ML16085A060: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX 76011-4511 March 25, 2016 EA-16-018 Mr. Adam C. Heflin, President and Chief Executive Officer Attention: Regulatory Affairs Wolf Creek Nuclear Operating Corporation P.O. Box 411 | {{#Wiki_filter:UNITED STATES | ||
Burlington, KS 66839 SUBJECT: WOLF CREEK NUCLEAR OPERATING CORPORATION - RESPONSE TO NOTICE OF VIOLATION (NRC INSPECTION REPORT 05000482/2015004) Dear Mr. Heflin: On February 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) cited Wolf Creek Nuclear Operating Corporation's failure, in the case of a significant condition adverse to quality, to assure that the cause of the condition was determined and corrective action taken to preclude | NUCLEAR REGULATORY COMMISSION | ||
repetition as required by 10 CFR Part 50 Appendix B, Criterion XVI, "Corrective Action." The Notice of Violation, enclosed with Inspection Report 05000482/2015004 (ML16043A054), required you to respond in writing within 30 days. You responded by letter dated March 10, 2016, (ML16076A358). We have reviewed your response and find that it meets the requirements of 10 CFR 2.201. We will review your corrective actions during a future inspection. In accordance with 10 CFR 2.390 of the NRC's "Agency's Rules of Practice and Procedure," a copy of this letter will be made available electronically for public inspection in the NRC Public | REGION IV 1600 E. LAMAR BLVD. ARLINGTON | ||
Document Room or from the NRC's Agencywide Documents Access Management System (ADAMS), which is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/ Nick Taylor, Chief Project Branch B Division of Reactor Projects Docket No: 50-482 License No: NPF-42 | , TX 76011-4511 March 25, 2016 | ||
Letter to Mr. Adam Heflin from Mr. Nick Taylor dated March 25, 2016 SUBJECT: WOLF CREEK NUCLEAR OPERATING CORPORATION - RESPONSE TO NOTICE OF VIOLATION (NRC INSPECTION REPORT 05000482/2015004) DISTRIBUTION: Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Branch Chief, DRP/B (Nick.Taylor@nrc.gov) Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) Senior Resident Inspector ( | EA-16-018 Mr. Adam C. Heflin, President | ||
and Chief Executive | |||
Officer Attention: Regulatory Affairs | |||
Wolf Creek Nuclear Operating Corporation | |||
P.O. Box 411 | |||
Burlington, KS 66839 | |||
SUBJECT: WOLF CREEK NUCLEAR OPERATING CORPORATION - RESPONSE TO NOTICE OF VIOLATION | |||
(NRC INSPECTION REPORT 05000482/2015004) | |||
Dear Mr. Heflin: On February 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) cited Wolf Creek Nuclear Operating Corporation | |||
's failure, in the case of a significant condition adverse to quality, to assure that the cause of the condition was determined and corrective action taken to preclude | |||
repetition | |||
as required by 10 CFR Part 50 Appendix B, Criterion XVI, "Corrective Action." The Notice of Violation, enclosed with Inspection Report 05000482/2015004 (ML16043A054), required you to respond in writing within 30 days. You responded by letter dated March 10 | |||
, 2016, (ML16076A358). We have reviewed your response and find that it meets the requirements of 10 CFR 2.201. We will review your corrective actions during a future inspection. | |||
In accordance with 10 CFR 2.390 of the NRC's "Agency's Rules of Practice | |||
and Procedure," a copy of this letter will be made available electronically for public inspection in the NRC Public | |||
Document Room or from the NRC's Agencywide Documents Access Management System (ADAMS), which is accessible from the NRC Web site at http://www.nrc.gov/reading | |||
-rm/adams.html | |||
(the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ Nick Taylor, Chief Project Branch B | |||
Division of Reactor Projects Docket No: | |||
50-482 License No: NPF | |||
-42 | |||
Letter to Mr. Adam Heflin from Mr. Nick Taylor dated March 25, 2016 | |||
SUBJECT: WOLF CREEK NUCLEAR OPERATING CORPORATION - RESPONSE TO NOTICE OF VIOLATION | |||
(NRC INSPECTION REPORT 05000482/2015004) | |||
DISTRIBUTION: | |||
Regional Administrator (Marc.Dapas@nrc.gov) | |||
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | |||
DRP Director (Troy.Pruett@nrc.gov) | |||
DRP Deputy Director (Ryan.Lantz@nrc.gov) | |||
DRS Director (Anton.Vegel@nrc.gov) | |||
DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Branch Chief, DRP/B (Nick.Taylor@nrc.gov) | |||
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) | |||
Senior Resident Inspector (Doug | |||
las.Dodson@nrc.gov) | |||
Resident Inspector (Fabian.Thomas@nrc.gov) | |||
Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Project Manager (Fred.Lyon@nrc.go | |||
v) RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
ACES (R4Enforcement.Resource@nrc.gov) | |||
Regional Counsel (Karla.Fuller@nrc.gov) | |||
Technical Support Assistant (Loretta.Williams@nrc.gov) | |||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | |||
RIV/ETA: OEDO (Teresa.Clark@nrc.gov) | |||
SUNSI Review By: NHT ADAMS: Yes No Sensitive | |||
Non-Sensitive | |||
Non-Publicly Available Publicly Available | |||
OFFICE RIV/DRP/B RIV/DRP/B NAME MHay NTaylor SIGNATURE | |||
/RA/ /RA/ DATE 3/24/16 3/25/16 | |||
}} | }} | ||
Revision as of 10:38, 30 June 2018
| ML16085A060 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 03/25/2016 |
| From: | Nick Taylor NRC/RGN-IV/DRP/RPB-B |
| To: | Heflin A C Wolf Creek |
| nick taylor | |
| References | |
| EA-16-018 IR 2015004 | |
| Download: ML16085A060 (2) | |
See also: IR 05000482/2015004
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV 1600 E. LAMAR BLVD. ARLINGTON
, TX 76011-4511 March 25, 2016
EA-16-018 Mr. Adam C. Heflin, President
and Chief Executive
Officer Attention: Regulatory Affairs
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
SUBJECT: WOLF CREEK NUCLEAR OPERATING CORPORATION - RESPONSE TO NOTICE OF VIOLATION
(NRC INSPECTION REPORT 05000482/2015004)
Dear Mr. Heflin: On February 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) cited Wolf Creek Nuclear Operating Corporation
's failure, in the case of a significant condition adverse to quality, to assure that the cause of the condition was determined and corrective action taken to preclude
repetition
as required by 10 CFR Part 50 Appendix B, Criterion XVI, "Corrective Action." The Notice of Violation, enclosed with Inspection Report 05000482/2015004 (ML16043A054), required you to respond in writing within 30 days. You responded by letter dated March 10
, 2016, (ML16076A358). We have reviewed your response and find that it meets the requirements of 10 CFR 2.201. We will review your corrective actions during a future inspection.
In accordance with 10 CFR 2.390 of the NRC's "Agency's Rules of Practice
and Procedure," a copy of this letter will be made available electronically for public inspection in the NRC Public
Document Room or from the NRC's Agencywide Documents Access Management System (ADAMS), which is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
/RA/ Nick Taylor, Chief Project Branch B
Division of Reactor Projects Docket No:
50-482 License No: NPF
-42
Letter to Mr. Adam Heflin from Mr. Nick Taylor dated March 25, 2016
SUBJECT: WOLF CREEK NUCLEAR OPERATING CORPORATION - RESPONSE TO NOTICE OF VIOLATION
(NRC INSPECTION REPORT 05000482/2015004)
DISTRIBUTION:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Senior Resident Inspector (Doug
las.Dodson@nrc.gov)
Resident Inspector (Fabian.Thomas@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Fred.Lyon@nrc.go
v) RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Teresa.Clark@nrc.gov)
SUNSI Review By: NHT ADAMS: Yes No Sensitive
Non-Sensitive
Non-Publicly Available Publicly Available
OFFICE RIV/DRP/B RIV/DRP/B NAME MHay NTaylor SIGNATURE
/RA/ /RA/ DATE 3/24/16 3/25/16