ML15105A081: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Powering forward. Together.*SMUDMarch 31, 2015DPG 15-094U.S. Nuclear Regulatory Commission,ATTN: Document Control Desk,Washington, DC 20555-0001,VOLUNTARY SUBMISSION OF PENDING LICENSING ACTIONS (RIS 2014-13RESPONSE)As requested in NRC Regulatory Issue Summary 2014-13, please find the attachedprojection of licensing actions anticipated by SMUD in association with the RanchoSeco Nuclear Generation Station (DPR-054).Sincerely,Einar T. | {{#Wiki_filter:Powering forward. | ||
Together. | |||
*SMUDMarch 31, 2015DPG 15-094U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk,Washington, DC 20555-0001, VOLUNTARY SUBMISSION OF PENDING LICENSING ACTIONS (RIS 2014-13RESPONSE) | |||
As requested in NRC Regulatory Issue Summary 2014-13, please find the attachedprojection of licensing actions anticipated by SMUD in association with the RanchoSeco Nuclear Generation Station (DPR-054). | |||
Sincerely, Einar T. Ronningen Superintendent, Rancho Seco Assets(DT)Enclosure Cc: Tracy Orf,Division of Operating Reactor Licensing Technical Assistant, U.S. Nuclear Regulatory Commission, Mail Stop O-8C2,Rockville, MD 20852-2738. | |||
Rancho Seco Nuclear Generating Station 1 14440 Twin Cities Road I Herald, CA 95638-9799 1.209.333.2935 I smud.org Enclosure 1RIS 2014-13Page 1 of 1Table of Estimated Licensing ActionsRancho Seco Nuclear Generating StationUnit 1DPR-054Licensing Licensing Licensing Projected Outage CommentsAction Action Action Submittal Related? | |||
If (AsNumber Description Date So, Date Needed)NeededLicenseAmendment License January,Request Termination 2017 N/A NONE(LAR)1 OCFR50.90}} | |||
Revision as of 01:53, 1 July 2018
| ML15105A081 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 03/31/2015 |
| From: | Ronningen E T Sacramento Municipal Utility District (SMUD) |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| DPG 15-094, RIS-14-013 | |
| Download: ML15105A081 (2) | |
Text
Powering forward.
Together.
- SMUDMarch 31, 2015DPG 15-094U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk,Washington, DC 20555-0001, VOLUNTARY SUBMISSION OF PENDING LICENSING ACTIONS (RIS 2014-13RESPONSE)
As requested in NRC Regulatory Issue Summary 2014-13, please find the attachedprojection of licensing actions anticipated by SMUD in association with the RanchoSeco Nuclear Generation Station (DPR-054).
Sincerely, Einar T. Ronningen Superintendent, Rancho Seco Assets(DT)Enclosure Cc: Tracy Orf,Division of Operating Reactor Licensing Technical Assistant, U.S. Nuclear Regulatory Commission, Mail Stop O-8C2,Rockville, MD 20852-2738.
Rancho Seco Nuclear Generating Station 1 14440 Twin Cities Road I Herald, CA 95638-9799 1.209.333.2935 I smud.org Enclosure 1RIS 2014-13Page 1 of 1Table of Estimated Licensing ActionsRancho Seco Nuclear Generating StationUnit 1DPR-054Licensing Licensing Licensing Projected Outage CommentsAction Action Action Submittal Related?
If (AsNumber Description Date So, Date Needed)NeededLicenseAmendment License January,Request Termination 2017 N/A NONE(LAR)1 OCFR50.90