{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 December 28, 2015 | ||
Mr. Paul Fessler Chief Nuclear Officer DTE Energy Company 6400 North Dixie Highway Newport, MI 48166 | Mr. Paul Fessler | ||
Chief Nuclear Officer DTE Energy Company 6400 North Dixie Highway Newport, MI 48166 | |||
SUBJECT: ENRICO FERMI ATOMIC POWER PLANT, UNIT 1 - NRC INSPECTION REPORT 05000016/2015010(DNMS) | SUBJECT: ENRICO FERMI ATOMIC POWER PLANT, UNIT 1 - NRC INSPECTION REPORT 05000016/2015010(DNMS) | ||
| Line 32: | Line 33: | ||
Based on the results of this inspection, the NRC did not identify any violations. | Based on the results of this inspection, the NRC did not identify any violations. | ||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of the NRC's Agencywide Documents Access and | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," | ||
of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of the NRC's Agencywide Documents Access and Managem ent System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). We will gladly discuss any questions you have concerning this inspection. | |||
Sincerely,/RA/ Michael Kunowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 50-016 License No. DPR-9 | Sincerely,/RA/ Michael Kunowski, Chief Materials Control, ISFSI, and Decommissioning Branch | ||
Division of Nuclear Materials Safety Docket No. 50-016 License No. DPR-9 | |||
IR 05000016/2015010(DNMS) | IR 05000016/2015010(DNMS) | ||
| Line 41: | Line 45: | ||
Supplemental Information cc w/encl: Distribution via LISTSERV We will gladly discuss any questions you have concerning this inspection. | Supplemental Information cc w/encl: Distribution via LISTSERV We will gladly discuss any questions you have concerning this inspection. | ||
Sincerely,/RA/ Michael Kunowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 50-016 License No. DPR-9 | Sincerely,/RA/ Michael Kunowski, Chief Materials Control, ISFSI, and Decommissioning Branch | ||
Division of Nuclear Materials Safety | |||
Docket No. 50-016 License No. DPR-9 | |||
===Enclosure:=== | ===Enclosure:=== | ||
| Line 49: | Line 57: | ||
Supplemental Information | Supplemental Information | ||
cc w/encl: Distribution via LISTSERV DISTRIBUTION: Darrell Roberts John Giessner Julio Lara | cc w/encl: Distribution via LISTSERV DISTRIBUTION | ||
: Darrell Roberts John Giessner Julio Lara | |||
Richard Skokowski | |||
License No.: DPR-9 Report No. : 05000016/2015010(DNMS) | Carole Ariano Paul Pelke Carmen Olteanu Jim Clay MCID Inspectors | ||
Licensee: DTE Electric Company Facility: Enrico Fermi Atomic Power Plant, Unit 1 Location: 6400 North Dixie Highway Newport, MI 48166 Inspection Date: December 4, 2015 Inspector: Peter J. Lee, Ph.D., CHP Approved by: Michael Kunowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety 2 | |||
ADAMS Accession Number: ML15362A632 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII DNMS RIII DNMS RIII RIII NAME PLee:rj: MKunowksi for MKunowksi DATE 12/28/15 12/28/15 OFFICIAL RECORD COPY | |||
Enclosure U.S. NUCLEAR REGULATORY COMMISSION | |||
REGION III Docket No.: 50-016 | |||
License No.: DPR-9 Report No. : 05000016/2015010(DNMS) | |||
Licensee: DTE Electric Company | |||
Facility: Enrico Fermi Atomic Power Plant, Unit 1 Location: 6400 North Dixie Highway Newport, MI 48166 | |||
Inspection Date: December 4, 2015 Inspector: Peter J. Lee, Ph.D., CHP | |||
Approved by: Michael Kunowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety 2 | |||
=EXECUTIVE SUMMARY= | =EXECUTIVE SUMMARY= | ||
| Line 61: | Line 85: | ||
This routine decommissioning inspection included reviews of facility management and control, and radiological safety. | This routine decommissioning inspection included reviews of facility management and control, and radiological safety. | ||
Facility Management and Control | Facility Management and Control The inspector concluded that the licensee conducted the quarterly surveillance in accordance with the requirement of the Technical Specification. (Section 1.1) | ||
Radiological Safety The inspector verified that no detectable licensed material had been released to the environment through the discharge from Sump 5. (Section 2.1) | |||
3 | 3 | ||
=REPORT DETAILS= | =REPORT DETAILS= | ||
1.0 Facility Management and Control 1.1 Decommissioning Performance and Status Review at Permanently Shut Down Reactors | Summary of Plant Activities During the inspection period, the licensee has returned to a passive monitoring Safe Storage (SAFSTOR) status from the active final decontamination phase of SAFSTOR. | ||
1.0 Facility Management and Control | |||
1.1 Decommissioning Performance and Status Review at Permanently Shut Down Reactors | |||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
(Inspection Procedure 71801) | (Inspection Procedure 71801) | ||
The inspector reviewed the second and third quarter radiation surveillance results for 2015. The inspector also toured the plant to observe the condition of the plant. | |||
====b. Observations and Findings==== | ====b. Observations and Findings==== | ||
| Line 77: | Line 106: | ||
====c. Conclusions==== | ====c. Conclusions==== | ||
The inspector concluded that the licensee conducted the quarterly surveillance in accordance with the requirement of the Technical Specification. 2.0 Radiological Safety | The inspector concluded that the licensee conducted the quarterly surveillance in accordance with the requirement of the Technical Specification. | ||
2.0 Radiological Safety 2.1 Effluent and Environmental Monitoring (Inspection Procedure 84750) | |||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
| Line 91: | Line 122: | ||
The sample contained a significant amount of sediment due to the technician disturbing the sediment in the sump during sampling. That indicated the Cs-137 contamination was retained in the sediment. Also, based on Inspection Report 050-00016/2011-010 (ML11112A056), the contamination of Cs-137 in the water collected from the East Sodium Gallery, Sump 4, was due to the contamination of sediment. | The sample contained a significant amount of sediment due to the technician disturbing the sediment in the sump during sampling. That indicated the Cs-137 contamination was retained in the sediment. Also, based on Inspection Report 050-00016/2011-010 (ML11112A056), the contamination of Cs-137 in the water collected from the East Sodium Gallery, Sump 4, was due to the contamination of sediment. | ||
c. Conclusion | c. Conclusion The inspector verified that no detectable licensed material had been released to the environment through the discharge from Sump 5. | ||
3.0 Exit Meeting The inspector presented the inspection results to members of the licensee's staff at the conclusion of the inspection on December 4, 2015. The licensee did not identify any of the documents or processes reviewed by the inspector as proprietary. | |||
ATTACHMENT: | |||
=SUPPLEMENTAL INFORMATION= | =SUPPLEMENTAL INFORMATION= | ||
SUPPLEMENTAL INFORMATION | SUPPLEMENTAL INFORMATION | ||
PARTIAL LIST OF PERSONS CONTACTED | |||
PARTIAL LIST OF PERSONS CONTACTED | |||
* | |||
: [[contact::L. Goodman]], Manager Licensing, MEP and Fermi 1 Custodial Delegate | : [[contact::L. Goodman]], Manager Licensing, MEP and Fermi 1 Custodial Delegate | ||
* | * | ||
| Line 102: | Line 139: | ||
* | * | ||
: [[contact::B. Rumans]], Radiation Protection Supervisor | : [[contact::B. Rumans]], Radiation Protection Supervisor | ||
* Present at the December 4, 2015, exit meeting. | * Present at the December 4, 2015, exit meeting. | ||
LIST OF PROCEDURES USED | |||
Inspection Procedure 84750: Effluent and Environmental Monitoring | LIST OF PROCEDURES USED | ||
LIST OF ACRONYMS USED | Inspection Procedure 71801: Decommissioning Performance and Status Review at Permanently Shut Down Reactors | ||
Inspection Procedure 84750: Effluent and Environmental Monitoring | |||
LIST OF ACRONYMS USED | |||
ADAMS Agencywide Documents Access and Management System CFR Code of Federal Regulations SAFSTOR Safe Storage | |||
DNMS Division of Nuclear Materials Safety | DNMS Division of Nuclear Materials Safety | ||
NRC Nuclear Regulatory Commission | NRC Nuclear Regulatory Commission | ||
pCi/L picocuries per liter | pCi/L picocuries per liter | ||
LICENSEE DOCUMENTS REVIEWED | LICENSEE DOCUMENTS REVIEWED | ||
ITEMS OPENED, CLOSED, AND DISCUSSED | Licensee documents reviewed and utilized during the course of this inspection are specifically identified in the "Report Details" above. | ||
ITEMS OPENED, CLOSED, AND DISCUSSED | |||
None | |||
}} | }} | ||
Revision as of 14:53, 30 June 2018
| ML15362A632 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 12/28/2015 |
| From: | Kunowski M A NRC/RGN-III/DNMS/MCID |
| To: | Fessler P DTE Electric Company |
| Lee P J | |
| References | |
| IR 2015010 | |
| Download: ML15362A632 (8) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 December 28, 2015
Mr. Paul Fessler
Chief Nuclear Officer DTE Energy Company 6400 North Dixie Highway Newport, MI 48166
SUBJECT: ENRICO FERMI ATOMIC POWER PLANT, UNIT 1 - NRC INSPECTION REPORT 05000016/2015010(DNMS)
Dear Mr. Fessler:
On December 4, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Enrico Fermi Atomic Power Plant, Unit 1 (Fermi 1). On December 4, the NRC inspector discussed the results of this inspection with members of your staff. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. The inspector documented the results of this inspection in the enclosed inspection report.
The inspection consisted of an examination of activities at the facility as they relate to safety and compliance with the Commission's rules and regulations. Areas examined during the inspection included facility management and control and radiological safety. Within these areas, the inspection consisted of a selective examination of procedures and representative records, field observations of activities in progress, and interviews with personnel.
Based on the results of this inspection, the NRC did not identify any violations.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding,"
of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of the NRC's Agencywide Documents Access and Managem ent System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). We will gladly discuss any questions you have concerning this inspection.
Sincerely,/RA/ Michael Kunowski, Chief Materials Control, ISFSI, and Decommissioning Branch
Division of Nuclear Materials Safety Docket No.50-016 License No. DPR-9
IR 05000016/2015010(DNMS)
w/Attachment:
Supplemental Information cc w/encl: Distribution via LISTSERV We will gladly discuss any questions you have concerning this inspection.
Sincerely,/RA/ Michael Kunowski, Chief Materials Control, ISFSI, and Decommissioning Branch
Division of Nuclear Materials Safety
Docket No.50-016 License No. DPR-9
Enclosure:
IR 05000016/2015010(DNMS)
w/Attachment:
Supplemental Information
cc w/encl: Distribution via LISTSERV DISTRIBUTION
Carole Ariano Paul Pelke Carmen Olteanu Jim Clay MCID Inspectors
ADAMS Accession Number: ML15362A632 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII DNMS RIII DNMS RIII RIII NAME PLee:rj: MKunowksi for MKunowksi DATE 12/28/15 12/28/15 OFFICIAL RECORD COPY
Enclosure U.S. NUCLEAR REGULATORY COMMISSION
REGION III Docket No.: 50-016
License No.: DPR-9 Report No. : 05000016/2015010(DNMS)
Licensee: DTE Electric Company
Facility: Enrico Fermi Atomic Power Plant, Unit 1 Location: 6400 North Dixie Highway Newport, MI 48166
Inspection Date: December 4, 2015 Inspector: Peter J. Lee, Ph.D., CHP
Approved by: Michael Kunowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety 2
EXECUTIVE SUMMARY
Enrico Fermi Atomic Power Plant, Unit 1 NRC Inspection Report 05000016/2015010(DNMS)
This routine decommissioning inspection included reviews of facility management and control, and radiological safety.
Facility Management and Control The inspector concluded that the licensee conducted the quarterly surveillance in accordance with the requirement of the Technical Specification. (Section 1.1)
Radiological Safety The inspector verified that no detectable licensed material had been released to the environment through the discharge from Sump 5. (Section 2.1)
3
REPORT DETAILS
Summary of Plant Activities During the inspection period, the licensee has returned to a passive monitoring Safe Storage (SAFSTOR) status from the active final decontamination phase of SAFSTOR.
1.0 Facility Management and Control
1.1 Decommissioning Performance and Status Review at Permanently Shut Down Reactors
a. Inspection Scope
The inspector reviewed the second and third quarter radiation surveillance results for 2015. The inspector also toured the plant to observe the condition of the plant.
b. Observations and Findings
The postings and boundaries for the contamination control areas were well maintained. There were no unexpected radiation readings detected. The radiation readings were consistent with the measurements taken during preparing to return to passive monitoring SAFSTOR.
c. Conclusions
The inspector concluded that the licensee conducted the quarterly surveillance in accordance with the requirement of the Technical Specification.
2.0 Radiological Safety 2.1 Effluent and Environmental Monitoring (Inspection Procedure 84750)
a. Inspection Scope
The inspector reviewed the analytical sampling data of groundwater from East Reactor Building, Sump 5, to evaluate the potential release of radioactive material to the environment.
b. Observations and Findings
Fermi 1 sumps are sampled semi-annually.
In December 2013 sampling, all the sumps were negative with the exception of Sump 5. Sump 5 receives water collected in structures associated with the Reactor building ventilation system. The discharge flows on the ground to the storm sewer nearby.
In December 2013, the original sample collected from Sump 5 and analyzed on February 13, 2014, indicated Cesium (Cs)-137 concentration of 34.4 picocuries per liter (pCi/L). In 2014 and 2015 sampling, all the sumps were negative.
The sample contained a significant amount of sediment due to the technician disturbing the sediment in the sump during sampling. That indicated the Cs-137 contamination was retained in the sediment. Also, based on Inspection Report 050-00016/2011-010 (ML11112A056), the contamination of Cs-137 in the water collected from the East Sodium Gallery, Sump 4, was due to the contamination of sediment.
c. Conclusion The inspector verified that no detectable licensed material had been released to the environment through the discharge from Sump 5.
3.0 Exit Meeting The inspector presented the inspection results to members of the licensee's staff at the conclusion of the inspection on December 4, 2015. The licensee did not identify any of the documents or processes reviewed by the inspector as proprietary.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
SUPPLEMENTAL INFORMATION
PARTIAL LIST OF PERSONS CONTACTED
- L. Goodman, Manager Licensing, MEP and Fermi 1 Custodial Delegate
- D. Breiding, Fermi 1 Custodian
- B. Rumans, Radiation Protection Supervisor
- Present at the December 4, 2015, exit meeting.
LIST OF PROCEDURES USED
Inspection Procedure 71801: Decommissioning Performance and Status Review at Permanently Shut Down Reactors
Inspection Procedure 84750: Effluent and Environmental Monitoring
LIST OF ACRONYMS USED
ADAMS Agencywide Documents Access and Management System CFR Code of Federal Regulations SAFSTOR Safe Storage
DNMS Division of Nuclear Materials Safety
NRC Nuclear Regulatory Commission
pCi/L picocuries per liter
LICENSEE DOCUMENTS REVIEWED
Licensee documents reviewed and utilized during the course of this inspection are specifically identified in the "Report Details" above.
ITEMS OPENED, CLOSED, AND DISCUSSED
None