainer
~~~~4e.Sec.6.4.1" Inspections and examinations shall be performed and documented on a periodic basis to assure that the integrity of the item and its container...is being maintained." Exce tion Inter retation The requirement implies that all inspections and examinations of items in storage are to be performed on the same schedule.Instead, the inspections and examinations are performed in accordance with material storage procedures which identify the characteristics to be inspected and include the required frequencies.
...isbeingmaintained."
These procedures are based on technical considerations which recognize that inspections and frequencies needed vary from item to item.5.N45.2.3, 5a.Sec.2.1 Cleanliness requirements for housekeeping activities shall be established on the basis of five zone designations.
ExcetionInterretationTherequirement impliesthatallinspections andexaminations ofitemsinstoragearetobeperformed onthesameschedule.
Exce tion Inter retation Instead of the five-level zone designation system referenced in ANSI N45.2.3, I&M bases its controls over housekeeping activities on a consideration of what is necessary and appropriate for the activity involved.The controls are effected through procedures or instructions.
Instead,theinspections andexaminations areperformed inaccordance withmaterialstorageprocedures whichidentifythecharacteristics tobeinspected andincludetherequiredfrequencies.
Factors considered in developing the procedures and instructions include cleanliness control, personnel safety, fire prevention and protection, radiation control and secu>ity;The procedures and instructions-make use of standard janitorial and work practices to the extent possible.However, in preparing these procedures, consideration is also given to the recommendations of Section 2.1 of ANSI N45.2.3.1.7-107 July, 1993  
Theseprocedures arebasedontechnical considerations whichrecognize thatinspections andfrequencies neededvaryfromitemtoitem.5.N45.2.3,5a.Sec.2.1Cleanliness requirements forhousekeeping activities shallbeestablished onthebasisoffivezonedesignations.
~~~~6.N45.2.4, 6a.Sec.2.2 Section 2.2 establishes prerequi sites which must be met before the installation, inspections and testing of instrumentation and electrical equipment may proceed.These prerequisites include personnel qualification, control of design, conforming and protected materials and availability of specified documents.
ExcetionInterretationInsteadofthefive-level zonedesignation systemreferenced inANSIN45.2.3,I&Mbasesitscontrolsoverhousekeeping activities onaconsideration ofwhatisnecessary andappropriate fortheactivityinvolved.
Exce tion Inter retation During the operations phase, this requirement is considered to be applicable to modifications and initial start-up of electrical equipment.
Thecontrolsareeffectedthroughprocedures orinstructions.
For routine or periodic inspection and testing, the prerequisite conditions will be achieved, as necessary.
Factorsconsidered indeveloping theprocedures andinstructions includecleanliness control,personnel safety,fireprevention andprotection, radiation controlandsecu>ity; Theprocedures andinstructions-makeuseofstandardjanitorial andworkpractices totheextentpossible.
6b.Sec.6.2.1~lt"Items requiring calibration shall be tagged or labeled on completion, indicating date of calibration and identity of person that performed calibration.
However,inpreparing theseprocedures, consideration isalsogiventotherecommendations ofSection2.1ofANSIN45.2.3.1.7-107July,1993  
" Exce ti on Inter retati on Frequently, physical size and/or location of installed plant instrumentation precludes attachment of calibration labels or tags.Instead, each instrument is uniquely identified and is traceable to its cal ibrati on record.A scheduled calibration program assures that each instrument's calibration is current.7.N45.2.5, 7a.Sec.2.5.2"When discrepancies, malfunctions or inaccuracies in inspection and testing equipment are found during calibration, all items inspected with 1.7-108 July, 1993 that equipment since the last previous calibration shall be considered unacceptable until an evaluation has been made by the responsible authori ty and appropr'i ate acti on taken." Exce tion Inter retation I&H uses the requirements of N18.7, Section 5.2.16, rather than N45.2.5, Section 2.5.2.The N18.7 requirements are more applicable to an operating plant.7b.Sec.5.4~ll"Hand torque wrenches used for inspection shall be controlled and must be calibrated at least weekly and more often if deemed necessary.
~~~~6.N45.2.4,6a.Sec.2.2Section2.2establishes prerequisiteswhichmustbemetbeforetheinstallation, inspections andtestingofinstrumentation andelectrical equipment mayproceed.Theseprerequisites includepersonnel qualification, controlofdesign,conforming andprotected materials andavailability ofspecified documents.
Impact torque wrenches used for inspection must be calibrated at least twice daily." Exce ti on Inter retation Torque wrenches are controlled as measuring and test equipment in accordance with ANSI N18.7, Section 5.2.16.Calibration intervals are based on use and calibration history rather than as per N45.2.5.8.N45.2.6, Sec.1.2"The requirements of this standard apply to personnel who perform inspections, examinations and tests during fabrication prior to or during receipt of items at the construction site, during construction, during preoperational and start-up testing and during operational phases of nuclear power plants." Exce tion Inter retation Personnel participating in testing who take data or make observations, where special training is not required to perform this function, need not be qualified in accordance with ANSI N45.2.6, but need only be trained to the extent necessary to perform the assigned function.1.7-109 July, 1993  
ExcetionInterretationDuringtheoperations phase,thisrequirement isconsidered tobeapplicable tomodifications andinitialstart-upofelectrical equipment.
Forroutineorperiodicinspection andtesting,theprerequisite conditions willbeachieved, asnecessary.
6b.Sec.6.2.1~lt"Itemsrequiring calibration shallbetaggedorlabeledoncompletion, indicating dateofcalibration andidentityofpersonthatperformed calibration.
"ExcetionInterretationFrequently, physicalsizeand/orlocationofinstalled plantinstrumentation precludes attachment ofcalibration labelsortags.Instead,eachinstrument isuniquelyidentified andistraceable toitscalibrationrecord.Ascheduled calibration programassuresthateachinstrument's calibration iscurrent.7.N45.2.5,7a.Sec.2.5.2"Whendiscrepancies, malfunctions orinaccuracies ininspection andtestingequipment arefoundduringcalibration, allitemsinspected with1.7-108July,1993 thatequipment sincethelastpreviouscalibration shallbeconsidered unacceptable untilanevaluation hasbeenmadebytheresponsible authorityandappropr'i ateactiontaken."ExcetionInterretationI&Husestherequirements ofN18.7,Section5.2.16,ratherthanN45.2.5,Section2.5.2.TheN18.7requirements aremoreapplicable toanoperating plant.7b.Sec.5.4~ll"Handtorquewrenchesusedforinspection shallbecontrolled andmustbecalibrated atleastweeklyandmoreoftenifdeemednecessary.
Impacttorquewrenchesusedforinspection mustbecalibrated atleasttwicedaily."ExcetionInterretationTorquewrenchesarecontrolled asmeasuring andtestequipment inaccordance withANSIN18.7,Section5.2.16.Calibration intervals arebasedonuseandcalibration historyratherthanasperN45.2.5.8.N45.2.6,Sec.1.2"Therequirements ofthisstandardapplytopersonnel whoperforminspections, examinations andtestsduringfabrication priortoorduringreceiptofitemsattheconstruction site,duringconstruction, duringpreoperational andstart-uptestingandduringoperational phasesofnuclearpowerplants."ExcetionInterretationPersonnel participating intestingwhotakedataormakeobservations, wherespecialtrainingisnotrequiredtoperformthisfunction, neednotbequalified inaccordance withANSIN45.2.6,butneedonlybetrainedtotheextentnecessary toperformtheassignedfunction.
1.7-109July,1993  


gRe.Guide1.58-Generalgualificationofnuclearpowerplantinspection, examination andtestingpersonnel.
g Re.Guide 1.58-General gualifi cation of nuclear power plant inspection, examination and testing personnel.
9a.C.2.a(7)Regulatory Guide1.58endorsestheguidelines ofSNT-TC-1A asanacceptable methodoftrainingandcertifying personnel conducting leak'tests.ExcetionInterretationIMtakestheposition, thatthe"Level"designation guidelines asrecommended inSNT-TC-lA, paragraph 4donotnecessarily assureadequateleaktestcapability.
9a.C.2.a(7)Regulatory Guide 1.58 endorses the guidelines of SNT-TC-1A as an acceptable method of training and certifying personnel conducting leak'tests.Exce ti on Inter retati on IM takes the position, that the"Level" designation guidelines as recommended in SNT-TC-lA, paragraph 4 do not necessarily assure adequate leak test capability.
I&Mmaintains thatdepartmental supervisors arebestabletojudgewhetherengineers andotherpersonnel arequalified todirectand/orperformleaktests.Therefore, I&Ndoesnotimplement therecommended "Level"designation guidelines.
I&M maintains that departmental supervisors are best able to judge whether engineers and other personnel are qualified to direct and/or perform leak tests.Therefore, I&N does not implement the recommended"Level" designation guidelines.
ItisI&M'sopinionthatthetrainingguidelines ofSNT-TC-1A, TableI-G,paragraph 5.2specifically areorientedtowardsthebasicphysicsinvolvedinleaktesting,andfurther,towardsindividuals whoarenotgraduateengineers.
It is I&M's opinion that the training guidelines of SNT-TC-1A, Table I-G, paragraph 5.2 specifically are oriented towards the basic physics involved in leak testing, and further, towards individuals who are not graduate engineers.
I&Mmaintains thatitmeetstheessenceofthesetrainingguidelines.
I&M maintains that it meets the essence of these training guidelines.
Thepreparation ofleaktestprocedures andtheconductofleaktestsatCookNuclearPlantisunderthedirectsupervision ofPerformance Engineers whoholdengineering degreesfromaccredited engineering schools.Thebasicphysicsofleaktestinghavebeenincorporated intotheapplicable testprocedures.
The preparation of leak test procedures and the conduct of leak tests at Cook Nuclear Plant is under the direct supervision of Performance Engineers who hold engineering degrees from accredited engineering schools.The basic physics of leak testing have been incorporated into the applicable test procedures.
Thereviewandapprovalofthedataobtainedfromleaktestsisperformed bydepartment supervisors whoarealsograduateengineers.
The review and approval of the data obtained from leak tests is performed by department supervisors who are also graduate engineers.
IMdoesrecognize theneedtoassurethatindividuals involvedinleaktestsarefullycognizant ofleaktestprocedural requirements andthoroughly familiarwiththetestequipment involved.
IM does recognize the need to assure that individuals involved in leak tests are fully cognizant of leak test procedural requirements and thoroughly fami liar with the test equipment involved.Plant performance engineers receive routine, informal orientation on testing programs to 1.7-110 July, 1993 ensure that these individuals fully understand the requirements of performing a leak test.9b.C5, C6, C7, CS, C10 Exce tion Inter retation I&M takes the position that the classification of inspection, examination and test personnel (inspection personnel) into"Levels" based on the requirements stated in Section 3.0 of ANSI N45.2.6 does not necessarily assure adequate inspection capability.
Plantperformance engineers receiveroutine,informalorientation ontestingprogramsto1.7-110July,1993 ensurethattheseindividuals fullyunderstand therequirements ofperforming aleaktest.9b.C5,C6,C7,CS,C10ExcetionInterretationI&Mtakesthepositionthattheclassification ofinspection, examination andtestpersonnel (inspection personnel) into"Levels"basedontherequirements statedinSection3.0ofANSIN45.2.6doesnotnecessarily assureadequateinspection capability.
I&M maintains that departmental and first line supervisors are best able to judge the inspection capability of the personnel under their supervi sion, and that"Level" classification would require an overly burdensome administrative work load, could inhibit inspection activities, and provides no assurance of inspection capabilities.
I&Mmaintains thatdepartmental andfirstlinesupervisors arebestabletojudgetheinspection capability ofthepersonnel undertheirsupervision,andthat"Level"classification wouldrequireanoverlyburdensome administrative workload,couldinhibitinspection activities, andprovidesnoassurance ofinspection capabilities.
Therefore, I&M does not implement the"Level" classification concept for inspection, examination and test personnel.
Therefore, I&Mdoesnotimplement the"Level"classification conceptforinspection, examination andtestpersonnel.
The methodology under which inspections, examinations and tests are conducted at the Cook Nuclear Plant requires the involvement of first line supervisors, engineering personnel, departmental supervisors and plant management.
Themethodology underwhichinspections, examinations andtestsareconducted attheCookNuclearPlantrequirestheinvolvement offirstlinesupervisors, engineering personnel, departmental supervisors andplantmanagement.
In essence, the last seven (7)project functions shown in Table 1 to ANSI N45.2.6 are assigned to supervisory and engineering personnel, and not to personnel of the inspector category.These management supervisory and engineering personnel, as a minimum, meet the educational and experience requirements of"Level II and Level III" personnel, as required, to meet the criteria of ANSI 18.1 which exceeds those of ANSI N45.2.6.In I&M's opinion, no useful purpose is served by classification of management, supervisory and engineering personnel into"Levels." Therefore, I&M takes the following positions relative to regulatory positions C5, 6, 7, 8 and 10 of Regulatory Guide 1.58.C-5 Based on the discussion in 9b, this position is not applicable to the Cook Nuclear Plant.1.7-111 July, 1993 C-6 Replacement personnel for Cook Nuclear Plant management, supervisory and engineering posi tions subject to ANSI 18.1 will meet the educational and experience requirements of ANSI 18.1 and therefore, those of ANSI N45.2.6.Replacement inspection personnel will, as a minimum, meet the educational and experience requirements of ANSI N45.2.6, Section 3.5.1-"Level I." C-7 I&M, as a general practice, complies with the training recommendations as set forth in this regulatory position.C-8 All I&M inspection, examination and test personnel are instructed in the normal course of employee training in radiation protection and the means to minimize radiation dose exposure.C-10 I&M maintains documentation to show that inspection personnel meet the minimum requirements of"Level I," and that management, supervisory and engineering personnel meet the minimum requirements of ANSI 18.1.10.N45.2.8, 10a.Sec.2.9e~Ri t Section 2.9e of N45.2.8.lists documents relating to the specific stage of installation activity which are to be available at the construction site.Exce tion Inter retation All of the documents listed are not necessarily required at the construction site for installation and testing.AEPSC and I&M assure that they are available to the site, as necessary.
Inessence,thelastseven(7)projectfunctions showninTable1toANSIN45.2.6areassignedtosupervisory andengineering personnel, andnottopersonnel oftheinspector category.
1.7-112 July, 1993  
Thesemanagement supervisory andengineering personnel, asaminimum,meettheeducational andexperience requirements of"LevelIIandLevelIII"personnel, asrequired, tomeetthecriteriaofANSI18.1whichexceedsthoseofANSIN45.2.6.InI&M'sopinion,nousefulpurposeisservedbyclassification ofmanagement, supervisory andengineering personnel into"Levels."
Therefore, I&Mtakesthefollowing positions relativetoregulatory positions C5,6,7,8and10ofRegulatory Guide1.58.C-5Basedonthediscussion in9b,thispositionisnotapplicable totheCookNuclearPlant.1.7-111July,1993 C-6Replacement personnel forCookNuclearPlantmanagement, supervisory andengineering positionssubjecttoANSI18.1willmeettheeducational andexperience requirements ofANSI18.1andtherefore, thoseofANSIN45.2.6.Replacement inspection personnel will,asaminimum,meettheeducational andexperience requirements ofANSIN45.2.6,Section3.5.1-"LevelI."C-7I&M,asageneralpractice, complieswiththetrainingrecommendations assetforthinthisregulatory position.
C-8AllI&Minspection, examination andtestpersonnel areinstructed inthenormalcourseofemployeetraininginradiation protection andthemeanstominimizeradiation doseexposure.
C-10I&Mmaintains documentation toshowthatinspection personnel meettheminimumrequirements of"LevelI,"andthatmanagement, supervisory andengineering personnel meettheminimumrequirements ofANSI18.1.10.N45.2.8,10a.Sec.2.9e~RitSection2.9eofN45.2.8.listsdocuments relatingtothespecificstageofinstallation activitywhicharetobeavailable attheconstruction site.ExcetionInterretationAllofthedocuments listedarenotnecessarily requiredattheconstruction siteforinstallation andtesting.AEPSCandI&Massurethattheyareavailable tothesite,asnecessary.
1.7-112July,1993  


10b.Sec.2.9e~REvidencethatengineering ordesignchangesaredocumented andapprovedshallbeavailable attheconstruction sitepriortoinstallation.
10b.Sec.2.9e~R Evidence that engineering or design changes are documented and approved shall be available at the construction site prior to installation.
ExcetionInterretationEquipment maybeinstalled beforefinalapprovalofengineering ordesignchanges.However,thesystemisnotplacedintoserviceuntilsuchchangesaredocumented andapproved.
Exce tion Inter retation Equipment may be installed before final approval of engineering or design changes.However, the system is not placed into service until such changes are documented and approved.10c.Sec.4.5.1~R" Installed systems and components shall be cleaned, flushed conditioned according to the requirements of ANSI N45.2.1.consideration shall be given to the following requirements: (Requirements are given for chemical conditioning, flushing controls.)
10c.Sec.4.5.1~R"Installed systemsandcomponents shallbecleaned,flushedconditioned according totherequirements ofANSIN45.2.1.consideration shallbegiventothefollowing requirements:
and Special and processExce tion Inter retation Systems and components are cleaned, flushed and conditioned as determined on a case-by-case basis.Measures are taken to help preclude the need for cleaning, flushing and conditioning through good practices during maintenance or modification activities.
(Requirements aregivenforchemicalconditioning, flushingcontrols.)
I.7-113 July, 1993 11.N45.2.9 lla.Sec.5.4, Item 2 Records shall not be stored loosely."They shall be firmly attached in binders or placed in folders or envelopes for storage on shelving in containers." Steel file cabinets are preferred.
andSpecialandprocessExcetionInterretationSystemsandcomponents arecleaned,flushedandconditioned asdetermined onacase-by-case basis.Measuresaretakentohelpprecludetheneedforcleaning, flushingandconditioning throughgoodpractices duringmaintenance ormodification activities.
Exce tion Inter retation Records are suitably stored in steel file cabinets, or on shelving in containers.
I.7-113July,1993 11.N45.2.9lla.Sec.5.4,Item2Recordsshallnotbestoredloosely."Theyshallbefirmlyattachedinbindersorplacedinfoldersorenvelopes forstorageonshelvingincontainers."
Methods other than binders, folders, or envelopes (for example, dividers)may be used to organize the records for storage.lib.Sec.6.2~ll"A list shall be maintained designating those personnel who shall have access to the files".Exce tion Inter retation Rules are established governing access to and control of files as provided for in ANSI N45.2.9, Section 5.3, Item 5.These rules do not always include a requirement for a list of personnel who are authorized access.It should be noted that duplicate files and/or microforms may exist for general use.11c.Sec.5.6~R When a single records storage facility is maintained, at least the following features should be considered in its construction:
Steelfilecabinetsarepreferred.
etc.Exce ti on Inter retati on The Cook Nuclear Plant Naster File Room and other off-site record storage facilities comply with the requirements of NUREG-0800 (7/81), Section 17.1.17.4.
ExcetionInterretationRecordsaresuitablystoredinsteelfilecabinets, oronshelvingincontainers.
1.7-114 July, 1993  
Methodsotherthanbinders,folders,orenvelopes (forexample,dividers) maybeusedtoorganizetherecordsforstorage.lib.Sec.6.2~ll"Alistshallbemaintained designating thosepersonnel whoshallhaveaccesstothefiles".ExcetionInterretationRulesareestablished governing accesstoandcontroloffilesasprovidedforinANSIN45.2.9,Section5.3,Item5.Theserulesdonotalwaysincludearequirement foralistofpersonnel whoareauthorized access.Itshouldbenotedthatduplicate filesand/ormicroforms mayexistforgeneraluse.11c.Sec.5.6~RWhenasinglerecordsstoragefacilityismaintained, atleastthefollowing featuresshouldbeconsidered initsconstruction:
etc.ExcetionInterretationTheCookNuclearPlantNasterFileRoomandotheroff-siterecordstoragefacilities complywiththerequirements ofNUREG-0800 (7/81),Section17.1.17.4.
1.7-114July,1993  


12.Re.Guide1.144ANSIN45.2.1212a.Sec.C3a(2)Applicable elementsofanorganization's gualityAssurance Programfor"designandconstruction phaseactivities shouldbeauditedatleastannuallyoratleastoncewithinthelifeoftheactivity, whichever isshorter."
12.Re.Guide 1.144 ANSI N45.2.12 12a.Sec.C3a(2)Applicable elements of an organization's guality Assurance Program for"design and construction phase activities should be audited at least annually or at least once within the life of the activity, whichever is shorter." Exce tion Inter retation Since most modifications are straight forward, they are not audited individually.
ExcetionInterretationSincemostmodifications arestraightforward,theyarenotauditedindividually.
Instead, selected controls over modifications are audited periodically.
Instead,selectedcontrolsovermodifications areauditedperiodically.
12b.Sec.C3b(1)~lt This section identifies procurement contracts which are exempted from being audited.Exce tion Inter retation In addition to the exemptions of Reg.Guide).144, AEPSC/18M considers that the National Institute of Standards and Technology, or other State and Federal Agencies which may provide services to AEPSC/IEN, are not required to be audited.12c.Sec.4.5.1~ll Responses to adverse audit findings, giving results of the review and investigation, shall clearly state the corrective action taken or planned to prevent recurrence."In the event that corrective action cannot be completed within thirty days, the audited organization's response shall include a scheduled date for the corrective action." 1.7-115 July, 1993 Exce ti on Inter retati on AEPSC/I&M take the position that certain circumstances warrant more than thirty (30)days to completely investigate the cause and/or total impact of an adverse finding.For these circumstances, an initial thirty (30)day response will be provided which addresses a schedule for known corrective actions, the reason why additional investigation time is needed, and a schedule for completion of the investigation.
12b.Sec.C3b(1)~ltThissectionidentifies procurement contracts whichareexemptedfrombeingaudited.ExcetionInterretationInadditiontotheexemptions ofReg.Guide).144,AEPSC/18M considers thattheNationalInstitute ofStandards andTechnology, orotherStateandFederalAgencieswhichmayprovideservicestoAEPSC/IEN, arenotrequiredtobeaudited.12c.Sec.4.5.1~llResponses toadverseauditfindings, givingresultsofthereviewandinvestigation, shallclearlystatethecorrective actiontakenorplannedtopreventrecurrence.
These initial responses require the approval of the Director-guali ty Assurance.
"Intheeventthatcorrective actioncannotbecompleted withinthirtydays,theauditedorganization's responseshallincludeascheduled dateforthecorrective action."1.7-115July,1993 ExcetionInterretationAEPSC/I&M takethepositionthatcertaincircumstances warrantmorethanthirty(30)daystocompletely investigate thecauseand/ortotalimpactofanadversefinding.Forthesecircumstances, aninitialthirty(30)dayresponsewillbeprovidedwhichaddresses ascheduleforknowncorrective actions,thereasonwhyadditional investigation timeisneeded,andascheduleforcompletion oftheinvestigation.
13.N45.2.13, 13a.Sec.3.2.2 N45.2.13 requires that technical requirements be specified in procurement documents b reference to technical requirement documents.
Theseinitialresponses requiretheapprovaloftheDirector-gualityAssurance.
Technical requirement documents are-to be prepared, reviewed and released under the requirements established by ANSI N45.2.11.Exce ti on Inter retati on For replacement parts and materials, AEPSC/IN follow ANSI N18.7, Section 5.2.13, Subitem 1, which states: "Where the original item or part is found to be commercially
13.N45.2.13,13a.Sec.3.2.2N45.2.13requiresthattechnical requirements bespecified inprocurement documents breference totechnical requirement documents.
'off the shelf'r without specifically identified gA requirements, spare and replacement parts may be similarly procured, but care shall be exercised to ensure at least equivalent performance." 13b.Sec.3.2.3~ll"Procurement documents shall require that the supplier have a documented guali ty Assurance Program that implements parts or all of ANSI N45.2 as well as applicable guality Assurance Program requirements of other nationally recognized codes and standards." 1.7-116 July, 1993 t
Technical requirement documents are-tobeprepared, reviewedandreleasedundertherequirements established byANSIN45.2.11.ExcetionInterretationForreplacement partsandmaterials, AEPSC/INfollowANSIN18.7,Section5.2.13,Subitem1,whichstates:"Wheretheoriginalitemorpartisfoundtobecommercially
Exce ti on Inter retati on Refer to Item 2j 13c.Sec.3.3(a)Reviews of procurement documents shall be performed prior to release for bid and contract award.Exce tion Inter retation-Documents may be released for bid or contract award before completing the necessary reviews.However, these reviews are completed before the item or service is put into service, or before work has progressed beyond the point where it would be impractical to reverse the action taken.13d.Sec.3.3(b)Review of changes to procurement documents shall be performed prior to release for bid and contract award.Exce tion Inter retation This requirement applies only to quality related changes (i.e., changes to the procurement document provisions identified in ANSI N18.7, Section 5.2.13.1, Subi tems 1 through 5).The timing of reviews will be the same as for review of the original procurement documents.
'offtheshelf'rwithoutspecifically identified gArequirements, spareandreplacement partsmaybesimilarly
13e.Sec.10.1~R"Where required by code, regulation, or contract requirement, documentary evidence that items conform to procurement documents shall be available at the nuclear power plant site prior to installation or use of such items, regardless of acceptance methods." 1.7-117 July, 1993 Exce tion Inter retation Refer to Item 2k."Post-installation test requirements and acceptance documentation shall be mutually established by the purchaser and supplier." Exce tion Inter retation In exercising its ultimate responsibility for its guality Assurance Program, AEPSC/IEH establishes post-installation test requirements giving due consi derati on to supplier recommendations.
: procured, butcareshallbeexercised toensureatleastequivalent performance."
14.Re.Guide 1.146 ANSI N45.2.23 and ANSI N45.2.2.12 14a.ANSI N45.2.23 Sec.1.1~R This standard provides requirements and guidance for the qualification of audit team leaders, henceforth identified as"lead auditors." 14b.ANSI N45.2.12, Sec.4.2.2 A lead auditor shall be appointed team leader.Exce tion Inter retation The AEPSC audit program is directed by the AEPSC Director-guality Assurance and is administered by designated gA Division section managers/supervisor who are certified lead auditors.Audits are, in most cases, conducted by individual auditors, not by"audit teams." These auditors are certified in accordance with established procedures and are assigned by the responsible gA section manager/supervisor based on their demonstrated audit capability and general knowledge of the audit subject.In certain cases, this results in an individual other than a"lead auditor" conducting the actual audit function.1.7-118 July, 1993  
13b.Sec.3.2.3~ll"Procurement documents shallrequirethatthesupplierhaveadocumented gualityAssurance Programthatimplements partsorallofANSIN45.2aswellasapplicable gualityAssurance Programrequirements ofothernationally recognized codesandstandards."
1.7-116July,1993 t
ExcetionInterretationRefertoItem2j13c.Sec.3.3(a)Reviewsofprocurement documents shallbeperformed priortoreleaseforbidandcontractaward.ExcetionInterretation-Documents maybereleasedforbidorcontractawardbeforecompleting thenecessary reviews.However,thesereviewsarecompleted beforetheitemorserviceisputintoservice,orbeforeworkhasprogressed beyondthepointwhereitwouldbeimpractical toreversetheactiontaken.13d.Sec.3.3(b)Reviewofchangestoprocurement documents shallbeperformed priortoreleaseforbidandcontractaward.ExcetionInterretationThisrequirement appliesonlytoqualityrelatedchanges(i.e.,changestotheprocurement documentprovisions identified inANSIN18.7,Section5.2.13.1,Subitems1through5).Thetimingofreviewswillbethesameasforreviewoftheoriginalprocurement documents.
13e.Sec.10.1~R"Whererequiredbycode,regulation, orcontractrequirement, documentary evidencethatitemsconformtoprocurement documents shallbeavailable atthenuclearpowerplantsitepriortoinstallation oruseofsuchitems,regardless ofacceptance methods."
1.7-117July,1993 ExcetionInterretationRefertoItem2k."Post-installation testrequirements andacceptance documentation shallbemutuallyestablished bythepurchaser andsupplier."
ExcetionInterretationInexercising itsultimateresponsibility foritsgualityAssurance Program,AEPSC/IEH establishes post-installation testrequirements givingdueconsiderationtosupplierrecommendations.
14.Re.Guide1.146ANSIN45.2.23andANSIN45.2.2.1214a.ANSIN45.2.23Sec.1.1~RThisstandardprovidesrequirements andguidanceforthequalification ofauditteamleaders,henceforth identified as"leadauditors."
14b.ANSIN45.2.12, Sec.4.2.2Aleadauditorshallbeappointed teamleader.ExcetionInterretationTheAEPSCauditprogramisdirectedbytheAEPSCDirector-gualityAssurance andisadministered bydesignated gADivisionsectionmanagers/supervisor whoarecertified leadauditors.
Auditsare,inmostcases,conducted byindividual
: auditors, notby"auditteams."Theseauditorsarecertified inaccordance withestablished procedures andareassignedbytheresponsible gAsectionmanager/supervisor basedontheirdemonstrated auditcapability andgeneralknowledge oftheauditsubject.Incertaincases,thisresultsinanindividual otherthana"leadauditor"conducting theactualauditfunction.
1.7-118July,1993  


Established AEPSCauditprocedures requirethat,inallcases,theauditfunctions ofpreparation/organization, reporting ofauditfindingsandevaluation ofcorrective actionsbereviewedbygADivisionsectionmanagers/supervisor, therebymeetingtherequirements ofANSIN45.2.23relativeto"leadauditors",
Established AEPSC audit procedures require that, in all cases, the audit functions of preparation/organization, reporting of audit findings and evaluation of corrective actions be reviewed by gA Division section managers/supervisor, thereby meeting the requirements of ANSI N45.2.23 relative to"lead auditors", and"audit team leaders." 1.7-119 July, 1993  
and"auditteamleaders."
~t I I~}}
1.7-119July,1993  
~tII~}}

Revision as of 07:34, 6 July 2018

Updated QA Program Description for Cook Nuclear Plant.
ML17331A312
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/31/1993
From: BARRY P C, FITZPATRICK E, SMITH W G
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17331A311 List:
References
NUDOCS 9305190223
Download: ML17331A312 (164)


Text

DONALD C.COOK NUCLEAR PLANT COOK NUCLEAR PLANT UNIT NUMBERS 1 AND 2 DOCKET NOS.50-135 AND 50-316 LICENSE NOS.DPR-58 AND DPR-74 UPDATED EQUALITY ASSURANCE PROGRAM DESCRIPTION FOR THE COOK NUCLEAR PIANT JULY, 3993 Concurred by:~AJ AEPSC Chi ef Nucl ear Engi ne Date: AEPSC Vice Pre dent-Nuclear Operations

~/io jVZ Date: Approved by: AEPSC Director-ua1ity Assurance Date: W/4305190223 930510 PDR ADQCN 05000315 P PDR Section EQUALITY ASSURANCE PROGRAM DESCRIPTION FOR THE COOK NUCLEAR PLANT TABLE OF CONTENTS Ti tl e Table of Contents Pacae No.1.7 1.7.1 1.7.2 1.7.3 1.7.4 1.7.5 1.7.6 1.7.7 1.7.8 1.7.9 1.7.10 1.7.11 1.7.12 1.7.13 1.7.14 1.7.15 1.7.16 1.7.17 1.7.18 1.7.19 Appendix A Appendix B Statement of Policy for the Donald C.Cook Nuclear Plant guality Assurance Program.Organization guali ty Assurance Program..Design Control Procurement Document Control Instructions, Procedures, and Drawings Document Control 1.7-1 1.7-4 1.7-2,9 1.7-37 1.7-43 1.7-46 1.7-49 Control of Purchased Items and Services..........1.7-51 Identification and Control of Items..Control of Special Processes Inspection Test Control Control of Measuring and Test Equipment....Handling, Storage and Shipping Inspection, Test and Operating Status.Nonconforming Items..Corrective Action.1.7-56 1.7-57 1.7-60 1.7-64 1.7-66 1.7-68 1.7-70~~~~~~1 e7o72 1.7-73 udits A Fire Protection gA Program Figure 1.7-1 Figure 1.7-2 Figure 1.7-3 Figure 1.7-4.1 0~~~~~t~~1~~~~Figure 1.7-5 Regulatory and Safety Guide/ANSI Standards AEPSC/IEM Exceptions to Operating Phase Standard and Regulatory Guides.1.7-77 1.7-81 1.7-88 1.7-89 1.7-90 1.7-91 1.7-92 1.7-93 1.7.98 guali ty Assurance Records.................1.7-75 American Electric Power Service Corporation 1 Riverside Plaza Columbus.OH 43215 614 223 1000~SF ANERlC'AN ELECTRIC POMfER STATEMENT OF POLICY FOR THE DONALD C.COOK NUCLEAR PLANT EQUALITY ASSURANCE PROGRAM POLICY American Electric Power Company Inc., recognizes the fundamental importance of controlling the design, modification, and operation of Indiana Michigan Power Company's Donald C.Cook Nuclear Plant (Cook Nuclear Plant)by implementing a planned and documented guality Assurance Program, including equality Control, that complies with applicable regulations, codes, and standards.

The guality Assurance Program has been established to control activities affecting safety-related functions of structures, systems, and components in the Cook Nuclear Plant.The guality Assurance Program supports the goal of maintaining the safety and reliability of the Cook Nuclear Plant at the highest level through a systematic program designed to assure that a j'ti V'iaaf'i'."e3~lkf'fect3j'i'j safety-related giTincBon's are conducted in compliance w'i th the appl i cabl e regul ati ons, codes, standards, and establ i shed corporate policies and practices.

As Chairman of the'Board and Chief Executive Officer of American Electric Power Company, Inc., I maintain the ultimate responsibility for the guality Assurance Program associated with the Cook Nuclear Plant.I have del egated responsi bi 1 i ti es~for~;::implefitentat'i;in.-:;.'.og:;";Laftd);,eoiapl jaic~e4Hi,th.;:::

%~he,,:,:q9NÃt>YAssuraÃce."::.Prrtg~ram~

as'outlined in this statemenf.'MPLEMENTATION The AEPSC Director-guality Assurance, under illy.direction, has been assigned the overall responsibility for specifying the guali ty Assurance Program requirements for the Cook Nuclear Plant and verifying their implementation.

The AEPSC Director-guality Assurance has authority to stop work on any activity affecting safety-related items that does not meet applicable administrative, technical, and/or regulatory requirements.

The AEPSC Director-guality Assurance does not have the authori ty to stop unit operations, but shall notify appropriate plant and/or corporate management of conditions not meeting the aforementioned criteria and recommend that unit operations be terminated.

Revised: 5/3/93 1.7-1 July, 1993 Statement of Policy for the Donald C.Cook Nuclear Plant Qua1i ty Assurance Program Page 2 The AEPSC Vice President-Nuclear Operations, under my,.direction, has been delegated responsibility for effectively implementing the Quality Assurance Program.The AEPSC Vice President-Nuclear Operations is the Manager of Nuclear Operations.

All other AEPSC divisions and departments, except Quality Assurance, having a supporting role for the Cook Nuclear Plant are functionally responsible to the Manager of Nuclear Operations.

The Plant Manager, under the direction of the AEPSC Vice President-Nuclear Operations, is delegated the responsibility for establishing the Cook Nuclear Plant Quality Control Program and implementing the Quality Assurance Program at the Cook Nuclear Plant.The AEPSC Director-Quality Assurance is responsible for providing technical direction to the Plant Manager for matters relating to the Quality Assurance Program at the Cook Nuclear Plant.The AEPSC Director-Quality Assurance is also responsible for maintaining a Quality Assurance Section at the Cook Nuclear Plant to perform required reviews, audits, and survei llances, and to provide technical liaison services to the Plant Manager.The implementation of the Quality Assurance Program is described in the AEPSC General Procedures (GPs)and subtier department/division procedures, Plant Manager's Instructions (PMIs), and subtier Department Head Instructions and Procedures, which in total document the requirements for implementation of the Program.Each AEPSC and Cook Nuclear Plant organization involved in activities affecting safety-related functions of structures, systems, and components in the Cook Nuclear Plant has the responsibility to implement the applicable policies and requirements of the Quality Assurance Program.This responsibility includes being familiar with, and complying with, the applicable Quality Assurance Program requirements.

COMPLIANCE The AEPSC Director-Quality Assurance shall monitor compliance with the established Quality Assurance Program.Audit programs shall be established to ensure that AEPSC and Cook Nuclear Plant activities comply with established program requirements, identify deficiencies or noncompliances, and obtain effective and timely corrective actions.Employees engaged in activities affecting safety-related functions of structures, systems, and components in the Cook Nuclear Plant who believe that the Quality Assurance Program is not being complied with, or that Revised: 5/3/93 1.7"2 July, 1993 Statement of Policy for the Donald C.Cook Nuclear Plant guali ty Assurance Program Page 3 a defi ci ency in quality exists, should notify their supervisor, the AEPSC Director-equality Assurance, and/or the Plant Hanager.If the notification does not in the employee's opinion receive prompt or appropriate attention, the employee should contact successively higher levels of management.

Employees reporting such conditions shall not be discriminated against by companies of the American Electric Power System.Discrimination includes discharge or other actions relative to compensation, terms, condi tions, or privileges of employment.

P E~P~.'%$.9,vape~r,:,:.",,.'.-.".

Chasrman of'the Boar'd and Chi ef Executi ve Of fi cer.American Electric Power Company, Inc.Revised: 5/3/93 1.7-3 July, 1993

1.7.1 ORGANIZATION

1.7.1.1 SCOPE American Electric Power Service Corporation (AEPSC)is responsible for establishing and implementing the Quality Assurance (QA)Program for the operational phase of the Donald C.Cook Nuclear Plant (Cook Nuclear Plant).Although authority for development and execution of various portions of the program may be delegated to others, such as contractors, agents or consultants, AEPSC retains overall responsibility.

AEPSC shall evaluate work delegated to such organizations.

Evaluations shall be based on the status of safety importance of the activity being performed and shall be initiated early enough to assure effective quality assurance during the performance of the delegated activity.This section of the Quality Assurance Program Description (QAPD)identifies the AEPSC organizational responsibilities for activities affecting the quality of safety-related nuclear power plant structures; systems, and components, and descri.bes the authority and duties assigned to them.It addresses responsibilities for, both attaining quality objectives and for the functions of establishing the QA Program, and verifying that activities affecting the quality of safety-related items are performed effectively in accordance with QA Program requirements.

1.7.1.2 IMPLEMENTATION 1.7.1.2.1 Source of Authorit The Chairman of the Hoard and Chief Executive Of f i cer of Ameri can Electric Power Company, Inc.(AEP)and AEPSC is responsible for safe operation of the Cook Nuclear Plant.Authority and responsibility for effectively implementing the QA Program for plant modifications, operations and maintenance are delegated P$to the AEPSC Vice President-Nuclear Operations (Hanager of Nuclear Operations).

In the operation of a nuclear power plant, the licensee is required to establish clear and direct lines of responsibility, authority and 1.7-4 July, 1993 accountabi 1 i ty.Thi s requirement i s appl i cabl e to the organi zati on providing support to the plant, as well as to the plant staff.I The AEPSC corporate support of the Cook Nuclear Plant is the responsibility of the entire organization under the directi on of the Hanager of Nuclear Operations who maintains primary responsibility for the Cook Nuclear Plant within the corporate organization.

The AEPSC Vice President-Nuclear Operations is the Hanager of Nuclear Operations.

All other AEPSC divisions and departments, other than the guality Assurance Division, having a supporting role for nuclear operations and for the Cook Nuclear Plant are functionally responsible to the Hanager of Nuclear Operations (reference Figure 1.7-1).In order to facilitate a more thorough understanding of the support functions, some of the responsibilities, authorities, and accountabi lities wi thin the organization are as follows: 1)The responsibilities of the Hanager of Nuclear Operations shall be dedicated to the area of Cook Nuclear Plant operations and support.2)The Hanager of Nuclear Operations shall be responsible for, and has the authority to direct, all Cook Nuclear Plant operational and support matters within the corporation and shall make, or concur, in all final decisions regarding significant nuclear safety matters.3)AEPSC organization managers responsible for Cook Nuclear Plant matters shall be familiar with activities within their scope of responsibility that affect plant safety and reliability..They shall be cognizant of, and sensitive to, internal and external factors that might affect the operations of Cook Nuclear Plant.4)AEPSC organization managers responsible for Cook Nuclear Plant matters have a commitment to seek and identify problem areas and 1.7-5 July 1993 take corrective action to eliminate unsafe conditions, or to improve trends that will upgrade plant safety and reliability.

5)The Manager of Nuclear Operations shall ensure that Cook Nuclear Plant personnel are not requested to perform inappropriate work or tasks by corporate personnel, and shall control assignments and requests that have the potential for diverting the attention of the Plant Manager from the primary responsibility for safe and reliable plant operation.

6)AEPSC organization managers having Cook Nuclear Plant support responsibilities, as well as the Plant Manager and plant organization managers, shall be familiar with the policy statements from higher management concerning nuclear safety and operational priorities.

They shall be responsible for ensuring that activi ties under their direction are performed in accordance with these policies.1.7.1.2.2 Res onsibilit for Attainin ualit Ob'ectives in AEPSC Nuclear'~~The AEP Chairman of the Board and Chief Executive OfFicer has assign'ed~th'e.,',overal':l~l:-,'.::vespon'sebi%';i',t j~883 for specifying gA Program requirements and verifying their implementation t~~':::the:,:,'AEPSC::;::,Directbr",-...:: uality: A'ssu rance,.:,:

The AEPSC Vice President-Nuclear Operations, under the direction of the AEPjChairmani of the~8'nard!an'd;,,aChsief!.::Eaecntih7e:,;.:,0'ff1~ce'i'.

is responsible for effectively implementing the CA Program.The Plant Manager, under the direction of the AEPSC Vice President-Nuclear Operations, is responsible for establishing the Cook Nuclear Plant guality Control Program and implementing the gA Program at the Cook Nuclear Plant.1.7-6 July, 1993

AEPSC has an independent off-site Nuclear Safety and Design Review Committee (NSDRC)which has been established pursuant to the requirements of the Technical Specifications for the Cook Nuclear Plant.The function of the NSDRC is to oversee the engineering, design, operation, and maintenance of the Cook Nuclear Plant by performing audits and independent reviews of activities which are specified in the facility Technical Speci fi cations.The Cook Nuclear Plant on-site review group is the Indiana Michigan Power Company (I&M)Plant Nuclear SaFety Review Committee (PNSRC).This committee has also been established pursuant to the requirements of the Cook Nuclear Plant Technical Specifications.

The function of the PNSRC is to review plant operations on a continuing basis and advise the Plant Manager on matters related to nuclear safety.1.7.1.2.3 Cor orate Or anization American Electric Power Com an AEP, the parent holding company, wholly owns the common stock of all AEP.System subsidiary (operating) companies.

The major operating companies and generation subsidiaries are shown in Figure 1.7-2.The Chairman of the Board and Chief Executive Officer of AEP is the Chief Executive Officer of AEPSC and all operating companies.

The responsibility for the functional management of the major operating companies is vested in the President of each operating company reporting to the AEPSC President and Chief Operating Officer who reports to the AEPSC Chairman of the Board.American Electric Power Service Cor oration The responsibility for administrative and technical direction of the AEP System and i ts faci 1 i ti es i s del egated to AEPSC.AEPSC provi des management and technological services to the various AEP System companies.

1.7-7 July, 1993

0 eratin Com anies The operating facilities of the AEP System are owned and operated by the respective operating companies.

The responsibility for executing the engineering, design, construction, specialized technical training, and certain operations'upervision is vested in AEPSC, while all, or part, of the administrative functional responsibility's assigned to the operating companies.

In the case of Cook Nuclear Plant, I&N general office staff (headquarters) provides public affairs, accounting, industrial safety direction and procurement support.The Cook Nuclear Plant is owned and operated by I&M which is part of the AEP System.1.7.1.2.4 uali t Assurance Res onsibi lit of AEPSC 1)AEPSC provides the technical direction for the Cook Nuclear Plant, and as such makes the final decisions.pertinent to safety-related changes in plant design.Further, AEPSC reviews Nuclear Regulatory Commission (NRC)letters, bulletins, notices, etc., for impact on plant design, and the need for design changes or modifications.

2)AEPSC furnishes quality assurance, engineering, design, construction, licensing, NRC correspondence, fuel management and radiological support activities.

3)AEPSC provides additional service in matters such as supplier qualification, procurement of original equipment and replacement parts, and the process of dedicating commercial grade items or services to safety-related applications.

4)The AEPSC gA Division provides technical direction in quality assurance matters to AEPSC and the Cook Nuclear Plant, and1.7-8 July, 1993

oversees the adequacy, effectiveness and implementation of the gA Program through review and audit activities.

5)Cognizant Engineer-(e.g., System Engineer, Equipment Engineer, Lead Engineer, Responsible Engineer, etc.)-The cognizant engineer, and/or engineer with the other titles noted, is that AEPSC individual who provides the engineering/design expertise for a particular area of responsibility.

This responsibility includes the implementation of the quality assurance and quality control measures for systems, equipment, structures, or functional areas included in that individual's responsibility.

The various titles used for the identification of an individual's responsibility and assignment shall be understood to mean the same as cognizant engineer in the respective areas of responsibility.

ualit Assurance Res onsibi lit of I&M-Cook Nuclear Plant IM's Cook Nuclear Plant staff operates the Cook Nuclear Plant in accordance with licensing requirements, including the Technical Specifications and such other commitments as established by the operating licenses.The Plant Manager Instruction (PHI)system and subtier instructions and procedures describe the means by which compliance is achieved and responsibilities are assigned, including interfaces with AEPSC.Figure 1.7-3 indicates the organizational relationships within the AEP System pertaining to the operation and support of the Cook Nuclear Plant.1.7.1.2.5 Or anization AEPSC1.7-9 July, 1993 The Chairman of the Board and Chief Executive Officer is ultimately responsible for the gA Program associated with the Cook Nuclear Plant.This responsibility

'j'.i administered through the following AEPSC organization management personnel:

AEPSC Director-guality Assurance AEPSC Vice President-Nuclear Operations AEPSC Vice President-Project Management and Construction ualit Assurance Dsvision The AEPSC Director-qua 1 i ty Assurance'iepo'ruing:;::::,:::to",.:::;,:,thi.:",:::NEP,.::::,":Cha'~",rIIian'.:".;::

o',::tthe',::::,:Board~andi!

Ch'i'i..f:,:::,:Execut'i lTo",::.":,".,Dsfufi cer,:,':: i s responsible for the Dual i ty Assurance'i":.i:: (DA'Pj)f~gi<Viss'onr.

The DA Diys's'ion consists of the following sections (Figure 1.7-4): gual i ty Assurance Engineering Section Nuclear Software guality Assurance Section Audi ts and Procurement Secti on guality Assurance Section (Site)The the gAD is organizationally independent and is responsible to perform fol 1 owing: Speci fy gA Program requirements.

Identi fy quality problems.Initiate, recommend, or provide solutions through designated channels.Verify implementation of solutions, as appropriate.

Prepare, issue and maintain gA Program documents, as required.Verify the implementation of the gA Program through scheduled audits and survei llances.Verify the implementation of computer software quality assurance through reviews, survei llances and audits.Audit engineering, design, procurement, construction and operational documents for incorporation of, and compliance with, applicable qual.ity assurance requirements to the extent specified by the AEPSC management-approved gA Program.Organize and conduct the gA auditor orientation, training, certification and qualification of AEPSC audit personnel.

Provide direction for the collection, storage, maintenance, and retention of quality assurance records.1.7-10 July, 1993 Maintain, on data base, a list of suppliers of nuclear (N)i tems and services, plus other selected categories of suppliers.

Identify noncompliances of the established gA Program to the responsible organizations for corrective actions, and report significant occurrences that jeopardize quality to senior AEPSC management.

Follow up on corrective actions identified by gA during and after disposition implementation.

Review the disposition of conditions adverse to quality to assure that action taken will preclude recurrence.

Conduct in-process gA audits or survei llances at supplier's facilities, as required.Assist and advise other AEP/AEPSC groups in matters related to the gA Program.Conduct audits as directed by the NSDRC.Review AEPSC investigated Condi':tion'eports and associated corrective and preventive action recommendations.

Maintain cognizance of industry and governmental quality assurance requirements such that the gA Program is compatible with requirements, as necessary.

Recommend for revision to, or improvements in, the established gA Program to senior AEPSC management.

Audi t dedication plans for commercial grade items and services.Issue"Stop Work" orders when significant conditions adverse to safety-related items are identified to prevent unsafe conditions from occurring and/or continuing.

Provide AEPSC management with periodic reports concerning the status, adequacy and implementation of the gA Program.Prepare and conduct special verification and/o'r surveillance programs on in-house activities, as requi red or requested.

Routinely attend, and participate in, daily plant work schedule and status meetings.Provide adequate gA coverage relative to procedural and inspection controls, acceptance criteria, and gA staffing and qualification of personnel to carry out gA assignments.

1.7-11 July, 1993

Determine the acceptability of vendors to supply products and services for safetyrelated applications.

Am lification of S ecific Res onsibilities uglification of the AEPSC Director-ualit Assurance The AEPSC Director-guality Assurance shall possess the following position requirements:

Bachelor's degree in engineering, scientific, or related discipline.

Ten (10)years experience in one of, or a combination of, the following areas: engineering, design, construction, operations, maintenance of fossil or nuclear power generation facilities'r utility faci'lities'A, of which at least four (4)years must be experience i n nuclear quality assurance related activities.

Knowledge of gA regulations, policies, practices and standards.

The same, or higher, organization reporting level as the highest line manager directly responsible for performing activities affecting the quality of safety-related items, such as engineering, procurement, construction and operation, and is sufficiently independent from cost and schedule.Effective communication channels with other senior management positions.

Responsibility

'for approval of gA Manual(s).

Performance of no other duties or responsibilities unrelated to gA that would prevent full attention to gA matters.Sto Work Orders The AEPSC gA Divi'sation is responsible for ensuring that activities affecting the quality of safety-related items are 1.7-12 July, 1993 performed in a manner that meets applicable administrative, technical, and regulatory requirements.

In order to carry out this responsibility, the AEP Gh'ai'rman

",of.:;:.";they~Board:

and Ghi'H::::,',Execiiti,"ie,':::Offi',ce'r" has given the AEPSC Director-guali ty Assurance the authority to stop work on any acti vi ty affecting the quality of safety-related items that does not meet the aforementioned requirements.

Stop work authority has been further delegated by the AEPSC Director-guali ty Assurance to the AEPSC guality Assurance Superintendent (si te).The AEPSC Director-guality Assurance and the AEPSC guality Assurance Superintendent do not have the authority to stop unit operations, but will notify appropriate Cook Nuclear Plant and/or corporate management of conditions which do not meet the aforementioned criteria, and recommend that unit operations be terminated.

A Auditor ualification and Certification Pro ram AEPSC has established and maintains a gA auditor training and certi fi cati on program for all AEPSC gA audi tors.Cond'i'tion Identi fi cati on Re ortin and Escal ati on AEPSC has established mechanisms for the identification, reporting and escalation of conChfjons affecting the quality of safety-related items to a level of management whereby satisfactory resolutions can be obtained.Nuclear 0 erations The AEPSC Vice President-Nuclear Operations (Manager of Nuclear Operations), reporting to the AEP ChaLreansof~~the::.':Bo'a@el andgg~h'sef Executi~ve Of'f~jceH, is responsible for nuclear operations.

Nuclear July, 1993 i

operations is comprised of the AEPSC Nuclear Operations Department, the AEPSC Nuclear Engineering Department, and the Cook Nuclear Plant Organization.

The AEPSC Nuclear Operations t::::.:::::: (NO,".:"'.)

De'pa'rtm'e'nt is responsible for the following:

Formulate policies and practices relative to safety, licensing, operation, maintenance, fuel management, and radiological support.Provide the Plant Manager with the technical and managerial guidance, direction and support to ensure the safe operation of the plant.Maintain liaison with the AEPSC Director-guali ty Assurance.

Implement the requirements of the AEPSC gA Program.Maintain knowledge of the latest safety, licensing, and regulatory requirements, codes, standards, and federal regulations applicable to the operation of Cook Nuclear Plant.Accompli sh the procurement, economic, technical, licensing and quality assurance activities dealing with the reactor core and its related fuel assemblies and components.

Prepare bid specifications, evaluate bids, and negotiate and administer contracts for the procurement of all nuclear fuel and related components and services.Naintain a special nuclear material accountability system.Provide analyses to support nuclear steam supply system operation, including reactor physics, fuel economics, fuel mechanical behavior, core thermal hydraulic and LOCA and non-LOCA transient safety analysis and other analysis activities as requested, furnish plant Technical Specification changes and other licensing work, and participate in NRC and NSDRC meetings as required by these analyses.Perform reactor core operation follow-up activities and other reactor core technical support activities as requested, and arrange for support from the fuel fabricator, when needed.Contract for, and provide technical support for, disposal of both high level and low level radioactive waste.1.7-14 July, 1993 Coordinate the development of neutronics and thermal hydraulic safety codes and conduct safety analyses.Conduct studies of the Cook Nuclear Plant licensing bases to determine the optimal changes to support unit operations at a lower primary pressure and temperature.

Coordinate NO)computer code development, and provide the interface control for N0$with the AEPSC Information System Department and Cook Nuclear Plant.Obtain and maintain the NRC Operating License and Technical Specifications for the Cook Nuclear Plant.Act as the communication link between the NRC, AEPSC, and the plant staff.Perform and coordinate efforts involved in gathering information, performing calculations and generic studies;preparing criteria, reports, and responses; reviewing items affecting safety;and interpreting regulations.

Review, coordinate, and resolve all matters pertaining to nuclear safety between Cook Nuclear Plant and AEPSC.This includes, but is not limited to: the review of certain plant design changes to ensure that the requirements of 10CFR50.59 are met;the preparation of safety evaluations, or reviews, for any designated subject;the preparation of changes to, and appropriate interpretation of, the plant Technical Specification submittals of license amendments; and the analysis of plant compliance with regulatory requirements.

Primary corporate contact for most oral and written communication with the NRC.Provide support in key areas of expertise, such as nuclear engineering, probabi li stic analysis, thermohydraulic analysis, chemical engineering, mechanical engineering, electrical engineering, and technical writing.Interface with vendors and other outside organizations on matters connected with the nuclear steam supply system and other areas affecting the safe design and operation of nuclear plants.July, 1993 Participate, as appropriate, in the review of nuclear plant operating experiences, and relate those experiences to the design and safe operation of Cook Nuclear Plant.Review, evaluate, and respond to NRC requests for information and NRC notifications of regulatory changes resulting in plant modifications or new facilities.

Such responses are generated in accordance with appropriate AEPSC Administrative Procedures.

Develop, specify, and/or review conceptual nuclear safety cri teria for Cook Nuclear Plant in accordance with established regulations.

This includes all information contained in the FSAR, as well as specialized information such as environmental qualification and seismic criteria.Review and evaluate performance requirements for systems, equipment and materials for compliance with specified safety cri teria.Review, on a conceptual basis, plant reports and proposed plant safety-related design changes, to the extent that they are related to the ultimate safe operation of the plant, for compliance with safety regulations, plant Technical Specifications, the Updated FSAR design basis, and with any other requirements under the Operating License, to determine if there are any unreviewed safety questions as defined in 10CFR50.59.

Perform reviews of Candjt~oo'eports and 10CFR21 reviews in accordance with corporate requirements.

Operate the Action Item Tracking (AIT)system for AEPSC internal commitment tracking.Coordinate design changes for the Cook Nuclear Plant, acting as a focal point within AEPSC.This program primarily involves project management responsi'bi li ties for scheduling and implementing Request for Changes (RFCs), and includes extensive interfacing with engineering, design, construction, and Cook Nuclear Plant.Provide working-level coordination with the Institute of Nuclear Power Operations (INPO)in the areas of INPO training, seminars, and workshops.

This effort includes providing AEPSC access to INPO resources, such as NUCLEAR NETWORK and Nuclear Plant July, 1993

Reliability Data System (NPRDS), and effectively integrating AEPSC and Cook Nucl ear Pl ant efforts towards uti 1 i zing INPO recommendations contained in operating experience reports to improve Cook Nuclear Plant performance.

Coordinate daily communication with the Cook Nuclear Plant, provide AEPSC management with a daily plant status report, and make presentations to senior management at regularly scheduled construction staff meetings.Process incoming vendor information.

Contribute to the annual FSAR updates through reviews of Licensee Event Reports, design changes and the Annual Operating Report.Radi ol ogi cal, emergency'p'1'a'nni'.ng and Support~4f~l,."th':.

se'cuAri:0 j A WAVWAWAVA pyograqt..AVWA'C..A WNW Corporate support of the Cook Nucl ear Pl ant'radiation protecti on and health physics'program, technical reviews and advice on the radiological aspects of design changes, modifications or capital improvements, the ALARA program, the radiation monitoring system, the environmental radiological monitoring and sampling program, dose and shielding analysis, radiochemistry review, implications of federal regulations, and meteorological monitoring.

Cook Nuclear Plant and corporate emergency planning, including procedure development, exercise scheduling, facility procurement and maintenance, and the liaison with off-site emergency planning groups, such as FEHA and the Hichigan State Police.Review federal codes and regulations as they relate to the development, implementation, revision and distribution of the Hodified Amended Security Plan (HASP).Interface with.the plant's security department providing support and maintaining security document files Qg.Provide Nuclear General Employee Training (NGET)for AEPSC personnel.

Coordinate the development of training for AEPSC personnel who support the operation and maintenance of Cook Nuclear Plant, l.7-17 July, 1993 ensuring a unified training program meeting annual goals and objectives.

Participate on the ALARA committee.

Prepare responses to the NRC on radiological, emergency planning and security issues.Serve as technical advisors on plant audits.Remain cognizant of current decommissioning practices and developments.

AEPSC Nuclear fn ineerin De artment The AEPSC Chief Nuclear Engineer, reporting to the AEPSC Vice President-Nuclear Operations, is responsible for certain engineering and design functions.

The AEPSC Nuclear Engineering Department is comprised of engineering and design entities at AEPSC, as well as an on-site engineering and design support organization at the Cook Nuclear Plant.The AEPSC Civil Engineering, Electrical Engineering, and System Planning Departments provide periodic, technical assistance for the Cook Nuclear Plant.The administrative and quality assurance controls for this assistance are controlled through documented interface agreements with gg AEPSC Nuclear Engineering P.AEPSC Nuclear Engineering

<,:,,~>(NE~)0eji'i':t~en't:.is responsible for the following:

Provide planning, engineering and design of the electrical facilities inside Cook Nuclear Plant up to the high voltage (HV), bushings of the main generator transformers and mechanical facilities inside Cook Nuclear Plant including:

determination of general layout and design;selection of equipment; preparation of one-line and flow diagrams;and, July, 1993

  • coordination of inside and outside plant facilities.

Provide.engineering and;dc'.ign of all controls for operation and protection of nuclear steam supply, steam generator, turbine generator, auxil'iary equipment and general plant protection, including checking and approving elementary, one-line, and flow drawings.Ensure that all purchased equipment conforms to accepted standards and fulfills the desired function.Closely follow manufacturer's engineering and design processes to assure provision of adequate and reliable equipment upon which depend the safety, reliability, and performance of the unit and plant.Prepare, review and/or approve design changes, sketches, drawings, calculations, and design verifications, as required.Prepare and/or approve dedication plans, specifications and purchase requisitions.

Perform drawing review of equipment, as appropriate.

Develop, review and/or approve procedures or correspondence as appropriate.

Obtain, review and perform engineering and design evaluations, including environmental equipment qualification (Eg).Establish and maintain a central file for equipment environmental qualification documentation.

Plinij Fac'i~1!i!ty!

Data:-::,,Basi"::::::(FDB)!."".

Perform calculations for proper application of equipment.

Perform and evaluate investigations, analyses and reports for facilities pertaining to the engineering design, operation and maintenance of the Cook Nuclear Plant.Assist field personnel in installation, start-up, and subsequent locating of problems in equipment, and in determining proper operation of equipment, during normal or after emergency operations.

July, 1993 Maintain a constant awareness for improvements and more reliable design of equipment and facilities, maintenance and operating methods or procedures.

Maintain a constant awareness of activities to ensure compliance with all applicable policies and procedures, initiating, when required, training or'retraining programs.Participate, as assigned, on the NSDRC and NSDRC subcommittees, and participate in matters covered in the committee's charter.Provide responses to NRC correspondence, as required.Participate in the evaluation and remedy of any situation requiring activation of the emergency response organization.

Provide support personnel for the Emergency Response Organization.

Provide technical support in areas of operation and maintenance, including:

the Inservice Inspection (ISI)Program;the gA Program;the Fire Protection gA Program;the AEP ALARA Program covering radiation"protection; and, the corporate and plant Industrial Safety program.Provide technical direction and assistance in the layout and arrangement of equipment piping, systems, controls, etc., for the development of drawings.Develop System Descriptions.

Provide analytical support in engineering and design disciplines (e.g., heat transfer, thermodynamics, fluid dynamics).

Provide engineering and design evaluations for PRs, LERs, INPO SOERs, and NRC Bulletins.

Participate, as assigned, on the AEPSC Cook:,:4i..on Assessment Group (~GAG).Nake recommendations and assist in the formulation of policies and practices relating to the design and engineering of office and service buildings, miscellaneous structures and material handling equipment, and provide the general supervision of the engineering of such facilities, structures and equipment.

Initiate and/or review, approve and control laboratory and field investigations and feasibility studies.Prepare and administer equipment, labor and service contracts.

1.7-20 July, 1993

Arrange for outside engineering, design and consulting assistance, as required.Perform shop a'nd field surveillance on equipment being manufactured, fabricated, or installed.

Provide field services to the Cook Nuclear Plant, including the assigning of personnel, as are required, during construction, normal or forced outages, or as requested.

Assist in the planning and execution of maintenance work on equipment, facilities, buildings and other structures.

Supervise maintenance and repairs of all masonry and concrete work at Cook Nuclear Plant, including supplying qualified inspection personnel.

Direct testing of materials used in concrete and testing of soils to be used in work at the Cook Nuclear Plant.Review and recommend concrete mix formulations for all new construction.

Implement the corrective action program, with regard to activi ties affecting the quality of safety-related items and services, that controls and documents items, services or activities which do not conform to requirements.

Assist in the preparation of applications for federal, state and local permits relative to installations being made which require such permits.Conduct periodic management reviews of.the activities of the department to ensure compliance with the objectives of the gA Program, and external technical surveillance, as necessary, of consultants, outside organizations and vendors over which the department is cognizant.

Establish and maintain a file for gA records.Develop, review and approve designs and drawings for mechanical, electrical and structural systems, equipment and facilities of the Cook Nuclear Plant.Perform required calculations and analyses, including pipe stress, pipe support design, cable sizing, conduit and cable tray support and structural steel and concrete.1.7-21 July, 1993 Assist field personnel in the resolution of problems stemming from the installation of design changes, or from as-found plant conditions, including assigning personnel to the plant.Formulate, administer, and implement policies and practices relating to the engineering, and design of the Cook Nuclear Plant.Conduct functions so as to be in conformance with the operating licenses of the Cook Nuclear Plant.Investigate evaluate and correct problems.Coordinate special projects and studies, as required.Coordinate the development and maintenance of the computerized Design Drawing Control (DDC)and the Vendor Drawing Control (VDC)programs which include coordinating the programs with interfacing divisions/departments.

Control the issuance and distribution of drawings for the Cook Nuclear Plant, including monitoring of the Aperture Card Microfilm Program.Supervise and control the work of consultants, architect/engineers and outside engineering and design agencies supplying services to AEPSC in their discipline and process notification of defects in accordance with company requirements.

Also perform detailed reviews of engineering and design work submitted by outside agencies.Review and update applicable sections of Cook Nuclear Plant Updated FSAR as assigned.Participate, as members and as assigned, on committees and ad hoc task forces that review nuclear activities.

Cook Nuclear Plant The Plant Hanager reports functionally and administratively to the AEPSC Vice President-Nuclear Operations (Manager of Nuclear Operations) and is responsible for the Cook Nuclear Plant activi ties (Figure 1.7-5).The Cook Nuclear Plant organization is responsible for the following:

1.7-22 July, 1993 Ensure the safety of all facility employees and the general public relative to general plant safety, as well as radiological safety, by maintaining'trict compliance with plant Technical Specifications, procedures and instructions.

Recommend facility engineering modification and ini tiate and approve plant improvement requisitions.

Ensure that work practices in all plant departments are consistent with regulatory standards, safety, approved procedures, and plant Technical Specifications.

Provide membership, as required, on the PNSRC.Maintain close working relationships with the NRC, as well as local, state, and federal government regulatory officials regarding conditions which could affect, or are affected, by Cook Nuclear Plant activities.

Set up plant load schedules and arrange for equipment outages.Develop and efficiently implement all site centralized training acti vi ti es.Administer the centralized facility training complex, simulator, and programs ensuring that program devel opment i s consi stent wi th the systematic approach to training, maintain INPO accreditations, regulatory and corporate requirements.

Ensure that human resource activities include employee support programs (i.e., fitness for duty)consistent with INPO/NUMARC guidelines, company policies, and regulatory requirements and standards.

Administer the NRC approved physical Security Program in compliance with regulatory standards, Modified Amended Security Plan (AASP), and company policy.Supervise, plan, and direct the activities related to the maintenance and installation of all Cook Nuclear Plant equipment, structures, grounds, and yards.Prepare and maintain records and reports pertinent to equipment maintenance and regulatory agency requirements.

Administer contracts and schedule outside contractors'ork forces.1.7-23 July, 1993

Enforce and coordinate Cook Nuclear Plant regulations, procedures, policies, and objectives to assure safety, efficiency, and conti nui ty in the operation of the Cook Nuclear Plant within the limits of the operating license and the Technical Specifications and formulation of related policies and procedures.

Plan, schedule, and direct activities relating to the operation of the Cook Nuclear Plant and associated switchyards; cooperate in planning and scheduling of work and procedures for refueling and maintenance of the Cook Nuclear Plant;and direct and coordinate fuel loading operations.

Review reports and records, direct general inspection of operating conditions of plant equipment, and investigate any abnormal conditions, making recommendations for repairs.Establish and administer equipment clearance procedures consistent with company, plant, and radiation protection standards; authorize and arrange for equipment outages to meet normal or emergency conditions.

Provide the shift operating crews with appropriate procedures and instructions to assist them in operating the Cook Nuclear Plant safely and efficiently.

Approve operator training programs administered by the Cook Nuclear Plant Training Department designed to provide operating personnel with the knowledge and skill required for safe operation of the facility, and for obtaining and holding NRC operator licenses.Coordinate training programs in plant safety and emergency procedures for Cook Nuclear Plant Operating Department personnel to ensure that each shift group will function properly i n the event of injury of personnel, fire, nuclear incident, or civil disorder.Advance planning and overall conduct of scheduled and forced outages, including the scheduling and coordination of all plant activities associated with refueling, preventive maintenance, corrective maintenance, equipment overhaul, Technical Specification surveillance, and design change installations.

Coordinate all Cook Nuclear Plant activi ties associated with the initiation, review, approval, engineering, design, production, 1.7-24 July, 1993 examination,.inspection, test, turnover, and close out of design changes.Develop and implement an effective guali ty Control (gC)Program.This encompasses, but is not limited to, the planning and directing of quality control activities to assure that industry codes, NRC regulations, and company instructions and policies regarding quality control for Cook Nuclear Plant are implemented, qualified personnel perform the work, and that these activities are properly documented.

Prepare reports of reportable events which are mandated by the NRC and the Technical Specifications.

Direct the activities of contractor gC/nondestructive examination (NDE)personnel assigned to the Safety.and Assessment Department and provide inspections of work performed.

Prepare statistical reports utilized in NRC Appraisal Meetings and Enforcement Conference.

Coordinate the efforts of outside agencies, such as American Nuclear Insurers (ANI), INPO, and third-party inspector programs.Maintain knowledge of developments and changes in NRC requirements, industry standards and codes, regulatory compliance activities, and quality control disciplines and techniques.

Stop plant operation in the event that conditions are found which are in violation of the Technical Specifications or adverse to qual i ty.Maintain and renew accreditation of training programs.gualification and certification of IKN personnel performing inspections or tests of major modifications and non-routine maintenance to the requirements of Regulatory Guide 1.58 and ANSI N45.2.6, except as noted in Appendix B hereto, item 9.gualification and certification of ILN NDE personnel to the requirements of the AEP NDE Hanual.gualification of I&N personnel performing inspection of normal operating activities to ANSI N18.1.1.7-25 July, 1993 Proper certification of contractor inspection, test and examination personnel in accordance with Regulatory Guide 1.58, ANSI N45.2.6,'ASME B8PV Code and/or SNT-TC-1A, as applicable.

Perform peer inspections of work completed by I8M personnel by independent persons qualified to ANSI N18.7.Conduct of the Inservice Inspection (ISI)Program.Procurement, receiving, quality control receipt inspection, storage, handling, issue, stock level maintenance, and overall control of stores items.Provide material service and support in accordance with policies and procedures required by AEP Purchasing and Stores, AEPSC gA, and the NRC, which are administered and enforced in a total effort to ensure safety and plant reliability.

Plan and direct engineering and technical studies, nuclear fuel management, equipment performance, instrument and control maintenance, on-site computer systems, Shift Technical Advisors, and emergency planning for the Cook Nuclear Plant.These activities support daily on-site operations in a safe, reliable, and efficient manner in accordance with all corporate policies, applicable laws, regulations, licenses, and Technical Specification requirements.

Implement station performance testing and monitor programs to ensure optimum plant efficiency.

Direct programs related to on-site fuel management and reactor core physics testing, and ensure satisfactory completion.

Establish testing and preventive maintenance programs related to station instrumentation, electrical systems, and computers.

Recommend alternatives to Cook Nuclear Plant operation, technical or emergency procedures, and design of equipment to improve safety of operations and overall plant efficiency.

Implement the corporate Emergency Plan as it pertains to the Cook Nuclear Plant site.Provide technical and engineering services in the fields of chemistry, radiation protection, ALARA, and environmental in 1.7-26 July, 1993 support of the safe operation of the plant and the health and safety of the employees and the public.Plan and schedule the activities of the Radiation Protection Department of the Cook Nuclear Plant in support of operations and maintenance.

Establish chemistry, radiochemistry, and health physics criteria which ensure maximum equipment liFe, and the protection of the health and safety of the workers and the public.Establish sampling and analysis programs which ensure the chemistry, radiochemistry, and health physics criteria are within the established criteria.Establish and direct investigations, responses, and corrective actions when outside the established criteria.Administer and direct the Cook Nuclear Plant's radioactive waste programs, including volume reduction, packaging and shipping.Administration of the gA Records Program.Maintain the Cook Nuclear Plant Facility Data Base.Pro ect Mana ement and Construction De artment The AEPSC Vice President-Project Management and Construction, reporting to the AEP Cha~emaP~Pof

~the.-:;Board~andFGh~ef..-"..::Execot~yi~0jjjci~r:, is responsible for the Project Management and Construction Department.'eporting to the AEPSC Vice President-Project Hanagement and Construction are the following:

Site Construction Manager, reporting administratively to the AEPSC Vice President-Project Management and Construction, and functionally to the Plant Manager-Cook Nuclear Plant.The Project Management and Construction Department is responsible for the following:

1.7-27 July, 1993 Administer and implement construction job orders issued by the Cook Nuclear Plant organization for major modifications, replacement and maintenance work with outside contractors.

Administer and monitor contractor's industrial safety programs and performance.

Administer human resources'unctions for site construction organization.

Hanage construction labor relations with the International Building and Construction Trades Unions.Scope, bid, recommend awards and administer construction labor and services contracts.

Plan, organize and control major construction projects, as assigned by the AEP Chadirman;:;"::of jihad':",Boar'0,"::-.""an~1.:,,Chief, Haintain cognizance on matters pertaining to the Cook Nuclear Plant and corporate emergency response organization.

Prepare construction labor estimates.

Provide constructabi lity guidance when requested in support of engineering and design changes.Participate on the Nuclear Safety Design Review Committee.

Purchasin and Stores De artment (not charted)The,:",4EPSC!EEgecdt'i'yeti c'e;.:Pres i den't~Op~riti onsPieporit'ing+fii the AEP Chapman,:-';ofrtha."-;Boartd~'andi!ChTe~f-'Execntxva Officer, is responsible for the Purchasing and Stores Department through the AEPSC Vice President-Purchasing and Haterials Hanagement.

The Purchasing and Stores Department is responsible for the following:

Procurement of safety-related items from only qualified and approved suppliers.

Provide supervision to Cook Nuclear Plant Purchasing Section.Provide ordering and stocking descriptions of safety-related items and include these descriptions in the Cook Nuclear Plant inventory 1.7-28 July, 1993 catalog, including necessary communications with suppliers, cognizant engineers, the Cook Nuclear Plant Stores Supervisor and other appropriate personnel.

Maintain and control the Material&Equipment database file for safety-related items.Establish computerized inventory status reports, on line inventory and purchase order inqui ry capabilities and other procedures to order, track and control materials.

Coordinate procurement activities with AEPSC Nuclear Operations, AEPSC Nuclear Engineering, Cook Nuclear Plant Site Purchasing, AEPSC guality Assurance and Cook Nuclear Plant personnel.

Prepare and issue requests for quotations, contracts, service orders".:::;,:,'blank'et";;:,;orders::,:

and purchase orders for safety-related items.Establish a system to implement corrective action as described in the AEPSC General Procedures for the Cook Nuclear Plant.Establish a system of document keeping and transmittal.

Establish a system of document control for controlled procedures, instructions, and purchasing documents for safety-related items.The maintenance and control of selected procurement document'itandard phrases as identified by the Director-guali ty Assurance, or designee.Conduct training sessions involving purchasing personnel and others on an annual basis, or more frequently, as required, and ascertain that training sessions include complete responsibilities associated with the purchase of safety-related items andgpepvi~ces:,.

1.7.2 1.7.2.1 EQUALITY ASSURANCE PROGRAM SCOPE Policies that define and establish the Cook Nuclear Plant gA Program are summarized in the individual sections of this document.The program is implemented through procedures and instructions responsive to provisions of the gAPD, and will be carried out for the life of the Cook Nuclear Plant.1.7-29 July, 1993 Quality assurance controls apply to activities affecting the quality of safety-related structures, systems and components to an extent based on the importance of those structures, systems, components, etc., (items)to safety.Such activities are performed under controlled conditions, including the use of appropriate equipment, environmental conditions, assignment of qualified personnel, and assurance that all applicable prerequisites have been met.Safety-related items are defined as items: Which are associated with the safe shutdown (hot)of the reactor;or isolation of the reactor;or maintenance of the integrity of the reactor coolant system pressure boundary.OR Whose failure might cause or increase the severity of a design basis accident as described in the Updated FSAR;or lead to a release of radioactivity in excess of 10CFR100 guidelines.

In general, items are classified as safety-related if they are: Seismic Class I, or Electrical Class lE;or associated with the Engineered Safety Features Actuation System (ESFAS);or associated with the Reactor Protection System (RPS).A special QA Program has been implemented for Fire Protection items (Section 1.7.19 herein).The QA Program also includes provision for Radwaste QA in accordance wi th the requirements of 10CFR71,$95part H.QA Program status, scope, adequacy, and compliance with IOCFR50, Appendix B, are regularly reviewed by AEPSC management through reports, meetings, and review of audit results.The implementation of the QA Program may be accomplished by AEPSC and/or Indiana Nichigan Power Company or delegated in whole or in part to other 1.7-30 July, 1993 AEP System companies or outside parties.However, AEPSC and/or Indiana Michigan Power Company retain full responsibility for all activities affecting safety-reIated items.The performance of the delegated organization i s evaluated by audit or survei llances on a frequency commensurate with their scope and importance of assigned work.1.7.2.2 IMPLEMENTATION 1.7.2.2.1 The Chairman of the Board and Chief Executive Officer of AEPSC has stated in a signed, formal"Statement of Policy", that it is the corporate policy to comply with the provisions of applicable codes, standards and regulations pertaining to quality assurance for nuclear power plants as required by the Cook Nuclear Plant operating licenses.The statement makes this gAPD and the associated implementing procedures and instructi ons mandatory, and requires compliance by all responsible organizations and individuals.

The statement also identifies the management positions wi thin the companies vested with responsibility an'd authority for implementing the program and assuring its effectiveness.

1.7.2.2.2 The gA Program at AEPSC and the Cook Nuclear Plant consist of controls exercised by organizations responsible for attaining quality objectives, and by organizations responsible for assurance functions.

The gA Program effectiveness is continually assessed through management review of various reports, NSDRC review of the gA audit program, and shall also be periodically reviewed by independent outside parties as deemed necessary by management.

The gA Program described in this gAPD is intended to apply for the life of the Cook Nuclear Plant.July, 1993

The QA Program applies to activities affecting the quality of safety-related structures, components, and related consumables during plant operation, maintenance, testing, and all design changes.Safety-related structures, systems and components are identified in the Facility Data Base and other documents which are developed and maintained for the plant.As deemed necessary by the AEPSC Director-Quality Assurance, or the Plant Manager, applicable porti ons of the QA Program controls will be applied to nonsafety-related activities associated with the implementation of the QA Program to ensure" that commitments are met (e.g., off-site records storage, training services, etc.).1.7.2.2.3 This QAPD, organized to present the QA Program for the Cook Nuclear Plant in the order of the 18 criteria of 10CFR50, Appendix B, states AEPSC policy for each of the criteria and describes how the controls pertinent to each are carried out.Any changes made to this QAPD that do not reduce the commitments previously accepted by the NRC must be submitted to the NRC at least annually.Any changes made to this QAPD that do reduce the commitments previously accepted by the NRC must be submitted to the NRC and receive NRC approval prior to implementation.

The submittal of the changes described above shall be made in accordance with the requirements of 10CFR50.54.

The program described in this QAPD will not be intentionally changed in any way that would prevent it from meeting the criteria of 10CFR50, Appendix 8 and other applicable operating license"requirements.

1.7.2.2.4 Documents used for implementing the provisions of this QAPD include the following:

1.7-32 July, 1993 Plant Manager Instructions (PHIs)establish the policy at the plant for compliance with specified criteria, and assign responsibility to the various departments,'s required, for implementation.

Plant Manager Procedures (PHPs), Department Head Procedures (DHPs), and in some cases Department Head Instructions (DHIs), have been prepared to describe the detailed activities required to support safe and effective plant operation as per the PMIs.The PHIs are reviewed by AEPSC (}A for concurrence that they will'satisfactorily implement regulatory requirements and commitments.

PHIs and PHPs are reviewed by the PNSRC prior to approval by the Plant Manager.DHPs and DHIs are reviewed within the departments prior to approval by the Department Head of origination.

DHPs and DHIs that might involve an unreviewed safety question as defined in 10CFR50.59 are reviewed by PNSRC prior to approval by the Department Head of origination.

AEPSC General Procedures (GPs)are utilized to define corporate policies and requirements for quality assurance, and to implement certain corporate gA Program requirements.

AEPSC division/department and/or section procedures are also used to implement gA Program requirements.

GPs may also be used to define policies which are nonprocedural in nature.When contractors perform work on-site under their own quality assurance programs, the programs are audited for compliance and consistency with the applicable requirements of the Cook Nuclear Plant's gA Program and the contract, and are approved by AEPSC gA prior to the start of work.Implementation of on-site contractor's gA programs, will be audited to assure that the contractor's programs are effective.

1.7-33 July, 1993

1.7.2.2.5~~~~Provisions of the gA Program for the Cook Nuclear Plant apply to activities affecti ng the quality of safety-related items.Appendix A to this gAPD lists the Regulatory/Safety Guides and ANSI Standards that identify AEPSC's commitment.

Appendix B descri bes necessary exceptions and clarifications to the requirements of those documents.

The scope of the program, and the extent to which its controls are applied, are established as follows: a)AEPSC uses the criteria specified in the Cook Nuclear Plant Updated FSAR for identifying structures, systems and components to which the gA Program applies.b)This identification process'results in the Facility Data Base for the Cook Nuclear Plant.This Facility Data Base is controlled by authorized personnel.

Facility Data Base items are determined by engineering analysis of the function(s) of plant i tems in relation to safe operation and shutdown.c)The extent to which controls specified in the gA Program are applied to Facility Data Base items is determined for each item considering its relative importance to safety.Such determinations are based on data in such documents as the Cook Nuclear Plant Technical Specifications and the Updated FSAR.1.7.2.2.6 Activities affecting safety-related items are accomplished under controlled conditions.

Preparations for such activities include consideration of the following:

a)b)c)Assigned personnel are qualified.

Work has been planned to applicable engineering and/or Technical Specifications.

Specified equipment and/or tools are available.

1.7-34 July, 1993

d)e)g)h)Items are in an acceptable status.Items on which work is to be performed are in the proper condition for the task.'roper approved instructions/procedures for the work are available for use.Items and facilities that could be damaged by the work have been protected, as required.Provisions have been made for special controls, processes, tests and verification methods.1.7.2.2.7 Responsibility and authority for planning and implementing indoctrination and training of AEPSC and Cook Nuclear Plant staff personnel are specifically designated, as follows: a)The training and indoctrination program provides for on-going training and periodic familiarization with the gA Program for the Cook Nuclear Plant.b)Personnel who perform inspection and examination functions are qualified in accordance with requirements of Regulatory Guide 1.8, ANSI N18.1, Regulatory Guide 1.58, ANSI N45.2.6, the ASHE BLPV Code, or SNT-TC-lA, as applicable, and with exceptions as noted in Appendix B hereto.c)AEPSC gA~y~auditors are qualified in accordance with Regulatory Guide 1.146 and ANSI N45.2.23.d)Personnel assigned duties such as special cleaning processes, welding, etc., are qualified in accordance with applicable codes, standards, regulatory guides and/or plant procedures.

1.7-35 July, 1993 e)The training, qual i fi cati on and certi fi cation program includes, as applicable, provisions for retraining, reexamination and recertification to ensure that proficiency is maintained.

f)Training, qualification, and cet tification records inc'luding documentation of objectives, wai vers/excepti ons, attendees and dates of attendance, are maintained at least as long as the personnel involved are performing activities to which the training, qualification and certification is relevant.g)Personnel responsible for performing activities that affect safety-related items are instructed as to the purpose, scope and implementation of the applicable manuals, instructions and procedures.

Management/supervisory personnel receive functional training to the level necessary to plan, coordinate and administer the day-to-day verification activities of the gA Program for which they are responsible.

Training of AEPSC and Cook Nuclear Plant personnel is performed employing the following techniques, as applicable:

I)on the job and formal training administered by the department or section the individual works for;2)formal training conducted by qualified instructors from the Cook Nuclear Plant Training Department or other entities (internal and external to the AEP System);and 3)formal, INPO accredited training conducted by the Cook Nuclear Plant Training Department.

Records of traini ng sessions for such training are maintained.

Where personnel qualifications or certi fi cations are required, these certi ficati ons are performed on a scheduled basis (consi stent with the appropriate code or standard).

'ook Nuclear Plant employees receive introductory training in quality assurance usually within the first two weeks of employment.

In addi tion, AEPSC personnel receive training prior to being allowed 1.7-36 July, 1993

~A unescorted access to the plant.This training includes management's policy for implementation of the gA Program through Plant Nanager and Department Head Instructions and Procedures.

These instructions also include a description of the gA Program, the use of instructions and procedures, personnel requirements for procedure compliance and the systems and components controlled by the gA Program.1.7.3 DESIGN CONTROL 1.7.3.1 SCOPE Design changes are accomplished in accordance with approved design.Activities to develop such designs are controlled.

Depending on the type of design change, these activities include design and field engineering; the performance of physics, seismic, stress, thermal, hydraulic and radiation evaluations; update of the FSAR;review of accident analyses;the development and control of associated computer programs;studies of material compatibility; accessibility for inservice inspection and maintenance; determination of quality standards; and requirement for equipment qualification.

The controls apply to preparation and review of design documents, including the correct translation of applicable regulatory requirements and design bases into design, procurement and procedural documents.

1.7.3.2 1.7.3.2.1 IMPLEMENTATION Design changes are controlled by procedures and instructions and are reviewed as required by lOCFR50.59 and the Technical Specifications.

Safety-related design changes are accomplished by one of two separate processes:

Minor Nodification (NN), or Request for Change (RFC).Those that do not alter the intended function of the item and can be determined by judgement to have a minimal overall impact on the item being modified may be implemented via the NH process.All other safety-1.7-37 July, 1993

related design changes, that are not appropriate for MN processing, are implemented via the RFC process.In cases where design changes could be deemed to be within the scope of RFCs or MNs solely due to possible insignificant adverse seismic effects, the change may be implemented via the Plant Modification (PN)process.In the case where safety-related items are involved and the change introduces only insignificant adverse seismic effects, the change may be implemented via the Plant Modification (PH)process.1.7.3.2.2 Design changes are reviewed to determine their impact on nuclear safety and to determine if the proposed changes involve an unreviewed safety question as defined by 10CFR50.59.

If a design change were to involve an unreviewed safety question, it would not be approved for implementation unti 1 the required NRC approval was received.RFCs (except those requiring emergency processing), HHs and PHs (having only insignificant seismic effect on safety rie]abed items)are reviewed and approved prior to implementation, as a minimum, by the cognizant AEPSC section and Plant Manager.The PNSRC also reviews those RFCs, NNs, and PNs for which safety evaluations are deemed necessary, pursuant to 10CFR50.59 and Technical Specification 6.5.1.6.1.7.3.2.3 For RFCs, the Change Control Board established within AEPSC provides an additional review and approval level.The Change Control Board is comprised of members of the Engineering, Design, Nuclear Operations and gA organizations within AEPSC, and is supplemented by other AEPSC organizations or individuals, as required.1.7-38 July, 1993 The cognizant member of the Change Control Board assigns a lead engineer for each RFC.The lead engineer is responsible for coordinating the RFC activities within AfPSC and maintaining close interface with AEPSC Site Engineering Support Project Engineering.

1.7.3.2.4 Proposed RFCs which require emergency processing are originated at the.plant, reviewed by the PNSRC, and approved by the Plant Hanager.Cook Nuclear Plant management then contacts the AEPSC NO/>, and other AEPSC management, as required, describes the change requested, and implements the change only after receiving verbal AEPSC management authorization to proceed.These reviews and approvals are documented and become a part of the RFC Packet.1.7.3.2.5 When RFCs or HHs involve design interfaces between internal or external design organizations, or across technical disciplines, these interfaces are controlled.

Procedures are used for the review, approval, release, distribution and revision of documents involving design interfaces to ensure that structures, systems and components are compatible geometrically and functionally with processes and the environment.

Lines of communication are established for controlling the flow of needed design information across design interfaces, including changes to the information as work progresses.

Decisions and problem resolutions involving design interfaces are made by the AEPSC organization having responsibility for engineering direction of the design effort.1.7.3.2.6 Checks are performed and documented to verify the dimensional accuracy and completeness of design drawings and specifications.

1.7-39 July, 1993 RFC design document packages are audited by AEPSC gA to assure that the documents have been prepared, verified, reviewed and approved in accordance with company procedures.

1.7.3.2.8 The extent of, and methods for, design verification are documented.

The""extent of design verification performed is a function of the importance of the item to safety, design complexity, degree of standardization, the state-of-the-art, and similarity with previously proven designs.Hethods for design verification include evaluation of the applicability of standardized or previously proven designs, alternate'alculations, qualification testing and design reviews.These methods may be used singly or in combination," depending on the needs for the design under consideration.

When design verification is done by evaluating standardized or previously proven designs, the applicability of such designs is confirmed.

Any differences from the proven design are documented and evaluated for the intended application.

gualification testing of prototypes, components, or features is used when the ability of an item to perform an essential safety function cannot otherwise be adequately substantiated.

This testing is performed before plant equipment installation, where possible, but always before reliance upon the item to perform a safety-related function.gualification testing is performed under conditions that simulate the most adverse design conditions, considering all relevant operating modes.Test requirements, procedures and results are documented.

Results are evaluated to assure that test requirements have been satisfied.

Design changes shown to be necessary through testing are made, and any necessary retesting or other verification is performed.

Test configurations are clearly documented.

1.7-40 July, 1993 Design reviews are performed by multi-organizational or interdisciplinary groups, or by single individuals.

Criteria are established to determine when a formal group review is required, and when review by an individual is sufficient.

Procedures require that minor design changes accomplished by the HN process also receive formal design verification.

Applicable design verification activities shall be completed prior to declaring the design change, or portion thereof, operational.

1.7.3.2.9 Persons representing applicable technical disciplines are assigned to perform design verifications.

These persons are qualified by appropriate education or experience, but are not directly responsible for the design.The designer's immediate supervisor may perform the verification, provided that: 2)3)The supervisor is the only technically qualified individual.

o The supervisor has not specified a singular design approach, ruled out design considerations, nor established the design inputs.and The need is g documented and approved g~by the supervisor's management.

and%:".",:l9 Regularly scheduled (}A audits verify conformance to previous items 1 through 3.Design verification on safety-related design changes shall be completed prior to declaring a design change, or portions thereof, operational.

1.7-41 July, 1993 1.7.3.2.10

~~~~Implementation of design changes is coordinated on site by AEPSC Site Engineering Support Project Engineering.

Material to perform the design change must meet the specifications established for the original system, or as specified by the lead engineer.For those design changes where testing after completion is required, the testing documentation is reviewed by the organization performing the test and, when specified, by the AEPSC lead engineer or other cognizant engineer(s).

Further, completed design changes are audited/survei lied by AEPSC gA following installation and testing.1.7.3.2.11 Changes to design documents, including field changes, are reviewed, approved and controlled in a manner commensurate with that used for the original design.Such changes are evaluated for impact.Information on approved changes is transmitted to all affected organizations.

1.7.3.2.12 Error and deficiencies in, and deviations from, approved design documents are identified and dispositioned in accordance with established design control and/or corrective action procedures.

1.7.3.2.13 Established 1)2)3)4)5)e)design control procedures provide for: controlled submission of design changes, engineering evaluation, review for impact on nuclear safety, audit by AEPSC gA, design modification, AEPSC managerial review, and 1.7-42 July, 1993 7)approval and record keeping for the implemented design change.1.7.4 PROCUREHENT DOCUHENT CONTROL 1.7.4.1 SCOPE Procurement documents define the characteristics of i tem(s)to be procured, identify applicable regulatory and industry codes/standards requirements, and specify supplier gA Program requirements to the extent necessary to assure adequate quality.1.7.4.2 1.7.4.2.1 IHPLEHENTATION Procurement control is established by instructions and procedures.

These documents require that purchase documents be sufficiently detailed to ensure that purchased safetP~r:ilat'ed@:gems and services Q%, are:)purchased to specification and code requirements equivalent to those of the original equipment or service (except when the Code of Federal Regulations requires upgrading), 2)properly documented to show compliance with the applicable specifications, codes and standards, and 3)purchased from vendors or contractors who have been evaluated and deemed qualified, or by the commercial grade dedication process.Procedures establish the review of procurement documents to determine that: Appt',opr,'.,i%tegtec4'ni.'.:cd'::;::;.and quality requirements are correctly stated, inspectable and controllable; there are adequate acceptance criteria;and procurement documents have been prepared, reviewed and approved in accordance with established requirements.

The manager of the originating group, with support of the cognizant AEPSC engineering group, is responsible for assuring that applicable requirements are set forth in procurement documents.

1.7-43 July, 1993 The Cook Nuclear Plant may request assistance of AEPSC cognizant engineers in any procurement activity.I 1.7.4.2.2 The Facility Data Base, in conjunction with other sources, is used for equipment safety classification and procurement grade.AEPSC specifications are used to determine requirements, codes or standards that i tems must fulfill, and define the documentation that must accompany the item to the plant.Procurement documents for safety-related items and services are reviewed to ensure that: correct classification is made;the requirements are properly stated;and that measures have been, or will be, implemented to assure the requirements are met and adequately provided for.'I Purchase requisitions for new safety-related items are initiated by the cognizant engineering group which establishes initial requirements.

Replacement/spares are purchased to requirements equivalent to the original unless upgrading is required by Federal Regulations, or deemed necessary by the cognizant engineering group.1.7.4.2.3 The contents of procurement documents vary according to the item(s)being purchased and its function(s) in the Cook Nuclear Plant.Provisions of this gAPD are considered for application to service contractors, also.As applicable, procurement documents include: a)Scope of work to be performed.

b)Technical requirements, with applicable drawings, specifications, codes and standards identified by title, document number, revision and date, with any required procedures, such as special process instructions identified in such a way as to indicate source and need.Imposition of guides/standards on AEPSC/IM suppliers and 1.7-44 July, 1993 c)d)e)g)subtier suppliers will be on a case-by-case basis depending upon the item or service to be supplied and upon the degree that AEPSC/I&M relies on suppliers to invoke guides/standards.

AEPSC/I&M recognizes that certain suppliers have acceptable 10CFR50, Appendix B gA programs, even through, the suppliers are not committed to Regulatory Guides or industry standards-(e.g.

ANSI N45.2.6.).

In those cases, in which suppliers are not committed to the same guides/standards as AEPSC/I&M, AEPSC/I&M will assure that (1)the supplier's gA program provides adequate gA controls, regardless of the lack of specific commitment, or (2)controls will be invoked directly by AEPSC/I&M to assure adequate'uality of items/services received by suppliers.

Regulatory, administrative and reporting requirements.

guality requirements appropriate to the complexity and scope of the work, including necessary tests and/or inspections.

A requirement for a documented gA Program, subject to gA review and written concurrence prior to the start of work.A requirement for the supplier to invoke applicable quality requirements on subtier suppliers.

Provisions for access to supplier, and subtier suppliers', facilities and records for inspections, survei llances and audits.Identification of documentation to be provided by the supplier, the schedule of submittals and documents requiring AEPSC approval.1.7.4.2.4 The AEPSC gA Division performs audits of procurement documents to assure that gA Program requirements have been met.These audits are conducted in accordance with AEP5C gA Division procedures.

1.7.4.2.5 Changes to procurement documents are controlled in a manner commensurate with that used for the original documents.

1.7-45 July, 1993 1.7.5 1.7.5.1 INSTRUCTIONS, PROCEDURES, AND DRAWINGS SCOPE Activities affecting the quality of safety-related structures, systems and components are accomplished using instructions, procedures and drawings appropriate to the circumstances, including acceptance criteria for determining if an activity has been satisfactorily completed.

1.7.5.2 1.7.5.2.1 IMPLEMENTATION Instructions and procedures incorporate:

1)a description of the activity to be accomplished, and 2)appropriate quantitative (such as tolerances and operating limits)and qualitative (such as workmanship and standards) acceptance criteria sufficient to determine that the activity has been satisfactorily accomplished.

Hold points for inspecti on are establ i shed when required.Instructions and procedures pertaining to the specification of, and/or implementation of, the gA Program receive multiple reviews for technical adequacy and inclusion of appropriate quality requirements.

Top tier instructions and procedures are reviewed and/or approved by AEPSC gA.Lower tier documents are reviewed and approved, as a minimum, by management/supervisory personnel trained to the level necessary to plan, coordinate and administer those day-to-day verification activities of the gA Program for which they are responsible.

Special procedures may be issued for activities which have short-term app1 i cabi 1 i ty.1.7.5.2.2 AEPSC activities relative to the Cook Nuclear Plant are outlined by procedures which provide the controls for the implementation of these 1.7-46 July, 1993 activities.

AEPSC has two categories of QA Program implementation procedures:

1)General Procedures (GPs)which are applicable to all AEPSC divisions and departments involved with Cook Nuclear Plant.2)Organization procedures which apply to the specific division, department or section involved.1.7;5;2.3 Activities at the Cook Nuclear Plant are controlled using plant procedures.

The PHIs have been classified into the following series: 1000 Personnel Selection, PNSRC Procedures 2000 Administration

-Document Control, Security, Training, Records, Emergency Plan, Fire Protection, Clearance Permits, Chemical Control, Internal Cleanliness, Spill Response, Standing orders, Corrective Maintenance.

3000 Procurement, Receiving, Shipping and Storage 4000 Operations, Fuel Handling, Surveillance Testing, Test Controls 5000 Maintenance, Repair, Modification, Special Processes, EQ and ISI Control of Contractors 6000 Technical-Chemistry/Radiological Controls, Radiation Protection, Performance/Engineering Testing, and Instrument and Control Maintenance and Calibration, Measuring and Test Equipment 7000 Quality Assurance, Quality Control Program and Condition/Problem Reporting Instructions and procedures identify the regulatory requirements and commitments which pertain to the subject that it will control and establish responsibilities for implementation.

Instructions and 1.7-47 July, 1993

procedures may either provide the guidance necessary for the development of supplemental instructions and/or procedures to implement thei r requirements, or provide comprehensive guidance based on the subject matter.1.7.5.2.4 Cook Nuclear Plant drawings are produced, controlled and distributed under the control of AEPSC and the Cook Nuclear Plant.AEPSC design drawings are produced by, or under the control of, the AEPSC Nuclear.Engineering Department under a set of procedures which direct their development and review.These procedures specify requirements for inclusion of quantitative and qualitative acceptance criteria.Specific drawings are reviewed and approved by the cognizant engineering organization.

AEPSC has stationed an on-site design staff to provide for the revision of certain types of design drawings to reflect as-built conditions.

1.7.5.2.5 Complex Cook Nuclear Plant procedures are designated as"In Hand" procedures.

Examples of".In Hand" procedures are those developed for extensive or complex jobs where reliance on memory cannot be trusted.Further, those procedures which describe a sequence which cannot be altered, or require the documentation of data during the course of the procedure, are considered."In Hand" procedures are designated as such by double asterisks (**)which precede the procedure number on the cover sheet, all pages and attachments of a procedure and the corresponding index.1.7-48 July, 1993 it 1.7.6 1.7.6.1 DOCUMENT CONTROL SCOPE Documents controlling activities within the scope defined in 1.7.2 herein are issued and changed according to established procedures.

Documents such as instructions, procedures and drawings, including changes thereto, are reviewed for adequacy, approved for release by authorized personnel, and are distributed and used at the location where a prescribed activity is performed.

Changes to controlled documents are reviewed and approved by the same organizations that performed the original review and approval, or by other qualified, responsible organizations specifically designated in accordance with the procedures governing these documents.

Obsolete or superseded documents are controlled to prevent inadvertent use.1.7.6.2 IMPLEMENTATION Controls are established for approval, issue and change of documents in the following categories:

a)b)c)d)e)f)g)Design documents (e.g., calculations, specifications, analyses)Drawings and related documents Procurement documents Instructions and procedures Updated Final Safety Analysis Report (UFSAR)Plant Technical Specifications Safeguards documents 1.7.6.2.2 The review, approval, issuance and change of documents are controlled by: 1.7-49 July, 1993 a)Establishment of criteria to ensure that adequate technical and quality requirements are incorporated.

b)Identification of the organization responsible for review, approval, issue and maintenance.

c)Review of changes to documents by the organization that performed the initial review and approval, or by the organization desi gnated in accordance with the procedure governing the review and approval of specific types of documents.

1.7.6.2.3 Documents are issued and controlled so that: a)The documents are available prior to commencing work.b)Obsolete documents are replaced by current documents in a timely manner.1.7.6.2.4 Haster lists, or equivalent controls, are used to identify the current revision of instructions, procedures, specifications and drawings.These control documents are updated and distributed to designated personnel who are responsible for maintaining current copies of the applicable documents.

The distribution of controlled documents is performed under procedures requiring receipt acknowledgement and in accordance wi th establ i shed di stri buti on 1 i sts.1.7.6.2.5 In the event a drawing is developed on-site to reflect an as-built configuration, the marked-up drawing is maintained in the Naster Plant File and all holders of the drawing are issued appropriate notification to inform them the revision they hold is not current, cannot be used 1.7-50 July, 1993 and, if required, reference must be made to the Master Plant File drawing.v 1.7.6.2.6 Documents prepared for use in training are appropriately marked to indicate that:hey cannot be used to operate or maintain the facility or to conduct activities affecting the quality of safety-related items.At the Cook Nuclear'Plant, unless a document is identified as'controlled'r

'working copy'nly, it is automatically assumed that the document is for information use only.1.7.7 1.7.7.1 CONTROL OF PURCHASED ITEMS AND SERVICES SCOPE Activities that implemenf approved procurement requests for items and services are controlled to assure conformance with procurement document requirements.

Controls include a system of supplier evaluation and selection audits, acceptance of items and documentation upon delivery, and periodic assessment of supplier performance.

Objective evidence of quality that demonstrates conformance with specified procurement document requirements is available to the Cook Nuclear Plant site prior to use of equipment, material, or services.1.7.7.2 IMPLEMENTATION 1.7.7.2.1 AEPSC qualifies suppliers,(dncludi ng,.dVstrmlbutors'Atoi the!mutenst>>

the!y, Le'reform",;;;:q'ual'iity',."::,re'lated@igbvi'ti'esp by performing a documented evaluation of their capability to provide items or services specified by procurement documents.

Items and services designated as safety-related are purchased from suppliers whose gA programs have been accepted in accordance with AEPSC requirements, or from commercial grade suppliers'hrough the AEPSC dedication program.Suppliers of other items/services 1.7-51 July, 1993 are subject to evaluation and approval based on acceptance criteria appl i cabl e to those i tems/servi ces.gualification oF such suppliers is determined by the AEPSC gA Division.In the discharge of this responsibility, the AEPSC gA Division may use information generated by other utilities.

The supplier l,:::;,: must be approved before procurement can be completed.

AEPSC is a member of the Nuclear Procurement Issues Committee (NUPIC), participates in joint supplier audits, and shares audit information consi stent with NUPIC requirements.

The supplier~l-:::;:;.'" must be acceptable, or acceptable subject to follow-up, before a procurement can be approve'd and processed.

Additional audits will be conducted, as necessary, to meet requirements.

Acceptance is not complete until it has been determined that the suppliers'A program can meet the requirements for the i tem(s)/service(s) offered.1.7.7.2.2 For items that are not unique to a nuclear power plant (" Commercial Grade")where requirements cannot be imposed in a practical manner at the time of procurement, programs for dedication to safety-related standards are established and accomplished by the AEPSC cognizant engineer prior to the item being accepted for safety-related use.1.7.7.2.3 In-process audits of suppliers'ctivities during fabrication, inspection, testing and shipment of items are performed when deemed necessary, depending upon supplier qualification status, complexity of the item(s)being furnished, the items'mportance to safety, and/or previous supplier history.These audits are performed by AEPSC gA.The cognizant engineer and/or responsible Cook Nuclear Plant personnel may also participate, if deemed necessary.

1.7-52 July, 1993

'I~~,l 1.7.7.2.4~~~~Spare and replacement parts are procured in such a manner that their performance and quality are at least equivalent to those of the parts that will be replaced.a)Specifications and codes referenced in procurement documents for spare or replacement items are at least equivalent to those for the original items or to properly reviewed and approved revisions.

b)Parts intended as spares or replacement for"off-the-shelf" items, or other items for which quality requirements were not originally specified, are evaluated for performance at least equivalent to the original.c)Where quality requirements for the original items cannot be determined, requirements and controls are established by engineering evaluation performed by qualified individuals.

The evaluation assures there is no adverse effect on interfaces, safety, interchangeability, fit, form, function, or compliance with applicable regulatory or code requirements.

Evaluation results are documented.

d)Any additional or modified design criteria, imposed after previous procurement of the item(s), are identified and incorporated.

1.7.7.2.5 Instructions and procedures address i~he requirements for supplier selection and control, as well as procurement document control.The prograingfor,'eceipt inspection of safety-related items addresses g~inspection of incoming items, including a review of the documentation required under the procurement.

Receipt inspection personnel are qualified and certified in accordance with the requirements of ANSI N45.2.6.Provisions for receipt inspection apply regardless of where 1.7-53 July, 1993

Nonconforming items, or missing or questionable documentation results in items being placed on"HOLD" and maintained in a designated, controlled area i:,":..-'":-'.

If the nonconformance cannot be cleared, the item is either scrapped, returned to manufacturer, or dispositioned through engineering analysis.1.7.7.2.7 Contractors providing services (on-si te)for safety-related components are required to have either a formal quality assurance program and procedures, or they must abide by the Cook Nuclear Plant gA Program and procedures.

Prior to their working at the Cook Nuclear Plant, contractors.::.::vio'rk'in3a'underT!t}j'e]::,r.',,:,nun quality assurance programs must be audited and approved by AEPSC gA.Contractor procedures must be reviewed and approved by the originating/sponsoring department head.Further, periodic audi ts'of site contractor acti vi ti es are conducted under the direction of the AEPSC guality Assurance Superintendent.

1.7.7.2.8~~~~To the extent prescribed in specific procurement documents, suppliers furnish quality records;documentary evidence that material and equipment either conforms to requirements or identifies any requirements that have not been met;and descriptions of those nonconformances from the procurement requirements, which have been disposi tioned"use-as-is" or"repair." This evidence is retained at the Plant, or at the Service Corporation.

To the extent prescribed in specific procurement agreements, suppliers are required to maintain additional (backup)documents in their record system.In some cases, such as with NSSS, suppliers are designated primary record retention responsibility.

1.7-55 July, 1993 1.7.7.2.9~~~~The capability of suppliers to furnish valid documentation is evaluated during procurement document reviews, annual supplier evaluations, and during audits.1.7.8 1.7.8.1 IDENTIFICATION AND CONTROL OF ITEMS SCOPE Items are identified and controlled to prevent their inadvertent use.Identification of items is maintained either on the items, their storage areas or containers, or on records traceable to the items.1.7.8.2 IMPLEMENTATION 1.7.8.2.1 Controls are established that provide for the identification and control of items (including partially fabricated assemblies).

1.7.8.2.2 Items are identified by physically marking the item or its container, and by maintaining records traceable to the item.The method of.identification is such that the quality of the item is not degraded.1.7.8.2.3 Items are traceable to applicable drawings, specifications, or other pertinent documents to ensure that only correct and acceptable items are used.Verification of traceabi lity is performed and documented prior to release for fabrication, assembly, or installation.

1.7-56 July, 1993

1.7.8.2.4~~~~Requirements for the identification by use of heat number, part number, serial number, etc., are included in AEPSC Specifications (DCCs)and/or the procurement document.1.7.8.2.5 Separate storage is provided for incorrect or defective items that are on hold and material which has been accepted for use.All safety-related items are appropriately tagged or identified (stamping, etc.)to provide easy identification as to the items'sage status.Records are maintained for the issue of items to provide traceabi li ty from storage to end use in the Cook Nuclear Plant.1.7.8.2.6 When materials are subdivided, appropriate identification numbers are transferred to each section of the material, or traceability is maintained through documentation.

1.7.9 1.7.9.1 CONTROL OF SPECIAL PROCESSES SCOPE Special processes are controlled and accomplished by qualified personnel using approved procedures and equipment in accordance with applicable codes, standards, specifications, criteria and other special requirements.

1.7.9.2 IMPLEMENTATION 1.7.9.2.1 Processes subject to special process controls are those for which full verification or characterization by direct inspection is impossible or 1.7-57 July, 1993 impractical.

Such processes include welding, heat treating, chemical cleaning, application of protective coatings, concrete placement and NDE.1.7.9.2.2 Special process requirements for chemical cleaning, application of protective coatings and concrete placement are set forth in AEPSC Specifications (DCCs)and/or directives prepared by the responsible AEPSC cognizant engineer.These documents are reviewed and approved by other personnel with the necessary technical competence.

AEPSC Specifications are audited by the AEPSC gA Division.Special process requirements for welding, heat treating and NDE are set forth in AEPSC Specifications, the AEP Melding and NDE Hanuals and plant procedures.

These specifications and manuals are prepared by, or are reviewed and approved by, the AEPSC Cognizant Engineer-Welding and NDE Administrator.

The administrative controls portion of the NDE Hanual is audited by AEPSC gA.Special process procedures, with the exception of welding and heat treating, are prepared by Cook Nuclear Plant personnel with technical knowledge in the discipline involved.These procedures, which are also reviewed by other personnel with the necessary technical competence, are qualified by testing.Welding is performed in accordance with procedures contained in the AEP Welding Hanual, or by approved contractor's procedures.

These procedures are qualified"in accordance with applicable codes, and Procedure gualification Records are prepared.Weld Procedure gualification Records are reviewed and approved by the AEPSC Cognizant Engineer-Welding.Weld qualification documentation is retained in the AEP Welding Hanual, or the approved contractor's manual.1.7-58 July, 1993

Contractor welding procedures are qualified by the contractor.

These procedures and the qua1ification documentation are reviewed and approved by the AEPSC Cognizant Engineer-Melding.This documentation is retained by the contractor.

1.7.9.2.3 NDE personnel are qualified and certified by a Cook Nuclear Plant NDE Leve1 III who has been qualified and certified by the designated AEPSC NDE Administrator.

Certification is by examination.

Personnel qualification is kept current by re-examination at time intervals\specified in qualification/certification procedures which are in accordance with the ASHE Code, Cook Nuclear Plant welders are qualified by the Haintenance Department using AEPSC approved procedures.

Supervision of Cook Nuclear Plant welder qualifications is performed by the Haintenance Department.

Examination of specimens is performed under the supervision of the Safety and Assessment Department in accordance with the AEP Welding Hanual covering welder qualification.

Cook Nuclear Plant welder qualification records are maintained for each welder by the Hain'tenance Department.

Contractor and craft welders are qualified by the contractor using procedures approved by the AEPSC Cognizant Engineer-'elding in accordance with AEPSC procedures.

Contractor and craft welder qualification records are maintained by the contractor.

1.7.9.2.4 gC/NOE Technicians assigned to the Safety and Assessment Department perform nondestructive testing for work performed by Cook Nuclear Plant and contractor personnel.

These individuals are qualified to either SNT-TC-IA, or ANSI N45.2.6, and records of the qualifications/

certifications are maintained at Cook Nuclear Plant.1.7-59 July, 1993

,

1.7.9.2.5 For special processes that require qualified equipment, such equipment is qualified in accdrdance with applicable codes, standards and specifications.

1.7.9.2.6 Special process qualifications are reviewed during regularly scheduled gA audits.gualification records are maintained in accordance with 1.7.17 herein.1.7.9.2.7 The documentation resulting from welding and nondestructive testing is reviewed by appropriate personnel.

1.7.10 INSPECTION 1.7.10.1 SCOPE~~~Activities affecting the quality of safety-related structures, systems and components are inspected to verify their conformance with requirements.

These inspections are performed'by personnel other than those who perform the activity.Inspections are performed by qualified personnel utilizing written procedures which establish prerequisites and provide documentation for evaluating test and inspection results.Direct inspection, process monitoring, or both, are used as necessary.

When applicable, hold points are used to ensure that inspections are accomplished at the correct points in the sequence of activities.

1.7.10.2 IMPLEMENTATION 1.7.10.2.1 Inspections are applied to appropriate activities to assure conformance to specified requirements.

Hold points are provided in the sequence of procedures to allow for the inspection, witnessing, examination, measurement, or review necessary to 1.7-60 July, 1993 assure that the critical, or irreversible, elements of an activity are being performed as required.Note that hold points may not apply to all procedures, but each must be reviewed for this attribute.

Hold points specify exactly what is to be done (e.g., type of inspection or examination, etc.), acceptance criteria, or reference to another procedure, etc., for the satisfactory completion of the hold point.When included in the sequence of a procedure, the activities required by hold points are completed prior to continuing work beyond that point.Process monitoring is used in whole, or in part, where direct inspection alone is impractical or inadequate.

1.7.10.2.2 Training, qualification and certification programs for personnel who perform inspections are established, implemented and documented in accordance with 1.7.2 herein and as described in Appendix B hereto, item 9b, with exceptions as noted therein.1.7.10.2.3 Inspection requirements are specified in procedures, instructions, drawings, or checklists as applicable.

They provide for the following, as appropriate:

a)Identification of applicable revisions of required instructions,drawings and specifications.

b)Identification of characteristics and activities to be inspected.

c)Inspection methods.d)Specification of measuring and test equipment having the necessary accuracy.1.7-61 July, 1993 e)Identification oF personnel responsible for performing the inspection.

f)Acceptance and rejection criteria.g)Recording of the inspection results and the identification of the inspector.

1.7.10.2.4 Inspections are conducted using the following programs: a~Peer Ins ection Pro ram.The Peer Inspection Program is based on the premise that ILH personnel are qualified to ANSI N18.1 (1971), Selection and Trainin of Nuclear Power Plant Personnel,'and are periodically trained in their skill area using INPO accredited training.As a result of their experience, qualifications, and training, 18M personnel may perform inspections of work functions associ ated with normal operation of the Plant, routine maintenance, and certain routine technical activities which are routinely performed by IEM personnel (peers).Peer inspection personnel are independent in that they do not perform or directly supervise the work being inspected, but they may be from the same work group.D.C.Cook Plant Safety and Assessment gC/NDE personnel, qualified in accordance with Regulatory Guide 1.58 and ANSI N45.2.6, will ensure (via surveillance) that peer inspections are being correctly implemented and make periodic reports to management.

b.ANSI N45.2.6 Ins ection Pro ram.Major modification and non-routine maintenance work on safetygrelated equipment is inspected per ANSI N45.2.6, uglification'f Ins ection Examination and Testin Personnel for Nuclear Power Plants, whether it is performed by I&H or contractor personnel.

All safetyP>related work performed by contract personnel is inspected per ANSI N45.2.6.1.7-62 July, 1993 Inspections of these work activities are performed by inspectors quali fi ed and certified in accordance with Regulatory Guide 1.58 and.ANSI N45.2.6.Contractors performing work on safety..-,'related equipment are required to comply with the applicable requirements of Regulatory Guide 1.33 and ANSI N45.2.1.7.10.2.5 Inspecti ons associ ated wi th the packaging and shi pment of radi oacti ve waste and materials are conducted using the following program: a)NRC Licensed Packa in s-Inspections of NRC licensed radioactive material packagings shall be performed by individuals independent from the work being performed.

The independent inspectors shall be Indiana Michigan Power personnel, qualified in accordance with Regulatory Guide 1.8 and ANSI N18.1, as a minimum.Additionally, the inspector shall be familiar with the activities being performed.

b)Non-NRC Licensed Packa in s and Containers

-Inspections of non-NRC licensed radioactive material packagings and containers (shipping and/or burial)shall be performed by Indiana Michigan Power personnel, qualified in accordance with Regulatory Guide 18.and ANSI N18.1, as a minimum.c)Trans ortati on Vehi cl es-Inspecti on of transportati on vehi cl es being shipped as"exclusive use", shall be performed by Indiana Nichigan Power personnel, qualified in accordance with Regulatory Guide 1.8 and ANSI N18.1, as a minimum.d)Other ins ections and Verification

-Inspections and verifications of other activities associated with the packaging and shipment of radioactive materials and waste shall be performed by Indiana and Michigan Power personnel, qualified in accordance with Regulatory Guide 1.8 and ANSI N18.1, as a minimum.1.7-63 July, 1993 1.7.10.2.6

~~~~Inspections are performed, documented, and the results evaluated by designated personnel in order to ensure that the results substantiate the acceptability of the item or work.Evaluation and review results are documented.

1.7.11 TEST CONTROL 1.7.11.1 SCOPE Testing is performed in accordance with established programs to demonstrate that structures, systems and components will perform satisfactorily in service.The testing is performed by qualified personnel in accordance with written procedures that incorporate specified requirements and acceptance criteria.Types of tests are: Scheduled Surveillance, preventive maintenance, post-design,'qualification.

Unscheduled Pre-and post-maintenance.

Test parameters (including any prerequisites), instrumentation requirements, and environmental conditions are specified in test procedures.

Test results are documented and evaluated.

1.7.11.2 IMPLEMENTATION 1.7.11.2.1 Tests are performed in accordance with programs, procedures and criteria that designate when tests are required and how they are to be performed.

Such testing includes the following:

1.7-64 July, 1993 a)qua 1 i fi cati on.tests, as appl i cabl e, to veri Fy desi gn adequacy.b)Acceptance tests of equipment and components to assure their operation prior to delivery or installation.

c)Post-design tests to assure proper and safe operation of systems and equipment prior to unrestricted operatioh.

d)Surveillance tests to assure continuing proper and safe operation of systems and equipment.

The PHI on surveillance testing controls the periodic testing of equipment and systems to fulfill the surveillance requirements established by the Technical Specifications.

Controls have been established to identify uncompleted surveillance testing to assure it is rescheduled for completion to meet Technical Specification frequency requirements.

Data taken during s'urvei]lance testing is reviewed by appropriate management personnel to assure that acceptance criteria is fulfilled, or corrective action is taken to correct deficiencies.

e)Maintenance tests after preventive or corrective maintenance.

1.7.11.2.2 Test procedures, as required, provide mandatory hold points for witness or review.1.7.11.2.3 Testing is accomplished'after installation, maintenance, or repair, by surveillance test procedures, or performance tests, which must be satisfactorily completed prior to determining the equipment i s in an operable status.All data resulting from these tests is retained at the Cook Nuclear Plant after review by appropriate management personnel.

1.7-65 July, 1993 e

1.7.12 CONTROL OF MEASURING AND TEST EgUIPHENT 1.7.12.1 SCOPE Measuring and testing equipment used in activities affecting the quality op safety-related s't'iuctur'ess:;~!systems;:;i'en'd:;":,coiiipon'eats are properly identified, controlled, calibrated and adjusted at specified intervals to maintain accuracy within necessary limits.r 1.7.12.2 IHPLEHENTATION 1.7.12.2.1 Established procedures and instructions are used for calibration and control of measuring and test equipment utilized in the measurement, inspection and monitoring of structures, systems and components.

These procedures and instructions describe calibration techniques and frequencies, and maintenance and control of the equipment.

AEPSC gA periodically assesses the effectiveness of the calibration program via the gA audit program.1.7.12.2.2 Heasuring and test equipment is uniquely identified and is traceable to i ts cal ibrati on source.1.7.12.2.3 A system has been established for attaching, or affixing labels, to measuring and test equipment to display the date calibrated and the next calibration due date, or a control system is used that identifies to potential users any equipment beyond the calibration due date.1.7-66 July, 1993 0

1.7.12.2.4

~~~~Measuring and test equipment is calibrated at specified intervals.

These intervals are based on the frequency of use, stability characteristics and other conditions that could adversely affect the required measurement accuracy.Calibration standards are traceable to nationally recognized standards; or where such standards do not exist, provisions are established to document the basis for calibration.

The primary standards used to calibrate secondary standards have, except in certain instances, an accuracy of at least four (4)times the required accuracy of the secondary standard.In those cases where the four (4)times accuracy cannot be achieved, the basis for acceptance is documented and is authorized by the responsible manager.The secondary standards have an accuracy that assures equipment being calibrated will be within required tolerances.

The basis for acceptance is documented and authorized by the responsible manager.1.7.12.2.5

~~~~Cook Nuclear Plant procedures define the requirements for the control of standards, test equipment and process equipment.

1.7.12.2.6 When measuring and testing equipment used for inspection and testing is found to be outside of required accuracy limits at the time of calibration, evaluations are conducted to determine the validity of the results obtained since the most recent calibration.

Retests, or reinspections, are performed on suspect items.The results of evaluations are documented.

1.7-67 July, 1993 1.7.13 HANDLING, STORAGE, AND SHIPPING 1.7.13.1 SCOPE Acti vi ti es with the potential for causing contami nati on or deterioration, by environmental conditions such as temperature or humidity that could adversely affect the ability of an item to perform its safety-related functions and activities necessary to prevent damage or loss, are identified and controlled.

These activities are cleaning, packaging, preserving, handling, shipping and storing.Controls are'" effected through the use of appropriate procedures and instructions.

1.7.13.2 IMPLEMENTATION 1.7.13.2.1 Procedures are used to control the cleaning, handling, storing, packaging, preserving and shipping of materials, components and systems in accordance with designated procurement requirements.

These procedures include,'but are not limited to, the following functions:

a)Cleaning-to assure that required cleanliness levels are achieved and maintained.

b)Packaging and preservation

-to provide adequate protection against damage or deterioration.

When necessary, these procedures provide for special environments, such as inert gas atmosphere, specific moisture content levels and temperature levels.c)Handling-to preclude damage or safety hazards.d)Storing-to minimize the possibility of loss, damage or deterioration of items in storage, including consumables such as chemicals, reagents and lubricants.

1.7-68 July, 1993 Controls have been established for limited shelf life items such as"0" rings, epoxy, lubricants, solvents and chemicals to assure they are correctly identified, stored and controlled to prevent shelf life expired materials from being used in the Cook Nuclear Plant.Controls are established in plant procedures.

1.7.13.2.3 Packaging and shipping requirements are provided to vendors in AEPSC Specifications (OCCs)which are a part of the procurement document, or are otherwise specified in the procurement document.Controls for receipt inspection, damaged items and special handling requirements at the Cook Nuclear Plant are established by plant procedures.

Special controls are provided to'assure that stainless steel components and materials are handled with approved lifting slings.Storage and surveillance requirements have been established to assure segregation of storage.Special controls have been implemented for critical, high value, or perishable items.Routine surveillance is conducted on stored material to provide inspection for damage, rotation of stored pumps and motors, inspection for protection of exposed surfaces and cleanliness of the storage area.1.7.13.2.5 Special handling procedures have been implemented for the processing of nuclear fuel during refueling outages.These procedures minimize the risk of damage to the new and spent fuel and the possible release of radioactive material when placing the spent fuel into the spent fuel pool.1.7-69 July, 1993 1.7.14 INSPECTION, TEST, AND OPERATING STATUS 1.7.14.1 SCOPE Operating status of structures, systems and components is indicated by tagging of valves and switches, or by other specified means, in such a manner as to prevent inadvertent operation.

The status of inspections and tests performed on individual items is clearly indicated by markings and/or logging under strict procedural controls to prevent inadvertent bypassing of such inspections and tests.1.7.14.2 IMPLEMENTATION 1.7.14.2.1 For design change activities, including item fabrication, installation and test, a program exists which specifies the degree of control required for the identiftcation of inspection and test status of structures, systems and components.

Physical identification is used to the extent practical to indicate the status of items requiring inspections, tests, or examinations.

Procedures'xist which provide for the use of calibration and rejection stickers, tags, stamps and other forms of identification to indicate test and inspection status.The Clearance Permit System uses various tags to identify equipment and system operability status.Another program establishes a tagging system for lifted leads, etc.For those items requiring calibration, the program provides for physical indication of calibration status by calibration stickers, or a control system is used.1.7.14.2.2 Application and removal of inspection and welding stamps, and of such status indicators as tags, markings, labels, etc., is controlled by plant procedures.

1.7-70 July, 1993 hh, The inspection status of materials received at the Cook Nuclear Plant is identified in accordance with established instructions.

The status is identified as Hold, ahold for guality Control Clearance, Reject, or Accept.The inspection status of work in progress is controlled by the use of hold points in procedures.

Plant guality Control, or departmental ANSI.N18.1 qualified personnel{reference 1.7.10.2.4 herein), inspect an activity at various stages and sign off the procedural inspection steps.The status of welding is controlled through the use of a weld data block which.identifies the inspection and NDE status of each weld.1.7.14.2.3 Required surveillance test procedures are defined in PHIs.These instructions provide for documenting bypassed, tests and rescheduling of the test.The status of testing after minor maintenance is recorded as part of the Job Order.The status oF testing after major maintenance is included as part of the procedure, and includes the performance of functional testing and approval of data by supervisory personnel.

Testing, inspection and other operations important to safety are conducted in accordance with properly reviewed and approved procedures.

The PHI for plant procedures requires that procedures be followed as written.Alteration to the sequence of a procedure can only be accomplished by a procedure change which is subject to the same controls as the original review and approval.When an immediate procedure change is required to continue in-process work or testing and the required complete review and approval process cannot be accomplished, an"On The Spot" change is processed in accordance with the PMI on plant procedures.

July, 1993

1.7.14.2.4

~~~~Nonconforming, inoperable, or malfunctioning structures, systems and components are clearly identified by tags, stickers,'stamps, etc., and documented to prevent inadvertent use.1.7.15 NONCONFORMING ITEMS 1.7.15.1 SCOPE Materials, parts, or components that do not conform to requirhments are controlled in order to prevent their inadvertent use.Nonconforming items are identified, documented, segregated when practical and dispositioned.

Affected organizations are notified of nonconformances.

1.7.15.2 IMPLEMENTATION 1.7.15.2.1 Items, services, or activities that are deficient in characteristic, documentation, or procedure, which render the quality unacceptable or indeterminate, are identified as nonconforming and any further use is controlled.

Nonconformances are documented and dispositioned, and notifi cation is made to affected organizations.

Personnel authorized to disposition, conditionally release and close out nonconformances are designated.

The Job Order System and/or the Condjgion Reports (refer to 1.7.16 herein)are used at Cook Nuclear Plant to identify nonconforming items and initiate corrective action for items which are installed or have been released to the Cook Nuclear Plant.Systems, components, or materials which require repair or inspection are controlled under the Job Order System.In addition, the various procedures identified in 1.7.14 herein provide for identification, segregation and documentation of nonconforming items.1.7-72 July, 1993 1.7.15.2'Nonconforming items are identified by marking, tagging, segregating, or by documented administrative controls.Documentation describes the nonconformance, the disposition of the nonconformance and the inspection requirements.

It also includes signature approval of the disposition.

Completed Job Orders are reviewed by the supervisor responsible for accomplishing the work, and the supervisor of the department/section that originated the Job Order.The gA Division periodically audits the Job Order System, and on a sample basis, Job Orders.1.7.15.2.3 Items that have been repaired or reworked are inspected and tested in accordance with the original inspection and test requirements, or alternatives, that have been documented.

Items that have the disposition of"repair" or"use-as-is" require documentation justifying acceptability.

The changes are recorded to denote the as-built condition.

When required by established procedures, surveillance or operability tests are conducted on an item after rework, repair or replacement.

1.7.15.2.4 Disposition of conditionally released items are closed out before the items are relied upon-to perform safety-related functions.

1.7.16, CORRECTIVE ACTION 1.7.16.1 SCOPE 4 Conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and 1.7-73 July, 1993 0 I nonconformances are identified promptly and corrected as soon as practical.

For significant conditions adverse to quality, the cause of the condition is determined, corrective action is taken to correct the immediate problem, and preventive action is implemented to prevent recurrence.

In these cases, the condition, cause and corrective action taken is documented and reported to appropriate levels of management.

1.7.16.2 IMPLEMENTATION 1.7.16.2.1 Procedures are established that describe the plant and AEPSC corrective action programs.These procedures are reviewed and concurred with by the AEPSC gA Division.1.7.16.2.2 Condition N~Reports provide the mechanism for plant and AEPSC personnel to notify management of conditions adverse to quality.Condition e~Reports are also used to report violations to codes, regulations and the Technical Specifications.

Investigations of reported conditions adverse to quality are assigned by management.

The Condition Q Report is used to document the investigation of an;:-:;,adverse condi't'ion; and to identify the need for a design change to correct system or equipment deficiencies, or to identify the need for the initiation of Job Orders to correct minor deficiencies.

Further, Condition jP, Reports are used to identify those actions necessary to prevent recurrence of the reported condition.

7~he,PNSRC:=::::,evalua'tes~~acfian~s:

takenpo!r..be sng." takensatodcroreci,,;

aLdpurevent r'ae'co'rr anni!,: o':.:::the:

de'fi agency,';,,for.,..con di tip n vra'p~ortsÃi'nv'o,'vyng i":.".'>l;:.",'a:::;:-,:--,,a;:;";:vi'iationso'f:,""::Tech"hnscal,:;>Poacifd'cat'ion b.;..:ih.;.:":;,',">>:.a:irepor'~ab~.e.-'e jen t i~::;:";;,=,*!any':,,'cocci de'otal:=",.'..!un'>1 adn, f ner or unt cofnl,:.1r,eodt riadi oac'tl:.v a';:r<<e lease 1.7-74 July, 1993 LV d!';--::Ã9:,.".a7,'s'a fety:"-,.rvel a'te'd':;'a'dverse'.,':tr'end

'VhVE PAYS VLVEhLVLVLV QL')'Vh S,V>>W'Eh WNWYhWhhYh hWEhChV lh4AWk)hYEEV e>'~-':: ':.'a-,'," jotenis:al.:;-::nuc:jear~sa'fete.';"'::hazard I EEECWAh XBWEVh (OV(Y~hk@hL Vh WhYL$WN%NV YhWh49~'f~Pe,";,::an:,,ventr'v':6'.nto,'"Tecvhni'ca'1:,"";.Sji'ecYfi cati'on',,".ELCOj;.'3".'0';"3<':

('fa'i'1:".u're:.',;.to co'm*p.ly, w'i::th'i'L'CO,':;sgnoht'..':.con'taj'ni'nqVSpeei'f i cFsh'utdo'Anijsche'du]

e);: umkV~VE'L'V~WWhh4%XWVL.h

'~V'W:IhauuatWaP~ELWEhWhWLINRSYhVLEVL~VuN~

'a'!',"."-,.'gga"..,T'ecViiii cal':;::,:;.Spec'i'a't'i'ori:"'..O'CO';-.'entry',,':.'th'at~'ww'as!

the",=:":ri'sul t;:,-,o f: hEh'VWIVhW L V W WWI M perhsonne:.l:;-!

error,:;., VK L+'V'hhhVwhVV'XC4C~

NA(E w v I The AEPSC NSDRC is responsible for assuring that independent reviews of violations (as specified in the Technical Specifications) are performed.

'These violations are considered significant problems which are documented on Condition>~Reports.The reviews will provide an independent evaluation of the reported problems and corrective actions.The AEPSC gA Division periodically audits the corrective action systems for compliance and effectiveness.

1.7.17 EQUALITY ASSURANCE RECORDS 1.7.17.1 SCOPE~~~Records that furnish evidence of activities affecting the quality of safety-related structures, systems and components are maintained.

They are accurate, complete, legible and are protected against damage, deterioration, or loss.They are identifiable and retrievable.

1.7.17.2 IMPLEMENTATION 1.7.17.2.1 Documents that furnish evidence of activities affecting the quality of safety-related items are generated and controlled in accordance with the procedure that governs those activities.

Upon completion, these documents are considered records.These records include: a)b)Results of reviews, inspections, survei llances, tests, audits and material analyses.gualification of personnel, procedures and equipment.

1.7-75 July, 1993

'C c)d)e)f)g)h)Operation logs.Haintenance and modification procedures and related inspection I results.Reportable occurrences.

Records required by the plant Technical Specifications.

Con'dj ti;on Reports.~rNcc4+N~5~i Other documentati on such as drawings, speci fi cati ons, dedi cati on plans, procurement documents, calibration procedures and reports.Radiographs.

1.7.17.2.2 Instructions and procedures establish the requirements for the identification and preparation of records for systems and equipment under the gA Program, and provide the controls for retention of these records.Criteria for the storage location of quality related records, and a retention schedule for these records, has been established.

File Indexes have been established to provide direction for filing, and to provide for the retrievability of the records.Controls have been established for limiting access to the Plant Haster File to prevent unauthorized entry, unauthorized removal, and for use of the records under emergency conditions.

The Nuclear..Records Hanagement Supervisor is responsible for the control and operation of the Plant Haster File Room.1.7.17.2.3 Within AEPSC, each department/division manager is responsible for the identification, collection, maintenance and storage of records generated by their department/division.

Procedures ensure the maintenance of 1.7-76 July, 1993 records sufficient to furnish objective evidence that activities affecting quality are in compliance with the established gA Program.I 1.7.17.2.4 When a document becomes a record, it is designated as permanent, or nonpermanent, and then transmitted to file.Nonpermanent records have specified retention times.Permanent records are maintained for the life of the plant or equipment, as applicable.

1.7.17.2.5 Only authorized personnel may issue corrections or supplements to records.1.7.17.2.6 Traceability between the record and the item or activity to which it applies is provided.1.7.17.2.7 Except for records that can only be stored as originals, such as radiographs and some strip charts, or micrographs thereof, records are stored in remote, dual facilities to prevent damage, deterioration, or loss due to natural or unnatural causes.When only the single original can be retained, special fire-rated facilities are used.1.7.18 AUDITS 1.7.18.1 SCOPE A comprehensive system of audits is carried out to provide independent evaluation of compliance with, and the effectiveness of, the gA Program, including those elements of the program implemented by suppliers and contractors.

Audits are performed in accordance with written procedures 1.7-77 iuly, 1993

or checklists by qualified personnel not having direct responsibility in the areas audited.Audit results are documented and reviewed by management.

Follow-up action is taken where indicated.

1.7.18.2 IMPLEMENTATION 1.7.18.2.1 AEPSC A Division Res onsibilities The basic responsibility for the assessment of the gA Program is vested in the AEPSC gAD.The AEPSC gAD is primarily responsible for ensuring that proper gA programs are established and for verification of their implementation.

These responsibilities are discharged in cooperation with the AEPSC and Cook Nuclear Plant management and their staffs.1.7.18.2.2 Internal audits are performed in accordance with established schedules that reflect the status and importance of safety to the activities being performed.

All areas where the requirements of 10CFR50, Appendix B apply are audited within a period of one to two years.1.7.18.2.3 The AEPSC gAD conducts audits to verify the adequacy and implementation of the gA Program at the Cook Nuclear Plant and within the AEP System.gA audit reports are distributed to the appropriate management and the NSDRC (all audits).1.7.18.2.4 The independent off-site review and audit organization is the AEPSC NSDRC.This committee is composed of AEPSC, I&M and Cook Nuclear Plant management members.An NSDRC Manual has been developed for this committee which contains the NSDRC Charter and procedures.

The NSDRC conducts periodic audits of Cook Nuclear Plant operations pursuant to established criteria (Technical Specifications, etc.).1.7-78 July, 1993 NSDRC audit reports are submitted for review to the NSORC membership and the Chairman of the NSORC P>.Condition Reports provide for the recording of actions taken to correct deficiencies found during these audits.1.7.18.2.5 The Cook Nuclear Plant on-site review group is the PNSRC.This committee reviews plant operations as a routine evaluation and serves to advise the Plant Hanager on matters related to nuclear safety.The composition of the committee is defined in the Technical Specifications.

The PNSRC also reviews instructions, procedures, and design changes for safety-related systems prior to approval by the Plant Hanager.In addition, this committee serves to conduct investigations of violations to Technical Specifications, and reviews significant Coi7dft'i~6n.":';Reports to determine if appropriate action has been taken.1.7.18.2.6 Audits of suppliers and contractors are scheduled based on the status of safety importance of the activities being performed, and are initiated early enough to assure effective quality assurance during design, procurement, manufacturing, construction, installation, inspection and testing.Principal contractors are required to audit their suppliers systematically in accordance with the criteria established within their quality assurance programs.'-

1.7.18.2.7 Regularly scheduled audits are supplemented by"special audits" when significant changes are made in the gA Program, when it is suspected 1.7-79 July, 1993

that quality is in jeopardy, or when an independent assessment of program e f fee ti veness i s cons i dered necessary.

C 1.7.18.2.8 Audits include an objective evaluation of practices, procedures, instructions, activities and items related to quality;and a review of documents and records to confirm that the gA Program is effective and properly implemented.

1.7.18.2.9 Audit procedures and the scope, plans, checklists and results of individual audits are documented.

1.7.1.2.10 Personnel selected for auditing assignments have experience, or are given training commensurate with the needs of the audit, and have no direct responsibilities in the areas audited.1.7.18.2.11 Hanagement of the audited organization identifies and takes appropriate action to correct observed deficiencies and to prevent recurrence.

Follow-up is performed by the auditing organization to ensure that the appropriate actions were taken.Such follow-up includes reaudits, when necessary.

1.7.18.2.12 The adequacy of the gA Program is regularly assessed by AEPSC management.

The following activities consti tute formal elements of that assessment:

1.7-80 July, 1993 a)Audit reports, including follow-up on corrective action accomplishment and effectiveness, are distributed to appropriate levels of management.

b)Individuals independent from the gA organization, but knowledgeable in auditi,ng and quality assurance, periodically review the effectiveness of the gA Programs.Conclusions and recommendations are reported to the AEPSC Vice President-Nuclear Operations.

1.7.19 FIRE PROTECTION gA PROGRAM 1.7.19.1 Introducti on The Cook Nuclear Plant Fire Protection gA Program has been developed using the guidance of NRC Branch Technical Position (APCSB)9.5-1, Appendix A, Section C,"guali ty Assurance Program," and NRC clarification"Nuclear Plant Fire Protection Functional Responsibi li ties, Administrative Controls, and guality Assurance," dated June 14, 1977.As such, the Fire Protection gA Program is part of the overall gA Program for the plant.The Fire Protection gA Program encompasses design, procurement, fabrication, construction, surveillance, inspection, operation, maintenance', modification, and audits.Implementation and assessment of the Fire Protection gA Program is the responsibility of each involved AEPSC and Indiana Michigan Power Company organization.

l.i.19.!The Fire Protection gA Program is under the management control of AEPSC.This control consists of: 1)Verifying the effectiveness of the Fire Protection gA Program through review, surveillance, and audits.1.7-81 July, 1993 2)Directing formulation, implementation, and assessment of the Fire Protection gA Program by procedural controls.3)Assuring the gA program is acceptable to the management responsible for fire protection.

The Plant Manager has delegated responsibility to various Cook Nuclear Plant departments for the following fire protection activities: "a)b)c)d)e)f)g)Maintenance of fire protection systems.Testing of fire protection equipment.

Fire safety inspections.

Fire fighting procedures.

Fire dri 1 l s.Emergency remote shutdown procedures.

Emergency repair procedures (10CFR50, Appendix R).The Fire Protection gA Program at the Cook Nuclear Plant also provides for inspection of fire hazards, explosion hazards, and training of fire brigade and responding fire departments.

The Safety and Assessment Department's Fire Protection Shift Supervisor on duty, or designee, is designated as the Fire Brigade Leader and coordinates the fire fighting efforts of shift personnel and the Fire Brigade.The Operations Department provides an individual with plant systems knowledge to serve as an advisor to the Fire Brigade Leader.1.7.19.3 Desi n Control and Procurement Document Control guality standards are specified in the design documents such as appropriate fire protection codes and standards, and, as necessary, deviations and changes from these quality standards are controlled.

The Cook Nuclear Plant design was reviewed by qualified personnel to ensure inclusion of appropriate fire protection requirements.

These reviews include items such as: 1.7-82 July, 1993 1)Verification as to the adequacy of electrical isolation and cable separation criteria.I 2)Verification of appropriate requirements for room isolation (sealing penetrations, floors and other fire barriers).

3)Determination for increase in fire loadings.4)Determination for the need of additional fire detection and suppression equipment.

Procurement of fire protection equipment and related items are subject to the requirements of the fire protection procurement documents.

A review of these documents is performed to assure fire protection requirements and quality requireme'nts are correctly stated, verifiable, and controllable, and that there is adequate acceptance and rejection criteria.Procurement documents must be prepared, reviewed, and approved according to gA Program requirements.

Design and procurement document changes, including field changes and design'deviations, are controlled by procedure.

1.7.19.4 Instructions Procedures and Drawin s II Inspections, tests, administrative controls, fire drills and training that assist in implementing the fire protection program are prescribed by approved instructions or procedures.

Indoctrination and training programs for fire prevention and fire fighting are implemented in accordance with approved procedures.

Activities associated with the fire protecti on systems and fire protection related systems are prescribed and accomplished in accordance with documented instructions, procedures, and drawings.Instructions and procedures for design, installation, inspection, tests, maintenance, 1.7-83 July, 1993 l

modification and administrative controls are reviewed through audits to assure that the fire protection program is maintained.

Operation and maintenance information has been provided to the plant in the form of System Descriptions and equipment supplier information.

1.7.19.5 Control of Purchased Items and Services Measures are established to assure that purchased items and services conform to procurement documents.

These measures include provisions, as appropriate, for source evaluation and selection, objective evidence of quality furnished by the contractor, inspections at suppliers, or receipt inspection.

Source or receipt inspection is provided, as a minimum, for those items where quality cannot be verified after installation.

1.1.19.6~~~A program for independent inspection of the fire protection activities has been established and implemented.

These inspections are performed by personnel other than those responsible for implementation of the activity.The inspections include: a)Inspection of installation, maintenance and modification of fire protection systems and equipment.

b)Inspections of penetration seals and fire retardant coating installations to verify the activity is satisfactorily completed in accordance with installation specifications.

1.7-84 July, 1993

c)Inspections of cable routing to verify conformance with design requirements as specified in AEPSC Specifications and/or plant procedures.

d)Inspections to verify that appropriate requirements for fire barriers are satisfied following installation, modification, repair or replacement activi ti es.e)Heasures to assure that inspection personnel are independent from the individuals performing the activity being inspected and are knowledgeable in the design and installation requirements for fire protection.

f)Inspection procedures, instructions or checklists for required inspections.

g)Periodic inspections of A'e protection systems, emergency breathing and auxiliary equipment.

h)Periodic inspections of materials subject to degradation, such as fire stops, seals and fire retardant coating as required by Technical Specifications or manufacturer's recommendations.

1.7.19.7 Test and Test Control a)Instal 1 ati on testing-Foll owing instal 1 ati on, modi fi cati on, repair, or replacement, sufficient testing is performed to demonstrate that the fire protection systems and equipment will perform satisfactorily.

Written test procedures for installation tests incorporate the requirements and acceptance limits contained in applicable design documents.

b)Peri odi c testing-Peri odi c testing occurs to document that fire protecti on equi pment functi ons in accordance wi th i ts desi gn.1.7-85 July, 1993

4 c)Programs have been established to verify the testing of fire protection systems, and to verify that test personnel are effectively trained.d)Test results are documented, evaluated, and their acceptability determined by a qualified responsible individual or group.1.7.19.8 Ins ection Test and 0 eratin Status The inspection, test and operating status for plant Technical Specification fire protection systems are performed as described in 1.7.14 herein.1.7.19.9 Nonconformin Items Technical Specification fire protection equipment nonconformances are identified and dispositioned as described in 1.7.15 herein.1.7.19.10 Corrective Action~~~The corrective action mechanism described in 1.7.16 herein applies to the Technical Specification fire protection equipment.

1.7.19.11 Records Records generated to support the fire protection program are controlled as described in 1.7.17 herein.1.7.19.12 Audi ts Audits are conducted and documented to verify compliance with the Fire Protection gA Program as described in 1.7.1.18 herein.Audits are periodically performed to verify compliance with the administrative controls and implementation of fire protection quality 1.7-86 July, 1993 0

assurance criteria.The audits are performed in accordance with pre-established written procedures or checklists.

Audit results are documented and reviewed by management having responsibility in the area audited.Follow-up action is taken by responsible management to correct the deficiencies revealed by the audit.1.7-87 July, 1993 AMERlCAN ELECTRIC POWER SERVlCE CORPORATlON Support Organization for the Cook Plant CHAIRMAN OF THE BOARD AND CHIEF EXECUTIVE OFFICER DIRECTOR QUALITY ASSURANCE VICE PRESIDENT NUCLEAR OPERATIONS I I I I I I I I VICE PRESIDENT PROJECT MANAGEMENT AND CONSTRUCTION OTHER AEPSC ENGINEERING/DESIGN SUPPORT OTHER AEPSC SUPPORT NUCLEAR OPERATIONS DEPARTMENT PROJECTMANAGEMENT AND CONSTRUCTION DEPARTMENT QVAUTYASSURANCE DIVISION NUCLEAR ENGINEERING DEPARTMENT PLANT MANAGER COOK NUCLEAR PLANT'I I I I I I I I I J SITE CONSTRUCTION MANAGER C C r ED+Qadi'OT PART OF AEPSC ORGANIZATION

-SHOWN FOR INFORMATION ONLY ADMINISTRATIVE AND FUNCTIONAL DIRECTION FUNCTIONAL DIRECTION FOR THE COOK NUCLEAR PLANT AMERICAN ELECT C POWER COMPANYAMERICAN ELECTRIC POWER COMPANY AMERICAN ELECTRIC POWER SERVICE CORPORATION APPALACHIAN POWER COMPANY OHIO POWER COMPANY INDIANA MICHIGAN POWER COMPANY COLUMBUS SOUTHERN POWER COMPANY KINGSPORT POWER COMPANY KENTUCKY POWER COMPANY WHEELING POWER COMPANY I I I I I I I COOK NUCLEAR PLANT ADMINISTRATIVE, TECHNICAL, AND FUNCTIONAL DIRECTION Tl C 2: O ORGANIZATIONAL RELATIONSHIPS WITHIN THE AMERICAN ELECTRIC POWER SYSTEM PERTAINING TO QUALITY ASSURANCE AND QUALITY CONTROL SUPPORT OF THE COOK NUCLEAR PLANT CHAIRMAN OF THE BOARD AND CHIEF EXECUllVE OFFICER AEPSC, INDIANA MICHIGAN POWER COMPANY AND OTHER AEP SUBSIDIARIES VICE PRESIDENT NUCLEAR OPERATlONS AEPSC AND VICE PRESIDENT, INDIANA MICHIGAN (MANAGER OF NUCLEAR OPERATlONS NUCLEAR OPERATIONS 8 NUCLEAR ENGINEERING DEPARTMENTS I I I I I OTHER AEPSC DEPARlMENTS DIRECTOR QUALITY ASSURANCE AEPSC PLANT MANAGER COOK NUCLEAR PLANT QUAUTY ASSURANCE SUPERINTENDENT (ON SITE)AEPSC SAFETY 8 ASSESSMENT SUPERINTENDENT Administrative and functional direction Technical direction Technical liaison Functional directIon for Cook Nuclear Plant Activities 1.7-90 July, 1993 AEPSC QUALITY ASSURANCE DIVISION ORGANIZATION AEPSC DIRECTOR QUALITYASSURANCE SECTION MANAGER AUDITS AND PROCUREMENT SECTION MANAGER QUALITYASSURANCE ENGINEERING

~SECTION MANAGER NUCLEAR SOFTWARE QUALITY ASSURANCE QUALITY ASSURANCE SUPERINTENDENT (SITE)

.Organization or the Cook Nuclear Plant Indiana Michigan Power Company Plant Manager Executive Staff Assistant Plant Safety Chairman Po Assistant Plant Manager Production Assistant Plant Manager Technical Support Assistant Plant Manager Projects Accounting and Budget Mana er Operations Superintendent Radlallon Protection Su erlntendent integrated Scheduling Superintendent Safety and Assessment Superintendent Quality Control/NDE Maintenance Superintendent Plant Englneqrlng Superintendent Computer Sciences Superintendent Admlnlstratlve Superintendent"I Stores Supervisor Chemistry Superintendent Emergency Planning Coordinator Site Construction Manager Nuclear Security Manager Tralnlng Superintendent Human Resources Supervisor APPENDIX A REGULATORY AND SAFETY GUIDES ANSI STANDARDS 1.Reg.Guide 1.8 (9/75)ANSI N18.1 (1971)Personnel Selection and Training Selection.

and Training of Nuclear Power Plant Personnel 2.Reg.Guide 1.14 (8/75)Reactor Coolant Pump Flywheel Integri ty 3.Reg.Guide 1.16 (8/75)Reporting of Operating Information, Appendix A-Technical Specifications 4.Safety Guide 30 (8/72)ANSI N45.2.4 (1972)equality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment Installation, Inspection, and Testing Requirements for Instrumentation and Electric Equipment During the Construction of Nuclear Power Generating Stations 5.Reg.Guide 1.33 (02/78)ANSI N18.7 (1976)(ANS 3.2 1976)ANSI N45.2 (1977)equality Assurance Program Requirements (Operation)

Administrative Controls and equality Assurance for the Operational Phase of Nuclear Power Plants equality Assurance Program Requirements for Nuclear Facilities 1.7-93 July, 1993 6.Reg.Guide 1.37 (3/73)~~~ANSI N45.2.1 (1973)guality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants Cleaning of Fluid Systems and Associated Components During Construction Phase of Nuclear Power Plants 7.Reg.Guide 1.3 (10/76)ANSI N45.2.2 (1972)guality Assurance Requirements for Packaging, Shipping, Receiving, Storage and Handling of Items for Water-Cooled Nuclear Power Plants Packaging, Shipping, Receiving, Storage and Handling of Items for Nuclear Power Plants (During the Construction Phase)~~~8.Reg.Guide 1.39 (10/76)ANSI N45.2.3 (1973)Housekeeping Requirements for Water-Cooled Nuclear Power Plants Housekeeping During the Construction Phase of Nuclear Power Plants 9.Reg.Guide 1.54 (6/73)ANSI N101.4 (1972)guality Assurance Requirements for Protective Coatings Applied to Water-Cooled Nuclear Power Plants guality Assurance for Protective Coatings Applied to Nuclear Facilities 10.Reg.Guide 1.58 (9/80)gualification of Nuclear Power Plant Inspection, Examination and Testing Personnel 1.7-94 July, 1993 ANS I N45.2.6 (1978)equal i fi cati ons of Inspecti on, Exami-nation, and Testing Personnel for Nuclear Power Plants 11.Reg.Guide 1.63 (7/78)Electric Penetration Assemblies in Containment Structures for Light-Mater-Cooled Nuclear Power Plants 12.Reg.Guide 1.64 (10/73)ANSI N45.2.11 (1974)equality Assurance Requirements for the Design of Nuclear Power Plants equality Assurance Requirements for the Design of Nuclear Power Plants 13.Reg.Guide 1.74 (2/74)ANSI N45.2.10{1973)equality Assurance Terms and Defini ti ons equality Assurance Terms and Definitions 14.Reg.Guide 1.88 (10/76)~~~ANSI N45.2.9 (1974)Collection, Storage, and Naintenance of Nuclear Power Plant equality, Assurance Records Requirements for Collection, Storage, and Haintenance of equality Assurance Records for Nuclear Power Plants 15.Reg.Guide 1.94 (4/76)equality Assurance Requirements for Installation, Inspection, and Testing of Structural Concrete and Structural Steel During the Construction Phase of Nuclear Power Plants 1.7-95 July, 1993 ANSI N45.2.5 (1974)Supplementary guality Assurance Requirements for Installation, Inspection, and Testing of Structural Concrete and Structural Steel During the Construction Phase of Nuclear Power Plants 16.Reg.Guide 1.108 (8/77)Periodic Testing of Diesel Generator Units used as Onsite Electric Power Systems at Nuclear Power Plants 17.Reg.Guide 1.123 (7/77)ANSI N45.2.13 (1976)guality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants guality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants 18.Reg.Guide 1.144 (1/79)ANSI N45.2.12{1977)Auditing of guality Assurance Programs for Nuclear Power Plants Requirements for Auditing of guali ty Assurance Programs for Nuclear Power Plants 19.Reg.Guide 1.146{8/80)ANSI N45.2.23 (1978)gualification of guality Assurance Program Audit Personnel for Nuclear Power Plants gualification of guality Assurance Program Audit Personnel for Nuclear Power Plants 1.7-96 July, 1993 20.ANSI N45.2.8 (1975)Supplementary equality Assurance Requirements for Installation, Inspection and Testing of Hechanical Equipment and Systems for the Construction Phase of Nuclear Power Plants 21.ANSI N45.4 (1972)Leakage-Rate Testing of Containment Structures for Nuclear Reactors 1.7-97 July, 1993 APPENDIX B AEPSC/IBM EXCEPTIONS TO OPERATING PHASE STANDARDS AND REGULATORY GUIDES 1.GENERAL Certain Regulatory Guides invoke, or imply, Regulatory Guides and standards in addition to the standard each primarily endorses.Certain ANSI Standards invoke, or imply, additional standards.

Exce ti on Inter retati on The AEPSC/I&M commitment refers to the Regulatory Guides and ANSI Standards specifically identified in Appendix A.Additional Regulatory Guides, ANSI Standards and similar documents implied, or referenced, in those specifically identified are not part of this commitment.

2.N18.7, General~~Exce tion Inter retation AEPSC and ILM have established both an on-site and off-site standing committee for independent review activities; together they form the independent review body.The standard numeric and qualification requirement may not be met by each group individually.

Procedures will be established to specify how each group will be involved in review activities.

This exception/interpretation is consistent with the plant's Technical Specifications.

1.7-98 July, 1993

~~~~2a.Sec.4.3.1"Personnel assi gned responsibility for independent reviews shall be specified in both number and technical disciplines, and shall collectively have the experience and competence required to review problems in the following areas: Exce tion Inter retation AEPSC Nuclear Safety and Design Review Committee (NSDRC)and Plant Nuclear Safety Review Committee (PNSRC)will not have members specified by number, nor by technical disciplines, and its members may not have the experience and competence required to review problems in all areas listed in this section.This exception/interpretation is consistent with the plant's Technical Specifications.

The NSDRC and PNSRC will not specifically include a member qualified in nondestructive testing, but will use qualified technical consultants to perform this and other functions as determined necessary by the respective committee chairman.2b.Sec.4.3.2.1~R"When a standing committee is responsible for the independent review program, it shall be composed of no less than five persons of whom no more than a minority are members of the on-site operating organization.

Competent alternates are permitted if designated in advance.The use of alternates shall be restricted to legitimate absences of principals." Exce tion Inter retation See Item 2a.1.7-99 July, 1993

~~~~~2c.Sec.4.3.3.1"...recommendations

...shall be disseminated promptly to appropriate members of management having responsibility in the area reviewed." Exce tion Inter retation Recommendations made as a result of review will generally be conveyed to the on-site, or off-site, standing committee.

Procedures will be maintained specifying how recommendations are to be considered.

2d.Sec.4.3.4 Re uirement"The following subjects shall be reviewed by the independent review body: Exce tion Inter retation Subjects requiring review will be as specified in the plant Technical Specifications.

2e.Sec.4.3.4(3)~ll"Changes in the Technical Specifications or License Amendments relating to nuclear safety are to be reviewed by the independent review body prior to implementation, except in those cases where the change is identical to a previously reviewed proposed change." Exce ti on Inter retati on'lthough the usual practice i's to meet this requirement, exceptions are made to NSDRC review and approval prior to implementation in rare cases with the permission of the NSDRC Chairman and Secretary.

PNSRC review and approval is always done prior to implementation of Technical Specification changes.1.7-100 July, 1993

~~~2f.Sec.4.4"The on-site operating organization shall provide, as part of the normal duties of plant supervisory personnel Exce tion Inter retation Some of the responsibilities of the on-site operating organization described in Section 4.4 may be'carried out by the PNSRC and/or NSDRC as described in plant Technical Specifications.

2g.Sec.5.2.2~lt"Temporary changes, which clearly do not change the intent of the approved procedure, shall as a minimum be approved by two members of the plant staff knowledgeable in the areas affected by the procedures.

At least one of these individuals shall be the supervisor in charge of the shift and hold a senior operator's license on the unit affected." Exce tion Inter retation IM considers that this requirement applies only to procedures identified in plant Technical Specifications.

Temporary changes to these procedures shall be approved as described in plant Technical Specifications.

2h.Sec.5.2.6~lt"In cases where required documentary evidence is not available, the associated equipment or materials must be considered nonconforming in accordance with Section 5.2.14.Until suitable documentary evidence is available to show the equipment or material is in conformance, affected systems shall be considered to be inoperable and reliance shall not be placed on such systems to fulfill their intended safety functions." Exce tion Inter retation I&H initiates appropriate corrective action when it is discovered that documentary evidence does not exist for a test or inspection which is a 1.7-101 July, 1993

requirement to verify equipment acceptability.

This action includes a technical evaluation of the equipment's operability status.I 2i.Sec.5.2."A surveillance testing and inspection program...shall include the establishment of a master surveillance schedule reflecting the status of all planned in-plant surveillance tests and inspections." Exce tion Inter retation Separate master schedules may exist for different programs, such as ISI, pump and valve testing, and Technical Specification surveillance testing.2j.Sec.5.2.13.1"To the extent necessary, procurement documents shall require suppliers to provide a guality Assurance Program consistent with the pertinent requirements of ANSI N45.2-1977." Exce tion Inter retation To the extent necessary, procurement documents require that the supplier has a documented guali ty Assurance Program consistent with the pertinent.

requirements of lOCFR50, Appendix B;ANSI N45.2;or other nationally recognized codes and standards.

2k.Sec.5.2.13.2~ll ANSI N18.7 and N45.2.13 specify that where required by code, regulation, or contract, documentary evidence that items conform to procurement requirements shall be available at the nuclear power plant site prior to installation or use of such items.Exce tion Inter retation The required documentary evidence is available at the site prior to use, but not necessarily prior to installation.

This allows installation to 1.7-102 July, 1993

proceed while any missing documents are being obtained, but precludes dependence on the item for safety purposes.21.Sec.5.2.15"Plant procedures shall be reviewed by an individual knowledgeable in the area affected by the procedure no less frequently than every two years to determine if changes are necessary or desirable." Exce tion Inter retation Biennial reviews are not performed in that IEM has programmatic control requirements in place that make the biennial review process redundant from a regulatory perspective.

These programmatic controls were effected in an effort to ensure that plant instructions and procedures are reviewed for possible revision when pertinent source material is revised, therefore maintaining the procedures current.We believe that this approach, in addition to an annual random sampling of procedures, better addresses the intent of the biennial review process and is more acceptable from both a technical and practical perspective than a static two-year review process.2m.Sec.5.2.16 Records shall be made, and equipment suitably marked, to indicate calibration status.Exce tion Inter retation See Item 6b.1.7-103 July, 1993

~~~~2n.Sec.5.3.5(4)This section requires that where sections of documents such as vendor manuals, operating and maintenance instructions, or drawings are incorporated directly, or by reference into a maintenance procedure, they shall receive the same level of review and approval as operating procedures.

Exce tion Inter retation Such documents are reviewed by appropriately qualified personnel prior to use to ensure that, when used as instructions, they provide proper and adequate information to ensure the required quality of work.Haintenance procedures which reference these documents receive the same level of review and approval as operating procedures.

3.N45.2.1, 3a.Sec.3 N45.2.I establishes criteria for classifying items into"cleanliness levels," and requires that items be so classified.

Exce tion Inter retation Instead of using the cleanliness level classification system of N45.2.1, the required cleanliness for specific items and activities is addressed on a case-by-case basis.Cleanliness is maintained, consistent with the work being performed, so as to prevent the introduction of foreign material.As a minimum, cleanliness inspections are performed prior to closure of"nuclear" systems and equipment.

Such inspections are documented.

1.7-104 July, 1993

~~3b.Sec.5"Fitting and tack-wel'ded joints (which will not be immediately sealed by welding)shall be wrapped with polyethylene or other nonhalogenated plastic film unti l the welds can be completed." Exce tion Inter retation I&N sometimes uses other nonhalogenated material, compatible with the parent material, since plastic film is subject to damage and does not always provide adequate protection.

4.N45.2.2, General II N45.2.2 establishes requirements and criteria for classifying safety'j related items into protection levels.Exce ti on Inter retati on Instead of classifying safety.-;:,'related items into protection levels, controls over the packaging, shipping, handling and storage of such items are established on a case-by-case basis with due regard for the item's complexity, use and sensitivity to damage.Prior to installation or use, the items are inspected and serviced, as necessary, to assure that no damage or deterioration exists which could affect their function.4a.Sec.3.9 and Appendix A3.9~ll"The item and the outside of containers shall be marked." (Further criteria for marking and tagging are given in the Appendix.)

Exce tion Inter retation These requirements were originally written for items packaged and shipped to construction projects.Full compliance is not always necessary in the case of items shipped to operating plants and may, in some cases, 0 1.7-105 July, 1993 increase the probability of damage to the item.The requirements are implemented to the extent necessary to assure traceabi li ty and integrity of the item.4b.Sec.5.2.2"Receiving inspections shall be performed in an area equivalent to the level of storage." Exce tion Inter retation Receiving inspection area environmental controls may be less stringent than storage environmental requirements for an item.However, such inspections are performed in a manner and in an environment which do not endanger the required quality of the item.4c.Sec.6.2.4"The use or storage of food, drinks and salt tablet dispensers in any storage area shall not be permitted." Exce ti on Inter retati on Packaged food for emergency or extended overtime use may be stored in material stock rooms.The packaging assures that materials are not contaminated.

Food will not be"used" in these areas.4d.Sec.6.3.4~ll"All items and their containers shall be plainly marked so that they are easily identified without excessive handling or unnecessary opening of crates and boxes." Exce tion Inter retation See N45.2.2, Section 3.9 (Exception 4b.).1.7-106 July, 1993

/t'

~~~~4e.Sec.6.4.1" Inspections and examinations shall be performed and documented on a periodic basis to assure that the integrity of the item and its container...is being maintained." Exce tion Inter retation The requirement implies that all inspections and examinations of items in storage are to be performed on the same schedule.Instead, the inspections and examinations are performed in accordance with material storage procedures which identify the characteristics to be inspected and include the required frequencies.

These procedures are based on technical considerations which recognize that inspections and frequencies needed vary from item to item.5.N45.2.3, 5a.Sec.2.1 Cleanliness requirements for housekeeping activities shall be established on the basis of five zone designations.

Exce tion Inter retation Instead of the five-level zone designation system referenced in ANSI N45.2.3, I&M bases its controls over housekeeping activities on a consideration of what is necessary and appropriate for the activity involved.The controls are effected through procedures or instructions.

Factors considered in developing the procedures and instructions include cleanliness control, personnel safety, fire prevention and protection, radiation control and secu>ity;The procedures and instructions-make use of standard janitorial and work practices to the extent possible.However, in preparing these procedures, consideration is also given to the recommendations of Section 2.1 of ANSI N45.2.3.1.7-107 July, 1993

~~~~6.N45.2.4, 6a.Sec.2.2 Section 2.2 establishes prerequi sites which must be met before the installation, inspections and testing of instrumentation and electrical equipment may proceed.These prerequisites include personnel qualification, control of design, conforming and protected materials and availability of specified documents.

Exce tion Inter retation During the operations phase, this requirement is considered to be applicable to modifications and initial start-up of electrical equipment.

For routine or periodic inspection and testing, the prerequisite conditions will be achieved, as necessary.

6b.Sec.6.2.1~lt"Items requiring calibration shall be tagged or labeled on completion, indicating date of calibration and identity of person that performed calibration.

" Exce ti on Inter retati on Frequently, physical size and/or location of installed plant instrumentation precludes attachment of calibration labels or tags.Instead, each instrument is uniquely identified and is traceable to its cal ibrati on record.A scheduled calibration program assures that each instrument's calibration is current.7.N45.2.5, 7a.Sec.2.5.2"When discrepancies, malfunctions or inaccuracies in inspection and testing equipment are found during calibration, all items inspected with 1.7-108 July, 1993 that equipment since the last previous calibration shall be considered unacceptable until an evaluation has been made by the responsible authori ty and appropr'i ate acti on taken." Exce tion Inter retation I&H uses the requirements of N18.7, Section 5.2.16, rather than N45.2.5, Section 2.5.2.The N18.7 requirements are more applicable to an operating plant.7b.Sec.5.4~ll"Hand torque wrenches used for inspection shall be controlled and must be calibrated at least weekly and more often if deemed necessary.

Impact torque wrenches used for inspection must be calibrated at least twice daily." Exce ti on Inter retation Torque wrenches are controlled as measuring and test equipment in accordance with ANSI N18.7, Section 5.2.16.Calibration intervals are based on use and calibration history rather than as per N45.2.5.8.N45.2.6, Sec.1.2"The requirements of this standard apply to personnel who perform inspections, examinations and tests during fabrication prior to or during receipt of items at the construction site, during construction, during preoperational and start-up testing and during operational phases of nuclear power plants." Exce tion Inter retation Personnel participating in testing who take data or make observations, where special training is not required to perform this function, need not be qualified in accordance with ANSI N45.2.6, but need only be trained to the extent necessary to perform the assigned function.1.7-109 July, 1993

g Re.Guide 1.58-General gualifi cation of nuclear power plant inspection, examination and testing personnel.

9a.C.2.a(7)Regulatory Guide 1.58 endorses the guidelines of SNT-TC-1A as an acceptable method of training and certifying personnel conducting leak'tests.Exce ti on Inter retati on IM takes the position, that the"Level" designation guidelines as recommended in SNT-TC-lA, paragraph 4 do not necessarily assure adequate leak test capability.

I&M maintains that departmental supervisors are best able to judge whether engineers and other personnel are qualified to direct and/or perform leak tests.Therefore, I&N does not implement the recommended"Level" designation guidelines.

It is I&M's opinion that the training guidelines of SNT-TC-1A, Table I-G, paragraph 5.2 specifically are oriented towards the basic physics involved in leak testing, and further, towards individuals who are not graduate engineers.

I&M maintains that it meets the essence of these training guidelines.

The preparation of leak test procedures and the conduct of leak tests at Cook Nuclear Plant is under the direct supervision of Performance Engineers who hold engineering degrees from accredited engineering schools.The basic physics of leak testing have been incorporated into the applicable test procedures.

The review and approval of the data obtained from leak tests is performed by department supervisors who are also graduate engineers.

IM does recognize the need to assure that individuals involved in leak tests are fully cognizant of leak test procedural requirements and thoroughly fami liar with the test equipment involved.Plant performance engineers receive routine, informal orientation on testing programs to 1.7-110 July, 1993 ensure that these individuals fully understand the requirements of performing a leak test.9b.C5, C6, C7, CS, C10 Exce tion Inter retation I&M takes the position that the classification of inspection, examination and test personnel (inspection personnel) into"Levels" based on the requirements stated in Section 3.0 of ANSI N45.2.6 does not necessarily assure adequate inspection capability.

I&M maintains that departmental and first line supervisors are best able to judge the inspection capability of the personnel under their supervi sion, and that"Level" classification would require an overly burdensome administrative work load, could inhibit inspection activities, and provides no assurance of inspection capabilities.

Therefore, I&M does not implement the"Level" classification concept for inspection, examination and test personnel.

The methodology under which inspections, examinations and tests are conducted at the Cook Nuclear Plant requires the involvement of first line supervisors, engineering personnel, departmental supervisors and plant management.

In essence, the last seven (7)project functions shown in Table 1 to ANSI N45.2.6 are assigned to supervisory and engineering personnel, and not to personnel of the inspector category.These management supervisory and engineering personnel, as a minimum, meet the educational and experience requirements of"Level II and Level III" personnel, as required, to meet the criteria of ANSI 18.1 which exceeds those of ANSI N45.2.6.In I&M's opinion, no useful purpose is served by classification of management, supervisory and engineering personnel into"Levels." Therefore, I&M takes the following positions relative to regulatory positions C5, 6, 7, 8 and 10 of Regulatory Guide 1.58.C-5 Based on the discussion in 9b, this position is not applicable to the Cook Nuclear Plant.1.7-111 July, 1993 C-6 Replacement personnel for Cook Nuclear Plant management, supervisory and engineering posi tions subject to ANSI 18.1 will meet the educational and experience requirements of ANSI 18.1 and therefore, those of ANSI N45.2.6.Replacement inspection personnel will, as a minimum, meet the educational and experience requirements of ANSI N45.2.6, Section 3.5.1-"Level I." C-7 I&M, as a general practice, complies with the training recommendations as set forth in this regulatory position.C-8 All I&M inspection, examination and test personnel are instructed in the normal course of employee training in radiation protection and the means to minimize radiation dose exposure.C-10 I&M maintains documentation to show that inspection personnel meet the minimum requirements of"Level I," and that management, supervisory and engineering personnel meet the minimum requirements of ANSI 18.1.10.N45.2.8, 10a.Sec.2.9e~Ri t Section 2.9e of N45.2.8.lists documents relating to the specific stage of installation activity which are to be available at the construction site.Exce tion Inter retation All of the documents listed are not necessarily required at the construction site for installation and testing.AEPSC and I&M assure that they are available to the site, as necessary.

1.7-112 July, 1993

10b.Sec.2.9e~R Evidence that engineering or design changes are documented and approved shall be available at the construction site prior to installation.

Exce tion Inter retation Equipment may be installed before final approval of engineering or design changes.However, the system is not placed into service until such changes are documented and approved.10c.Sec.4.5.1~R" Installed systems and components shall be cleaned, flushed conditioned according to the requirements of ANSI N45.2.1.consideration shall be given to the following requirements: (Requirements are given for chemical conditioning, flushing controls.)

and Special and processExce tion Inter retation Systems and components are cleaned, flushed and conditioned as determined on a case-by-case basis.Measures are taken to help preclude the need for cleaning, flushing and conditioning through good practices during maintenance or modification activities.

I.7-113 July, 1993 11.N45.2.9 lla.Sec.5.4, Item 2 Records shall not be stored loosely."They shall be firmly attached in binders or placed in folders or envelopes for storage on shelving in containers." Steel file cabinets are preferred.

Exce tion Inter retation Records are suitably stored in steel file cabinets, or on shelving in containers.

Methods other than binders, folders, or envelopes (for example, dividers)may be used to organize the records for storage.lib.Sec.6.2~ll"A list shall be maintained designating those personnel who shall have access to the files".Exce tion Inter retation Rules are established governing access to and control of files as provided for in ANSI N45.2.9, Section 5.3, Item 5.These rules do not always include a requirement for a list of personnel who are authorized access.It should be noted that duplicate files and/or microforms may exist for general use.11c.Sec.5.6~R When a single records storage facility is maintained, at least the following features should be considered in its construction:

etc.Exce ti on Inter retati on The Cook Nuclear Plant Naster File Room and other off-site record storage facilities comply with the requirements of NUREG-0800 (7/81), Section 17.1.17.4.

1.7-114 July, 1993

12.Re.Guide 1.144 ANSI N45.2.12 12a.Sec.C3a(2)Applicable elements of an organization's guality Assurance Program for"design and construction phase activities should be audited at least annually or at least once within the life of the activity, whichever is shorter." Exce tion Inter retation Since most modifications are straight forward, they are not audited individually.

Instead, selected controls over modifications are audited periodically.

12b.Sec.C3b(1)~lt This section identifies procurement contracts which are exempted from being audited.Exce tion Inter retation In addition to the exemptions of Reg.Guide).144, AEPSC/18M considers that the National Institute of Standards and Technology, or other State and Federal Agencies which may provide services to AEPSC/IEN, are not required to be audited.12c.Sec.4.5.1~ll Responses to adverse audit findings, giving results of the review and investigation, shall clearly state the corrective action taken or planned to prevent recurrence."In the event that corrective action cannot be completed within thirty days, the audited organization's response shall include a scheduled date for the corrective action." 1.7-115 July, 1993 Exce ti on Inter retati on AEPSC/I&M take the position that certain circumstances warrant more than thirty (30)days to completely investigate the cause and/or total impact of an adverse finding.For these circumstances, an initial thirty (30)day response will be provided which addresses a schedule for known corrective actions, the reason why additional investigation time is needed, and a schedule for completion of the investigation.

These initial responses require the approval of the Director-guali ty Assurance.

13.N45.2.13, 13a.Sec.3.2.2 N45.2.13 requires that technical requirements be specified in procurement documents b reference to technical requirement documents.

Technical requirement documents are-to be prepared, reviewed and released under the requirements established by ANSI N45.2.11.Exce ti on Inter retati on For replacement parts and materials, AEPSC/IN follow ANSI N18.7, Section 5.2.13, Subitem 1, which states: "Where the original item or part is found to be commercially

'off the shelf'r without specifically identified gA requirements, spare and replacement parts may be similarly procured, but care shall be exercised to ensure at least equivalent performance." 13b.Sec.3.2.3~ll"Procurement documents shall require that the supplier have a documented guali ty Assurance Program that implements parts or all of ANSI N45.2 as well as applicable guality Assurance Program requirements of other nationally recognized codes and standards." 1.7-116 July, 1993 t

Exce ti on Inter retati on Refer to Item 2j 13c.Sec.3.3(a)Reviews of procurement documents shall be performed prior to release for bid and contract award.Exce tion Inter retation-Documents may be released for bid or contract award before completing the necessary reviews.However, these reviews are completed before the item or service is put into service, or before work has progressed beyond the point where it would be impractical to reverse the action taken.13d.Sec.3.3(b)Review of changes to procurement documents shall be performed prior to release for bid and contract award.Exce tion Inter retation This requirement applies only to quality related changes (i.e., changes to the procurement document provisions identified in ANSI N18.7, Section 5.2.13.1, Subi tems 1 through 5).The timing of reviews will be the same as for review of the original procurement documents.

13e.Sec.10.1~R"Where required by code, regulation, or contract requirement, documentary evidence that items conform to procurement documents shall be available at the nuclear power plant site prior to installation or use of such items, regardless of acceptance methods." 1.7-117 July, 1993 Exce tion Inter retation Refer to Item 2k."Post-installation test requirements and acceptance documentation shall be mutually established by the purchaser and supplier." Exce tion Inter retation In exercising its ultimate responsibility for its guality Assurance Program, AEPSC/IEH establishes post-installation test requirements giving due consi derati on to supplier recommendations.

14.Re.Guide 1.146 ANSI N45.2.23 and ANSI N45.2.2.12 14a.ANSI N45.2.23 Sec.1.1~R This standard provides requirements and guidance for the qualification of audit team leaders, henceforth identified as"lead auditors." 14b.ANSI N45.2.12, Sec.4.2.2 A lead auditor shall be appointed team leader.Exce tion Inter retation The AEPSC audit program is directed by the AEPSC Director-guality Assurance and is administered by designated gA Division section managers/supervisor who are certified lead auditors.Audits are, in most cases, conducted by individual auditors, not by"audit teams." These auditors are certified in accordance with established procedures and are assigned by the responsible gA section manager/supervisor based on their demonstrated audit capability and general knowledge of the audit subject.In certain cases, this results in an individual other than a"lead auditor" conducting the actual audit function.1.7-118 July, 1993

Established AEPSC audit procedures require that, in all cases, the audit functions of preparation/organization, reporting of audit findings and evaluation of corrective actions be reviewed by gA Division section managers/supervisor, thereby meeting the requirements of ANSI N45.2.23 relative to"lead auditors", and"audit team leaders." 1.7-119 July, 1993

~t I I~