{{#Wiki_filter:Watts Bar Nuclear Plant, Post Office Box 2000 Spring City, Tennessee 37381 January 12, 2018 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington | {{#Wiki_filter:Watts Bar Nuclear Plant, Post Office Box 2000 Spring City, Tennessee 37381 January 12 , 2018 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington , D.C. 20555-0001 Watts Bar Nuclear Plant , Un i t 1 & Unit 2 Facility Operating License No. NPF-90 NRC Docket No. 50-390 , 50-391 10 CFR 50.4 1 O CFR 50 , Appendix E, Section V 10 CFR 50.54(q)(5) 10 CFR 72.4 10 CFR 72.44(f) | ||
, D.C. 20555-0001 Watts Bar Nuclear Plant, | |||
==Subject:== | ==Subject:== | ||
Emergency Plan Implementing Procedure Revision In accordance with the requirements of 10 CFR Part 50 , Appendix E , Section V , 10 CFR 50.54(q)(5), and 10 CFR 72.44(f), the following Emergency Plan Implementing Procedure (EPIP) has been revised with administrative and editorial changes: EPIP 12 Revision 0042 Effective Date Emergency Equipment and Supplies 1 2/19/2017 The above referenced revision continues to comply with regulations and there is no reduction in effectiveness of the plan. The revision includes adding signature and review blocks to allow for documentation of individual page inventory completion. There are no regulatory commitments in this letter. Please direct all questions concerning this matter to Thomas Detchemendy, Emergency Preparedness Manager, at (423) 365-3232. | |||
Emergency Plan Implementing Procedure Revision In accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, 10 CFR 50.54(q)(5), and 10 CFR 72.44(f), the following Emergency Plan Implementing Procedure (EPIP) has been revised with administrative and editorial changes: EPIP 12 Revision 0042 Effective Date Emergency Equipment and Supplies | Respectfully , en Paul Simmons Site Vic e President Watts Bar Nuclear Plant U.S. Regulatory Commission January 12, 2018 Page2 cc: NRC Regional Administrator | ||
. There are no regulatory commitments in this letter. Please direct all questions concerning this matter to Thomas Detchemendy, Emergency Preparedness | |||
Respectfully | |||
, en Paul Simmons Site | |||
-Region II NRC Senior Resident Inspector | -Region II NRC Senior Resident Inspector | ||
-Watts Bar Nuclear Plant NRC Project Manager -Watts Bar Nuclear Plant}} | -Watts Bar Nuclear Plant NRC Project Manager -Watts Bar Nuclear Plant}} | ||
Revision as of 05:01, 6 July 2018
| ML18012A266 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 01/12/2018 |
| From: | Simmons P Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| EPIP 12, Rev. 42 | |
| Download: ML18012A266 (2) | |
Text
Watts Bar Nuclear Plant, Post Office Box 2000 Spring City, Tennessee 37381 January 12 , 2018 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington , D.C. 20555-0001 Watts Bar Nuclear Plant , Un i t 1 & Unit 2 Facility Operating License No. NPF-90 NRC Docket No. 50-390 , 50-391 10 CFR 50.4 1 O CFR 50 , Appendix E,Section V 10 CFR 50.54(q)(5) 10 CFR 72.4 10 CFR 72.44(f)
Subject:
Emergency Plan Implementing Procedure Revision In accordance with the requirements of 10 CFR Part 50 , Appendix E ,Section V , 10 CFR 50.54(q)(5), and 10 CFR 72.44(f), the following Emergency Plan Implementing Procedure (EPIP) has been revised with administrative and editorial changes: EPIP 12 Revision 0042 Effective Date Emergency Equipment and Supplies 1 2/19/2017 The above referenced revision continues to comply with regulations and there is no reduction in effectiveness of the plan. The revision includes adding signature and review blocks to allow for documentation of individual page inventory completion. There are no regulatory commitments in this letter. Please direct all questions concerning this matter to Thomas Detchemendy, Emergency Preparedness Manager, at (423) 365-3232.
Respectfully , en Paul Simmons Site Vic e President Watts Bar Nuclear Plant U.S. Regulatory Commission January 12, 2018 Page2 cc: NRC Regional Administrator
-Region II NRC Senior Resident Inspector
-Watts Bar Nuclear Plant NRC Project Manager -Watts Bar Nuclear Plant